Permit #2023110866
Permit Details
Status: COED
| Parcel Id: 16-11-31-1260-00000-0380 |
| CONDITIONED SPACE: 2708 sqft |
| GARAGE: 426 sqft |
| OPENED PORCH (WITH ROOF) : 708 sqft |
| Total Square Footage: 3842 sqft |
| Block: 00000 |
| Subdivision: 2081 - Creekside Village at Grand Haven |
| Job Phone: 908-334-6117 |
| Location Address: 46 CREEKSIDE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/28/2024 |
| NOC: RECORDED |
| Applicant name: KIM EUGENE ADAMS |
| Owner: ANDREW BENJAMIN MICHAEL |
|
Address 115 LEGENDARY DRIVE UNIT 212 SAINT AUGUSTINE, FL 32092 |
| Lot: 0380 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
JMD QUALITY CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
300 CANOPY WALK LANE APT 342 ZEPHYRHILLS, FL 33542 |
CGC1526854 (Exp: 08/31/2026) | 908-334-6117 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
SCOTT DALE CRIDER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 353092 PALM COAST, FL 32137 |
CCC1333991 (Exp: 08/31/2026) | 386-276-0758 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
SCOTT H STILLWELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4500 US 1 UNIT 206 BUNNELL, FL 32110 |
CAC1819433 (Exp: 08/31/2026) | 386-864-4404 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 05/19/2025 | APPROVED | FSLADISH |
| Note: 5/19/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 05/19/2025 | APPROVED | FSLADISH |
| Note: 5/19/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 05/19/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 well irr-no cc contact customer-service@palmcoastgov.com to sechedule work order-RAISE water meter pit so is flush with grades-and in future please do this before the FINAL | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/15/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 5/15/25 Met on site to compare site plan and final survey due to some dicrepencies. Determined that due to site specific conditions and a natural area on right side drainage will work as required by COPC standards. Approving this Final survey as noted. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 04/24/25 READY TO SET PAVERS _________________________________________________________________________________________________________________ 4/21/2025 - PREVIOUS INSPECTION NOTES READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/15/2025 | APPROVED | FSLADISH |
| Note: 5/15/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9463 5/15/25 Met on site to compare site plan and final survey due to some dicrepencies. Determined that due to site specific conditions and a natural area on right side drainage will work as required by COPC standards. Approving this Final survey as noted. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 04/24/25 READY TO SET PAVERS _________________________________________________________________________________________________________________ 4/21/2025 - PREVIOUS INSPECTION NOTES READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| BLD - BUILDING FINAL | 05/01/2025 | FINAL APPROVED | HCAMACHO |
| Note: | |||
| ROW- PRE-APRON (PRE-POUR) | 04/24/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/24/25 READY TO SET PAVERS _________________________________________________________________________________________________________________ 4/21/2025 - PREVIOUS INSPECTION NOTES READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| U-CROSS CONNECTION | 04/22/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irr-no cc | |||
| BLD - BUILDING FINAL | 04/22/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Need Locking breakers on oven & cooktop 2. Missing light kit in attic above garage. 3. seal Holes in garage and spare storage. 4. Missing SD in two bedrooms on first floor. 5. Missing SD at bottom of stair case 6. Railing on stairs not finished. 7. Flooring on stairs not finished. 8. Need concrete pads outside slider in kit. 9. Need concrete pad at bottom of exterior stairs in the rear of the house. 10. Need to revise Energy Calcs,for both airhandlers 11. Need house Number. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/21/2025 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PAVER RESTRAINTS | 04/21/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ELECTRIC - EARLY POWER | 04/07/2025 | APPROVED | HCAMACHO |
| Note: | |||
| ELECTRIC - EARLY POWER | 03/17/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 3/17/25 1. Wires are not safed off in outlet boxes NEC 440.14 2. Wires are not safed off in boxes with blank plates NEC 440.14 3. Outlets and switches missing covers E3906.10 Inspector Notes from Inspection 2200 Emailed FPL @ 10:20AM, power release Inspector Notes from Inspection 2200 Emailed FPL @ 10:20AM, power release | |||
| WINDOW NAILING | 02/25/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: All exterior doors and house to garage door inspected. | |||
| GRAVITY SEWER TEST | 02/11/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 ADRRESS NEEDS TO BE POSTED FOR ''911'' PURPOSES ON DOC-BOX OR OR POST C/O AT EXIT POINT NEEDS TO BE BRASS 4'' | |||
| SEWER TIE IN | 02/11/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 ADRRESS NEEDS TO BE POSTED FOR ''911'' PURPOSES ON DOC-BOX OR OR POST | |||
| LATH/BRICK/ WATER BARRIER | 01/03/2025 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2490 1. Missing Front Door 2. Missing House to Garage door 3. Missing side Garage Door 4. Missing door from kitchen to outside patio. 5. Missing door from bedroom to outside patio. Need to check all before Final Inspection. Need to check Installation and Seal. Inspector Notes from Inspection 2420 12-3-24 1. Missing front door. 2. Missing door from kitchen to outside patio. 3. Missing door upstairs to deck. 4. Upstairs smoke alarm needs to be moved back away from bathroom door. check at insulation. Inspector Notes from Inspection 2467 Roofing worksheet was submitted for revision. Inspector Notes from Inspection 2460 1. TF01 Is missing tie downs on both sides for continues load path. Marked on plan and wall. 2. Check all Threaded Rods. Some are loose and some not in place. Will check at Rough. 11/12/2024 - PREVIOUS INSPECTION NOTES Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4 | |||
| INSULATION | 12/06/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Missing Front Door 2. Missing House to Garage door 3. Missing side Garage Door 4. Missing door from kitchen to outside patio. 5. Missing door from bedroom to outside patio. Need to check all before Final Inspection. Need to check Installation and Seal. Inspector Notes from Inspection 2420 12-3-24 1. Missing front door. 2. Missing door from kitchen to outside patio. 3. Missing door upstairs to deck. 4. Upstairs smoke alarm needs to be moved back away from bathroom door. check at insulation. Inspector Notes from Inspection 2467 Roofing worksheet was submitted for revision. Inspector Notes from Inspection 2460 1. TF01 Is missing tie downs on both sides for continues load path. Marked on plan and wall. 2. Check all Threaded Rods. Some are loose and some not in place. Will check at Rough. 11/12/2024 - PREVIOUS INSPECTION NOTES Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4 | |||
| ALL ROUGH | 12/03/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 12-3-24 1. Missing front door. 2. Missing door from kitchen to outside patio. 3. Missing door upstairs to deck. 4. Upstairs smoke alarm needs to be moved back away from bathroom door. check at insulation. Inspector Notes from Inspection 2467 Roofing worksheet was submitted for revision. Inspector Notes from Inspection 2460 1. TF01 Is missing tie downs on both sides for continues load path. Marked on plan and wall. 2. Check all Threaded Rods. Some are loose and some not in place. Will check at Rough. 11/12/2024 - PREVIOUS INSPECTION NOTES Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4 | |||
| ROOF VALLEY & METAL | 11/19/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: Roofing worksheet was submitted for revision. Inspector Notes from Inspection 2460 1. TF01 Is missing tie downs on both sides for continues load path. Marked on plan and wall. 2. Check all Threaded Rods. Some are loose and some not in place. Will check at Rough. 11/12/2024 - PREVIOUS INSPECTION NOTES Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/15/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. TF01 Is missing tie downs on both sides for continues load path. Marked on plan and wall. 2. Check all Threaded Rods. Some are loose and some not in place. Will check at Rough. 11/12/2024 - PREVIOUS INSPECTION NOTES Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4 | |||
| ROOF VALLEY & METAL | 11/12/2024 | Disapproved - NO FEE | HCAMACHO |
| Note: 1.Need revision on Roofing Worksheet, to meet what has been installed. Installed 2 layer of synthetic and it calls for Peel & Stick. 2. No Shingles on site, can not verify Shingles to Product Approval. Need Revision approved by city prior to inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/12/2024 | Disapproved -FEE REQUIRED | HCAMACHO |
| Note: Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/15/2024 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/03/2024 | CANCELLED BY APPLICANT | HCAMACHO |
| Note: 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4 | |||
| WALL SHEATHING | 09/26/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Plans call for 1/2" Zip w/ tyvek, 19/32 CDX was installed. Please revise plans to match what was installed. FBC (A) 107.4 Check for revised plans at next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/26/2024 | PARTIALLY APPROVED | HCAMACHO |
| Note: Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4 | |||
| ELECTRIC-TUG | 09/16/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 10:20AM, power release | |||
| TIE BEAM / LINTEL | 08/12/2024 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 08/05/2024 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 07/26/2024 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/18/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: ADRRESS NEEDS TO BE POSTED FOR ''911'' PURPOSES ON DOC-BOX OR OR POST | |||
| WATER METER INSTALLATION REQUEST | 07/17/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/25/2025 | 04/25/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/03/2025 | 04/03/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/02/2024 | 12/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/22/2024 | 11/26/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/19/2024 | 11/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/06/2024 | 11/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/02/2024 | 08/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/02/2024 | 08/05/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/08/2024 | 01/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/08/2024 | 01/09/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/27/2023 | 12/27/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/27/2023 | 12/28/2023 |
| Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| MECH | COMPLETE | 12/27/2023 | 01/04/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 12/27/2023 | 12/27/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical load calcs. | |||
| URB | COMPLETE | 11/21/2023 | 11/29/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM 11-29-23 (JB) COMPLETED PENDING ZONING HOLD. | |||
| BLD | HOLD | 11/20/2023 | 11/22/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 11/20/2023 | 11/22/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 11/20/2023 | 11/28/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in sitting area switch wall . NEC 2017 210.52 2. Need outlet by sink in bath 2 NEC 2017 210.52 (D) 3. Upload Electrical load calcs and Riser diagram. | |||
| ENGIN1 | COMPLETE | 11/20/2023 | 11/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 11/20/2023 | 11/22/2023 |
| LOCATE | COMPLETE | 11/20/2023 | 11/22/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/20/2023 | 11/27/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor | |||
| SW1 | COMPLETE | 11/20/2023 | 11/29/2023 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/20/2023 | 11/21/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan: this property requires 6 trees for 16039 sq ft | |||
| BADMIN | COMPLETE | 11/20/2023 | 11/28/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/19/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/19/2025 |
| CONNECTION FEES | ¤25.00 | 03/28/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/28/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 03/28/2024 |
| IMPACT FEE FIRE | ¤428.09 | 03/28/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/28/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/28/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 03/28/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/28/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 03/28/2024 |
| SURCHARGE FS 533.721 | ¤3.57 | 03/28/2024 |
| SURCHARGE - FS 468.631 | ¤5.35 | 03/28/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/28/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/28/2024 |
| SW ENG PRE APRON | ¤30.00 | 03/28/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/28/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/28/2024 |
| SEWER INSPECTION | ¤25.00 | 03/28/2024 |
| SITE PLAN 30 | ¤30.00 | 03/28/2024 |
| WATER-METER | ¤505.39 | 03/28/2024 |
| ADJUSTMENT 50% | (¤627.46) | 03/28/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/28/2024 |
| INSPECTION - RESIDENTIAL | ¤954.25 | 03/28/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤270.66 | 03/28/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,209.84 |