Permit #2023110238
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00640-0040 |
| GARAGE: 888 sqft |
| CONDITIONED SPACE: 2956 sqft |
| OPENED PORCH (WITH ROOF) : 270 sqft |
| Total Square Footage: 4114 sqft |
| Block: 00640 |
| Subdivision: - |
| Job Phone: 386-237-5837 |
| Location Address: 87 WHEATFIELD DR |
| Type: DU - DUPLEX |
| Issue Date: 01/05/2024 |
| NOC: RECORDED |
| Applicant name: MARSEL GILMANSHIN |
| Owner: IOURI SINKEVITCH |
|
Address 412 OCEAN VIEW AVENUE APT 5C BROOKLYN, NY 11235 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤495,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GILMANS DEVELOPMENT CORP
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4873 PALM COAST PARKWAY NW #4 PALM COAST, FL 32137 |
CBC1263180 (Exp: 08/31/2026) | 386-237-5837 |
Sub Contractors
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
SERGEY A VORONIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7631 SEVERN JACKSONVILLE, FL 32224 |
EC13011326 (Exp: 08/31/2026) | 360-798-2819 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/13/2025 | FINAL APPROVED | MKRASKI |
| ROW - FINAL INSPECTION | 03/12/2025 | APPROVED | TPOLACEK |
| Note: 03/12/25 TPOLACEK*** CORRECTION MADE TO SWALE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/11/2025 - PREVIOUS INSPECTION NOTES 03/11/25 TPOLACEK*** ALL CORRECTIONS EXCEPT THE LEFT SIDE SWALE ARE COMPLETED. SPOKE WITH BUILDER THEY ARE GOING TO SOD TODAY AND RESUBMIT INSPECTION FOR TOMORROW. Inspector Notes from Inspection 9465 03/10/25 TPOLACEK*** AFTER HEAVY RAIN THIS MORNING THERE IS A SMALL AMOUNT OF STANDING WATER IN BOTH REAR CORNERS. , IN BACK RIGHT WHERE DIRT WAS PUSHED INTO ADJOINING PROPERTY BEHING FENCE THIS MUST BE GRADED AND SEED AND STRAW, ENTIRE LEFT SIDE OF PROPERTY WHERE MACHINE MADE ENTRY AND BARE EARTH IS MUST BE SEEDED AND STRAW, LEFT SIDE SWALE MUST BE REPAIRED AND SODDED WITH BAHIA TO AS GOOD OR BETTER THAN BEFORE CONSTRUCTION. ALL MUST BE DONE BEFORE FINAL STORMWATER INSPECTION. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9463 03/10/25TPOLACEK*** ALTHOUGH A COMMON WAS PROPOSED NEIGHBOR ON RIGHT HAS SINCE INSTALLED A FENCE AND MADE COMMON IMPOSSIBLE. BUILDER HAS SMALL INSIDE SWALE THAT WILL WORK. SPOKE WITH BUILDER AND EXPLAINED SMALL SHRUB BY AC WILL NEED TO BE REMOVED OUT OF CONVEYENCE AND i WILL APPROVE THE FINAL SURVEY AS NOTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/4/2025 - PREVIOUS INSPECTION NOTES ** 03/04/25 BUIDERS SITE PLAN WAS PROPOSED AS A COMMON DRAINAGE CONVEYANCE ON THE RIGHT SIDE NEED TO REMOVE BERM AND BUILD AS PROPOSED. SEE THE LETTER BELOW THAT WAS SENT TO ALL BUILDERS AND CONTRACTORS DATED APRIL 9, 2024. ***CONTRACTORS NEWSFLASH*** Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/11/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irrigation-no cross connection | |||
| ROW - FINAL INSPECTION | 03/11/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 03/11/25 TPOLACEK*** ALL CORRECTIONS EXCEPT THE LEFT SIDE SWALE ARE COMPLETED. SPOKE WITH BUILDER THEY ARE GOING TO SOD TODAY AND RESUBMIT INSPECTION FOR TOMORROW. Inspector Notes from Inspection 9465 03/10/25 TPOLACEK*** AFTER HEAVY RAIN THIS MORNING THERE IS A SMALL AMOUNT OF STANDING WATER IN BOTH REAR CORNERS. , IN BACK RIGHT WHERE DIRT WAS PUSHED INTO ADJOINING PROPERTY BEHING FENCE THIS MUST BE GRADED AND SEED AND STRAW, ENTIRE LEFT SIDE OF PROPERTY WHERE MACHINE MADE ENTRY AND BARE EARTH IS MUST BE SEEDED AND STRAW, LEFT SIDE SWALE MUST BE REPAIRED AND SODDED WITH BAHIA TO AS GOOD OR BETTER THAN BEFORE CONSTRUCTION. ALL MUST BE DONE BEFORE FINAL STORMWATER INSPECTION. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9463 03/10/25TPOLACEK*** ALTHOUGH A COMMON WAS PROPOSED NEIGHBOR ON RIGHT HAS SINCE INSTALLED A FENCE AND MADE COMMON IMPOSSIBLE. BUILDER HAS SMALL INSIDE SWALE THAT WILL WORK. SPOKE WITH BUILDER AND EXPLAINED SMALL SHRUB BY AC WILL NEED TO BE REMOVED OUT OF CONVEYENCE AND i WILL APPROVE THE FINAL SURVEY AS NOTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/4/2025 - PREVIOUS INSPECTION NOTES ** 03/04/25 BUIDERS SITE PLAN WAS PROPOSED AS A COMMON DRAINAGE CONVEYANCE ON THE RIGHT SIDE NEED TO REMOVE BERM AND BUILD AS PROPOSED. SEE THE LETTER BELOW THAT WAS SENT TO ALL BUILDERS AND CONTRACTORS DATED APRIL 9, 2024. ***CONTRACTORS NEWSFLASH*** Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/11/2025 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 03/10/25 TPOLACEK*** AFTER HEAVY RAIN THIS MORNING THERE IS A SMALL AMOUNT OF STANDING WATER IN BOTH REAR CORNERS. , IN BACK RIGHT WHERE DIRT WAS PUSHED INTO ADJOINING PROPERTY BEHING FENCE THIS MUST BE GRADED AND SEED AND STRAW, ENTIRE LEFT SIDE OF PROPERTY WHERE MACHINE MADE ENTRY AND BARE EARTH IS MUST BE SEEDED AND STRAW, LEFT SIDE SWALE MUST BE REPAIRED AND SODDED WITH BAHIA TO AS GOOD OR BETTER THAN BEFORE CONSTRUCTION. ALL MUST BE DONE BEFORE FINAL STORMWATER INSPECTION. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9463 03/10/25TPOLACEK*** ALTHOUGH A COMMON WAS PROPOSED NEIGHBOR ON RIGHT HAS SINCE INSTALLED A FENCE AND MADE COMMON IMPOSSIBLE. BUILDER HAS SMALL INSIDE SWALE THAT WILL WORK. SPOKE WITH BUILDER AND EXPLAINED SMALL SHRUB BY AC WILL NEED TO BE REMOVED OUT OF CONVEYENCE AND i WILL APPROVE THE FINAL SURVEY AS NOTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/4/2025 - PREVIOUS INSPECTION NOTES ** 03/04/25 BUIDERS SITE PLAN WAS PROPOSED AS A COMMON DRAINAGE CONVEYANCE ON THE RIGHT SIDE NEED TO REMOVE BERM AND BUILD AS PROPOSED. SEE THE LETTER BELOW THAT WAS SENT TO ALL BUILDERS AND CONTRACTORS DATED APRIL 9, 2024. ***CONTRACTORS NEWSFLASH*** Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. | |||
| BLD - BUILDING FINAL | 03/11/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. ODU breakers are over sized FBC (A)107.4 2. E-cals onsite are missing Building Dept. stamp of approval FBC 107.3.1 3. All garage penitrations in walls and ceiling must be sealed FBC R302.6 4. Breaker lock for AHU not installed properly NEC 424.19 5. No heater sticker on AHU FBCR M1303.1 6. Remove all trash and extra building materials before final can be approved FBC 1501.4 7. Range is required to be GFCI protected NEC 210.8 8. Penisula missing outlet @ end NEC 210.52 9. Termite sticker not posted FBC R 319 10. Pep tanks require GFCI protection NEC 210.8 Not ready, stopped inspection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/10/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 03/10/25TPOLACEK*** ALTHOUGH A COMMON WAS PROPOSED NEIGHBOR ON RIGHT HAS SINCE INSTALLED A FENCE AND MADE COMMON IMPOSSIBLE. BUILDER HAS SMALL INSIDE SWALE THAT WILL WORK. SPOKE WITH BUILDER AND EXPLAINED SMALL SHRUB BY AC WILL NEED TO BE REMOVED OUT OF CONVEYENCE AND i WILL APPROVE THE FINAL SURVEY AS NOTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/4/2025 - PREVIOUS INSPECTION NOTES ** 03/04/25 BUIDERS SITE PLAN WAS PROPOSED AS A COMMON DRAINAGE CONVEYANCE ON THE RIGHT SIDE NEED TO REMOVE BERM AND BUILD AS PROPOSED. SEE THE LETTER BELOW THAT WAS SENT TO ALL BUILDERS AND CONTRACTORS DATED APRIL 9, 2024. ***CONTRACTORS NEWSFLASH*** Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/10/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 03/10/25 TPOLACEK*** AFTER HEAVY RAIN THIS MORNING THERE IS A SMALL AMOUNT OF STANDING WATER IN BOTH REAR CORNERS. , IN BACK RIGHT WHERE DIRT WAS PUSHED INTO ADJOINING PROPERTY BEHING FENCE THIS MUST BE GRADED AND SEED AND STRAW, ENTIRE LEFT SIDE OF PROPERTY WHERE MACHINE MADE ENTRY AND BARE EARTH IS MUST BE SEEDED AND STRAW, LEFT SIDE SWALE MUST BE REPAIRED AND SODDED WITH BAHIA TO AS GOOD OR BETTER THAN BEFORE CONSTRUCTION. ALL MUST BE DONE BEFORE FINAL STORMWATER INSPECTION. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9463 03/10/25TPOLACEK*** ALTHOUGH A COMMON WAS PROPOSED NEIGHBOR ON RIGHT HAS SINCE INSTALLED A FENCE AND MADE COMMON IMPOSSIBLE. BUILDER HAS SMALL INSIDE SWALE THAT WILL WORK. SPOKE WITH BUILDER AND EXPLAINED SMALL SHRUB BY AC WILL NEED TO BE REMOVED OUT OF CONVEYENCE AND i WILL APPROVE THE FINAL SURVEY AS NOTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/4/2025 - PREVIOUS INSPECTION NOTES ** 03/04/25 BUIDERS SITE PLAN WAS PROPOSED AS A COMMON DRAINAGE CONVEYANCE ON THE RIGHT SIDE NEED TO REMOVE BERM AND BUILD AS PROPOSED. SEE THE LETTER BELOW THAT WAS SENT TO ALL BUILDERS AND CONTRACTORS DATED APRIL 9, 2024. ***CONTRACTORS NEWSFLASH*** Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. | |||
| U-CROSS CONNECTION | 03/10/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/04/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 03/04/25 BUIDERS SITE PLAN WAS PROPOSED AS A COMMON DRAINAGE CONVEYANCE ON THE RIGHT SIDE NEED TO REMOVE BERM AND BUILD AS PROPOSED. SEE THE LETTER BELOW THAT WAS SENT TO ALL BUILDERS AND CONTRACTORS DATED APRIL 9, 2024. ***CONTRACTORS NEWSFLASH*** Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. | |||
| ELECTRIC - EARLY POWER | 02/11/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Per manufacturer specs SPD is to be installed on a 20a breaker Check at final Emailed FPL for power release @ 2pm | |||
| ROW- PRE-APRON (PRE-POUR) | 01/15/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 01/15/25 TPOLACEK*** WORKED WITH CREW TO ACCOMPLISH LESS THAN 8% SLOPE IN APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/14/2025 - PREVIOUS INSPECTION NOTES 01/14/25 TPOLACEK** DRIVEWAY APRON EXCEEDS THE MAXIMUM ALLOWED 8% SLOPE. PLEASE RESET FORM BOARDS TO ACHIEVE LESS THAN 8% SLOPE. 1/13/2025 - PREVIOUS INSPECTION NOTES 01/13/25 TPOLACEK** SPOKE WITH CREW ON SITE. ROADSIDE FORM BOARD CAN NOT BE MORE THAN 2" OVER EXISTING EDGE OF ROAD, MITER END FORM BOARD NEED TO BE AT EDGE OF DRIVEWAY 18" TO SIDE OF PIPE AND AT FOOTER END 9" TO SIDE OF PIPE, THEY WILL REFORM AND CALL IN FOR NEW INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 01/14/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 01/14/25 TPOLACEK** DRIVEWAY APRON EXCEEDS THE MAXIMUM ALLOWED 8% SLOPE. PLEASE RESET FORM BOARDS TO ACHIEVE LESS THAN 8% SLOPE. 1/13/2025 - PREVIOUS INSPECTION NOTES 01/13/25 TPOLACEK** SPOKE WITH CREW ON SITE. ROADSIDE FORM BOARD CAN NOT BE MORE THAN 2" OVER EXISTING EDGE OF ROAD, MITER END FORM BOARD NEED TO BE AT EDGE OF DRIVEWAY 18" TO SIDE OF PIPE AND AT FOOTER END 9" TO SIDE OF PIPE, THEY WILL REFORM AND CALL IN FOR NEW INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 01/13/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 01/13/25 TPOLACEK** SPOKE WITH CREW ON SITE. ROADSIDE FORM BOARD CAN NOT BE MORE THAN 2" OVER EXISTING EDGE OF ROAD, MITER END FORM BOARD NEED TO BE AT EDGE OF DRIVEWAY 18" TO SIDE OF PIPE AND AT FOOTER END 9" TO SIDE OF PIPE, THEY WILL REFORM AND CALL IN FOR NEW INSPECTION | |||
| FIREWALL DRYWALL NAILING | 12/30/2024 | CANCELLED BY INSPECTOR | MKRASKI |
| Note: Duplicate inspection | |||
| GRAVITY SEWER TEST | 12/11/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 1. Porta-jon must be on site 2. Job box needs to be up facing the road with the address visible Make repaires before next inspection | |||
| SEWER TIE IN | 12/11/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 1. Porta-jon must be on site 2. Job box needs to be up facing the road with the address visible Make repaires before next inspection | |||
| PEP TANK INSTALLATION REQUEST | 11/20/2024 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 10/29/2024 | APPROVED | MKRASKI |
| LATH/BRICK/ WATER BARRIER | 10/28/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Silt fence must be kept in orginal condition FBC 3307.1 2. All exterior penitrations and hole in block require water barrier and lath FBC R402.4.1.1 | |||
| FIREWALL FINAL | 10/07/2024 | APPROVED | MKRASKI |
| FIREWALL DRYWALL NAILING | 10/07/2024 | CANCELLED BY APPLICANT | WEB |
| FIREWALL FINAL | 09/25/2024 | Disapproved - NO FEE | MKRASKI |
| Note: Not ready, call in once 5/8'' type X board has been installed on ceiling and 1/2'' on wall per plans | |||
| WINDOW NAILING | 09/25/2024 | APPROVED | MKRASKI |
| Note: | |||
| INSULATION | 09/24/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Added window nailing inspection for B side garage entry gap exceeds a 1/4'' | |||
| INSULATION | 09/23/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Previous items not reapired from all rough (window/door gaps exceed 1/4'') FBCR 609.1 | |||
| FIREWALL DRYWALL NAILING | 09/23/2024 | APPROVED | MKRASKI |
| FIREWALL DRYWALL NAILING | 09/12/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 9/12/24 1. Repair silt fence to original condition FBC 3307.1 2. Smoke barrier must extend to to of soffit ***Previous items not repaired*** 9/11/24 1. Windows and doors have to large of gaps around them, bucks required to fill gap FBCR 609.11/4'' max Check at insulation 9/9/2024 - PREVIOUS INSPECTION NOTES 9/9/24 Make ALL repairs before re-inspection 1. E-cals still do not match duct layout FBC [A]107.4 2. Address is not visible from road FBC 319.1 9/4/2024 - PREVIOUS INSPECTION NOTES 9/4/24 1. E-cals on site STILL do not match duct work that was installed, marked on E-cals 2. Silt fence shall be kept in orginal condition through out build FBC 3307.1 FBC [A]107.4 3. Address not visible from road per FBC 319.1 Make ALL repairs before calling in re-inspection 8/29/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 1. Repair silt fence to orginal condition 2. Clean up trash from site Check on next inspection 08-29-2024 1. Framing not complete over doors. 2. Mechanical layout and energy calcs not on site. | |||
| ALL ROUGH | 09/11/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 9/11/24 1. Windows and doors have to large of gaps around them, bucks required to fill gap FBCR 609.11/4'' max Check at insulation 9/9/2024 - PREVIOUS INSPECTION NOTES 9/9/24 Make ALL repairs before re-inspection 1. E-cals still do not match duct layout FBC [A]107.4 2. Address is not visible from road FBC 319.1 9/4/2024 - PREVIOUS INSPECTION NOTES 9/4/24 1. E-cals on site STILL do not match duct work that was installed, marked on E-cals 2. Silt fence shall be kept in orginal condition through out build FBC 3307.1 FBC [A]107.4 3. Address not visible from road per FBC 319.1 Make ALL repairs before calling in re-inspection 8/29/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 1. Repair silt fence to orginal condition 2. Clean up trash from site Check on next inspection 08-29-2024 1. Framing not complete over doors. 2. Mechanical layout and energy calcs not on site. | |||
| ALL ROUGH | 09/09/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 9/9/24 Make ALL repairs before re-inspection 1. E-cals still do not match duct layout FBC [A]107.4 2. Address is not visible from road FBC 319.1 9/4/2024 - PREVIOUS INSPECTION NOTES 9/4/24 1. E-cals on site STILL do not match duct work that was installed, marked on E-cals 2. Silt fence shall be kept in orginal condition through out build FBC 3307.1 FBC [A]107.4 3. Address not visible from road per FBC 319.1 Make ALL repairs before calling in re-inspection 8/29/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 1. Repair silt fence to orginal condition 2. Clean up trash from site Check on next inspection 08-29-2024 1. Framing not complete over doors. 2. Mechanical layout and energy calcs not on site. | |||
| ALL ROUGH | 09/04/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 9/4/24 1. E-cals on site STILL do not match duct work that was installed, marked on E-cals 2. Silt fence shall be kept in orginal condition through out build FBC 3307.1 FBC [A]107.4 3. Address not visible from road per FBC 319.1 Make ALL repairs before calling in re-inspection 8/29/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 1. Repair silt fence to orginal condition 2. Clean up trash from site Check on next inspection 08-29-2024 1. Framing not complete over doors. 2. Mechanical layout and energy calcs not on site. | |||
| ALL ROUGH | 08/29/2024 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2467 1. Repair silt fence to orginal condition 2. Clean up trash from site Check on next inspection 08-29-2024 1. Framing not complete over doors. 2. Mechanical layout and energy calcs not on site. | |||
| ROOF VALLEY & METAL | 04/01/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Repair silt fence to orginal condition 2. Clean up trash from site Check on next inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/27/2024 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/22/2024 | Disapproved - NO FEE | RSIMS |
| Note: 3/21/24: * You will still need a dumpster on site. Both Units: 1). 2 Ply trusses 01 are not connected as required. Highlighted on MiTek. 2). Trusses 02: are not strapped per the detail on plan page S2.1 (staggered each side). 3). Truss buckets attached to 01 truss need nails fully sunk. Check all brackets. Unit A: 4). 1st (2) - JG2 truss (just past garage back wall) - the replacement straps are covered on the bottom with foam board so we cannot visually inspect for proper anchoring. Unit B: 1st - JG2 truss (just past garage back wall on right) - the replacement straps are covered on the bottom with foam board so we cannot visually inspect for proper anchoring. 3/19/2024 - PREVIOUS INSPECTION NOTES 1. Must have clean set of plans bound together for inspector per FBC 107.3.1 2. Clean job box 3. Silt fence required around job site 4. No dumpster on site, Trash needs to be cleaned up and dumpster onsite Stopped inspection | |||
| WALL SHEATHING | 03/22/2024 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/19/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Must have clean set of plans bound together for inspector per FBC 107.3.1 2. Clean job box 3. Silt fence required around job site 4. No dumpster on site, Trash needs to be cleaned up and dumpster onsite Stopped inspection | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/18/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/21/2024 | APPROVED | MKRASKI |
| TIE BEAM / LINTEL | 02/20/2024 | Disapproved - NO FEE | MKRASKI |
| Note: No dowel layout on site stopped inspection, FBC 107.3.1 | |||
| MONOLITHIC SLAB | 02/07/2024 | APPROVED | RSIMS |
| Note: 2/6/2024 - PREVIOUS INSPECTION NOTES No ready contractor still on site installing rebar | |||
| MONOLITHIC SLAB | 02/06/2024 | Disapproved - NO FEE | MKRASKI |
| Note: No ready contractor still on site installing rebar | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/26/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Porta-jon must be on site 2. Job box needs to be up facing the road with the address visible Make repaires before next inspection | |||
| WATER METER INSTALLATION REQUEST | 01/26/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/15/2024 | 03/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/15/2024 | 03/15/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/21/2023 | 11/21/2023 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/21/2023 | 11/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/21/2023 | 11/30/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 11/21/2023 | 11/21/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/07/2023 | 11/08/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 11/07/2023 | 11/13/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/07/2023 | 11/07/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/07/2023 | 11/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 11/07/2023 | 11/07/2023 |
| LOCATE | COMPLETE | 11/07/2023 | 11/13/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/07/2023 | 11/08/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/07/2023 | 11/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/07/2023 | 11/07/2023 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Survey / Site Plan wrong square footage. | |||
| BADMIN | COMPLETE | 11/07/2023 | 11/08/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 11/07/2023 | 01/03/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/13/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/13/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/13/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/13/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/13/2025 |
| CONNECTION FEES | ¤42.00 | 03/13/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 03/13/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/13/2025 |
| SEWER CAPITAL FACILITY | ¤192.42 | 03/13/2025 |
| WATER CAPITAL FACILITY FEE | ¤141.26 | 03/13/2025 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 01/05/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/05/2024 |
| SEWER CREDIT | (¤1,806.00) | 01/05/2024 |
| SEWER INSPECTION | ¤25.00 | 01/05/2024 |
| SITE PLAN 30 | ¤30.00 | 01/05/2024 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 01/05/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤440.70 | 01/05/2024 |
| ADJUSTMENT 50% | (¤1,012.23) | 01/05/2024 |
| INSPECTION - RESIDENTIAL | ¤1,553.75 | 01/05/2024 |
| IMPACT FEE FIRE | ¤856.18 | 01/05/2024 |
| FC IMPACT FEE EMS | ¤124.00 | 01/05/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 01/05/2024 |
| WATER- TURN ON | ¤50.00 | 01/05/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/05/2024 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 01/05/2024 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 01/05/2024 |
| IMPACT FEE PARKS | ¤3,600.18 | 01/05/2024 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 01/05/2024 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 01/05/2024 |
| SURCHARGE FS 533.721 | ¤10.12 | 01/05/2024 |
| SURCHARGE - FS 468.631 | ¤15.18 | 01/05/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/05/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/05/2024 |
| CONNECTION FEES | ¤2,332.52 | 01/05/2024 |
| SW ENG PRE APRON | ¤30.00 | 01/05/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/05/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/05/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/05/2023 |
| SW ENG RES REVIEW 200 | (¤200.00) | 12/05/2023 |
| SW ENG INSPECTION 80 | (¤80.00) | 12/05/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/05/2023 |
| SW ENG PRE APRON | ¤30.00 | 12/05/2023 |
| SW ENG PRE APRON | (¤30.00) | 12/05/2023 |
| SURCHARGE - FS 468.631 | ¤15.18 | 12/05/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/05/2023 |
| SW ENG - FOUNDATION SURVEY | (¤20.00) | 12/05/2023 |
| SURCHARGE - FS 468.631 | (¤15.18) | 12/05/2023 |
| SURCHARGE FS 533.721 | ¤10.12 | 12/05/2023 |
| SURCHARGE FS 533.721 | (¤10.12) | 12/05/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 12/05/2023 |
| WATER -IRRIGATION INSPECTION | (¤50.00) | 12/05/2023 |
| IMPACT FEE SCHOOL | (¤10,900.00) | 12/05/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 12/05/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 12/05/2023 |
| IMPACT FEE TRANSPORTATION | (¤2,812.00) | 12/05/2023 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 12/05/2023 |
| IMPACT FEE PARKS | ¤3,600.18 | 12/05/2023 |
| IMPACT FEE PARKS | (¤3,600.18) | 12/05/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/05/2023 |
| INSPECTION - RESIDENTIAL | ¤1,553.75 | 12/05/2023 |
| INSPECTION - RESIDENTIAL | (¤1,553.75) | 12/05/2023 |
| ADJUSTMENT 50% | (¤1,012.23) | 12/05/2023 |
| ADJUSTMENT 50% | ¤1,012.23 | 12/05/2023 |
| WATER- TURN ON | ¤50.00 | 12/05/2023 |
| WATER- TURN ON | (¤50.00) | 12/05/2023 |
| CONNECTION FEES | ¤2,332.52 | 12/05/2023 |
| CONNECTION FEES | (¤2,332.52) | 12/05/2023 |
| FC IMPACT FEE LIBRARY | (¤536.00) | 12/05/2023 |
| IMPACT FEE FIRE | (¤856.18) | 12/05/2023 |
| IMPACT FEE FIRE | ¤856.18 | 12/05/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 12/05/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | (¤436.00) | 12/05/2023 |
| PLAN REVIEW - RESIDENTIAL | (¤440.70) | 12/05/2023 |
| ADMINISTRATIVE RESIDENTIAL | (¤30.00) | 12/05/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤440.70 | 12/05/2023 |
| FC IMPACT FEE EMS | ¤124.00 | 12/05/2023 |
| FC IMPACT FEE EMS | (¤124.00) | 12/05/2023 |
| SITE PLAN 30 | ¤30.00 | 12/05/2023 |
| SEWER INSPECTION | ¤25.00 | 12/05/2023 |
| SEWER CREDIT | (¤1,806.00) | 12/05/2023 |
| SEWER INSPECTION | (¤25.00) | 12/05/2023 |
| SEWER CREDIT | ¤1,806.00 | 12/05/2023 |
| SW ENG - REVIEW 20 | (¤20.00) | 12/05/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 12/05/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 12/05/2023 |
| WATER CAPITAL FACILITY FEE | (¤7,847.76) | 12/05/2023 |
| SITE PLAN 30 | (¤30.00) | 12/05/2023 |
| SEWER CAPITAL FACILITY | (¤10,689.64) | 12/05/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤40,496.48 |