Permit #2023111063
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-5112-00000-0050 |
| Block: 00000 |
| Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK |
| Job Phone: 386-795-3234 |
| Location Address: 11 COMMERCE BLVD |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 08/01/2024 |
| NOC: RECORDED |
| Applicant name: CHARLES ANDREW COLEMAN |
| Owner: PALM COAST INDUSTRIAL EQUITIES LLC |
|
Address 24 CHURCH STREET MONTCLAIR, NJ 07042 |
|
Address ATTN SCOTT GLAUBERG MONTCLAIR, NJ 07042 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤1,500,000.00 |
| Job Description: UNIT 1 COMBINE UNITS 1,2,3 INTO ONE TENANT SPACE. |
| Type: CN |
Contractor
COLEMAN GOODEMOTE CONSTRUCTION COMPANY INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
619 N. BEACH ST. DAYTONA BEACH, FL 32114 |
CGC057396 (Exp: 08/31/2026) | 386-257-3570 | 386-253-6692 |
Sub Contractors
MICHAEL WAYNE LYNCH
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
512 FENTRESS BLVD DAYTONA BEACH, FL 32114 |
SUITE I DAYTONA BEACH, FL 32114 |
EC13013629 (Exp: 08/31/2026) | 386-529-4803 |
GARY S WELBORN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1709 North Nova Road Holly Hill, 32117 |
CFC1426839 (Exp: 08/31/2026) | (386) 257-1172 | 386-252-5979 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 05/14/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: Pre pour south east parking lot exits and dust collector slab | |||
| ABOVE CEILING | 05/04/2026 | APPROVED - AS NOTED | RMARTIN |
| Note: 5/4/26 All M.E.P met on site, need to schedule fire sprinkler rough inspection prior to closing celing. 1/23/26: Will check during above ceiling inspection. Plumbing: North side (south side) bathroom - Vent has a strap that needs to be raised one spot to straighten pipe and remove dip. Roof penetrations will be checked at above ceiling or Plumbing final. | |||
| ELECTRIC - EARLY POWER | 04/27/2026 | APPROVED - AS NOTED | RMARTIN |
| Note: Released power to FPL, will need approved revision on all electrical riser/panel schedule changes by final inspection. | |||
| ELECTRIC OTHER | 04/27/2026 | CANCELLED BY INSPECTOR | RMARTIN |
| HVAC ROUGH | 03/24/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Remaining (2)Fresh Air ducts. 2. Fresh Air & Exhaust connected through the walls. 3. All exhaust ducts ran and seamed. 4. Fresh Air wrap done. (Marked on Plans) 3/5/2026 - PREVIOUS INSPECTION NOTES 1. 10 out of 12 Fresh Air ducts/seams looked. Ok to wrap. Marked on plans. 2. Still need to connect trought the wall. 3. Exhaust not done yet. 1/22/2026 - PREVIOUS INSPECTION NOTES 1. Contractor Added FD on Fire wall marked. 2. Looked at the remaining duct work to be insulated, and supply duct. 3. Contractor submitting revision for exhaust and fresh air outlets going out the side of the building instead of roof. Not done yet. 12/11/2025 - PREVIOUS INSPECTION NOTES 1. Looked at the ducts for seams and hanging in the office area, and in the factory side. See plans for Marked areas. 2. Looked at the installation of the fire dampers. Marked. | |||
| FIREWALL PENETRATIONS | 03/19/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: Stencils in place 12/23/2025 - PREVIOUS INSPECTION NOTES North wall. Fire dampers inspected north and south as well | |||
| HVAC ROUGH | 03/05/2026 | PARTIALLY APPROVED | HCAMACHO |
| Note: 1. 10 out of 12 Fresh Air ducts/seams looked. Ok to wrap. Marked on plans. 2. Still need to connect trought the wall. 3. Exhaust not done yet. 1/22/2026 - PREVIOUS INSPECTION NOTES 1. Contractor Added FD on Fire wall marked. 2. Looked at the remaining duct work to be insulated, and supply duct. 3. Contractor submitting revision for exhaust and fresh air outlets going out the side of the building instead of roof. Not done yet. 12/11/2025 - PREVIOUS INSPECTION NOTES 1. Looked at the ducts for seams and hanging in the office area, and in the factory side. See plans for Marked areas. 2. Looked at the installation of the fire dampers. Marked. | |||
| FRAMING | 02/19/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: Doorways 1/23/2026 - PREVIOUS INSPECTION NOTES 12/12/2025 - PREVIOUS INSPECTION NOTES Non-rated partition wall. North end | |||
| INSULATION | 02/19/2026 | APPROVED | KSANDOE |
| Note: 2/3/2026 - PREVIOUS INSPECTION NOTES 2 bathrooms at each end remain New inspection due to canceled inspection 1/30/2026 - PREVIOUS INSPECTION NOTES 1/23/2026 - PREVIOUS INSPECTION NOTES 12/19/2025 - PREVIOUS INSPECTION NOTES Pending plumbing 12/8/2025 - PREVIOUS INSPECTION NOTES SE to the corner 11/26/2025 - PREVIOUS INSPECTION NOTES North wall | |||
| INSULATION | 02/03/2026 | CANCELLED BY APPLICANT | WEB |
| Note: 1/30/2026 - PREVIOUS INSPECTION NOTES 1/23/2026 - PREVIOUS INSPECTION NOTES 12/19/2025 - PREVIOUS INSPECTION NOTES Pending plumbing 12/8/2025 - PREVIOUS INSPECTION NOTES SE to the corner 11/26/2025 - PREVIOUS INSPECTION NOTES North wall | |||
| INSULATION | 02/03/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: 2 bathrooms at each end remain New inspection due to canceled inspection 1/30/2026 - PREVIOUS INSPECTION NOTES 1/23/2026 - PREVIOUS INSPECTION NOTES 12/19/2025 - PREVIOUS INSPECTION NOTES Pending plumbing 12/8/2025 - PREVIOUS INSPECTION NOTES SE to the corner 11/26/2025 - PREVIOUS INSPECTION NOTES North wall | |||
| INSULATION | 01/30/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: 1/23/2026 - PREVIOUS INSPECTION NOTES 12/19/2025 - PREVIOUS INSPECTION NOTES Pending plumbing 12/8/2025 - PREVIOUS INSPECTION NOTES SE to the corner 11/26/2025 - PREVIOUS INSPECTION NOTES North wall | |||
| FIREWALL DRYWALL NAILING | 01/30/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: 1/27/2026 - PREVIOUS INSPECTION NOTES 1/22/2026 - PREVIOUS INSPECTION NOTES One side garage door cover up | |||
| FIREWALL DRYWALL NAILING | 01/27/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: 1/22/2026 - PREVIOUS INSPECTION NOTES One side garage door cover up | |||
| FIREWALL PENETRATIONS | 01/27/2026 | PARTIALLY APPROVED | KSANDOE |
| INSULATION | 01/23/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: 12/19/2025 - PREVIOUS INSPECTION NOTES Pending plumbing 12/8/2025 - PREVIOUS INSPECTION NOTES SE to the corner 11/26/2025 - PREVIOUS INSPECTION NOTES North wall | |||
| PLUMBING 2ND ROUGH | 01/23/2026 | APPROVED | RSIMS |
| Note: 1/23/26: Will check during above ceiling inspection. North side (south side) bathroom - Vent has a strap that needs to be raised one spot to straighten pipe and remove dip. Roof penetrations will be checked at above ceiling or Plumbing final. New inspection due to canceled inspection 12/31/2025 - PREVIOUS INSPECTION NOTES 12/31/25: Inspected South Side of Building (office areas) for in wall plumbing. Inspector Notes from Inspection 3070 *** NOTES ADDED BY RSIMS 12/30/2025 10:46:35 AM *** 12/29/25: Lift station inspected. A plan revision will need to be submitted for new Invert @ 37" BFF along with directional change of discharge piping and tie-in to main 3" sanitary drain. 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: Cancelled by Applicant at @ 1020. 12/10/2025 - PREVIOUS INSPECTION NOTES 12/10/25: This is a partial inspection for water supplies and sanitary drain to be installedup to and into ceiling space for all fixtures on the North end of the building to allow drywall to be installed on framed walls, etc. This does not include the proposed tank and SE pump. THIS PARTIAL APPROVAL IS ALSO PENDING CITY APPROVAL OF THE MULTIPLE REVISIONS THAT WERE SUBMITTED. 11/10/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR AREA ON OUTSIDE OF BATHROOM GROUP ON NORTH SIDE OF BUILDING WHERE PROPOSED TANK IS GOING TO BE 11/3/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR BACK BATHROOMS 10/29/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR THE FRONT OF BUILDING WITH BACK TO BACK BATHROOMS , L/T AT FAR EAST SIDE OF BUILDING | |||
| FRAMING | 01/23/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: 12/12/2025 - PREVIOUS INSPECTION NOTES Non-rated partition wall. North end | |||
| ELECTRIC 2ND ROUGH | 01/22/2026 | PARTIALLY APPROVED | RMARTIN |
| Note: 1/22/25 offices and front rest rooms, walls good 12/11/2025 - PREVIOUS INSPECTION NOTES 12/11/25 Marked on print remainder of walls to look at. 12/10/2025 - PREVIOUS INSPECTION NOTES 12/5/2025 - PREVIOUS INSPECTION NOTES 12/5/25 Office area fire wall 1/2 wall, contractor could not locate approved plans that were highlighted last inspection. Need to locate those plans and have on site for next inspection. 11/24/2025 - PREVIOUS INSPECTION NOTES Partial walls only marked on print. | |||
| HVAC ROUGH | 01/22/2026 | PARTIALLY APPROVED | HCAMACHO |
| Note: 1. Contractor Added FD on Fire wall marked. 2. Looked at the remaining duct work to be insulated, and supply duct. 3. Contractor submitting revision for exhaust and fresh air outlets going out the side of the building instead of roof. Not done yet. 12/11/2025 - PREVIOUS INSPECTION NOTES 1. Looked at the ducts for seams and hanging in the office area, and in the factory side. See plans for Marked areas. 2. Looked at the installation of the fire dampers. Marked. | |||
| FIREWALL DRYWALL NAILING | 01/22/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: One side garage door cover up | |||
| FIREWALL FRAMING | 01/22/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: 11/24/2025 - PREVIOUS INSPECTION NOTES North side | |||
| ELECTRIC 2ND ROUGH | 01/22/2026 | APPROVED | RMARTIN |
| Note: 1/22/2026 - PREVIOUS INSPECTION NOTES 1/22/25 offices and front rest rooms, walls good 12/11/2025 - PREVIOUS INSPECTION NOTES 12/11/25 Marked on print remainder of walls to look at. 12/10/2025 - PREVIOUS INSPECTION NOTES 12/5/2025 - PREVIOUS INSPECTION NOTES 12/5/25 Office area fire wall 1/2 wall, contractor could not locate approved plans that were highlighted last inspection. Need to locate those plans and have on site for next inspection. 11/24/2025 - PREVIOUS INSPECTION NOTES Partial walls only marked on print. | |||
| FIREWALL NAILING | 01/13/2026 | APPROVED | KSANDOE |
| Note: 1/6/2026 - PREVIOUS INSPECTION NOTES Call in when red board is ready 12/19/2025 - PREVIOUS INSPECTION NOTES South end, north side New inspection due to canceled inspection 12/10/2025 - PREVIOUS INSPECTION NOTES North wall 12/5/2025 - PREVIOUS INSPECTION NOTES 12/3/2025 - PREVIOUS INSPECTION NOTES 11/24/2025 - PREVIOUS INSPECTION NOTES North side, first layer, one side | |||
| PLUMBING 2ND ROUGH | 01/07/2026 | CANCELLED BY APPLICANT | WEB |
| Note: 12/31/2025 - PREVIOUS INSPECTION NOTES 12/31/25: Inspected South Side of Building (office areas) for in wall plumbing. Inspector Notes from Inspection 3070 *** NOTES ADDED BY RSIMS 12/30/2025 10:46:35 AM *** 12/29/25: Lift station inspected. A plan revision will need to be submitted for new Invert @ 37" BFF along with directional change of discharge piping and tie-in to main 3" sanitary drain. 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: Cancelled by Applicant at @ 1020. 12/10/2025 - PREVIOUS INSPECTION NOTES 12/10/25: This is a partial inspection for water supplies and sanitary drain to be installedup to and into ceiling space for all fixtures on the North end of the building to allow drywall to be installed on framed walls, etc. This does not include the proposed tank and SE pump. THIS PARTIAL APPROVAL IS ALSO PENDING CITY APPROVAL OF THE MULTIPLE REVISIONS THAT WERE SUBMITTED. 11/10/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR AREA ON OUTSIDE OF BATHROOM GROUP ON NORTH SIDE OF BUILDING WHERE PROPOSED TANK IS GOING TO BE 11/3/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR BACK BATHROOMS 10/29/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR THE FRONT OF BUILDING WITH BACK TO BACK BATHROOMS , L/T AT FAR EAST SIDE OF BUILDING | |||
| MONOLITHIC SLAB | 01/07/2026 | APPROVED | KSANDOE |
| Note: 11/25/2025 - PREVIOUS INSPECTION NOTES North Wall | |||
| ELECTRIC 1ST ROUGH | 01/05/2026 | PARTIALLY APPROVED | MKRASKI |
| Note: lift station conduit approved | |||
| FIREWALL NAILING | 01/05/2026 | PARTIALLY APPROVED | KSANDOE |
| Note: Call in when red board is ready 12/19/2025 - PREVIOUS INSPECTION NOTES South end, north side New inspection due to canceled inspection 12/10/2025 - PREVIOUS INSPECTION NOTES North wall 12/5/2025 - PREVIOUS INSPECTION NOTES 12/3/2025 - PREVIOUS INSPECTION NOTES 11/24/2025 - PREVIOUS INSPECTION NOTES North side, first layer, one side | |||
| PLUMBING 2ND ROUGH | 12/31/2025 | PARTIALLY APPROVED | RSIMS |
| Note: 12/31/25: Inspected South Side of Building (office areas) for in wall plumbing. Inspector Notes from Inspection 3070 *** NOTES ADDED BY RSIMS 12/30/2025 10:46:35 AM *** 12/29/25: Lift station inspected. A plan revision will need to be submitted for new Invert @ 37" BFF along with directional change of discharge piping and tie-in to main 3" sanitary drain. 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: Cancelled by Applicant at @ 1020. 12/10/2025 - PREVIOUS INSPECTION NOTES 12/10/25: This is a partial inspection for water supplies and sanitary drain to be installedup to and into ceiling space for all fixtures on the North end of the building to allow drywall to be installed on framed walls, etc. This does not include the proposed tank and SE pump. THIS PARTIAL APPROVAL IS ALSO PENDING CITY APPROVAL OF THE MULTIPLE REVISIONS THAT WERE SUBMITTED. 11/10/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR AREA ON OUTSIDE OF BATHROOM GROUP ON NORTH SIDE OF BUILDING WHERE PROPOSED TANK IS GOING TO BE 11/3/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR BACK BATHROOMS 10/29/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR THE FRONT OF BUILDING WITH BACK TO BACK BATHROOMS , L/T AT FAR EAST SIDE OF BUILDING | |||
| PLUMBING 1ST ROUGH | 12/30/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/30/2025 10:46:35 AM *** 12/29/25: Lift station inspected. A plan revision will need to be submitted for new Invert @ 37" BFF along with directional change of discharge piping and tie-in to main 3" sanitary drain. 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: Cancelled by Applicant at @ 1020. 12/10/2025 - PREVIOUS INSPECTION NOTES 12/10/25: This is a partial inspection for water supplies and sanitary drain to be installedup to and into ceiling space for all fixtures on the North end of the building to allow drywall to be installed on framed walls, etc. This does not include the proposed tank and SE pump. THIS PARTIAL APPROVAL IS ALSO PENDING CITY APPROVAL OF THE MULTIPLE REVISIONS THAT WERE SUBMITTED. 11/10/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR AREA ON OUTSIDE OF BATHROOM GROUP ON NORTH SIDE OF BUILDING WHERE PROPOSED TANK IS GOING TO BE 11/3/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR BACK BATHROOMS 10/29/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR THE FRONT OF BUILDING WITH BACK TO BACK BATHROOMS , L/T AT FAR EAST SIDE OF BUILDING | |||
| PLUMBING 1ST ROUGH | 12/23/2025 | CANCELLED BY APPLICANT | RSIMS |
| Note: 12/23/25: Cancelled by Applicant at @ 1020. 12/10/2025 - PREVIOUS INSPECTION NOTES 12/10/25: This is a partial inspection for water supplies and sanitary drain to be installedup to and into ceiling space for all fixtures on the North end of the building to allow drywall to be installed on framed walls, etc. This does not include the proposed tank and SE pump. THIS PARTIAL APPROVAL IS ALSO PENDING CITY APPROVAL OF THE MULTIPLE REVISIONS THAT WERE SUBMITTED. 11/10/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR AREA ON OUTSIDE OF BATHROOM GROUP ON NORTH SIDE OF BUILDING WHERE PROPOSED TANK IS GOING TO BE 11/3/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR BACK BATHROOMS 10/29/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR THE FRONT OF BUILDING WITH BACK TO BACK BATHROOMS , L/T AT FAR EAST SIDE OF BUILDING | |||
| FIREWALL FINAL | 12/23/2025 | PARTIALLY APPROVED | KSANDOE |
| FIREWALL PENETRATIONS | 12/23/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: North wall. Fire dampers inspected north and south as well | |||
| FIREWALL NAILING | 12/19/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 12/10/2025 - PREVIOUS INSPECTION NOTES North wall 12/5/2025 - PREVIOUS INSPECTION NOTES 12/3/2025 - PREVIOUS INSPECTION NOTES 11/24/2025 - PREVIOUS INSPECTION NOTES North side, first layer, one side | |||
| FIREWALL NAILING | 12/19/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: South end, north side New inspection due to canceled inspection 12/10/2025 - PREVIOUS INSPECTION NOTES North wall 12/5/2025 - PREVIOUS INSPECTION NOTES 12/3/2025 - PREVIOUS INSPECTION NOTES 11/24/2025 - PREVIOUS INSPECTION NOTES North side, first layer, one side | |||
| INSULATION | 12/19/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: Pending plumbing 12/8/2025 - PREVIOUS INSPECTION NOTES SE to the corner 11/26/2025 - PREVIOUS INSPECTION NOTES North wall | |||
| FRAMING | 12/12/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: Non-rated partition wall. North end | |||
| ELECTRIC 2ND ROUGH | 12/11/2025 | PARTIALLY APPROVED | RMARTIN |
| Note: 12/11/25 Marked on print remainder of walls to look at. 12/10/2025 - PREVIOUS INSPECTION NOTES 12/5/2025 - PREVIOUS INSPECTION NOTES 12/5/25 Office area fire wall 1/2 wall, contractor could not locate approved plans that were highlighted last inspection. Need to locate those plans and have on site for next inspection. 11/24/2025 - PREVIOUS INSPECTION NOTES Partial walls only marked on print. | |||
| HVAC ROUGH | 12/11/2025 | PARTIALLY APPROVED | HCAMACHO |
| Note: 1. Looked at the ducts for seams and hanging in the office area, and in the factory side. See plans for Marked areas. 2. Looked at the installation of the fire dampers. Marked. | |||
| PLUMBING 1ST ROUGH | 12/10/2025 | PARTIALLY APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/10/2025 1:54:28 PM *** 12/10/25: This is a partial inspection for water supplies and sanitary drain to be installedup to and into ceiling space for all fixtures on the North end of the building to allow drywall to be installed on framed walls, etc. This does not include the proposed tank and SE pump. THIS PARTIAL APPROVAL IS ALSO PENDING CITY APPROVAL OF THE MULTIPLE REVISIONS THAT WERE SUBMITTED. 11/10/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR AREA ON OUTSIDE OF BATHROOM GROUP ON NORTH SIDE OF BUILDING WHERE PROPOSED TANK IS GOING TO BE 11/3/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR BACK BATHROOMS 10/29/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR THE FRONT OF BUILDING WITH BACK TO BACK BATHROOMS , L/T AT FAR EAST SIDE OF BUILDING | |||
| ELECTRIC 2ND ROUGH | 12/10/2025 | CANCELLED BY APPLICANT | MKRASKI |
| Note: 12/5/2025 - PREVIOUS INSPECTION NOTES 12/5/25 Office area fire wall 1/2 wall, contractor could not locate approved plans that were highlighted last inspection. Need to locate those plans and have on site for next inspection. 11/24/2025 - PREVIOUS INSPECTION NOTES Partial walls only marked on print. | |||
| FIREWALL NAILING | 12/10/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: North wall 12/5/2025 - PREVIOUS INSPECTION NOTES 12/3/2025 - PREVIOUS INSPECTION NOTES 11/24/2025 - PREVIOUS INSPECTION NOTES North side, first layer, one side | |||
| INSULATION | 12/08/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: SE to the corner 11/26/2025 - PREVIOUS INSPECTION NOTES North wall | |||
| FIREWALL NAILING | 12/05/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: 12/3/2025 - PREVIOUS INSPECTION NOTES 11/24/2025 - PREVIOUS INSPECTION NOTES North side, first layer, one side | |||
| ELECTRIC 2ND ROUGH | 12/05/2025 | PARTIALLY APPROVED | RMARTIN |
| Note: 12/5/25 Office area fire wall 1/2 wall, contractor could not locate approved plans that were highlighted last inspection. Need to locate those plans and have on site for next inspection. 11/24/2025 - PREVIOUS INSPECTION NOTES Partial walls only marked on print. | |||
| ELECTRIC 1ST ROUGH | 12/05/2025 | CANCELLED BY APPLICANT | WEB |
| FIREWALL NAILING | 12/03/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: 11/24/2025 - PREVIOUS INSPECTION NOTES North side, first layer, one side | |||
| INSULATION | 11/26/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: North wall | |||
| MONOLITHIC SLAB | 11/25/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: North Wall | |||
| ELECTRIC 2ND ROUGH | 11/24/2025 | PARTIALLY APPROVED | RMARTIN |
| Note: Partial walls only marked on print. | |||
| ELECTRIC 1ST ROUGH | 11/24/2025 | APPROVED - AS NOTED | RMARTIN |
| Note: Underground and some walls marked on print | |||
| FIREWALL FRAMING | 11/24/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: North side | |||
| FIREWALL NAILING | 11/24/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: North side, first layer, one side | |||
| PLUMBING 1ST ROUGH | 11/10/2025 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS WAS FOR AREA ON OUTSIDE OF BATHROOM GROUP ON NORTH SIDE OF BUILDING WHERE PROPOSED TANK IS GOING TO BE 11/3/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR BACK BATHROOMS 10/29/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR THE FRONT OF BUILDING WITH BACK TO BACK BATHROOMS , L/T AT FAR EAST SIDE OF BUILDING | |||
| PLUMBING 1ST ROUGH | 11/03/2025 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS WAS FOR BACK BATHROOMS 10/29/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR THE FRONT OF BUILDING WITH BACK TO BACK BATHROOMS , L/T AT FAR EAST SIDE OF BUILDING | |||
| MONOLITHIC SLAB | 11/03/2025 | APPROVED | FWILLIS |
| Note: 11/3/25 - INSPECTED SOUTH END MONO INSPECTION. New inspection due to canceled inspection 10/23/2025 - PREVIOUS INSPECTION NOTES UNIT #1 PARTIAL, NORTH SIDE. | |||
| PLUMBING 1ST ROUGH | 10/29/2025 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS WAS FOR THE FRONT OF BUILDING WITH BACK TO BACK BATHROOMS , L/T AT FAR EAST SIDE OF BUILDING | |||
| MONOLITHIC SLAB | 10/24/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 10/23/2025 - PREVIOUS INSPECTION NOTES UNIT #1 PARTIAL, NORTH SIDE. | |||
| MONOLITHIC SLAB | 10/23/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: UNIT #1 PARTIAL, NORTH SIDE. | |||
| PLUMBING 1ST ROUGH | 10/20/2025 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS WAS FOR NORTH SIDE OF ''OL PALMCOAST DATA'' ADDRESS IS CONFUSING. DWV ONL | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | |||
| Note: 5/14/2026 - PREVIOUS INSPECTION NOTES Pre pour south east parking lot exits and dust collector slab | |||
| HVAC FINAL | |||
| PLUMBING FINAL | |||
| Note: 12/29/25: Lift station inspected. A plan revision will need to be submitted for new Invert @ 37" BFF along with directional change of discharge piping and tie-in to main 3" sanitary drain. 1/23/26: Will check during above ceiling inspection. Plumbing: North side (south side) bathroom - Vent has a strap that needs to be raised one spot to straighten pipe and remove dip. Roof penetrations will be checked at above ceiling or Plumbing final. | |||
| ELECTRIC FINAL | |||
| ELECTRIC 1ST ROUGH | |||
| Note: 1/6/2026 - PREVIOUS INSPECTION NOTES lift station conduit approved | |||
| FIREWALL DRYWALL NAILING | |||
| Note: 1/30/2026 - PREVIOUS INSPECTION NOTES 1/27/2026 - PREVIOUS INSPECTION NOTES 1/22/2026 - PREVIOUS INSPECTION NOTES One side garage door cover up | |||
| FIREWALL PENETRATIONS | |||
| Note: 1/27/2026 - PREVIOUS INSPECTION NOTES | |||
| FIREWALL PENETRATIONS | |||
| Note: 3/19/2026 - PREVIOUS INSPECTION NOTES Stencils in place 12/23/2025 - PREVIOUS INSPECTION NOTES North wall. Fire dampers inspected north and south as well | |||
| FIREWALL FINAL | |||
| Note: 12/23/2025 - PREVIOUS INSPECTION NOTES | |||
| FIREWALL FRAMING | |||
| Note: 1/22/2026 - PREVIOUS INSPECTION NOTES 11/24/2025 - PREVIOUS INSPECTION NOTES North side | |||
| FRAMING | |||
| Note: 2/19/2026 - PREVIOUS INSPECTION NOTES Doorways 1/23/2026 - PREVIOUS INSPECTION NOTES 12/12/2025 - PREVIOUS INSPECTION NOTES Non-rated partition wall. North end | |||
| BUILDING FINAL | |||
| FIRE FINAL | |||
| U - UTILITY COMMERCIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 05/11/2026 | 05/12/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | CANCEL | 05/11/2026 | 05/12/2026 |
| BLD | COMPLETE | 05/11/2026 | 05/12/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/09/2026 | 03/09/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/09/2026 | 03/18/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 03/09/2026 | 03/18/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/09/2026 | 03/09/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 03/09/2026 | 03/09/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/26/2026 | 02/27/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 12/15/2025 | 12/15/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/25/2025 | 12/09/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/25/2025 | 12/04/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 11/25/2025 | 12/04/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/25/2025 | 12/09/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | HOLD | 11/25/2025 | 12/09/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-PLUMBING (FBCP), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA STATUTES (F.S.), FLORIDA ADMINISTRATIVE CODE (F.A.C.) AND AUTHORITY HAVING JURISDICTION (A.H.J.). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Provide location of required check valve and fullopen valve on plans 712.2 FBC Plumbing THIS WAS A PREVIOUS COMMENT THAT WAS NOT ANSWERED IN PLAN REVIEW. PLEASE PROVIDE SO I CAN RELEASE THE PLUMBING INSPECTION HOLD. 1. Add backflow device schedule. List various backflow devices, manufacturer, model and applicable design standard they must conform to for each device type. Section 608. Table 608.1. Backflow preventer required at hose-bibbs, janitor sink, ice-maker, hot water dispenser, and any other water utilizing appliance connected to the water system including any not shown in the plans (e.g. coffee/tea maker with direct water supply connection). | |||
| MECH | COMPLETE | 07/30/2025 | 08/01/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/30/2025 | 08/01/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 07/30/2025 | 08/01/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/30/2025 | 07/08/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA BUILDING CODE-PLUMBING (FBCP), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Revise occupant load maximum floor area for F1 occupancy. Table 1004.5 shows 100sqft per person. Also change number of occupants in code analysis. 1004/Table1004.5 FBC Building 2023 | |||
| DSD | COMPLETE | 06/30/2025 | 07/03/2025 |
| Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/30/2025 | 07/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/30/2025 | 07/08/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-MECHANICAL (FBCM), FLORIDA BUILDING CODE-ENERGY CONSERVATION (FBCEC), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Design location on energy calcs has to be daytona beach or st. augustine. (not ocala). AHJ 2. Provide detail on plans and manufacturers specs on fire dampers per 607.3.1 FBC Mechanical 2023 | |||
| PLUM | HOLD | 06/30/2025 | 07/08/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-PLUMBING (FBCP), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA STATUTES (F.S.), FLORIDA ADMINISTRATIVE CODE (F.A.C.) AND AUTHORITY HAVING JURISDICTION (A.H.J.). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Add backflow device schedule. List various backflow devices, manufacturer, model and applicable design standard they must conform to for each device type. Section 608. Table 608.1. Backflow preventer required at hose-bibbs, janitor sink, ice-maker, hot water dispenser, and any other water utilizing appliance connected to the water system including any not shown in the plans (e.g. coffee/tea maker with direct water supply connection). 2. Provide note to indicate all backflow devices are subject to testing by an independent, third party, Florida licensed backflow testing agency and each backflow device will be tested and provided with an approved testing tag at time of installation. 312.10.2 | |||
| UD1 | COMPLETE | 06/30/2025 | 07/03/2025 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 06/30/2025 | 07/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/18/2024 | 01/30/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/05/2024 | 01/18/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Ok Repeat comment: 2. Provide note on plans for systems commissioning per C408.2 FBC Energy Conservation 2020 7Th edition Repeat Comment: 3. Provide note on plans stating documentation requirements per C408.2.5 Energy Conservation 2020 7Th edition 4. Ok | |||
| BLD | COMPLETE | 11/30/2023 | 12/12/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 11/30/2023 | 12/01/2023 |
| Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/30/2023 | 12/11/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 11/30/2023 | 12/12/2023 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/30/2023 | 12/07/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Heatload Calculation per C403.2.1 FBC Energy Conservation 2020 7Th edition 2. Provide note on plans for systems commissioning per C408.2 FBC Energy Conservation 2020 7Th edition 3. Provide note on plans stating documentation requirements per C408.2.5 Energy Conservation 2020 7Th edition 4. Plan sheet M300 Note #2. Revise to say the smoke detectors shall set off alarm indicating appliances a supervisory signal and activating a visable and audible signal inside the area per AHJ | |||
| PLUM | COMPLETE | 11/30/2023 | 12/12/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 11/30/2023 | 12/12/2023 |
| Note: Released By: ALEXANDER BLAKE - - ABLAKE@PALMCOASTGOV.COM | |||
| DSD | HOLD | 11/28/2023 | 11/28/2023 |
| Note: Held By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM Provide a layout plan to show all 3 units with connections and opening labeling each unit. What is the new purposed business occupying this space? |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤65.00 | 03/19/2026 |
| PLAN REVIEW - REVISION | ¤65.00 | 12/18/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 09/11/2025 |
| ADMINISTRATIVE - EXTENSION | ¤40.00 | 08/04/2025 |
| PLAN REVIEW - REVISION | ¤130.00 | 08/04/2025 |
| PLAN REVIEW - REVISION | ¤130.00 | 08/04/2025 |
| PLAN REVIEW - REVISION | ¤130.00 | 08/04/2025 |
| PLAN REVIEW - REVISION | ¤130.00 | 08/04/2025 |
| PLAN REVIEW - REVISION | ¤130.00 | 08/04/2025 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 08/01/2024 |
| INSPECTION COMMERCIAL | ¤10,500.00 | 08/01/2024 |
| PLAN REVIEW - COMMERCIAL | ¤1,725.00 | 08/01/2024 |
| SURCHARGE FS 533.721 | ¤61.50 | 08/01/2024 |
| SURCHARGE - FS 468.631 | ¤92.25 | 08/01/2024 |
| SITE PLAN 30 | ¤30.00 | 08/01/2024 |
| ADJUSTMENT 50% | (¤6,150.00) | 08/01/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 08/01/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,193.75 |