I want to search for...
Permit #2023110504
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00090-0100 |
| CONDITIONED SPACE: 1903 sqft |
| GARAGE: 435 sqft |
| OPENED PORCH (WITH ROOF) : 182 sqft |
| OPENED PORCH (WITH ROOF) : 70 sqft |
| Total Square Footage: 2590 sqft |
| Block: 00090 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 202-494-2019 |
| Location Address: 6 SENLAC CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/18/2023 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB FUND 2 LLC |
|
Address 3670 MAGUIRE BOULEVARD SUITE 220 ORLANDO, FL 32803 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/18/2024 | FINAL APPROVED | BTAYLOR |
| Note: 6/17/2024 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/14/2024 - PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 06/17/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 6/14/2024 - PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 06/17/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: New inspection due to canceled inspection 6/14/2024 - PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 06/14/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| U-CROSS CONNECTION | 05/31/2024 | APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 05/31/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE ------------------------------------------------------------------------ 5/30/2024 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH FROM DRIVEWAY BEFORE PASSING | |||
| U -UTILITY RESIDENTIAL FINAL | 05/31/2024 | FINAL APPROVED | DHANEY |
| Note: 5/30/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/30/2024 7:46:23 AM *** Sewer clean out needs trimmed to ground level . | |||
| U -UTILITY RESIDENTIAL FINAL | 05/30/2024 | Disapproved - NO FEE | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 5/30/2024 7:46:23 AM *** Sewer clean out needs trimmed to ground level . | |||
| ROW - STORMWATER FINAL | 05/30/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH FROM DRIVEWAY BEFORE PASSING | |||
| ROW - FINAL APRON (AFTER POUR) | 05/29/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/29/2024 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/29/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/08/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: *** NOTES ADDED BY FSLADISH 5/8/2024 10:59:08 AM *** 5/8/24 PIPE IN TOLERANCE. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ELECTRIC - EARLY POWER | 04/26/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 2-28-24 1. Emailed FPL at 2:24. 4-26-24 1. Emailed FPL at 10:54. | |||
| LATH/BRICK/ WATER BARRIER | 04/03/2024 | APPROVED | BTAYLOR |
| INSULATION | 04/03/2024 | APPROVED | BTAYLOR |
| Note: 4/1/2024 - PREVIOUS INSPECTION NOTES 3/27/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 3-7-24 1. Silt fence needs to be replaced before next inspection to avoid a failed inspection with a fee. 3-22-24 1. Dryer vent pipe joints need to all be sealed. 3-27-24 1. Dryer vent pipe joints need to all be sealed. 4-1-24 1. Dryer vent pipe joints need to all be sealed. | |||
| INSULATION | 04/01/2024 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 3/27/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 3-7-24 1. Silt fence needs to be replaced before next inspection to avoid a failed inspection with a fee. 3-22-24 1. Dryer vent pipe joints need to all be sealed. 3-27-24 1. Dryer vent pipe joints need to all be sealed. 4-1-24 1. Dryer vent pipe joints need to all be sealed. | |||
| INSULATION | 03/27/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 3-7-24 1. Silt fence needs to be replaced before next inspection to avoid a failed inspection with a fee. 3-22-24 1. Dryer vent pipe joints need to all be sealed. 3-27-24 1. Dryer vent pipe joints need to all be sealed. | |||
| GRAVITY SEWER TEST | 03/25/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 03/25/2024 | APPROVED | MGIBSON |
| ALL ROUGH | 03/22/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2467 3-7-24 1. Silt fence needs to be replaced before next inspection to avoid a failed inspection with a fee. 3-22-24 1. Dryer vent pipe joints need to all be sealed. | |||
| ROOF VALLEY & METAL | 03/07/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-7-24 1. Silt fence needs to be replaced before next inspection to avoid a failed inspection with a fee. | |||
| WALL SHEATHING | 03/05/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/05/2024 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 02/28/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 2-28-24 1. Emailed FPL at 2:24. | |||
| TIE BEAM / LINTEL | 02/23/2024 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 02/23/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/14/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/08/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/19/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/14/2024 | 06/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/22/2024 | 02/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/22/2024 | 02/22/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 02/12/2024 | 02/12/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | HOLD | 02/12/2024 | 02/12/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/12/2024 | 02/12/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/22/2023 | 11/27/2023 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 11/22/2023 | 11/22/2023 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/22/2023 | 11/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/22/2023 | 12/01/2023 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 11/14/2023 | 01/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/13/2023 | 11/13/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 11/13/2023 | 11/14/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/13/2023 | 11/14/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/13/2023 | 11/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 11/13/2023 | 11/14/2023 |
| LOCATE | COMPLETE | 11/13/2023 | 11/15/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/13/2023 | 11/16/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/13/2023 | 11/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/13/2023 | 11/14/2023 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Site plan must show 7.5' utility easement on right side. 2. Site plan rear set back is not clear there are numbers on top of setback. | |||
| BADMIN | COMPLETE | 11/13/2023 | 11/14/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/17/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/30/2024 |
| CONNECTION FEES | ¤21.00 | 05/30/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/30/2024 |
| SEWER CAPITAL FACILITY | ¤96.21 | 05/30/2024 |
| WATER CAPITAL FACILITY FEE | ¤70.63 | 05/30/2024 |
| SITE PLAN 30 | ¤30.00 | 12/18/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 12/18/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 12/18/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/18/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/18/2023 |
| SEWER INSPECTION | ¤25.00 | 12/18/2023 |
| WATER- TURN ON | ¤25.00 | 12/18/2023 |
| ADJUSTMENT 50% | (¤650.40) | 12/18/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/18/2023 |
| INSPECTION - RESIDENTIAL | ¤990.00 | 12/18/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤280.80 | 12/18/2023 |
| CONNECTION FEES | ¤1,166.26 | 12/18/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 12/18/2023 |
| IMPACT FEE FIRE | ¤428.09 | 12/18/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/18/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/18/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 12/18/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/18/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 12/18/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/18/2023 |
| SURCHARGE FS 533.721 | ¤6.50 | 12/18/2023 |
| SURCHARGE - FS 468.631 | ¤9.76 | 12/18/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/18/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/18/2023 |
| SW ENG PRE APRON | ¤30.00 | 12/18/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,876.04 |