I want to search for...
Permit #2023110057
Permit Details
Status: COED
| Parcel Id: 07-11-31-7015-00020-0260 |
| CONDITIONED SPACE: 2595 sqft |
| GARAGE: 1260 sqft |
| OPENED PORCH (WITH ROOF) : 289 sqft |
| SCREEN PORCH (SOLID ROOF) : 375 sqft |
| Total Square Footage: 4519 sqft |
| Block: 00020 |
| Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE |
| Job Phone: 386-627-0430 |
| Location Address: 131 COCHISE CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/27/2024 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: MINERVINI GAETANO & CONCETTA MINERVINI H&W |
|
Address 12 LAMAR LN PALM COAST, FL 32137 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
SCOTT H STILLWELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4500 US 1 UNIT 206 BUNNELL, FL 32110 |
CAC1819433 (Exp: 08/31/2026) | 386-864-4404 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/22/2025 | FINAL APPROVED | HCAMACHO |
| ROW - STORMWATER FINAL | 12/31/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE ---------------------------------------------------------------- 12/17/2024 - PREVIOUS INSPECTION NOTES ** ENTIRE CULVERT PIPE CULVERT PIPE NEED TO BE CLEANED OUT 75% BLOCKED WITH MUD AND SEDIMENT | |||
| U -UTILITY RESIDENTIAL FINAL | 12/17/2024 | Disapproved - NO FEE | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/17/2024 10:16:58 AM *** seewer clean out missing cap-install coupling/cap | |||
| U -UTILITY RESIDENTIAL FINAL | 12/17/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/17/2024 11:12:03 AM *** owner bought/installed sewer cean out coupling/cap 12/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 12/17/2024 10:16:58 AM *** seewer clean out missing cap-install coupling/cap | |||
| ROW - STORMWATER FINAL | 12/17/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** ENTIRE CULVERT PIPE CULVERT PIPE NEED TO BE CLEANED OUT 75% BLOCKED WITH MUD AND SEDIMENT | |||
| U-CROSS CONNECTION | 12/17/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/17/2024 10:16:02 AM *** irrigation meter lus VB-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 11/15/2024 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/15/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: LEFT SIDE AT SEAWALL STILL NEED SOME WORK ON THE GRADING SO GRASS MEETS THE HEIGHT OF THE SEAWALL. PASSING AS NOTED SO YOU CAN MOVE ON TO FINALS. ---------------------------------------------------------------- 11/8/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REPAIR WASH OUT ALONG LEFT SIDE OF SEAWALL 2) NEED TO REMOVE THE CRAPE MYRTLE OUT OF THE DRAINAGE PATTERN FRONT LEFT OF LOT -------------------------------------------------------------------- 11/7/2024 - PREVIOUS INSPECTION NOTES NEED TO HAVE ADDRESS PRESENT FROM THE STREET OR A PERMIT BOX WITH THE ADDRESS PRESENT AT THE TIME OF THE INSPECTION. Sec 300.01 E1 The construction site must have the address clearly displayed and the Builders Box must include the following documents before an inspection will be conducted: Topographical Survey -Lot grading plan and the Swale Plan. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/08/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO REPAIR WASH OUT ALONG LEFT SIDE OF SEAWALL 2) NEED TO REMOVE THE CRAPE MYRTLE OUT OF THE DRAINAGE PATTERN FRONT LEFT OF LOT -------------------------------------------------------------------- 11/7/2024 - PREVIOUS INSPECTION NOTES NEED TO HAVE ADDRESS PRESENT FROM THE STREET OR A PERMIT BOX WITH THE ADDRESS PRESENT AT THE TIME OF THE INSPECTION. Sec 300.01 E1 The construction site must have the address clearly displayed and the Builders Box must include the following documents before an inspection will be conducted: Topographical Survey -Lot grading plan and the Swale Plan. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/07/2024 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/07/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO HAVE ADDRESS PRESENT FROM THE STREET OR A PERMIT BOX WITH THE ADDRESS PRESENT AT THE TIME OF THE INSPECTION. Sec 300.01 E1 The construction site must have the address clearly displayed and the Builders Box must include the following documents before an inspection will be conducted: Topographical Survey -Lot grading plan and the Swale Plan. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/17/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS ARE MADE --------------------------------------------------------------------- 10/16/2024 - PREVIOUS INSPECTION NOTES YOU DO NOT HAVE ENOUGH BASE BEHIND THE CONCRETE APRON. BASE NEEDS TO BE LEVEL WITH THE CONRETE SO WHEN YOU GLUE PAVERS TO THE CONCRETE THEY WILL MATCH. ---------------------------------------------------------------------- 10/2/2024 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL BASE NEEDS TO BE COMPACTED TO CITY'S STANDARDS AND HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/16/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: YOU DO NOT HAVE ENOUGH BASE BEHIND THE CONCRETE APRON. BASE NEEDS TO BE LEVEL WITH THE CONRETE SO WHEN YOU GLUE PAVERS TO THE CONCRETE THEY WILL MATCH. ---------------------------------------------------------------------- 10/2/2024 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL BASE NEEDS TO BE COMPACTED TO CITY'S STANDARDS AND HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PAVER RESTRAINTS | 10/02/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/02/2024 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL BASE NEEDS TO BE COMPACTED TO CITY'S STANDARDS AND HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ELECTRIC - EARLY POWER | 08/27/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9:35am | |||
| GRAVITY SEWER TEST | 08/08/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 08/08/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 07/25/2024 | APPROVED | FWILLIS |
| Note: 7/16/2024 - PREVIOUS INSPECTION NOTES 7/16/24 The duct layout provide does not match the as built duct system installed. Please submit a revision to the building department showing the installed duct system. Or install the system as per the approved plan. 7/15/2024 - PREVIOUS INSPECTION NOTES 7/15/24 Item 2 listed below has not been corrected. Inspector Notes from Inspection 2420 1. 5 head test for DWV is not holding water. 2. Please have an approved HVAC duct layout onsite. Check for corrections at insulation. | |||
| INSULATION | 07/16/2024 | Disapproved - NO FEE | JWALKER |
| Note: 7/16/24 The duct layout provide does not match the as built duct system installed. Please submit a revision to the building department showing the installed duct system. Or install the system as per the approved plan. 7/15/2024 - PREVIOUS INSPECTION NOTES 7/15/24 Item 2 listed below has not been corrected. Inspector Notes from Inspection 2420 1. 5 head test for DWV is not holding water. 2. Please have an approved HVAC duct layout onsite. Check for corrections at insulation. | |||
| INSULATION | 07/15/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 7/15/24 Item 2 listed below has not been corrected. Inspector Notes from Inspection 2420 1. 5 head test for DWV is not holding water. 2. Please have an approved HVAC duct layout onsite. Check for corrections at insulation. | |||
| ALL ROUGH | 07/09/2024 | APPROVED - AS NOTED | JWALKER |
| Note: 1. 5 head test for DWV is not holding water. 2. Please have an approved HVAC duct layout onsite. Check for corrections at insulation. | |||
| LATH/BRICK/ WATER BARRIER | 07/01/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 1. The 2 x ridge beam at the rear right roof. Support the ends for continous load path. 3. Front entry overframing strap not nailed to truss below. Check for corrections at next inspection. | |||
| ROOF VALLEY & METAL | 07/01/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 1. The 2 x ridge beam at the rear right roof. Support the ends for continous load path. 3. Front entry overframing strap not nailed to truss below. Check for corrections at next inspection. | |||
| WALL SHEATHING | 06/18/2024 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/18/2024 | APPROVED - AS NOTED | JWALKER |
| Note: 1. The 2 x ridge beam at the rear right roof. Support the ends for continous load path. 3. Front entry overframing strap not nailed to truss below. Check for corrections at next inspection. | |||
| ELECTRIC-TUG | 06/13/2024 | APPROVED | JWALKER |
| TIE BEAM / LINTEL | 05/16/2024 | APPROVED | LMILLER |
| Note: 05-16-24 OK to pour remainder of lentel 5/1/2024 - PREVIOUS INSPECTION NOTES 1. Please have a full set of apprvoed plans on site and inorder for the reispection. 2. Rear porch the lintel installed has not details on the prints. Please provide type and length of lintel as well as finished height to bottom of beam. 3. Rear porch the 4'8" block wall shown on the plans has not been installed. 4. The left side garage door opening calls for a 10' finished height to the bottom of the beam. Contractor has installed the lintel to the top of the block wall creating an approximate 13' opening height. PlEASE HAVE THE ENGINEER SUBMIT A REVISON TO THE BUILDING DEPARTMENT FOR THE LISTED ITEMS ABOVE. Due to the structual nature of these areas no concrete to be poured in any areas. | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/02/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/01/2024 | Disapproved - NO FEE | JWALKER |
| Note: 1. Please have a full set of apprvoed plans on site and inorder for the reispection. 2. Rear porch the lintel installed has not details on the prints. Please provide type and length of lintel as well as finished height to bottom of beam. 3. Rear porch the 4'8" block wall shown on the plans has not been installed. 4. The left side garage door opening calls for a 10' finished height to the bottom of the beam. Contractor has installed the lintel to the top of the block wall creating an approximate 13' opening height. PlEASE HAVE THE ENGINEER SUBMIT A REVISON TO THE BUILDING DEPARTMENT FOR THE LISTED ITEMS ABOVE. Due to the structual nature of these areas no concrete to be poured in any areas. | |||
| MONOLITHIC SLAB | 04/10/2024 | APPROVED | FWILLIS |
| Note: 4/8/2024 - PREVIOUS INSPECTION NOTES 4-8-24 1. Detail 1 is cut off so can only see half of the detail. 2. Back right side of the house is set to be fully poured. Plans call out detail 1. It is built like a stem wall not detail 1. | |||
| MONOLITHIC SLAB | 04/08/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 4-8-24 1. Detail 1 is cut off so can only see half of the detail. 2. Back right side of the house is set to be fully poured. Plans call out detail 1. It is built like a stem wall not detail 1. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/27/2024 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/14/2024 | CANCELLED BY APPLICANT | WEB |
| WATER METER INSTALLATION REQUEST | 03/11/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 07/24/2024 | 07/24/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/18/2024 | 07/23/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout missing return air and needs to be more readable | |||
| BLD | COMPLETE | 05/08/2024 | 05/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/08/2024 | 05/09/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/08/2024 | 05/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/02/2024 | 05/02/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/02/2024 | 05/02/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/08/2024 | 04/09/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/23/2024 | 02/23/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/16/2024 | 02/17/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utilization Agrreement. | |||
| ELEC | COMPLETE | 02/16/2024 | 02/23/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/16/2024 | 02/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/16/2024 | 02/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/16/2024 | 02/23/2024 |
| Note: Released By: JPI | |||
| ZON | HOLD | 02/09/2024 | 02/09/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please add 4 foundation plantings at the rear of the home on the side that faces the canal on the landscape plan. Please submit the exterior elevation page with the front and rear. We only received the two side elevations. | |||
| ELEC | HOLD | 02/09/2024 | 02/09/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Outlets in storage room need to be GFCI protected. NEC 2017 210.8 | |||
| BLD | COMPLETE | 02/09/2024 | 02/15/2024 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 02/09/2024 | 02/09/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/09/2024 | 02/09/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/09/2024 | 02/09/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please add 4 foundation plantings at the rear of the home on the side that faces the canal on the landscape plan. Please submit the exterior elevation page with the front and rear. We only received the two side elevations. Also, there was a paver sheet submitted with these corrections. Are you installing a paver driveway? If so, that needs to be shown on the site plan and also a fully completed, signed and notarized Right-of-Way Utililzation Agreement is required. It must be signed by all persons on property deed and all owner's names must be notarized. | |||
| BLD | HOLD | 11/02/2023 | 11/08/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 11/02/2023 | 11/07/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 11/02/2023 | 11/03/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need outlet in storage room. NEC 2017 210.52 (G) 2. Outlets in kitchen need to be GFCI . NEC 2017 210.8 3. Need light and switch by exterior door on back porch. NEC 2017 210.70 | |||
| ENGIN1 | COMPLETE | 11/02/2023 | 11/02/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 11/02/2023 | 11/06/2023 |
| LOCATE | COMPLETE | 11/02/2023 | 11/07/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/02/2023 | 11/06/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 11/02/2023 | 11/17/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Due to concerns about the proposed FFE as it relates to the adjacent structures as well as the centerline of the road the COPC suggests lowering the grades as indicated on the attached site plan. | |||
| ZON | HOLD | 11/02/2023 | 11/03/2023 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Site plan walkway must be 6' max. 2. Floor plan needs to specify depth of both sides of garage. 3. Landscape plan missing sod type. 4. Elevation plan garage exceeds plate height of principal structure. | |||
| BADMIN | COMPLETE | 11/02/2023 | 11/08/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 11/02/2023 | 01/02/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 11/02/2023 | 11/03/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 11/1/23, the structure will not fall inside the SFHA. No elevation certificates will be required. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/22/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/22/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/22/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/22/2025 |
| WATER-METER | ¤514.49 | 02/28/2024 |
| WATER- TURN ON | ¤25.00 | 02/28/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/28/2024 |
| SURCHARGE FS 533.721 | ¤9.93 | 02/27/2024 |
| SURCHARGE - FS 468.631 | ¤14.89 | 02/27/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/27/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/27/2024 |
| SW ENG PRE APRON | ¤30.00 | 02/27/2024 |
| WATER- TURN ON | ¤25.00 | 02/27/2024 |
| ADJUSTMENT 50% | (¤992.81) | 02/27/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/27/2024 |
| INSPECTION - RESIDENTIAL | ¤1,523.50 | 02/27/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤432.12 | 02/27/2024 |
| CONNECTION FEES | ¤1,187.26 | 02/27/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 02/27/2024 |
| IMPACT FEE FIRE | ¤428.09 | 02/27/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/27/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/27/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 02/27/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/27/2024 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 02/27/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 02/27/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/27/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/27/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/27/2024 |
| SEWER CREDIT | (¤1,147.00) | 02/27/2024 |
| SEWER INSPECTION | ¤25.00 | 02/27/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 02/27/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 02/27/2024 |
| SITE PLAN 30 | ¤30.00 | 02/27/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,768.50 |