I want to search for...
Permit #2023110997
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00110-0010 |
| CONDITIONED SPACE: 2282 sqft |
| GARAGE: 519 sqft |
| OPENED PORCH (WITH ROOF) : 665 sqft |
| Total Square Footage: 3466 sqft |
| Block: 00110 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 908-334-6117 |
| Location Address: 95 FORRESTER PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/19/2024 |
| NOC: RECORDED |
| Applicant name: KIM EUGENE ADAMS |
| Owner: GORDON DAVID & GRETCHEN H&W |
|
Address 206 THIRD STREET OXFORD, MD 21654 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single family Residence |
| Type: CN |
Contractor
JMD QUALITY CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
300 CANOPY WALK LANE APT 342 ZEPHYRHILLS, FL 33542 |
CGC1526854 (Exp: 08/31/2026) | 908-334-6117 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
DANIEL GOULDNER
| Status | Location Address | State License Number |
| ACTIVE |
400 OLD HAW CREEK RD BUNNELL, FL 32110 |
CAC1818907 (Exp: 08/31/2026) |
SCOTT DALE CRIDER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 353092 PALM COAST, FL 32137 |
CCC1333991 (Exp: 08/31/2026) | 386-276-0758 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/23/2025 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 1/23/2025 2:25:50 PM *** 1. Please post insulation cert at attic. FBC EC R303.1.1.2 2. Pleaser install anti siphon vaccum breaker at Hose bibb in lanai. FBCR P2902.4.3 1. Master bath windows are to be tempered glass. Please have completed prior to final. 2. Please submit a revision to the building department for the change of windows and slider | |||
| BLD - BUILDING FINAL | 01/23/2025 | FINAL APPROVED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 1/23/2025 3:26:35 PM *** virtual on repairs approved 1/23/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/23/2025 2:25:50 PM *** 1. Please post insulation cert at attic. FBC EC R303.1.1.2 2. Pleaser install anti siphon vaccum breaker at Hose bibb in lanai. FBCR P2902.4.3 1. Master bath windows are to be tempered glass. Please have completed prior to final. 2. Please submit a revision to the building department for the change of windows and slider | |||
| U -UTILITY RESIDENTIAL FINAL | 01/22/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 1/13/2025 12:48:48 PM *** well irrigation-no cross connection | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/21/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/21/25 YOUR FIELD SURVEY WILL BE CONDUCTED ONCE YOU HAVE A FINAL SURVEY THAT PASSES INSPECTION THE INSPECTOR WILL SCHEDULE THIS INSPECTION _____________________________________________________________________________________________________________________ 1/17/2025 - PREVIOUS INSPECTION NOTES ** 01/17/25 CANCELLED BY BUILDER VIA PHONE CALL | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/21/2025 | APPROVED | EMADISON |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 01/21/2025 | APPROVED | EMADISON |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/21/2025 | APPROVED | EMADISON |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/21/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/21/25 YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE PLAN AS SUBMITTED ON YOUR SITE PLAN. BOTH LEFT AND RIGHT SIDES WERE TO BE BUILT AS COMMON SWALES NOT INSIDE SWALE , SEE THE ATTACHED CONTRACTOR NEWS FLASH THAT WAS SENT TO ALL BUILDERS AND CONTRACTORS. CONTRACTORS NEWSFLASH Grading and Final Surveys ** April 9, 2024 **The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/21/2025 | APPROVED | EMADISON |
| Note: ** 01/21/25 INSPECTOR MISTAKE ON PREVIOUS FINAL SURVEY INSPECTION EVERYTHING LOOKS GOOD At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/17/2025 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 01/17/25 CANCELLED BY BUILDER VIA PHONE CALL | |||
| WINDOW NAILING | 01/14/2025 | APPROVED | HCAMACHO |
| Note: Added this inspection for the missing front door. Logs and construction debris in the swale need to be removed before further inspection will be passed. | |||
| U-CROSS CONNECTION | 01/13/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/13/2025 12:48:48 PM *** well irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 12/23/2024 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS ------------------------------------------------------------------------- 12/13/2024 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/13/2024 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ELECTRIC - EARLY POWER | 09/24/2024 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2200 Emailed fpl @ 11am | |||
| LATH/BRICK/ WATER BARRIER | 07/19/2024 | APPROVED | JWALKER |
| INSULATION | 07/16/2024 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 1. Master bath windows are to be tempered glass. Please have completed prior to final. 2. Please submit a revision to the building department for the change of windows and slider 3. Front door not installed. 4. Please have the approved duct layout onsite. 5. Seal the concrete cut at the kitchen island. Please have items 1 and 2 completed prior to final building inspection. Items 4 and 5 completed prior to insulation. The front door opening can be sealed off if door cannot be installed at the insulation inspection | |||
| ALL ROUGH | 07/10/2024 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Master bath windows are to be tempered glass. Please have completed prior to final. 2. Please submit a revision to the building department for the change of windows and slider 3. Front door not installed. 4. Please have the approved duct layout onsite. 5. Seal the concrete cut at the kitchen island. Please have items 1 and 2 completed prior to final building inspection. Items 4 and 5 completed prior to insulation. The front door opening can be sealed off if door cannot be installed at the insulation inspection | |||
| ALL ROUGH | 06/26/2024 | CANCELLED BY APPLICANT | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 6/26/2024 9:26:37 AM *** Inspector walked job with super, a full all rough inspection will need to be done once windows and doors are installed to spec. and All exhaust fan assembly ducts need to be replaced cannot use dryer extension foil duct. and branch vent needs to be sloped towards drain for condensation. Roof Penetrations are sealed, Okay to Spray foam insulate the underside of roof Sheathing. | |||
| ROOF VALLEY & METAL | 05/22/2024 | APPROVED | JWALKER |
| Note: 5/14/2024 - PREVIOUS INSPECTION NOTES 5-14-24 1. Need to have roof braces and tie downs approved before this inspection can be called in. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/21/2024 | APPROVED | FWILLIS |
| Note: 5/21/24 - ITEM CORRECTED 5/14/2024 - PREVIOUS INSPECTION NOTES 5/13/2024 - PREVIOUS INSPECTION NOTES 5/13/24 - NO PLANS ON SITE. JOB BOX MIGHT BE ON NEIGHBORING PROPERTY IN THE WOODS. IF SO INSTALL ON THIS PROPERTY AS PER THE BUILDING CODE, SINCE THIS IS YOUR PROJECT. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 0/2024 45-10-24 second entry today cancelled prior today but was reschuled for approval of roof sheathing only. (OK to dry in) 5/10/2024 - PREVIOUS INSPECTION NOTES cancelled per framer (not ready) 5-14-24 1. Mitek book is not complete. 2. Need detail and structural pages for bearing walls and strap call outs. | |||
| ROOF VALLEY & METAL | 05/14/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-14-24 1. Need to have roof braces and tie downs approved before this inspection can be called in. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/14/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 5/13/2024 - PREVIOUS INSPECTION NOTES 5/13/24 - NO PLANS ON SITE. JOB BOX MIGHT BE ON NEIGHBORING PROPERTY IN THE WOODS. IF SO INSTALL ON THIS PROPERTY AS PER THE BUILDING CODE, SINCE THIS IS YOUR PROJECT. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 0/2024 45-10-24 second entry today cancelled prior today but was reschuled for approval of roof sheathing only. (OK to dry in) 5/10/2024 - PREVIOUS INSPECTION NOTES cancelled per framer (not ready) 5-14-24 1. Mitek book is not complete. 2. Need detail and structural pages for bearing walls and strap call outs. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/13/2024 | Disapproved - NO FEE | FWILLIS |
| Note: 5/13/24 - NO PLANS ON SITE. JOB BOX MIGHT BE ON NEIGHBORING PROPERTY IN THE WOODS. IF SO INSTALL ON THIS PROPERTY AS PER THE BUILDING CODE, SINCE THIS IS YOUR PROJECT. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 0/2024 45-10-24 second entry today cancelled prior today but was reschuled for approval of roof sheathing only. (OK to dry in) 5/10/2024 - PREVIOUS INSPECTION NOTES cancelled per framer (not ready) | |||
| WALL SHEATHING | 05/10/2024 | APPROVED | LMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/10/2024 | CANCELLED BY APPLICANT | LMILLER |
| Note: cancelled per framer (not ready) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/10/2024 | PARTIALLY APPROVED | LMILLER |
| Note: 45-10-24 second entry today cancelled prior today but was reschuled for approval of roof sheathing only. (OK to dry in) 5/10/2024 - PREVIOUS INSPECTION NOTES cancelled per framer (not ready) | |||
| ELECTRIC-TUG | 05/07/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed fpl @ 11am | |||
| GRAVITY SEWER TEST | 04/22/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED TO HAVE ADDRESS POSTEDB FOR ''911'' ALSO NEED TO HAVE PORTABLE RESTROOM ON SITE BEFORE SLAB INSPECTION AND 3307.1 PROTECTION OF PROPERTY SILT FENCE SHALL BE IN PLACE BEFORE SCHEDUALING OF SLAB INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 04/22/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED TO HAVE ADDRESS POSTEDB FOR ''911'' ALSO NEED TO HAVE PORTABLE RESTROOM ON SITE BEFORE SLAB INSPECTION AND 3307.1 PROTECTION OF PROPERTY SILT FENCE SHALL BE IN PLACE BEFORE SCHEDUALING OF SLAB INSPECTION. THIS WAS AVIRTUAL INSPECTION | |||
| TIE BEAM / LINTEL | 04/17/2024 | APPROVED | LMILLER |
| Note: 4-17-24 prior notes resolved 4/12/2024 - PREVIOUS INSPECTION NOTES 4/12/24- Per plans.....Missing Multiple Footing dowels thru out. Please relocate footing dowels marked for Clearence from masonry. R606.3.4 . Please walk Job site Prior to calling in Inspection. 4/10/2024 - PREVIOUS INSPECTION NOTES The plans in the job box are folded all different ways and out of order. Please provide a FULL set of approved plans IN ORDER. | |||
| TIE BEAM / LINTEL | 04/12/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 4/12/24- Per plans.....Missing Multiple Footing dowels thru out. Please relocate footing dowels marked for Clearence from masonry. R606.3.4 . Please walk Job site Prior to calling in Inspection. 4/10/2024 - PREVIOUS INSPECTION NOTES The plans in the job box are folded all different ways and out of order. Please provide a FULL set of approved plans IN ORDER. | |||
| TIE BEAM / LINTEL | 04/10/2024 | Disapproved - NO FEE | JWALKER |
| Note: The plans in the job box are folded all different ways and out of order. Please provide a FULL set of approved plans IN ORDER. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/18/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/04/2024 | APPROVED | AGAETANO |
| Note: 3/1/2024 - PREVIOUS INSPECTION NOTES 2/29/2024 - PREVIOUS INSPECTION NOTES 2/27/2024 - PREVIOUS INSPECTION NOTES 02-27-2024 1. Visqueene not onstalled. 2. Debris in footing. Check all. 3. Head test failed. Inspection stopped. 02-29-2024 1. Debris in footing. Check all. 2. Plumbing lines not sleeved or releiving arch. 3. Root in slab. Check all. 03-01-2024 Above issue not resolved. Root in slab. Check all. Inspector spoke to contractor yesterday and explained to check all areas for roots and debris. | |||
| MONOLITHIC SLAB | 03/01/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 2/29/2024 - PREVIOUS INSPECTION NOTES 2/27/2024 - PREVIOUS INSPECTION NOTES 02-27-2024 1. Visqueene not onstalled. 2. Debris in footing. Check all. 3. Head test failed. Inspection stopped. 02-29-2024 1. Debris in footing. Check all. 2. Plumbing lines not sleeved or releiving arch. 3. Root in slab. Check all. 03-01-2024 Above issue not resolved. Root in slab. Check all. Inspector spoke to contractor yesterday and explained to check all areas for roots and debris. | |||
| MONOLITHIC SLAB | 02/29/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 2/27/2024 - PREVIOUS INSPECTION NOTES 02-27-2024 1. Visqueene not onstalled. 2. Debris in footing. Check all. 3. Head test failed. Inspection stopped. 02-29-2024 1. Debris in footing. Check all. 2. Plumbing lines not sleeved or releiving arch. 3. Root in slab. Check all. | |||
| MONOLITHIC SLAB | 02/27/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 02-27-2024 1. Visqueene not onstalled. 2. Debris in footing. Check all. 3. Head test failed. Inspection stopped. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/22/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED TO HAVE ADDRESS POSTEDB FOR ''911'' ALSO NEED TO HAVE PORTABLE RESTROOM ON SITE BEFORE SLAB INSPECTION AND 3307.1 PROTECTION OF PROPERTY SILT FENCE SHALL BE IN PLACE BEFORE SCHEDUALING OF SLAB INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 02/22/2024 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 12/14/2023 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/17/2025 | 01/21/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/14/2025 | 01/16/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| BLD | COMPLETE | 01/13/2025 | 01/14/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/16/2024 | 05/20/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM cant verify digital signature | |||
| BLD | COMPLETE | 03/26/2024 | 04/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/18/2024 | 03/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/18/2024 | 03/18/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/04/2024 | 01/05/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/28/2023 | 12/28/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please provide the Row originals to our office | |||
| ELEC | COMPLETE | 12/28/2023 | 12/29/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/13/2023 | 12/13/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM On right of way notary only notarized the wife's signature. They must notarize both the Husband and wife's signature Plans show two AC pads. Site and landscape plan only show one. | |||
| MECH | COMPLETE | 12/13/2023 | 12/14/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 12/13/2023 | 12/14/2023 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 12/14/23 and found a Gopher Tortoise burrow within close proximity to project location. The burrow appears to be 25 feet past any development but if any impacts occur to the burrow in the future, further coordination may be needed. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. | |||
| BLD | COMPLETE | 12/04/2023 | 12/04/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/27/2023 | 12/01/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 11/27/2023 | 12/01/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/27/2023 | 11/28/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/27/2023 | 11/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 11/27/2023 | 11/29/2023 |
| LOCATE | COMPLETE | 11/27/2023 | 11/28/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/27/2023 | 11/29/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| SW1 | COMPLETE | 11/27/2023 | 11/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/27/2023 | 11/27/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Plans and landscape show two AC pads. Site plan only shows one Additional tree required for this lot size. Site plan states paver driveway and landscape states concrete. If you are installing a paver driveway please provide a right of way utilization agreement signed by all owners on deed and have notarized. Once electronic copy is approved we will ask for the original to be turned into us for recording. | |||
| BADMIN | COMPLETE | 11/27/2023 | 12/04/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 11/27/2023 | 01/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLENV | HOLD | 11/27/2023 | 11/30/2023 |
| Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conduced a site visit on 11/30/23 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/22/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/22/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/22/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/22/2025 |
| CONNECTION FEES | ¤1,187.26 | 01/19/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 01/19/2024 |
| IMPACT FEE FIRE | ¤428.09 | 01/19/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/19/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/19/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 01/19/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/19/2024 |
| RECORDING FEE REIMBURSE DOC | ¤8.50 | 01/19/2024 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 01/19/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 01/19/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/19/2024 |
| SURCHARGE FS 533.721 | ¤3.12 | 01/19/2024 |
| SURCHARGE - FS 468.631 | ¤4.69 | 01/19/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/19/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/19/2024 |
| SW ENG PRE APRON | ¤30.00 | 01/19/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/19/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/19/2024 |
| SEWER CREDIT | (¤850.00) | 01/19/2024 |
| SEWER INSPECTION | ¤25.00 | 01/19/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 01/19/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 01/19/2024 |
| SITE PLAN 30 | ¤30.00 | 01/19/2024 |
| WATER- TURN ON | ¤25.00 | 01/19/2024 |
| ADJUSTMENT 50% | (¤548.03) | 01/19/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/19/2024 |
| INSPECTION - RESIDENTIAL | ¤830.50 | 01/19/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤235.56 | 01/19/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,035.22 |