I want to search for...

Permit #2023110182

Permit Details

Status: EXPIRED

Parcel Id: 07-11-31-7001-00110-0800
Block: 00110
Subdivision: 2143 - SECTION 1-FLORIDA PARK
Job Phone: 786-512-4421
Location Address: 32 FISCHER LN
Type: DR - DRIVEWAY
Issue Date: 11/14/2023
NOC: RECORDED
Applicant name: ABEL MENENDEZ
Owner: GUERRA RALPH R & LESLIE A CARROLL H&W

Address

32 FISCHER LANE

PALM COAST, FL 32137

Lot: 0800
Contracted Stated Job Value: ¤14,000.00
Job Description: PAVER DRIVEWAY
Type: CN

Contractor

ROYAL TILE & PAVERS INC
Status Location Address Phone
ACTIVE

69 FLEETWOOD DR

PALM COAST, FL 32137

786-512-4421

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 05/09/2024 FINAL APPROVED DHANEY
ROW - FINAL INSPECTION 05/07/2024 APPROVED EMADISON
Note: *** NOTES ADDED BY EMADISON 5/7/2024 8:17:51 AM *** ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. 4/24/2024 - PREVIOUS INSPECTION NOTES ** 04/24/24 NEED TO REMOVE THE PAVERS AND MORTOR FROM THE RIGHT OF WAY ** SEE ATTACHED PHOTOS
ROW - FINAL INSPECTION 04/24/2024 Disapproved - NO FEE EMADISON
Note: ** 04/24/24 NEED TO REMOVE THE PAVERS AND MORTOR FROM THE RIGHT OF WAY ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 12/12/2023 APPROVED - AS NOTED EMADISON
Note: ** 12/12/23 READY TO SET PAVERS __________________________________________________________________________________________________________________ New inspection due to canceled inspection 11/22/2023 - PREVIOUS INSPECTION NOTES ** 11/22/23 READY TP POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _______________________________________________________________________________________________________________________ 11/21/2023 - PREVIOUS INSPECTION NOTES ** 11/21/23 WATER LINES NEED TO BE CAPPED TO ENSURE THEY DO NOT TURN ON AND DUMP WATER INTO THE POUR AREA ** BUILDER NEEDS TO PROVIDE DRIVEWAY PAVE DETAIL SHEET SHOWING WHAT OPTION THEY ARE INSTALLING DRIVEWAY TO ** CULVERT WAS GOOD AT THE TIME OF THE INSPECTION ______________________________________________________________________________________________________________________ 11/17/2023 - PREVIOUS INSPECTION NOTES
ROW- PRE-APRON (PRE-POUR) 11/30/2023 CANCELLED BY APPLICANT WEB
Note: 11/22/2023 - PREVIOUS INSPECTION NOTES ** 11/22/23 READY TP POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _______________________________________________________________________________________________________________________ 11/21/2023 - PREVIOUS INSPECTION NOTES ** 11/21/23 WATER LINES NEED TO BE CAPPED TO ENSURE THEY DO NOT TURN ON AND DUMP WATER INTO THE POUR AREA ** BUILDER NEEDS TO PROVIDE DRIVEWAY PAVE DETAIL SHEET SHOWING WHAT OPTION THEY ARE INSTALLING DRIVEWAY TO ** CULVERT WAS GOOD AT THE TIME OF THE INSPECTION ______________________________________________________________________________________________________________________ 11/17/2023 - PREVIOUS INSPECTION NOTES
ROW- PRE-APRON (PRE-POUR) 11/22/2023 PARTIALLY APPROVED EMADISON
Note: ** 11/22/23 READY TP POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _______________________________________________________________________________________________________________________ 11/21/2023 - PREVIOUS INSPECTION NOTES ** 11/21/23 WATER LINES NEED TO BE CAPPED TO ENSURE THEY DO NOT TURN ON AND DUMP WATER INTO THE POUR AREA ** BUILDER NEEDS TO PROVIDE DRIVEWAY PAVE DETAIL SHEET SHOWING WHAT OPTION THEY ARE INSTALLING DRIVEWAY TO ** CULVERT WAS GOOD AT THE TIME OF THE INSPECTION ______________________________________________________________________________________________________________________ 11/17/2023 - PREVIOUS INSPECTION NOTES
ROW- PAVER RESTRAINTS 11/22/2023 APPROVED EMADISON
Note: ** 11/22/23 READY TO POUR PAVER RESTRAINTS AND APRON ** ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ____________________________________________________________________________________________________________________ 11/21/2023 - PREVIOUS INSPECTION NOTES ** 11/21/23 NEED TO CAP WATER LINES IN POUR AREA
ROW- PAVER RESTRAINTS 11/21/2023 Disapproved - NO FEE EMADISON
Note: ** 11/21/23 NEED TO CAP WATER LINES IN POUR AREA
ROW- PRE-APRON (PRE-POUR) 11/21/2023 Disapproved - NO FEE EMADISON
Note: ** 11/21/23 WATER LINES NEED TO BE CAPPED TO ENSURE THEY DO NOT TURN ON AND DUMP WATER INTO THE POUR AREA ** BUILDER NEEDS TO PROVIDE DRIVEWAY PAVE DETAIL SHEET SHOWING WHAT OPTION THEY ARE INSTALLING DRIVEWAY TO ** CULVERT WAS GOOD AT THE TIME OF THE INSPECTION ______________________________________________________________________________________________________________________ 11/17/2023 - PREVIOUS INSPECTION NOTES
ROW- PRE-APRON (PRE-POUR) 11/17/2023 CANCELLED BY APPLICANT EMADISON
ROW - FINAL APRON (AFTER POUR)

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/06/2023 11/09/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 11/06/2023 11/13/2023
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 11/06/2023 11/06/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG INSPECTION 40 ¤40.00 11/14/2023
SW ENG PRE APRON ¤30.00 11/14/2023
SW ENG RES REVIEW 200 ¤200.00 11/14/2023
SITE PLAN 15 ¤15.00 11/14/2023
ADJUSTMENT 50% (¤15.00) 11/14/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/14/2023
RECORDING FEE REIMBURSE DOC ¤44.00 11/08/2023
Fees Total Due: ¤0.00 Total Paid: ¤344.00