I want to search for...

Permit #2023110997

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00110-0010
CONDITIONED SPACE: 2282 sqft
GARAGE: 519 sqft
OPENED PORCH (WITH ROOF) : 665 sqft
Total Square Footage: 3466 sqft
Block: 00110
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: 908-334-6117
Location Address: 95 FORRESTER PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/19/2024
NOC: RECORDED
Applicant name: KIM EUGENE ADAMS
Owner: GORDON DAVID & GRETCHEN H&W

Address

206 THIRD STREET

OXFORD, MD 21654

Lot: 0010
Contracted Stated Job Value: ¤250,000.00
Job Description: Single family Residence
Type: CN

Contractor

JMD QUALITY CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

300 CANOPY WALK LANE APT 342

ZEPHYRHILLS, FL 33542

CGC1526854 (Exp: 08/31/2026) 908-334-6117

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
DANIEL GOULDNER
Status Location Address State License Number
ACTIVE

400 OLD HAW CREEK RD

BUNNELL, FL 32110

CAC1818907 (Exp: 08/31/2026)
SCOTT DALE CRIDER
Status Location Address State License Number Phone
ACTIVE

PO BOX 353092

PALM COAST, FL 32137

CCC1333991 (Exp: 08/31/2026) 386-276-0758
WILLIAM TODD SIKES
Status Location Address State License Number Phone
ACTIVE

83 PORT ROYAL DR

ST AUGUSTINE, FL 32084

EC0002726 (Exp: 08/31/2026) 904-762-8762

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/23/2025 Disapproved - NO FEE JSTEWART
Note: *** NOTES ADDED BY JSTEWART 1/23/2025 2:25:50 PM *** 1. Please post insulation cert at attic. FBC EC R303.1.1.2 2. Pleaser install anti siphon vaccum breaker at Hose bibb in lanai. FBCR P2902.4.3 1. Master bath windows are to be tempered glass. Please have completed prior to final. 2. Please submit a revision to the building department for the change of windows and slider
BLD - BUILDING FINAL 01/23/2025 FINAL APPROVED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 1/23/2025 3:26:35 PM *** virtual on repairs approved 1/23/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/23/2025 2:25:50 PM *** 1. Please post insulation cert at attic. FBC EC R303.1.1.2 2. Pleaser install anti siphon vaccum breaker at Hose bibb in lanai. FBCR P2902.4.3 1. Master bath windows are to be tempered glass. Please have completed prior to final. 2. Please submit a revision to the building department for the change of windows and slider
U -UTILITY RESIDENTIAL FINAL 01/22/2025 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 1/13/2025 12:48:48 PM *** well irrigation-no cross connection
ROW FIELD SURVEY /GRADING CERTIFICATION 01/21/2025 Disapproved - NO FEE EMADISON
Note: ** 01/21/25 YOUR FIELD SURVEY WILL BE CONDUCTED ONCE YOU HAVE A FINAL SURVEY THAT PASSES INSPECTION THE INSPECTOR WILL SCHEDULE THIS INSPECTION _____________________________________________________________________________________________________________________ 1/17/2025 - PREVIOUS INSPECTION NOTES ** 01/17/25 CANCELLED BY BUILDER VIA PHONE CALL
ROW FIELD SURVEY /GRADING CERTIFICATION 01/21/2025 APPROVED EMADISON
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 01/21/2025 APPROVED EMADISON
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved.
ROW - FINAL APRON (AFTER POUR) 01/21/2025 APPROVED EMADISON
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/21/2025 Disapproved - NO FEE EMADISON
Note: ** 01/21/25 YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE PLAN AS SUBMITTED ON YOUR SITE PLAN. BOTH LEFT AND RIGHT SIDES WERE TO BE BUILT AS COMMON SWALES NOT INSIDE SWALE , SEE THE ATTACHED CONTRACTOR NEWS FLASH THAT WAS SENT TO ALL BUILDERS AND CONTRACTORS. CONTRACTORS NEWSFLASH Grading and Final Surveys ** April 9, 2024 **The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns.
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/21/2025 APPROVED EMADISON
Note: ** 01/21/25 INSPECTOR MISTAKE ON PREVIOUS FINAL SURVEY INSPECTION EVERYTHING LOOKS GOOD At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 01/17/2025 CANCELLED BY APPLICANT EMADISON
Note: ** 01/17/25 CANCELLED BY BUILDER VIA PHONE CALL
WINDOW NAILING 01/14/2025 APPROVED HCAMACHO
Note: Added this inspection for the missing front door. Logs and construction debris in the swale need to be removed before further inspection will be passed.
U-CROSS CONNECTION 01/13/2025 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/13/2025 12:48:48 PM *** well irrigation-no cross connection
ROW- PRE-APRON (PRE-POUR) 12/23/2024 APPROVED PFLANAGAN
Note: READY FOR PAVERS ------------------------------------------------------------------------- 12/13/2024 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- PRE-APRON (PRE-POUR) 12/13/2024 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ELECTRIC - EARLY POWER 09/24/2024 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2200 Emailed fpl @ 11am
LATH/BRICK/ WATER BARRIER 07/19/2024 APPROVED JWALKER
INSULATION 07/16/2024 APPROVED JWALKER
Note: Inspector Notes from Inspection 2420 1. Master bath windows are to be tempered glass. Please have completed prior to final. 2. Please submit a revision to the building department for the change of windows and slider 3. Front door not installed. 4. Please have the approved duct layout onsite. 5. Seal the concrete cut at the kitchen island. Please have items 1 and 2 completed prior to final building inspection. Items 4 and 5 completed prior to insulation. The front door opening can be sealed off if door cannot be installed at the insulation inspection
ALL ROUGH 07/10/2024 APPROVED - AS NOTED JWALKER
Note: 1. Master bath windows are to be tempered glass. Please have completed prior to final. 2. Please submit a revision to the building department for the change of windows and slider 3. Front door not installed. 4. Please have the approved duct layout onsite. 5. Seal the concrete cut at the kitchen island. Please have items 1 and 2 completed prior to final building inspection. Items 4 and 5 completed prior to insulation. The front door opening can be sealed off if door cannot be installed at the insulation inspection
ALL ROUGH 06/26/2024 CANCELLED BY APPLICANT JSTEWART
Note: *** NOTES ADDED BY JSTEWART 6/26/2024 9:26:37 AM *** Inspector walked job with super, a full all rough inspection will need to be done once windows and doors are installed to spec. and All exhaust fan assembly ducts need to be replaced cannot use dryer extension foil duct. and branch vent needs to be sloped towards drain for condensation. Roof Penetrations are sealed, Okay to Spray foam insulate the underside of roof Sheathing.
ROOF VALLEY & METAL 05/22/2024 APPROVED JWALKER
Note: 5/14/2024 - PREVIOUS INSPECTION NOTES 5-14-24 1. Need to have roof braces and tie downs approved before this inspection can be called in.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/21/2024 APPROVED FWILLIS
Note: 5/21/24 - ITEM CORRECTED 5/14/2024 - PREVIOUS INSPECTION NOTES 5/13/2024 - PREVIOUS INSPECTION NOTES 5/13/24 - NO PLANS ON SITE. JOB BOX MIGHT BE ON NEIGHBORING PROPERTY IN THE WOODS. IF SO INSTALL ON THIS PROPERTY AS PER THE BUILDING CODE, SINCE THIS IS YOUR PROJECT. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 0/2024 45-10-24 second entry today cancelled prior today but was reschuled for approval of roof sheathing only. (OK to dry in) 5/10/2024 - PREVIOUS INSPECTION NOTES cancelled per framer (not ready) 5-14-24 1. Mitek book is not complete. 2. Need detail and structural pages for bearing walls and strap call outs.
ROOF VALLEY & METAL 05/14/2024 Disapproved - NO FEE BTAYLOR
Note: 5-14-24 1. Need to have roof braces and tie downs approved before this inspection can be called in.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/14/2024 Disapproved - NO FEE BTAYLOR
Note: 5/13/2024 - PREVIOUS INSPECTION NOTES 5/13/24 - NO PLANS ON SITE. JOB BOX MIGHT BE ON NEIGHBORING PROPERTY IN THE WOODS. IF SO INSTALL ON THIS PROPERTY AS PER THE BUILDING CODE, SINCE THIS IS YOUR PROJECT. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 0/2024 45-10-24 second entry today cancelled prior today but was reschuled for approval of roof sheathing only. (OK to dry in) 5/10/2024 - PREVIOUS INSPECTION NOTES cancelled per framer (not ready) 5-14-24 1. Mitek book is not complete. 2. Need detail and structural pages for bearing walls and strap call outs.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/13/2024 Disapproved - NO FEE FWILLIS
Note: 5/13/24 - NO PLANS ON SITE. JOB BOX MIGHT BE ON NEIGHBORING PROPERTY IN THE WOODS. IF SO INSTALL ON THIS PROPERTY AS PER THE BUILDING CODE, SINCE THIS IS YOUR PROJECT. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 0/2024 45-10-24 second entry today cancelled prior today but was reschuled for approval of roof sheathing only. (OK to dry in) 5/10/2024 - PREVIOUS INSPECTION NOTES cancelled per framer (not ready)
WALL SHEATHING 05/10/2024 APPROVED LMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/10/2024 CANCELLED BY APPLICANT LMILLER
Note: cancelled per framer (not ready)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/10/2024 PARTIALLY APPROVED LMILLER
Note: 45-10-24 second entry today cancelled prior today but was reschuled for approval of roof sheathing only. (OK to dry in) 5/10/2024 - PREVIOUS INSPECTION NOTES cancelled per framer (not ready)
ELECTRIC-TUG 05/07/2024 APPROVED - AS NOTED MKRASKI
Note: Emailed fpl @ 11am
GRAVITY SEWER TEST 04/22/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 NEED TO HAVE ADDRESS POSTEDB FOR ''911'' ALSO NEED TO HAVE PORTABLE RESTROOM ON SITE BEFORE SLAB INSPECTION AND 3307.1 PROTECTION OF PROPERTY SILT FENCE SHALL BE IN PLACE BEFORE SCHEDUALING OF SLAB INSPECTION THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 04/22/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 NEED TO HAVE ADDRESS POSTEDB FOR ''911'' ALSO NEED TO HAVE PORTABLE RESTROOM ON SITE BEFORE SLAB INSPECTION AND 3307.1 PROTECTION OF PROPERTY SILT FENCE SHALL BE IN PLACE BEFORE SCHEDUALING OF SLAB INSPECTION. THIS WAS AVIRTUAL INSPECTION
TIE BEAM / LINTEL 04/17/2024 APPROVED LMILLER
Note: 4-17-24 prior notes resolved 4/12/2024 - PREVIOUS INSPECTION NOTES 4/12/24- Per plans.....Missing Multiple Footing dowels thru out. Please relocate footing dowels marked for Clearence from masonry. R606.3.4 . Please walk Job site Prior to calling in Inspection. 4/10/2024 - PREVIOUS INSPECTION NOTES The plans in the job box are folded all different ways and out of order. Please provide a FULL set of approved plans IN ORDER.
TIE BEAM / LINTEL 04/12/2024 Disapproved -FEE REQUIRED JSTEWART
Note: 4/12/24- Per plans.....Missing Multiple Footing dowels thru out. Please relocate footing dowels marked for Clearence from masonry. R606.3.4 . Please walk Job site Prior to calling in Inspection. 4/10/2024 - PREVIOUS INSPECTION NOTES The plans in the job box are folded all different ways and out of order. Please provide a FULL set of approved plans IN ORDER.
TIE BEAM / LINTEL 04/10/2024 Disapproved - NO FEE JWALKER
Note: The plans in the job box are folded all different ways and out of order. Please provide a FULL set of approved plans IN ORDER.
FOUND SURVEY APPROVED (OFFICE) 03/18/2024 APPROVED TBAKER
MONOLITHIC SLAB 03/04/2024 APPROVED AGAETANO
Note: 3/1/2024 - PREVIOUS INSPECTION NOTES 2/29/2024 - PREVIOUS INSPECTION NOTES 2/27/2024 - PREVIOUS INSPECTION NOTES 02-27-2024 1. Visqueene not onstalled. 2. Debris in footing. Check all. 3. Head test failed. Inspection stopped. 02-29-2024 1. Debris in footing. Check all. 2. Plumbing lines not sleeved or releiving arch. 3. Root in slab. Check all. 03-01-2024 Above issue not resolved. Root in slab. Check all. Inspector spoke to contractor yesterday and explained to check all areas for roots and debris.
MONOLITHIC SLAB 03/01/2024 Disapproved -FEE REQUIRED AGAETANO
Note: 2/29/2024 - PREVIOUS INSPECTION NOTES 2/27/2024 - PREVIOUS INSPECTION NOTES 02-27-2024 1. Visqueene not onstalled. 2. Debris in footing. Check all. 3. Head test failed. Inspection stopped. 02-29-2024 1. Debris in footing. Check all. 2. Plumbing lines not sleeved or releiving arch. 3. Root in slab. Check all. 03-01-2024 Above issue not resolved. Root in slab. Check all. Inspector spoke to contractor yesterday and explained to check all areas for roots and debris.
MONOLITHIC SLAB 02/29/2024 Disapproved -FEE REQUIRED AGAETANO
Note: 2/27/2024 - PREVIOUS INSPECTION NOTES 02-27-2024 1. Visqueene not onstalled. 2. Debris in footing. Check all. 3. Head test failed. Inspection stopped. 02-29-2024 1. Debris in footing. Check all. 2. Plumbing lines not sleeved or releiving arch. 3. Root in slab. Check all.
MONOLITHIC SLAB 02/27/2024 Disapproved -FEE REQUIRED AGAETANO
Note: 02-27-2024 1. Visqueene not onstalled. 2. Debris in footing. Check all. 3. Head test failed. Inspection stopped.
PLUMBING 1ST ROUGH UNDERGROUND 02/22/2024 APPROVED - AS NOTED MGIBSON
Note: NEED TO HAVE ADDRESS POSTEDB FOR ''911'' ALSO NEED TO HAVE PORTABLE RESTROOM ON SITE BEFORE SLAB INSPECTION AND 3307.1 PROTECTION OF PROPERTY SILT FENCE SHALL BE IN PLACE BEFORE SCHEDUALING OF SLAB INSPECTION
WATER METER INSTALLATION REQUEST 02/22/2024 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 12/14/2023 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
MECH COMPLETE 01/17/2025 01/21/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 01/14/2025 01/16/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
BLD COMPLETE 01/13/2025 01/14/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 05/16/2024 05/20/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM cant verify digital signature
BLD COMPLETE 03/26/2024 04/01/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/18/2024 03/18/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/18/2024 03/18/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 01/04/2024 01/05/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON HOLD 12/28/2023 12/28/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please provide the Row originals to our office
ELEC COMPLETE 12/28/2023 12/29/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 12/13/2023 12/13/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM On right of way notary only notarized the wife's signature. They must notarize both the Husband and wife's signature Plans show two AC pads. Site and landscape plan only show one.
MECH COMPLETE 12/13/2023 12/14/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLENV COMPLETE 12/13/2023 12/14/2023
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 12/14/23 and found a Gopher Tortoise burrow within close proximity to project location. The burrow appears to be 25 feet past any development but if any impacts occur to the burrow in the future, further coordination may be needed. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot.
BLD COMPLETE 12/04/2023 12/04/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 11/27/2023 12/01/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 11/27/2023 12/01/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 11/27/2023 11/28/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/27/2023 11/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 11/27/2023 11/29/2023
LOCATE COMPLETE 11/27/2023 11/28/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 11/27/2023 11/29/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition
SW1 COMPLETE 11/27/2023 11/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 11/27/2023 11/27/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Plans and landscape show two AC pads. Site plan only shows one Additional tree required for this lot size. Site plan states paver driveway and landscape states concrete. If you are installing a paver driveway please provide a right of way utilization agreement signed by all owners on deed and have notarized. Once electronic copy is approved we will ask for the original to be turned into us for recording.
BADMIN COMPLETE 11/27/2023 12/04/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 11/27/2023 01/16/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLENV HOLD 11/27/2023 11/30/2023
Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conduced a site visit on 11/30/23 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 01/22/2025
REINSPECTION RESIDENTIAL ¤40.00 01/22/2025
REINSPECTION RESIDENTIAL ¤40.00 01/22/2025
REINSPECTION RESIDENTIAL ¤40.00 01/22/2025
CONNECTION FEES ¤1,187.26 01/19/2024
FC IMPACT FEE EMS ¤62.00 01/19/2024
IMPACT FEE FIRE ¤428.09 01/19/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/19/2024
FC IMPACT FEE LIBRARY ¤268.00 01/19/2024
IMPACT FEE PARKS ¤1,800.99 01/19/2024
IMPACT FEE SCHOOL ¤5,450.00 01/19/2024
RECORDING FEE REIMBURSE DOC ¤8.50 01/19/2024
RECORDING FEE REIMBURSE DOC ¤44.00 01/19/2024
IMPACT FEE TRANSPORTATION ¤1,812.00 01/19/2024
WATER -IRRIGATION INSPECTION ¤25.00 01/19/2024
SURCHARGE FS 533.721 ¤3.12 01/19/2024
SURCHARGE - FS 468.631 ¤4.69 01/19/2024
SW ENG - FOUNDATION SURVEY ¤20.00 01/19/2024
SW ENG INSPECTION 80 ¤80.00 01/19/2024
SW ENG PRE APRON ¤30.00 01/19/2024
SW ENG - REVIEW 20 ¤20.00 01/19/2024
SW ENG RES REVIEW 200 ¤200.00 01/19/2024
SEWER CREDIT (¤850.00) 01/19/2024
SEWER INSPECTION ¤25.00 01/19/2024
SEWER CAPITAL FACILITY ¤5,441.03 01/19/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 01/19/2024
SITE PLAN 30 ¤30.00 01/19/2024
WATER- TURN ON ¤25.00 01/19/2024
ADJUSTMENT 50% (¤548.03) 01/19/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/19/2024
INSPECTION - RESIDENTIAL ¤830.50 01/19/2024
PLAN REVIEW - RESIDENTIAL ¤235.56 01/19/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,035.22