I want to search for...
Permit #2023120088
Permit Details
Status: COED
| Subdivision: 2322 - RETREAT AT TOWN CENTER PHASE 1 |
| Job Phone: 904-781-7060 |
| Location Address: 32 MARKET AVE |
| Type: SNMON - MONUMENT SIGN |
| Issue Date: 01/24/2024 |
| NOC: RECORDED |
| Applicant name: DANIEL WILLIAM BUTTERWORTH |
| Owner: TOLL SOUTHEAST LP CO INC |
|
Address 1140 VIRGINIA DRIVE FORT WASHINGTON, PA 19034 |
| Contracted Stated Job Value: ¤76,000.00 |
| Job Description: MONUMENT SIGN RETREAT AT TOWN CENTER |
| Type: CN |
Contractor
ALL WEATHER CONTRACTORS INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1702 LINDSEY ROAD JACKSONVILLE, FL 32221 |
CGC1523954 (Exp: 08/31/2026) | 904-781-7060 | 904-619-5011 |
Sub Contractors
DEXTER GLENTON ALIE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
864 POYDRAS LN N JACKSONVILLE, FL 32219 |
EC13009280 (Exp: 08/31/2026) | 904-475-2961 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL | 01/14/2025 | FINAL APPROVED | RSIMS |
| Note: 7/9/2024 - PREVIOUS INSPECTION NOTES 7/9/24: 1). Electrical rough was never completed. 2). Landscape revision has been rejected. 3). No meter to be able to check GFCI outlet. | |||
| LDSC-LANDSCAPE/IRRIGATION FINAL | 01/13/2025 | APPROVED - AS NOTED | DLEAP |
| Note: 8/6/2024 12:43:54 PM- PREVIOUS INSPECTION NOTES 7/9/2024 2:12:57 PM- PREVIOUS INSPECTION NOTES REPEAT COMMENT- PER APPROVED LANDSCAPE PLAN - SHEET L.02 DATED 11-20-21 1. Landscape at base of tower sign does not match landscape plan. IT has smaller area and less plants this is a promiant, "high profile" structure and needs to be built as designed and approved. NOTE: Landscape/Irrigation Design was approved with the Preliminary Plat Construction Plans and will need to be as-built and approved with the Preliminary Plat Construction Plan final inspections. Note that the landscaping that has been installed at the monument sign does not match the Landscape Plan approved on 12/14/21 (AR# 4769 - Sheet L.02). | |||
| LDSC-LANDSCAPE/IRRIGATION FINAL | 08/06/2024 | Disapproved - NO FEE | RPICATAGI |
| Note: 7/9/2024 2:12:57 PM- PREVIOUS INSPECTION NOTES REPEAT COMMENT- PER APPROVED LANDSCAPE PLAN - SHEET L.02 DATED 11-20-21 1. Landscape at base of tower sign does not match landscape plan. IT has smaller area and less plants this is a promiant, "high profile" structure and needs to be built as designed and approved. | |||
| ELECTRIC 1ST ROUGH | 07/19/2024 | APPROVED | RMARTIN |
| Note: 7/16/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 7/16/2024 12:57:24 PM *** NEED TO HAVE SITE STICKS FOR BURIED DEPTH NEC 300.5 | |||
| ELECTRIC 1ST ROUGH | 07/16/2024 | Disapproved - NO FEE | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 7/16/2024 12:57:24 PM *** NEED TO HAVE SITE STICKS FOR BURIED DEPTH NEC 300.5 | |||
| LDSC-LANDSCAPE/IRRIGATION FINAL | 07/09/2024 | Disapproved - NO FEE | RPICATAGI |
| Note: 1. Landscape at base of tower sign does not match landscape plan. IT has smaller area and less plants this is a promiant, "high profile" structure and needs to be built as designed and approved. | |||
| FINAL | 07/09/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 7/9/24: 1). Electrical rough was never completed. 2). Landscape revision has been rejected. 3). No meter to be able to check GFCI outlet. | |||
| ELECTRIC FINAL | 07/08/2024 | APPROVED | AWATERS |
| LATH/BRICK/WATER BARRIER | 04/10/2024 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/WATER BARRIER | 04/10/2024 | APPROVED | FWILLIS |
| Note: Water Barrier No Lath. Installing Cement Board on top of House Wrap as per plan. | |||
| FRAMING | 04/08/2024 | APPROVED | RSIMS |
| Note: 4/5/2024 - PREVIOUS INSPECTION NOTES 4/4/24: * Not framed per Engineer detail. Explained to PM and on-site rep how to correct. 4/2/2024 - PREVIOUS INSPECTION NOTES SUBMITTING NEW CHANGES OF ROOF FASTENING AND LETTER FROM ENGINEER, TO THE CITY FOR REVIEW. New inspection due to canceled inspection 3/20/2024 - PREVIOUS INSPECTION NOTES RESCHEDULE AFTER CLIPS ARE INSTALLED AT THE ROOF, AS PER OUR CONVERSATION AND ENGINEER LETTER ON SITE. | |||
| FRAMING | 04/05/2024 | Disapproved - NO FEE | RSIMS |
| Note: 4/4/24: * Not framed per Engineer detail. Explained to PM and on-site rep how to correct. 4/2/2024 - PREVIOUS INSPECTION NOTES SUBMITTING NEW CHANGES OF ROOF FASTENING AND LETTER FROM ENGINEER, TO THE CITY FOR REVIEW. New inspection due to canceled inspection 3/20/2024 - PREVIOUS INSPECTION NOTES RESCHEDULE AFTER CLIPS ARE INSTALLED AT THE ROOF, AS PER OUR CONVERSATION AND ENGINEER LETTER ON SITE. | |||
| FRAMING | 04/02/2024 | Disapproved - NO FEE | FWILLIS |
| Note: SUBMITTING NEW CHANGES OF ROOF FASTENING AND LETTER FROM ENGINEER, TO THE CITY FOR REVIEW. New inspection due to canceled inspection 3/20/2024 - PREVIOUS INSPECTION NOTES RESCHEDULE AFTER CLIPS ARE INSTALLED AT THE ROOF, AS PER OUR CONVERSATION AND ENGINEER LETTER ON SITE. | |||
| FRAMING | 04/01/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 3/20/2024 - PREVIOUS INSPECTION NOTES RESCHEDULE AFTER CLIPS ARE INSTALLED AT THE ROOF, AS PER OUR CONVERSATION AND ENGINEER LETTER ON SITE. | |||
| COLUMN-POST/BEAM/TIE DOWN CONNECTOR | 03/20/2024 | APPROVED | FWILLIS |
| Note: POST CONNECTIONS ARE GOOD. | |||
| FRAMING | 03/20/2024 | Disapproved - NO FEE | FWILLIS |
| Note: RESCHEDULE AFTER CLIPS ARE INSTALLED AT THE ROOF, AS PER OUR CONVERSATION AND ENGINEER LETTER ON SITE. | |||
| DOWN CELL | 02/26/2024 | APPROVED | FWILLIS |
| Note: 2/26/24 - CORRECTIONS MADE 2/22/2024 - PREVIOUS INSPECTION NOTES NOT PER PLAN. REBAR MISSING EVERY 24" AS PER PLAN. WRONG REBAR IN DOWN CELL. CLEANOUTS WILL BE NEEDED WHEN YOU DRILL AND EPOXY. | |||
| DOWN CELL | 02/22/2024 | Disapproved - NO FEE | FWILLIS |
| Note: NOT PER PLAN. REBAR MISSING EVERY 24" AS PER PLAN. WRONG REBAR IN DOWN CELL. CLEANOUTS WILL BE NEEDED WHEN YOU DRILL AND EPOXY. | |||
| FOOTER | 02/15/2024 | APPROVED | FWILLIS |
Review History
| Department | Status | Date In | Date Out |
| PLLA | INFORMATION | 01/13/2025 | 01/13/2025 |
| Note: Marked INFORMATION By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM NOTE: Landscape/Irrigation Design was approved with the Preliminary Plat Construction Plans and will need to be as-built and approved with the Preliminary Plat Construction Plan final inspections. Note that the landscaping that has been installed at the monument sign does not match the Landscape Plan approved on 12/14/21 (AR# 4769 - Sheet L.02). | |||
| PLLA | HOLD | 11/05/2024 | 11/20/2024 |
| Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM applicant shall submit and As-Built Plan | |||
| PLLA | COMPLETE | 10/21/2024 | 10/21/2024 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| PLLA | HOLD | 09/03/2024 | 09/17/2024 |
| Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM 1. The landscape pdf is not approved. The approved plan was stamped with the City of Palm Coast approval. The approved plan proposed three palm trees behind the tower. Three palm trees proposed and are shown on submitted sheet E2.1 2. Provide the approved plan from Site plan application for review and upload it to this permit application | |||
| ELEC | COMPLETE | 07/22/2024 | 08/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 07/22/2024 | 08/05/2024 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/10/2024 | 07/19/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. We do not accept pictures for the burried pipe. You will need to uncover spots for the inspector. | |||
| BADMIN | INFORMATION | 07/09/2024 | 07/09/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Please rename your file names to Photo of Electric Trench | |||
| BADMIN | INFORMATION | 07/08/2024 | 07/08/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please resubmit under supporting documents (not landscape plan). Please be more descriptive the directions for these pictures and the intentions. We do not typically accept photos for inspections. If you were directed to do this, include this in your correction sheet details. You may upload altogether as one file, and name the file what the pictures are for. (example - photos of electric trench) | |||
| BLD | COMPLETE | 04/02/2024 | 04/04/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 01/10/2024 | 01/24/2024 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 01/10/2024 | 01/11/2024 |
| Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/29/2023 | 12/29/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/04/2023 | 12/12/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| DSD | HOLD | 12/04/2023 | 12/04/2023 |
| Note: Held By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM Provide documentation from CDD that signage has been approved by ARC. | |||
| ELEC | HOLD | 12/04/2023 | 12/12/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. List electrical sub contractor | |||
| PLLA | HOLD | 12/04/2023 | 12/18/2023 |
| Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM 1. Provide landscape plan 2. Provide irrigation plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION - COMMERCIAL | ¤60.00 | 07/15/2024 |
| SURCHARGE FS 533.721 | ¤3.47 | 01/24/2024 |
| SURCHARGE - FS 468.631 | ¤5.21 | 01/24/2024 |
| SITE PLAN 30 | ¤30.00 | 01/24/2024 |
| ADJUSTMENT 50% | (¤347.20) | 01/24/2024 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 01/24/2024 |
| INSPECTION COMMERCIAL | ¤532.00 | 01/24/2024 |
| PLAN REVIEW - COMMERCIAL | ¤87.40 | 01/24/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 01/12/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤465.88 |