I want to search for...

Permit #2023110504

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00090-0100
CONDITIONED SPACE: 1903 sqft
GARAGE: 435 sqft
OPENED PORCH (WITH ROOF) : 182 sqft
OPENED PORCH (WITH ROOF) : 70 sqft
Total Square Footage: 2590 sqft
Block: 00090
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 202-494-2019
Location Address: 6 SENLAC CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/18/2023
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB FUND 2 LLC

Address

3670 MAGUIRE BOULEVARD SUITE 220

ORLANDO, FL 32803

Lot: 0100
Contracted Stated Job Value: ¤200,000.00
Job Description: Single Family Residence
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/18/2024 FINAL APPROVED BTAYLOR
Note: 6/17/2024 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/14/2024 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 06/17/2024 CANCELLED BY APPLICANT WEB
Note: 6/14/2024 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 06/17/2024 CANCELLED BY APPLICANT BTAYLOR
Note: New inspection due to canceled inspection 6/14/2024 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 06/14/2024 CANCELLED BY APPLICANT BTAYLOR
U-CROSS CONNECTION 05/31/2024 APPROVED DHANEY
ROW - STORMWATER FINAL 05/31/2024 APPROVED PFLANAGAN
Note: CORRECTION MADE ------------------------------------------------------------------------ 5/30/2024 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH FROM DRIVEWAY BEFORE PASSING
U -UTILITY RESIDENTIAL FINAL 05/31/2024 FINAL APPROVED DHANEY
Note: 5/30/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/30/2024 7:46:23 AM *** Sewer clean out needs trimmed to ground level .
U -UTILITY RESIDENTIAL FINAL 05/30/2024 Disapproved - NO FEE DHANEY
Note: *** NOTES ADDED BY DHANEY 5/30/2024 7:46:23 AM *** Sewer clean out needs trimmed to ground level .
ROW - STORMWATER FINAL 05/30/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH FROM DRIVEWAY BEFORE PASSING
ROW - FINAL APRON (AFTER POUR) 05/29/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/29/2024 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 05/29/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- PRE-APRON (PRE-POUR) 05/08/2024 APPROVED - AS NOTED FSLADISH
Note: *** NOTES ADDED BY FSLADISH 5/8/2024 10:59:08 AM *** 5/8/24 PIPE IN TOLERANCE. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ELECTRIC - EARLY POWER 04/26/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 2-28-24 1. Emailed FPL at 2:24. 4-26-24 1. Emailed FPL at 10:54.
LATH/BRICK/ WATER BARRIER 04/03/2024 APPROVED BTAYLOR
INSULATION 04/03/2024 APPROVED BTAYLOR
Note: 4/1/2024 - PREVIOUS INSPECTION NOTES 3/27/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 3-7-24 1. Silt fence needs to be replaced before next inspection to avoid a failed inspection with a fee. 3-22-24 1. Dryer vent pipe joints need to all be sealed. 3-27-24 1. Dryer vent pipe joints need to all be sealed. 4-1-24 1. Dryer vent pipe joints need to all be sealed.
INSULATION 04/01/2024 Disapproved -FEE REQUIRED BTAYLOR
Note: 3/27/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 3-7-24 1. Silt fence needs to be replaced before next inspection to avoid a failed inspection with a fee. 3-22-24 1. Dryer vent pipe joints need to all be sealed. 3-27-24 1. Dryer vent pipe joints need to all be sealed. 4-1-24 1. Dryer vent pipe joints need to all be sealed.
INSULATION 03/27/2024 Disapproved - NO FEE BTAYLOR
Note: Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 3-7-24 1. Silt fence needs to be replaced before next inspection to avoid a failed inspection with a fee. 3-22-24 1. Dryer vent pipe joints need to all be sealed. 3-27-24 1. Dryer vent pipe joints need to all be sealed.
GRAVITY SEWER TEST 03/25/2024 APPROVED MGIBSON
SEWER TIE IN 03/25/2024 APPROVED MGIBSON
ALL ROUGH 03/22/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2467 3-7-24 1. Silt fence needs to be replaced before next inspection to avoid a failed inspection with a fee. 3-22-24 1. Dryer vent pipe joints need to all be sealed.
ROOF VALLEY & METAL 03/07/2024 APPROVED - AS NOTED BTAYLOR
Note: 3-7-24 1. Silt fence needs to be replaced before next inspection to avoid a failed inspection with a fee.
WALL SHEATHING 03/05/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/05/2024 APPROVED BTAYLOR
ELECTRIC-TUG 02/28/2024 APPROVED - AS NOTED BTAYLOR
Note: 2-28-24 1. Emailed FPL at 2:24.
TIE BEAM / LINTEL 02/23/2024 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 02/23/2024 APPROVED TBAKER
MONOLITHIC SLAB 02/14/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 02/08/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/19/2024 APPROVED BVITALE

Review History

Department Status Date In Date Out
MECH COMPLETE 06/14/2024 06/14/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/22/2024 02/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/22/2024 02/22/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 HOLD 02/12/2024 02/12/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab.
ZON HOLD 02/12/2024 02/12/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 02/12/2024 02/12/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 11/22/2023 11/27/2023
Note: Released By: JPI
ZON COMPLETE 11/22/2023 11/22/2023
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/22/2023 11/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 11/22/2023 12/01/2023
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
SWALE COMPLETE 11/14/2023 01/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 11/13/2023 11/13/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 11/13/2023 11/14/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 11/13/2023 11/14/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/13/2023 11/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 11/13/2023 11/14/2023
LOCATE COMPLETE 11/13/2023 11/15/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 11/13/2023 11/16/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 11/13/2023 11/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 11/13/2023 11/14/2023
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Site plan must show 7.5' utility easement on right side. 2. Site plan rear set back is not clear there are numbers on top of setback.
BADMIN COMPLETE 11/13/2023 11/14/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 06/17/2024
REINSPECTION RESIDENTIAL ¤40.00 05/30/2024
CONNECTION FEES ¤21.00 05/30/2024
SW ENG REINSPECTION 20 ¤20.00 05/30/2024
SEWER CAPITAL FACILITY ¤96.21 05/30/2024
WATER CAPITAL FACILITY FEE ¤70.63 05/30/2024
SITE PLAN 30 ¤30.00 12/18/2023
SEWER CAPITAL FACILITY ¤5,344.82 12/18/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 12/18/2023
SW ENG - REVIEW 20 ¤20.00 12/18/2023
SW ENG RES REVIEW 200 ¤200.00 12/18/2023
SEWER INSPECTION ¤25.00 12/18/2023
WATER- TURN ON ¤25.00 12/18/2023
ADJUSTMENT 50% (¤650.40) 12/18/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/18/2023
INSPECTION - RESIDENTIAL ¤990.00 12/18/2023
PLAN REVIEW - RESIDENTIAL ¤280.80 12/18/2023
CONNECTION FEES ¤1,166.26 12/18/2023
FC IMPACT FEE EMS ¤62.00 12/18/2023
IMPACT FEE FIRE ¤428.09 12/18/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/18/2023
FC IMPACT FEE LIBRARY ¤268.00 12/18/2023
IMPACT FEE PARKS ¤1,800.99 12/18/2023
IMPACT FEE SCHOOL ¤5,450.00 12/18/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 12/18/2023
WATER -IRRIGATION INSPECTION ¤25.00 12/18/2023
SURCHARGE FS 533.721 ¤6.50 12/18/2023
SURCHARGE - FS 468.631 ¤9.76 12/18/2023
SW ENG - FOUNDATION SURVEY ¤20.00 12/18/2023
SW ENG INSPECTION 80 ¤80.00 12/18/2023
SW ENG PRE APRON ¤30.00 12/18/2023
Fees Total Due: ¤0.00 Total Paid: ¤21,876.04