Permit #2023110866

Permit Details

Status: COED

Parcel Id: 16-11-31-1260-00000-0380
CONDITIONED SPACE: 2708 sqft
GARAGE: 426 sqft
OPENED PORCH (WITH ROOF) : 708 sqft
Total Square Footage: 3842 sqft
Block: 00000
Subdivision: 2081 - Creekside Village at Grand Haven
Job Phone: 908-334-6117
Location Address: 46 CREEKSIDE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/28/2024
NOC: RECORDED
Applicant name: KIM EUGENE ADAMS
Owner: ANDREW BENJAMIN MICHAEL

Address

115 LEGENDARY DRIVE UNIT 212

SAINT AUGUSTINE, FL 32092

Lot: 0380
Contracted Stated Job Value: ¤200,000.00
Job Description: Single Family Residence
Type: CN

Contractor

JMD QUALITY CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

300 CANOPY WALK LANE APT 342

ZEPHYRHILLS, FL 33542

CGC1526854 (Exp: 08/31/2026) 908-334-6117

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
SCOTT DALE CRIDER
Status Location Address State License Number Phone
ACTIVE

PO BOX 353092

PALM COAST, FL 32137

CCC1333991 (Exp: 08/31/2026) 386-276-0758
WILLIAM TODD SIKES
Status Location Address State License Number Phone
ACTIVE

83 PORT ROYAL DR

ST AUGUSTINE, FL 32084

EC0002726 (Exp: 08/31/2026) 904-762-8762
SCOTT H STILLWELL
Status Location Address State License Number Phone
ACTIVE

4500 US 1 UNIT 206

BUNNELL, FL 32110

CAC1819433 (Exp: 08/31/2026) 386-864-4404

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 05/19/2025 APPROVED FSLADISH
Note: 5/19/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 05/19/2025 APPROVED FSLADISH
Note: 5/19/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 05/19/2025 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9035 well irr-no cc contact customer-service@palmcoastgov.com to sechedule work order-RAISE water meter pit so is flush with grades-and in future please do this before the FINAL
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/15/2025 APPROVED - AS NOTED FSLADISH
Note: 5/15/25 Met on site to compare site plan and final survey due to some dicrepencies. Determined that due to site specific conditions and a natural area on right side drainage will work as required by COPC standards. Approving this Final survey as noted. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 04/24/25 READY TO SET PAVERS _________________________________________________________________________________________________________________ 4/21/2025 - PREVIOUS INSPECTION NOTES READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW FIELD SURVEY /GRADING CERTIFICATION 05/15/2025 APPROVED FSLADISH
Note: 5/15/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9463 5/15/25 Met on site to compare site plan and final survey due to some dicrepencies. Determined that due to site specific conditions and a natural area on right side drainage will work as required by COPC standards. Approving this Final survey as noted. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 04/24/25 READY TO SET PAVERS _________________________________________________________________________________________________________________ 4/21/2025 - PREVIOUS INSPECTION NOTES READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
BLD - BUILDING FINAL 05/01/2025 FINAL APPROVED HCAMACHO
Note:
ROW- PRE-APRON (PRE-POUR) 04/24/2025 APPROVED - AS NOTED EMADISON
Note: ** 04/24/25 READY TO SET PAVERS _________________________________________________________________________________________________________________ 4/21/2025 - PREVIOUS INSPECTION NOTES READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
U-CROSS CONNECTION 04/22/2025 APPROVED - AS NOTED LFITZGERALD
Note: well irr-no cc
BLD - BUILDING FINAL 04/22/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Need Locking breakers on oven & cooktop 2. Missing light kit in attic above garage. 3. seal Holes in garage and spare storage. 4. Missing SD in two bedrooms on first floor. 5. Missing SD at bottom of stair case 6. Railing on stairs not finished. 7. Flooring on stairs not finished. 8. Need concrete pads outside slider in kit. 9. Need concrete pad at bottom of exterior stairs in the rear of the house. 10. Need to revise Energy Calcs,for both airhandlers 11. Need house Number.
ROW- PRE-APRON (PRE-POUR) 04/21/2025 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- PAVER RESTRAINTS 04/21/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ELECTRIC - EARLY POWER 04/07/2025 APPROVED HCAMACHO
Note:
ELECTRIC - EARLY POWER 03/17/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 3/17/25 1. Wires are not safed off in outlet boxes NEC 440.14 2. Wires are not safed off in boxes with blank plates NEC 440.14 3. Outlets and switches missing covers E3906.10 Inspector Notes from Inspection 2200 Emailed FPL @ 10:20AM, power release Inspector Notes from Inspection 2200 Emailed FPL @ 10:20AM, power release
WINDOW NAILING 02/25/2025 APPROVED - AS NOTED HCAMACHO
Note: All exterior doors and house to garage door inspected.
GRAVITY SEWER TEST 02/11/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 ADRRESS NEEDS TO BE POSTED FOR ''911'' PURPOSES ON DOC-BOX OR OR POST C/O AT EXIT POINT NEEDS TO BE BRASS 4''
SEWER TIE IN 02/11/2025 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 ADRRESS NEEDS TO BE POSTED FOR ''911'' PURPOSES ON DOC-BOX OR OR POST
LATH/BRICK/ WATER BARRIER 01/03/2025 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2490 1. Missing Front Door 2. Missing House to Garage door 3. Missing side Garage Door 4. Missing door from kitchen to outside patio. 5. Missing door from bedroom to outside patio. Need to check all before Final Inspection. Need to check Installation and Seal. Inspector Notes from Inspection 2420 12-3-24 1. Missing front door. 2. Missing door from kitchen to outside patio. 3. Missing door upstairs to deck. 4. Upstairs smoke alarm needs to be moved back away from bathroom door. check at insulation. Inspector Notes from Inspection 2467 Roofing worksheet was submitted for revision. Inspector Notes from Inspection 2460 1. TF01 Is missing tie downs on both sides for continues load path. Marked on plan and wall. 2. Check all Threaded Rods. Some are loose and some not in place. Will check at Rough. 11/12/2024 - PREVIOUS INSPECTION NOTES Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4
INSULATION 12/06/2024 APPROVED - AS NOTED HCAMACHO
Note: 1. Missing Front Door 2. Missing House to Garage door 3. Missing side Garage Door 4. Missing door from kitchen to outside patio. 5. Missing door from bedroom to outside patio. Need to check all before Final Inspection. Need to check Installation and Seal. Inspector Notes from Inspection 2420 12-3-24 1. Missing front door. 2. Missing door from kitchen to outside patio. 3. Missing door upstairs to deck. 4. Upstairs smoke alarm needs to be moved back away from bathroom door. check at insulation. Inspector Notes from Inspection 2467 Roofing worksheet was submitted for revision. Inspector Notes from Inspection 2460 1. TF01 Is missing tie downs on both sides for continues load path. Marked on plan and wall. 2. Check all Threaded Rods. Some are loose and some not in place. Will check at Rough. 11/12/2024 - PREVIOUS INSPECTION NOTES Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4
ALL ROUGH 12/03/2024 APPROVED - AS NOTED BTAYLOR
Note: 12-3-24 1. Missing front door. 2. Missing door from kitchen to outside patio. 3. Missing door upstairs to deck. 4. Upstairs smoke alarm needs to be moved back away from bathroom door. check at insulation. Inspector Notes from Inspection 2467 Roofing worksheet was submitted for revision. Inspector Notes from Inspection 2460 1. TF01 Is missing tie downs on both sides for continues load path. Marked on plan and wall. 2. Check all Threaded Rods. Some are loose and some not in place. Will check at Rough. 11/12/2024 - PREVIOUS INSPECTION NOTES Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4
ROOF VALLEY & METAL 11/19/2024 APPROVED - AS NOTED HCAMACHO
Note: Roofing worksheet was submitted for revision. Inspector Notes from Inspection 2460 1. TF01 Is missing tie downs on both sides for continues load path. Marked on plan and wall. 2. Check all Threaded Rods. Some are loose and some not in place. Will check at Rough. 11/12/2024 - PREVIOUS INSPECTION NOTES Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/15/2024 APPROVED - AS NOTED HCAMACHO
Note: 1. TF01 Is missing tie downs on both sides for continues load path. Marked on plan and wall. 2. Check all Threaded Rods. Some are loose and some not in place. Will check at Rough. 11/12/2024 - PREVIOUS INSPECTION NOTES Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4
ROOF VALLEY & METAL 11/12/2024 Disapproved - NO FEE HCAMACHO
Note: 1.Need revision on Roofing Worksheet, to meet what has been installed. Installed 2 layer of synthetic and it calls for Peel & Stick. 2. No Shingles on site, can not verify Shingles to Product Approval. Need Revision approved by city prior to inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/12/2024 Disapproved -FEE REQUIRED HCAMACHO
Note: Need approved plans with City Stamp before inspection on new engineering tie down sheet and truss layout. All previous notes still apply to next inspection. Did not check because of missing approved plan. 10/15/2024 - PREVIOUS INSPECTION NOTES 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/15/2024 Disapproved - NO FEE HCAMACHO
Note: 1. Plans are missing Connector schedule, so I could not verify connectors at bearing points. Check all. 2. Plans do not have a bearing wall detail for carring floor trusses or roof trusses. Using all thread. Check all. 3. Check all bearing points for the correct conectors. 4. Back wall on second floor in main area is missing continues tied downs. Need detail for wall. 5. Previous notes have not been retified yet. 6. Checked down cells. 7. Used concrete to wood straps on wood to wood at posts in middle of house. 10/3/2024 - PREVIOUS INSPECTION NOTES 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/03/2024 CANCELLED BY APPLICANT HCAMACHO
Note: 9/26/2024 - PREVIOUS INSPECTION NOTES Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4
WALL SHEATHING 09/26/2024 APPROVED - AS NOTED HCAMACHO
Note: 1. Plans call for 1/2" Zip w/ tyvek, 19/32 CDX was installed. Please revise plans to match what was installed. FBC (A) 107.4 Check for revised plans at next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/26/2024 PARTIALLY APPROVED HCAMACHO
Note: Roof sheathing calls for 5/8 Zip Board on plans. 19/32 CDX was installed on roof. Revise plans to match what was installed. Still need to check Trusses, Framing, and Ties, framer still working at time of inspection. FBC (A) 107.4
ELECTRIC-TUG 09/16/2024 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 10:20AM, power release
TIE BEAM / LINTEL 08/12/2024 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 08/05/2024 APPROVED TDOAK
MONOLITHIC SLAB 07/26/2024 APPROVED LMILLER
PLUMBING 1ST ROUGH UNDERGROUND 07/18/2024 APPROVED - AS NOTED MGIBSON
Note: ADRRESS NEEDS TO BE POSTED FOR ''911'' PURPOSES ON DOC-BOX OR OR POST
WATER METER INSTALLATION REQUEST 07/17/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 04/25/2025 04/25/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 04/03/2025 04/03/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/02/2024 12/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 11/22/2024 11/26/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 11/19/2024 11/21/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 11/06/2024 11/14/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/02/2024 08/05/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/02/2024 08/05/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 01/08/2024 01/08/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 01/08/2024 01/09/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 12/27/2023 12/27/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD HOLD 12/27/2023 12/28/2023
Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
MECH COMPLETE 12/27/2023 01/04/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC HOLD 12/27/2023 12/27/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical load calcs.
URB COMPLETE 11/21/2023 11/29/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM 11-29-23 (JB) COMPLETED PENDING ZONING HOLD.
BLD HOLD 11/20/2023 11/22/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 11/20/2023 11/22/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 11/20/2023 11/28/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in sitting area switch wall . NEC 2017 210.52 2. Need outlet by sink in bath 2 NEC 2017 210.52 (D) 3. Upload Electrical load calcs and Riser diagram.
ENGIN1 COMPLETE 11/20/2023 11/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 11/20/2023 11/22/2023
LOCATE COMPLETE 11/20/2023 11/22/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 11/20/2023 11/27/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor
SW1 COMPLETE 11/20/2023 11/29/2023
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON HOLD 11/20/2023 11/21/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan: this property requires 6 trees for 16039 sq ft
BADMIN COMPLETE 11/20/2023 11/28/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 05/19/2025
REINSPECTION RESIDENTIAL ¤40.00 05/19/2025
CONNECTION FEES ¤25.00 03/28/2024
CONTRACTOR CHANGE ¤20.00 03/28/2024
FC IMPACT FEE EMS ¤62.00 03/28/2024
IMPACT FEE FIRE ¤428.09 03/28/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/28/2024
FC IMPACT FEE LIBRARY ¤268.00 03/28/2024
IMPACT FEE PARKS ¤1,800.99 03/28/2024
IMPACT FEE SCHOOL ¤5,450.00 03/28/2024
IMPACT FEE TRANSPORTATION ¤3,311.00 03/28/2024
SURCHARGE FS 533.721 ¤3.57 03/28/2024
SURCHARGE - FS 468.631 ¤5.35 03/28/2024
SW ENG - FOUNDATION SURVEY ¤20.00 03/28/2024
SW ENG INSPECTION 80 ¤80.00 03/28/2024
SW ENG PRE APRON ¤30.00 03/28/2024
SW ENG - REVIEW 20 ¤20.00 03/28/2024
SW ENG RES REVIEW 200 ¤200.00 03/28/2024
SEWER INSPECTION ¤25.00 03/28/2024
SITE PLAN 30 ¤30.00 03/28/2024
WATER-METER ¤505.39 03/28/2024
ADJUSTMENT 50% (¤627.46) 03/28/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/28/2024
INSPECTION - RESIDENTIAL ¤954.25 03/28/2024
PLAN REVIEW - RESIDENTIAL ¤270.66 03/28/2024
Fees Total Due: ¤0.00 Total Paid: ¤13,209.84