I want to search for...

Permit #2023110675

Permit Details

Status: COED

Parcel Id: 07-11-31-7010-00140-0190
CONDITIONED SPACE: 2782 sqft
GARAGE: 707 sqft
OPENED PORCH (WITH ROOF) : 629 sqft
OPENED PORCH (WITH ROOF) : 170 sqft
Total Square Footage: 4288 sqft
Block: 00140
Subdivision: 2137 - SECTION 10-FLORIDA PARK
Job Phone: 904-347-7837
Location Address: 72 FLEMINGWOOD LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/09/2024
NOC: RECORDED
Applicant name: ERIC PAUL PANNONE
Owner: CASTAWAY CONSTRUCTION LLC

Address

30 FERNON LANE

PALM COAST, FL 32137

Lot: 0190
Contracted Stated Job Value: ¤450,000.00
Job Description: Single Family Residence
Type: CN

Contractor

CASTAWAY CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

30 FERNON LANE

PALM COAST, FL 32137

CBC1266321 (Exp: 08/31/2026) 904-347-7837

Sub Contractors

ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692
SHAWN R RAMNARINE SINGH
Status Location Address State License Number Phone
INACTIVE

4 SEASIDE CT

PALM COAST, FL 32164

CAC1818766 (Exp: 08/31/2026) 306-302-2179
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/25/2025 FINAL APPROVED HCAMACHO
BLD - BUILDING FINAL 08/18/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Need to revise energy calcs to match A/C installed.FBC [A] 107.4 2. Guest Bedrooms need light.FBC EC R404.1 3. Dishwasher was in place but not hooked up. FBCR P2717.2 4. Shower head in guest bath in the rear is loose in the wall.P2710.1
ROW - FINAL APRON (AFTER POUR) 08/18/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 08/18/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 08/18/2025 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 08/11/2025 APPROVED - AS NOTED EMADISON
Note: ** 08/11/25 A HOT ASPHALT ROAD REPAIR PATCH IS REQUIRED ACROSS THE EDGE OF DRIVEWAY APRON YOU MUST CHIP AWAY ANY OVER POURED CONCRETE
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/11/2025 APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/14/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: BACK RIGHT CORNER YOU STILL DONT HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP. NEED TO OFIX SO NO WATER WILL IMPACT ANY ADJACENT LOTS SURROUNDING THIS LOT. --------------------------------------------------------------------------- 5/30/2025 - PREVIOUS INSPECTION NOTES THE BACK DRAINAGE PATTERN YOU STILL DO NOT HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF DRAINAGE PATTERN IN SOME AREAS. ------------------------------------------------------------------------------------------------- 4/21/2025 - PREVIOUS INSPECTION NOTES 4/21/25 PLEASE READ INSPECTORS PREVIOUS NOTES. YOU CULVERT PIPE SHOTS OF 20.55 TO 20.33 IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. PLEASE VERIFY ELEVATION. YOU ALSO HAVE LISTED THAT TIS CULVERT PIPE IS 12" RCP PIPE. PLEASE VERIFY THAT IT 13 X 17 ELIPTICAL CMP. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow SWALE PLAN SPECIFIC DETAILS 1. Culvert pipe shall be a 13"x17" elliptical CMP (ALUMINIZED) or 15" diameter HDPE or 15" diameter CMP (ALUMINIZED). - unless specified otherwise- installed in accordance with The City of Palm Coast Residential Culvert Detail (DWG NO. 300.C). Substitutes require prior approval by the City Storrnwater Engineer. 3/13/2025 - PREVIOUS INSPECTION NOTES ** 03/13/25 CULVERT PIPE IS OUT OF TOLERANCE IN ACCORDANCE WITH THE ELEVATION SET ON THE SWALE PLAN DIAGRAM ** SWALE ON LEFT SIDE FLOW IS INCONSISTANT AND WILL HOLD WATER _____________________________________________________________________________________________________________________ 3/5/2025 - PREVIOUS INSPECTION NOTES 1) THE FINAL SURVEY DOESN'T HAVE THE FOLLOWING NO IVERTS OF THE CULVERT, NO EDGE OF PAVEMENT ELEVATIONS, AND NO CENTERLINE OF ROAD ELEVATIONS. 2) NEED TO CLEAN UP ELEVATIONS ON RIGHT SIDE OF HOUSE SO WE CAN READ SURVEY CORRECTLY. 3) FINAL SURVEY STATES THAT YOU DO NOT HAVE 6" OFF THE BACK OF THE STRUCTURE TO THE DRAINAGE PATTERN. PER FBC Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. 4) FINAL SURVEY STATES YOU DO NOT HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN PER CITY CODE Section 300.01 D(6) V-17 The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope.
ROW- PROJECT STATUS 06/04/2025 Status Check PFLANAGAN
Note: MET WITH ALLEN AND THEY NEED TO RAISE SO THERE IS .30 FROM THE SWALES TO THE TOP OF THE SWALES IN THE LOT SO NO WATER WILL IMPACT THE ADJACENT LOTS
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/30/2025 Disapproved - NO FEE PFLANAGAN
Note: THE BACK DRAINAGE PATTERN YOU STILL DO NOT HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF DRAINAGE PATTERN IN SOME AREAS. ------------------------------------------------------------------------------------------------- 4/21/2025 - PREVIOUS INSPECTION NOTES 4/21/25 PLEASE READ INSPECTORS PREVIOUS NOTES. YOU CULVERT PIPE SHOTS OF 20.55 TO 20.33 IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. PLEASE VERIFY ELEVATION. YOU ALSO HAVE LISTED THAT TIS CULVERT PIPE IS 12" RCP PIPE. PLEASE VERIFY THAT IT 13 X 17 ELIPTICAL CMP. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow SWALE PLAN SPECIFIC DETAILS 1. Culvert pipe shall be a 13"x17" elliptical CMP (ALUMINIZED) or 15" diameter HDPE or 15" diameter CMP (ALUMINIZED). - unless specified otherwise- installed in accordance with The City of Palm Coast Residential Culvert Detail (DWG NO. 300.C). Substitutes require prior approval by the City Storrnwater Engineer. 3/13/2025 - PREVIOUS INSPECTION NOTES ** 03/13/25 CULVERT PIPE IS OUT OF TOLERANCE IN ACCORDANCE WITH THE ELEVATION SET ON THE SWALE PLAN DIAGRAM ** SWALE ON LEFT SIDE FLOW IS INCONSISTANT AND WILL HOLD WATER _____________________________________________________________________________________________________________________ 3/5/2025 - PREVIOUS INSPECTION NOTES 1) THE FINAL SURVEY DOESN'T HAVE THE FOLLOWING NO IVERTS OF THE CULVERT, NO EDGE OF PAVEMENT ELEVATIONS, AND NO CENTERLINE OF ROAD ELEVATIONS. 2) NEED TO CLEAN UP ELEVATIONS ON RIGHT SIDE OF HOUSE SO WE CAN READ SURVEY CORRECTLY. 3) FINAL SURVEY STATES THAT YOU DO NOT HAVE 6" OFF THE BACK OF THE STRUCTURE TO THE DRAINAGE PATTERN. PER FBC Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. 4) FINAL SURVEY STATES YOU DO NOT HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN PER CITY CODE Section 300.01 D(6) V-17 The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope.
ROW- PROJECT STATUS 05/23/2025 Status Check EMADISON
Note: ** 05/23/25 AS A COURTESY CHECKED CULVERT ELEVATION FOR BUILDER AS HIS FINAL SURVEY IS SHOWING OUT OF TOLERANCE ACCORDING TO INVERT ON SWALE PLAN SHOT CULVERT AFTER REMOVING SEDIMENT FROM BOTTOM OF CULVERT (LEFT 20.45) AND (RIGHT 20.36) CULVERT ELEVATION IS GOOD ONCE DEBRIS WAS REMOVED ** NOTIFIED BUILDER OF STATUS.
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/21/2025 Disapproved -FEE REQUIRED FSLADISH
Note: **05/23/25 AS A COURTESY CHECKED CULVERT ELEVATION FOR BUILDER AS HIS FINAL SURVEY IS SHOWING OUT OF TOLERANCE ACCORDING TO INVERT ON SWALE PLAN SHOT CULVERT AFTER REMOVING SEDIMENT FROM BOTTOM OF CULVERT (LEFT 20.45) AND (RIGHT 20.36) CULVERT ELEVATION IS GOOD ONCE DEBRIS WAS REMOVED ** NOTIFIED BUILDER OF STATUS. 4/21/25 PLEASE READ INSPECTORS PREVIOUS NOTES. YOU CULVERT PIPE SHOTS OF 20.55 TO 20.33 IS OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. PLEASE VERIFY ELEVATION. YOU ALSO HAVE LISTED THAT TIS CULVERT PIPE IS 12" RCP PIPE. PLEASE VERIFY THAT IT 13 X 17 ELIPTICAL CMP. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 SWALE PLAN The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in the direction of the drainage flow SWALE PLAN SPECIFIC DETAILS 1. Culvert pipe shall be a 13"x17" elliptical CMP (ALUMINIZED) or 15" diameter HDPE or 15" diameter CMP (ALUMINIZED). - unless specified otherwise- installed in accordance with The City of Palm Coast Residential Culvert Detail (DWG NO. 300.C). Substitutes require prior approval by the City Storrnwater Engineer. 3/13/2025 - PREVIOUS INSPECTION NOTES ** 03/13/25 CULVERT PIPE IS OUT OF TOLERANCE IN ACCORDANCE WITH THE ELEVATION SET ON THE SWALE PLAN DIAGRAM ** SWALE ON LEFT SIDE FLOW IS INCONSISTANT AND WILL HOLD WATER _____________________________________________________________________________________________________________________ 3/5/2025 - PREVIOUS INSPECTION NOTES 1) THE FINAL SURVEY DOESN'T HAVE THE FOLLOWING NO IVERTS OF THE CULVERT, NO EDGE OF PAVEMENT ELEVATIONS, AND NO CENTERLINE OF ROAD ELEVATIONS. 2) NEED TO CLEAN UP ELEVATIONS ON RIGHT SIDE OF HOUSE SO WE CAN READ SURVEY CORRECTLY. 3) FINAL SURVEY STATES THAT YOU DO NOT HAVE 6" OFF THE BACK OF THE STRUCTURE TO THE DRAINAGE PATTERN. PER FBC Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. 4) FINAL SURVEY STATES YOU DO NOT HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN PER CITY CODE Section 300.01 D(6) V-17 The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope.
ROW FIELD SURVEY /GRADING CERTIFICATION 04/17/2025 Disapproved - NO FEE FSLADISH
Note: 4/17/25 YOU MUST FIRST SUBMIT A FINAL SURVEY INSPECTION FOR REVIEW AND PASSAGE BEFORE YOU CAN HAVE A FIELD SURVEY INSPECTION COMPLETED.
U-CROSS CONNECTION 04/17/2025 APPROVED DHANEY
ROW- PROJECT STATUS 04/14/2025 Status Check EMADISON
Note: ** READY FOR SOD
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/13/2025 Disapproved - NO FEE EMADISON
Note: ** 03/13/25 CULVERT PIPE IS OUT OF TOLERANCE IN ACCORDANCE WITH THE ELEVATION SET ON THE SWALE PLAN DIAGRAM ** SWALE ON LEFT SIDE FLOW IS INCONSISTANT AND WILL HOLD WATER _____________________________________________________________________________________________________________________ 3/5/2025 - PREVIOUS INSPECTION NOTES 1) THE FINAL SURVEY DOESN'T HAVE THE FOLLOWING NO IVERTS OF THE CULVERT, NO EDGE OF PAVEMENT ELEVATIONS, AND NO CENTERLINE OF ROAD ELEVATIONS. 2) NEED TO CLEAN UP ELEVATIONS ON RIGHT SIDE OF HOUSE SO WE CAN READ SURVEY CORRECTLY. 3) FINAL SURVEY STATES THAT YOU DO NOT HAVE 6" OFF THE BACK OF THE STRUCTURE TO THE DRAINAGE PATTERN. PER FBC Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. 4) FINAL SURVEY STATES YOU DO NOT HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN PER CITY CODE Section 300.01 D(6) V-17 The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/05/2025 Disapproved - NO FEE PFLANAGAN
Note: 1) THE FINAL SURVEY DOESN'T HAVE THE FOLLOWING NO IVERTS OF THE CULVERT, NO EDGE OF PAVEMENT ELEVATIONS, AND NO CENTERLINE OF ROAD ELEVATIONS. 2) NEED TO CLEAN UP ELEVATIONS ON RIGHT SIDE OF HOUSE SO WE CAN READ SURVEY CORRECTLY. 3) FINAL SURVEY STATES THAT YOU DO NOT HAVE 6" OFF THE BACK OF THE STRUCTURE TO THE DRAINAGE PATTERN. PER FBC Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. 4) FINAL SURVEY STATES YOU DO NOT HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN PER CITY CODE Section 300.01 D(6) V-17 The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope.
GRAVITY SEWER TEST 01/09/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 NEED ADDRESS POSTED FOR ''911'' PURPOSES THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 01/09/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 NEED ADDRESS POSTED FOR ''911'' PURPOSES THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 11/21/2024 APPROVED PFLANAGAN
Note: CORRECTIONS MADE TO CULVERT IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. ------------------------------------------------------------------------------------ 11/19/2024 - PREVIOUS INSPECTION NOTES NAIL HAS BEEN RE-ESTABLISH AND MATCHES CENTER. CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL. ------------------------------------------------------------------------------------------- 11/12/2024 - PREVIOUS INSPECTION NOTES COULD NOT FIND NAIL IN THE EDGE OF PAVEMENT NEED TO RE-ESTABLISH BENCH MARK AT THE SAME LOCATION AND AT THE ELEVATION SO WE CAN INSPECT CULVERT CORRECTLY. --------------------------------------------------------------------------------- 11/8/2024 - PREVIOUS INSPECTION NOTES CONTRACTOR ON SITE WANTED TO CANCEL DUE TO WATER IN POURING AREA.
ROW- PRE-APRON (PRE-POUR) 11/19/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: NAIL HAS BEEN RE-ESTABLISH AND MATCHES CENTER. CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL. ------------------------------------------------------------------------------------------- 11/12/2024 - PREVIOUS INSPECTION NOTES COULD NOT FIND NAIL IN THE EDGE OF PAVEMENT NEED TO RE-ESTABLISH BENCH MARK AT THE SAME LOCATION AND AT THE ELEVATION SO WE CAN INSPECT CULVERT CORRECTLY. --------------------------------------------------------------------------------- 11/8/2024 - PREVIOUS INSPECTION NOTES CONTRACTOR ON SITE WANTED TO CANCEL DUE TO WATER IN POURING AREA.
ROW- PRE-APRON (PRE-POUR) 11/12/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: COULD NOT FIND NAIL IN THE EDGE OF PAVEMENT NEED TO RE-ESTABLISH BENCH MARK AT THE SAME LOCATION AND AT THE ELEVATION SO WE CAN INSPECT CULVERT CORRECTLY. --------------------------------------------------------------------------------- 11/8/2024 - PREVIOUS INSPECTION NOTES CONTRACTOR ON SITE WANTED TO CANCEL DUE TO WATER IN POURING AREA.
ROW- PRE-APRON (PRE-POUR) 11/08/2024 CANCELLED BY APPLICANT PFLANAGAN
Note: CONTRACTOR ON SITE WANTED TO CANCEL DUE TO WATER IN POURING AREA.
ELECTRIC - EARLY POWER 09/24/2024 APPROVED HCAMACHO
Note: 6/12/2024 - PREVIOUS INSPECTION NOTES
LATH/BRICK/ WATER BARRIER 08/26/2024 APPROVED FWILLIS
WINDOW NAILING 08/22/2024 APPROVED FWILLIS
Note: *** NOTES ADDED BY JSTEWART 8/2/2024 12:43:25 PM *** for all windows and doors, back order at all rough inspection.
INSULATION 08/22/2024 APPROVED FWILLIS
ALL ROUGH 08/07/2024 APPROVED JSTEWART
Note: 8/2/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/2/2024 12:42:27 PM *** 1. Please have branch vents in Master and spare bath sloped toward main drain. 2. Please install Mechanical fasteners at all exhaust duct connection to fan assembly. FBCR M1601.4.1 3. Please install gasket to face of all supply and return boots. FBC EC TABLE R402.4.1.1 4. Master toilet exhaust duct Not connected please connect, seal, fasten, and strap. FBCR M1601.4.1/ FBCR M1601.4.4 5. Please have energy calcs onsite with duct Layout matching what is installed. FBC [A]107.3.1 6. Please post address for emergency services. FBCR 319.1
ALL ROUGH 08/02/2024 Disapproved -FEE REQUIRED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 8/2/2024 12:44:20 PM *** Added a window nailing inspection for all windows and doors, back order at all rough inspection. *** NOTES ADDED BY JSTEWART 8/2/2024 12:42:27 PM *** 1. Please have branch vents in Master and spare bath sloped toward main drain. 2. Please install Mechanical fasteners at all exhaust duct connection to fan assembly. FBCR M1601.4.1 3. Please install gasket to face of all supply and return boots. FBC EC TABLE R402.4.1.1 4. Master toilet exhaust duct Not connected please connect, seal, fasten, and strap. FBCR M1601.4.1/ FBCR M1601.4.4 5. Please have energy calcs onsite with duct Layout matching what is installed. FBC [A]107.3.1 6. Please post address for emergency services. FBCR 319.1
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/01/2024 APPROVED FWILLIS
ROOF VALLEY & METAL 06/28/2024 APPROVED LMILLER
WALL SHEATHING 06/25/2024 APPROVED LMILLER
ROOF SHEATHING 06/21/2024 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 06/18/2024 APPROVED TBAKER
ELECTRIC - EARLY POWER 06/12/2024 CANCELLED BY APPLICANT JWALKER
ELECTRIC-TUG 06/12/2024 APPROVED JWALKER
TIE BEAM / LINTEL 05/29/2024 APPROVED JWALKER
Note: 5/28/2024 - PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 05/28/2024 CANCELLED BY APPLICANT JWALKER
MONOLITHIC SLAB 05/06/2024 APPROVED JSTEWART
Note: 5/3/2024 - PREVIOUS INSPECTION NOTES Slab has not been completed 6 workers onsite. Please do not schedule inspections untill work has been completed.
MONOLITHIC SLAB 05/03/2024 Disapproved -FEE REQUIRED JWALKER
Note: Slab has not been completed 6 workers onsite. Please do not schedule inspections untill work has been completed.
PLUMBING 1ST ROUGH UNDERGROUND 04/29/2024 APPROVED - AS NOTED MGIBSON
Note: NEED ADDRESS POSTED FOR ''911'' PURPOSES
WATER METER INSTALLATION REQUEST 04/29/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 08/19/2025 08/20/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 07/11/2025 07/11/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM If htis is a revised site plan, please enter what the changes are/reason for submittal. If this is a final survey, upload under the final survey document type and name your file final survey.
ENGIN1 COMPLETE 06/18/2024 06/18/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/18/2024 06/18/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 03/14/2024 03/20/2024
Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM For the next submission, the flow arrow direction should be corrected in the back corner of the property.
ENGIN1 COMPLETE 03/14/2024 03/18/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/14/2024 03/14/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 02/13/2024 02/13/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 02/13/2024 02/15/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 02/13/2024 02/15/2024
Note: Released By: JPI
SW1 HOLD 02/13/2024 02/22/2024
Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM 1- There are no proposed elevations on the plan, only existing elevations. Please show the proposed elevations on a 20 ft grid on your property. 2- Sod elevations adjacent to the structure are 4" below the FFE for block and 6" for wood frame structures. 3- Currently, it is the same as the FFE on the plan. Please note the drainage from the structure is to be a 6 inch minimum slope for the first 10’. 4- Please depict the driveway width at the edge of pavement (EOP) as well. 5- When designing your proposed elevations please be aware that the lot drainage must not negatively impact any adjacent property.
ENGIN1 COMPLETE 02/13/2024 02/13/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ELEC COMPLETE 11/29/2023 11/30/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 11/29/2023 11/29/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM House doesn't meet the minimum side setback of 7.5ft on right side
MECH HOLD 11/29/2023 11/29/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition
BLD HOLD 11/29/2023 12/01/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
SW1 HOLD 11/29/2023 12/06/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM NEED TO SUBMIT A NEW SITE PLAN
ENGIN1 COMPLETE 11/29/2023 11/29/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 11/16/2023 11/20/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 11/16/2023 11/17/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 11/16/2023 11/16/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Outlets in garage and laundry need to be GFCI protected. NEC 2017 210.8 2. Need correct outlet spacing in bed 4. wall behind door. NEC 2017 210.52 3. Submit electrical load calcs.
ENGIN1 COMPLETE 11/16/2023 11/16/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 11/16/2023 11/20/2023
LOCATE COMPLETE 11/16/2023 11/16/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 11/16/2023 11/20/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on Heatload needs to be Daytona Beach. 2. Provide Duct layout signed by the AC contractor
SW1 HOLD 11/16/2023 11/22/2023
Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Please remove all contour lines, need proposed elv's clearly shown on a 20' grid to show proper lot drainage, need proposed elv's at house corners, show flow arrows
ZON HOLD 11/16/2023 11/16/2023
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Site plan missing width of driveway and walkway. 2. Landscape missing sod type and irrigation if not bahia. 3. Color Material missing exterior material.
BADMIN COMPLETE 11/16/2023 11/21/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 11/16/2023 01/05/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 08/24/2025
REINSPECTION RESIDENTIAL ¤40.00 08/24/2025
REINSPECTION RESIDENTIAL ¤40.00 08/24/2025
SW ENG REINSPECTION 30 ¤30.00 08/24/2025
SW ENG REINSPECTION 30 ¤30.00 08/24/2025
SW ENG - REVIEW 20 ¤20.00 04/09/2024
SW ENG RES REVIEW 200 ¤200.00 04/09/2024
SEWER INSPECTION ¤25.00 04/09/2024
SEWER CAPITAL FACILITY ¤5,441.03 04/09/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 04/09/2024
SITE PLAN 30 ¤30.00 04/09/2024
WATER- TURN ON ¤25.00 04/09/2024
ADJUSTMENT 50% (¤999.87) 04/09/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/09/2024
INSPECTION - RESIDENTIAL ¤1,534.50 04/09/2024
PLAN REVIEW - RESIDENTIAL ¤435.24 04/09/2024
CONNECTION FEES ¤1,187.26 04/09/2024
FC IMPACT FEE EMS ¤62.00 04/09/2024
IMPACT FEE FIRE ¤428.09 04/09/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/09/2024
FC IMPACT FEE LIBRARY ¤268.00 04/09/2024
IMPACT FEE PARKS ¤1,800.99 04/09/2024
IMPACT FEE SCHOOL ¤5,450.00 04/09/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 04/09/2024
WATER -IRRIGATION INSPECTION ¤25.00 04/09/2024
SURCHARGE FS 533.721 ¤10.00 04/09/2024
SURCHARGE - FS 468.631 ¤15.00 04/09/2024
SW ENG - FOUNDATION SURVEY ¤20.00 04/09/2024
SW ENG INSPECTION 80 ¤80.00 04/09/2024
SW ENG PRE APRON ¤30.00 04/09/2024
Fees Total Due: ¤0.00 Total Paid: ¤22,364.25