I want to search for...

Permit #2023110057

Permit Details

Status: COED

Parcel Id: 07-11-31-7015-00020-0260
CONDITIONED SPACE: 2595 sqft
GARAGE: 1260 sqft
OPENED PORCH (WITH ROOF) : 289 sqft
SCREEN PORCH (SOLID ROOF) : 375 sqft
Total Square Footage: 4519 sqft
Block: 00020
Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE
Job Phone: 386-627-0430
Location Address: 131 COCHISE CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/27/2024
NOC: RECORDED
Applicant name: ANNA WIKTORIA LISOWSKI
Owner: MINERVINI GAETANO & CONCETTA MINERVINI H&W

Address

12 LAMAR LN

PALM COAST, FL 32137

Lot: 0260
Contracted Stated Job Value: ¤400,000.00
Job Description: Single Family Residence
Type: CN

Contractor

GOLDEN FOX HOME REMODELING, INC
Status Location Address State License Number Phone
ACTIVE

72 HERNANDEZ AVE

PALM COAST, FL 32137

CBC1259266 (Exp: 08/31/2026) 386-627-0430

Sub Contractors

DANIEL J LUSINSKI
Status Location Address Mailing Address State License Number Phone
ACTIVE

389 PALM COAST PARKWAY SW

PALM COAST, FL 32137

#4

PALM COAST, FL 32137

CCC1330133 (Exp: 08/31/2026) 386-338-7926
WILLIAM TODD SIKES
Status Location Address State License Number Phone
ACTIVE

83 PORT ROYAL DR

ST AUGUSTINE, FL 32084

EC0002726 (Exp: 08/31/2026) 904-762-8762
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
SCOTT H STILLWELL
Status Location Address State License Number Phone
ACTIVE

4500 US 1 UNIT 206

BUNNELL, FL 32110

CAC1819433 (Exp: 08/31/2026) 386-864-4404

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/22/2025 FINAL APPROVED HCAMACHO
ROW - STORMWATER FINAL 12/31/2024 APPROVED PFLANAGAN
Note: CORRECTION MADE ---------------------------------------------------------------- 12/17/2024 - PREVIOUS INSPECTION NOTES ** ENTIRE CULVERT PIPE CULVERT PIPE NEED TO BE CLEANED OUT 75% BLOCKED WITH MUD AND SEDIMENT
U -UTILITY RESIDENTIAL FINAL 12/17/2024 Disapproved - NO FEE LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/17/2024 10:16:58 AM *** seewer clean out missing cap-install coupling/cap
U -UTILITY RESIDENTIAL FINAL 12/17/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/17/2024 11:12:03 AM *** owner bought/installed sewer cean out coupling/cap 12/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 12/17/2024 10:16:58 AM *** seewer clean out missing cap-install coupling/cap
ROW - STORMWATER FINAL 12/17/2024 CANCELLED BY APPLICANT EMADISON
Note: ** ENTIRE CULVERT PIPE CULVERT PIPE NEED TO BE CLEANED OUT 75% BLOCKED WITH MUD AND SEDIMENT
U-CROSS CONNECTION 12/17/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/17/2024 10:16:02 AM *** irrigation meter lus VB-no cross connection
ROW - FINAL APRON (AFTER POUR) 11/15/2024 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 11/15/2024 APPROVED - AS NOTED PFLANAGAN
Note: LEFT SIDE AT SEAWALL STILL NEED SOME WORK ON THE GRADING SO GRASS MEETS THE HEIGHT OF THE SEAWALL. PASSING AS NOTED SO YOU CAN MOVE ON TO FINALS. ---------------------------------------------------------------- 11/8/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REPAIR WASH OUT ALONG LEFT SIDE OF SEAWALL 2) NEED TO REMOVE THE CRAPE MYRTLE OUT OF THE DRAINAGE PATTERN FRONT LEFT OF LOT -------------------------------------------------------------------- 11/7/2024 - PREVIOUS INSPECTION NOTES NEED TO HAVE ADDRESS PRESENT FROM THE STREET OR A PERMIT BOX WITH THE ADDRESS PRESENT AT THE TIME OF THE INSPECTION. Sec 300.01 E1 The construction site must have the address clearly displayed and the Builders Box must include the following documents before an inspection will be conducted: Topographical Survey -Lot grading plan and the Swale Plan.
ROW FIELD SURVEY /GRADING CERTIFICATION 11/08/2024 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO REPAIR WASH OUT ALONG LEFT SIDE OF SEAWALL 2) NEED TO REMOVE THE CRAPE MYRTLE OUT OF THE DRAINAGE PATTERN FRONT LEFT OF LOT -------------------------------------------------------------------- 11/7/2024 - PREVIOUS INSPECTION NOTES NEED TO HAVE ADDRESS PRESENT FROM THE STREET OR A PERMIT BOX WITH THE ADDRESS PRESENT AT THE TIME OF THE INSPECTION. Sec 300.01 E1 The construction site must have the address clearly displayed and the Builders Box must include the following documents before an inspection will be conducted: Topographical Survey -Lot grading plan and the Swale Plan.
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/07/2024 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 11/07/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO HAVE ADDRESS PRESENT FROM THE STREET OR A PERMIT BOX WITH THE ADDRESS PRESENT AT THE TIME OF THE INSPECTION. Sec 300.01 E1 The construction site must have the address clearly displayed and the Builders Box must include the following documents before an inspection will be conducted: Topographical Survey -Lot grading plan and the Swale Plan.
ROW- PRE-APRON (PRE-POUR) 10/17/2024 APPROVED PFLANAGAN
Note: CORRECTIONS ARE MADE --------------------------------------------------------------------- 10/16/2024 - PREVIOUS INSPECTION NOTES YOU DO NOT HAVE ENOUGH BASE BEHIND THE CONCRETE APRON. BASE NEEDS TO BE LEVEL WITH THE CONRETE SO WHEN YOU GLUE PAVERS TO THE CONCRETE THEY WILL MATCH. ---------------------------------------------------------------------- 10/2/2024 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL BASE NEEDS TO BE COMPACTED TO CITY'S STANDARDS AND HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- PRE-APRON (PRE-POUR) 10/16/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: YOU DO NOT HAVE ENOUGH BASE BEHIND THE CONCRETE APRON. BASE NEEDS TO BE LEVEL WITH THE CONRETE SO WHEN YOU GLUE PAVERS TO THE CONCRETE THEY WILL MATCH. ---------------------------------------------------------------------- 10/2/2024 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL BASE NEEDS TO BE COMPACTED TO CITY'S STANDARDS AND HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- PAVER RESTRAINTS 10/02/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- PRE-APRON (PRE-POUR) 10/02/2024 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL BASE NEEDS TO BE COMPACTED TO CITY'S STANDARDS AND HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ELECTRIC - EARLY POWER 08/27/2024 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 9:35am
GRAVITY SEWER TEST 08/08/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 08/08/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 07/25/2024 APPROVED FWILLIS
Note: 7/16/2024 - PREVIOUS INSPECTION NOTES 7/16/24 The duct layout provide does not match the as built duct system installed. Please submit a revision to the building department showing the installed duct system. Or install the system as per the approved plan. 7/15/2024 - PREVIOUS INSPECTION NOTES 7/15/24 Item 2 listed below has not been corrected. Inspector Notes from Inspection 2420 1. 5 head test for DWV is not holding water. 2. Please have an approved HVAC duct layout onsite. Check for corrections at insulation.
INSULATION 07/16/2024 Disapproved - NO FEE JWALKER
Note: 7/16/24 The duct layout provide does not match the as built duct system installed. Please submit a revision to the building department showing the installed duct system. Or install the system as per the approved plan. 7/15/2024 - PREVIOUS INSPECTION NOTES 7/15/24 Item 2 listed below has not been corrected. Inspector Notes from Inspection 2420 1. 5 head test for DWV is not holding water. 2. Please have an approved HVAC duct layout onsite. Check for corrections at insulation.
INSULATION 07/15/2024 Disapproved -FEE REQUIRED JWALKER
Note: 7/15/24 Item 2 listed below has not been corrected. Inspector Notes from Inspection 2420 1. 5 head test for DWV is not holding water. 2. Please have an approved HVAC duct layout onsite. Check for corrections at insulation.
ALL ROUGH 07/09/2024 APPROVED - AS NOTED JWALKER
Note: 1. 5 head test for DWV is not holding water. 2. Please have an approved HVAC duct layout onsite. Check for corrections at insulation.
LATH/BRICK/ WATER BARRIER 07/01/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2460 1. The 2 x ridge beam at the rear right roof. Support the ends for continous load path. 3. Front entry overframing strap not nailed to truss below. Check for corrections at next inspection.
ROOF VALLEY & METAL 07/01/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2460 1. The 2 x ridge beam at the rear right roof. Support the ends for continous load path. 3. Front entry overframing strap not nailed to truss below. Check for corrections at next inspection.
WALL SHEATHING 06/18/2024 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/18/2024 APPROVED - AS NOTED JWALKER
Note: 1. The 2 x ridge beam at the rear right roof. Support the ends for continous load path. 3. Front entry overframing strap not nailed to truss below. Check for corrections at next inspection.
ELECTRIC-TUG 06/13/2024 APPROVED JWALKER
TIE BEAM / LINTEL 05/16/2024 APPROVED LMILLER
Note: 05-16-24 OK to pour remainder of lentel 5/1/2024 - PREVIOUS INSPECTION NOTES 1. Please have a full set of apprvoed plans on site and inorder for the reispection. 2. Rear porch the lintel installed has not details on the prints. Please provide type and length of lintel as well as finished height to bottom of beam. 3. Rear porch the 4'8" block wall shown on the plans has not been installed. 4. The left side garage door opening calls for a 10' finished height to the bottom of the beam. Contractor has installed the lintel to the top of the block wall creating an approximate 13' opening height. PlEASE HAVE THE ENGINEER SUBMIT A REVISON TO THE BUILDING DEPARTMENT FOR THE LISTED ITEMS ABOVE. Due to the structual nature of these areas no concrete to be poured in any areas.
FOUND SURVEY APPROVED (OFFICE) 05/02/2024 APPROVED TBAKER
TIE BEAM / LINTEL 05/01/2024 Disapproved - NO FEE JWALKER
Note: 1. Please have a full set of apprvoed plans on site and inorder for the reispection. 2. Rear porch the lintel installed has not details on the prints. Please provide type and length of lintel as well as finished height to bottom of beam. 3. Rear porch the 4'8" block wall shown on the plans has not been installed. 4. The left side garage door opening calls for a 10' finished height to the bottom of the beam. Contractor has installed the lintel to the top of the block wall creating an approximate 13' opening height. PlEASE HAVE THE ENGINEER SUBMIT A REVISON TO THE BUILDING DEPARTMENT FOR THE LISTED ITEMS ABOVE. Due to the structual nature of these areas no concrete to be poured in any areas.
MONOLITHIC SLAB 04/10/2024 APPROVED FWILLIS
Note: 4/8/2024 - PREVIOUS INSPECTION NOTES 4-8-24 1. Detail 1 is cut off so can only see half of the detail. 2. Back right side of the house is set to be fully poured. Plans call out detail 1. It is built like a stem wall not detail 1.
MONOLITHIC SLAB 04/08/2024 Disapproved - NO FEE BTAYLOR
Note: 4-8-24 1. Detail 1 is cut off so can only see half of the detail. 2. Back right side of the house is set to be fully poured. Plans call out detail 1. It is built like a stem wall not detail 1.
PLUMBING 1ST ROUGH UNDERGROUND 03/27/2024 APPROVED JWALKER
PLUMBING 1ST ROUGH UNDERGROUND 03/14/2024 CANCELLED BY APPLICANT WEB
WATER METER INSTALLATION REQUEST 03/11/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 07/24/2024 07/24/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 07/18/2024 07/23/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout missing return air and needs to be more readable
BLD COMPLETE 05/08/2024 05/14/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 05/08/2024 05/09/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 05/08/2024 05/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/02/2024 05/02/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/02/2024 05/02/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 04/08/2024 04/09/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 02/23/2024 02/23/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON HOLD 02/16/2024 02/17/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utilization Agrreement.
ELEC COMPLETE 02/16/2024 02/23/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/16/2024 02/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 02/16/2024 02/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 02/16/2024 02/23/2024
Note: Released By: JPI
ZON HOLD 02/09/2024 02/09/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please add 4 foundation plantings at the rear of the home on the side that faces the canal on the landscape plan. Please submit the exterior elevation page with the front and rear. We only received the two side elevations.
ELEC HOLD 02/09/2024 02/09/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Outlets in storage room need to be GFCI protected. NEC 2017 210.8
BLD COMPLETE 02/09/2024 02/15/2024
Note: Released By: JPI
SW1 COMPLETE 02/09/2024 02/09/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/09/2024 02/09/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 02/09/2024 02/09/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please add 4 foundation plantings at the rear of the home on the side that faces the canal on the landscape plan. Please submit the exterior elevation page with the front and rear. We only received the two side elevations. Also, there was a paver sheet submitted with these corrections. Are you installing a paver driveway? If so, that needs to be shown on the site plan and also a fully completed, signed and notarized Right-of-Way Utililzation Agreement is required. It must be signed by all persons on property deed and all owner's names must be notarized.
BLD HOLD 11/02/2023 11/08/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 11/02/2023 11/07/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 11/02/2023 11/03/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need outlet in storage room. NEC 2017 210.52 (G) 2. Outlets in kitchen need to be GFCI . NEC 2017 210.8 3. Need light and switch by exterior door on back porch. NEC 2017 210.70
ENGIN1 COMPLETE 11/02/2023 11/02/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 11/02/2023 11/06/2023
LOCATE COMPLETE 11/02/2023 11/07/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 11/02/2023 11/06/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 11/02/2023 11/17/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Due to concerns about the proposed FFE as it relates to the adjacent structures as well as the centerline of the road the COPC suggests lowering the grades as indicated on the attached site plan.
ZON HOLD 11/02/2023 11/03/2023
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Site plan walkway must be 6' max. 2. Floor plan needs to specify depth of both sides of garage. 3. Landscape plan missing sod type. 4. Elevation plan garage exceeds plate height of principal structure.
BADMIN COMPLETE 11/02/2023 11/08/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 11/02/2023 01/02/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM COMPLETE 11/02/2023 11/03/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 11/1/23, the structure will not fall inside the SFHA. No elevation certificates will be required.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 01/22/2025
REINSPECTION RESIDENTIAL ¤40.00 01/22/2025
SW ENG REINSPECTION 20 ¤20.00 01/22/2025
SW ENG REINSPECTION 30 ¤30.00 01/22/2025
WATER-METER ¤514.49 02/28/2024
WATER- TURN ON ¤25.00 02/28/2024
WATER -IRRIGATION INSPECTION ¤25.00 02/28/2024
SURCHARGE FS 533.721 ¤9.93 02/27/2024
SURCHARGE - FS 468.631 ¤14.89 02/27/2024
SW ENG - FOUNDATION SURVEY ¤20.00 02/27/2024
SW ENG INSPECTION 80 ¤80.00 02/27/2024
SW ENG PRE APRON ¤30.00 02/27/2024
WATER- TURN ON ¤25.00 02/27/2024
ADJUSTMENT 50% (¤992.81) 02/27/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/27/2024
INSPECTION - RESIDENTIAL ¤1,523.50 02/27/2024
PLAN REVIEW - RESIDENTIAL ¤432.12 02/27/2024
CONNECTION FEES ¤1,187.26 02/27/2024
FC IMPACT FEE EMS ¤62.00 02/27/2024
IMPACT FEE FIRE ¤428.09 02/27/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/27/2024
FC IMPACT FEE LIBRARY ¤268.00 02/27/2024
IMPACT FEE PARKS ¤1,800.99 02/27/2024
IMPACT FEE SCHOOL ¤5,450.00 02/27/2024
RECORDING FEE REIMBURSE DOC ¤44.00 02/27/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 02/27/2024
WATER -IRRIGATION INSPECTION ¤25.00 02/27/2024
SW ENG - REVIEW 20 ¤20.00 02/27/2024
SW ENG RES REVIEW 200 ¤200.00 02/27/2024
SEWER CREDIT (¤1,147.00) 02/27/2024
SEWER INSPECTION ¤25.00 02/27/2024
SEWER CAPITAL FACILITY ¤5,441.03 02/27/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 02/27/2024
SITE PLAN 30 ¤30.00 02/27/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,768.50