I want to search for...

Permit #2023120131

Permit Details

Status: INSPECT

Parcel Id: 22-11-30-5545-00000-0040
Block: 00000
Subdivision: 2246 - SANDLAKE SUBDIVISION
Job Phone: 386-931-5710
Location Address: 4800 US HWY 1 N
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 06/11/2024
NOC: Unknown
Applicant name: CHELSEA MARIE BARNEY
Owner: MPW PALM COAST LLC & MCFT PALM COAST LLC

Address

2918-A MARTINSVILLE ROAD

GREENSBORO, NC 27408

Lot: 0040
Job Description: SITE WORK: EVOLVE MULTI-FAMILY
Type: CN

Contractor

4C'S TRUCKING & EXCAVATION INC
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 2682

BUNNELL, FL 32110

CGC1525599 (Exp: 08/31/2026) 386-437-1257 386-437-4468

Inspection History

Type Request Date Result Inspector
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/02/2026 FINAL APPROVED JMYERS
Note: 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 SITE VISIT WITH CONTRACTOR FUTURE WALK THROUGH TO BE SCHEDULED. 7/10/2025 - PREVIOUS INSPECTION NOTES 7/9/25 NEW CURB INLET PROTECTIONS HAVE BEEN INSTALLED. THESE SHALL BE MAINTAINED THROUGHOUT THE REMAINDER OF CONSTRUCTION AS WELL AS ALL OTHER SWPPP REQUIREMENTS. FOLLOW UP INSPECTION NEXT MONTH. 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 CURB INLET PROTECTIONS NEED TO BE CLEANED AND RE-INSTALLED. ALL TRASH NEEDS TO BE PICKED UP. FOLLOW UP INSPECTION ON FRIDAY 5/9/25 4/1/2025 - PREVIOUS INSPECTION NOTES 4/1/25 ROAD AND INLET PROTECTIONS NEED TO BE CLEANED. FOLLOW UP INSPECTION IN ONE MONTH 3/11/2025 - PREVIOUS INSPECTION NOTES 3/11/25 SILT FENCE REPAIRS IN PROGRESS 3/7/2025 - PREVIOUS INSPECTION NOTES 3/7/25 INLETS TOWARDS THE SOUTHERN PORTION OF THE SITE STILL NEED PROTECTION, AND PERIMETER SILT FENCE NEEDS REPAIRS. FOLLOW UP INSPECTION ON TUESDAY 3/11/25 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 SOME CURB INLETS ARE MISSING INLET PROTECTION CLOSER TO EMERGENCY ACCESS, NEED TO INSTALL. SILT FENCE NEEDS REPAIR AROUND SOUTHERN BLOCK OF BUILDINGS. FOLLOW UP INSPECTION FRIDAY 3/7/25 Inspector Notes from Inspection 9210 2/14/25 SILT FENCE HAS BEEN PARTIALLY INSTALLED. HYDROSEED ALONG LAKE BANK SCHEDULED PER DISCUSSION FOLLOW UP INSPECTION IN ONE MONTH 2/7/2025 3:19:01 PM- PREVIOUS INSPECTION NOTES 2/7/25 INLET PROTECTION HAS BEEN CLEANED AND RE-INSTALLED. SILT FENCE STILL REQUIRED ALONG LAKE. FOLLOW UP INSPECTION ON FRIDAY 2/14/25 2/4/2025 5:08:14 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE REQUIRED ALONG LAKE. INLET PROTECTION NEEDS TO BE CLEANED AND RE-INSTALLED. FULL SWPPP LOG BOOK AND PLANS REQUIRED ON-SITE. FOLLOW UP INSPECTION FRIDAY 2/7/25
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 05/19/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9240 Inspector Notes from Inspection 9245 Inspector Notes from Inspection 9602 6/17/2024 - PREVIOUS INSPECTION NOTES this inspection was performed on each phase permits issued exiting water body-added MES with rip rap arouind apron
UROW-RETENT/DETENT STABILI 05/19/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9240 Inspector Notes from Inspection 9245 Inspector Notes from Inspection 9602 6/17/2024 - PREVIOUS INSPECTION NOTES this inspection was performed on each phase permits issued exiting water body-added MES with rip rap arouind apron
UROW- CURBING & GUTTER 05/19/2026 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9240 Inspector Notes from Inspection 9245 Inspector Notes from Inspection 9602 6/17/2024 - PREVIOUS INSPECTION NOTES this inspection was performed on each phase permits issued 10/8/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9108 Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 inspected =approved per Don-past city inspector with no notes same notes above for this inspection on going along US1 for both turn lanes/drainage that are being constructed Fcurb/Miami curb installed-remaing D curb to be installed at various areas this inspection was performed on each phase permits issued
UROW - FINAL DRAINAGE 05/19/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9245 Inspector Notes from Inspection 9602 6/17/2024 - PREVIOUS INSPECTION NOTES this inspection was performed on each phase permits issued
U-ROW FINAL 05/19/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9602 6/17/2024 - PREVIOUS INSPECTION NOTES this inspection was performed on each phase permits issued
ROW - FINAL INSPECTION 05/19/2026 APPROVED - AS NOTED LFITZGERALD
Note: this inspection was performed on each phase permits issued
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 05/19/2026 APPROVED - AS NOTED LFITZGERALD
Note: 6/17/2024 - PREVIOUS INSPECTION NOTES this inspection was performed on each phase permits issued
UC-ASPHALT PRE PLACEMENT 05/19/2026 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9220 Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9240 Inspector Notes from Inspection 9245 Inspector Notes from Inspection 9602 6/17/2024 - PREVIOUS INSPECTION NOTES this inspection was performed on each phase permits issued exiting water body-added MES with rip rap arouind apron 10/15/2025 - PREVIOUS INSPECTION NOTES 2nd lift from about middle of project working to USI then turn lanes site now with top lift-turn lanes as well
UC-SUBSTANTIAL WALK-THRU 05/19/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9145 Inspector Notes from Inspection 9220 Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9240 Inspector Notes from Inspection 9245 Inspector Notes from Inspection 9602 6/17/2024 - PREVIOUS INSPECTION NOTES this inspection was performed on each phase permits issued exiting water body-added MES with rip rap arouind apron
UC- PRELIMINARY AS-BUILTS 05/19/2026 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9140 Inspector Notes from Inspection 9145 Inspector Notes from Inspection 9220 Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9240 Inspector Notes from Inspection 9245 Inspector Notes from Inspection 9602 6/17/2024 - PREVIOUS INSPECTION NOTES this inspection was performed on each phase permits issued exiting water body-added MES with rip rap arouind apron
UC-FINAL SITE INSPECTION 05/19/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9220 Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9240 Inspector Notes from Inspection 9245 Inspector Notes from Inspection 9602 6/17/2024 - PREVIOUS INSPECTION NOTES this inspection was performed on each phase permits issued exiting water body-added MES with rip rap arouind apron
UC-ASPHALT PRE PLACEMENT 10/14/2025 PARTIALLY APPROVED LFITZGERALD
Note: 2nd lift from about middle of project working to USI then turn lanes
UC-MOT MAINTENANCE OF TRAFFIC 10/08/2025 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 inspected =approved per Don-past city inspector with no notes same notes above for this inspection on going along US1 for both turn lanes/drainage that are being constructed
U - SEWER TIE IN 10/08/2025 APPROVED - AS NOTED LFITZGERALD
Note: inspected by Don with no notes
UROW- CURBING & GUTTER 10/08/2025 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9108 Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 inspected =approved per Don-past city inspector with no notes same notes above for this inspection on going along US1 for both turn lanes/drainage that are being constructed Fcurb/Miami curb installed-remaing D curb to be installed at various areas
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 10/07/2025 PARTIALLY APPROVED JMYERS
Note: 10-07-25 SITE VISIT WITH CONTRACTOR FUTURE WALK THROUGH TO BE SCHEDULED. 7/10/2025 - PREVIOUS INSPECTION NOTES 7/9/25 NEW CURB INLET PROTECTIONS HAVE BEEN INSTALLED. THESE SHALL BE MAINTAINED THROUGHOUT THE REMAINDER OF CONSTRUCTION AS WELL AS ALL OTHER SWPPP REQUIREMENTS. FOLLOW UP INSPECTION NEXT MONTH. 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 CURB INLET PROTECTIONS NEED TO BE CLEANED AND RE-INSTALLED. ALL TRASH NEEDS TO BE PICKED UP. FOLLOW UP INSPECTION ON FRIDAY 5/9/25 4/1/2025 - PREVIOUS INSPECTION NOTES 4/1/25 ROAD AND INLET PROTECTIONS NEED TO BE CLEANED. FOLLOW UP INSPECTION IN ONE MONTH 3/11/2025 - PREVIOUS INSPECTION NOTES 3/11/25 SILT FENCE REPAIRS IN PROGRESS 3/7/2025 - PREVIOUS INSPECTION NOTES 3/7/25 INLETS TOWARDS THE SOUTHERN PORTION OF THE SITE STILL NEED PROTECTION, AND PERIMETER SILT FENCE NEEDS REPAIRS. FOLLOW UP INSPECTION ON TUESDAY 3/11/25 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 SOME CURB INLETS ARE MISSING INLET PROTECTION CLOSER TO EMERGENCY ACCESS, NEED TO INSTALL. SILT FENCE NEEDS REPAIR AROUND SOUTHERN BLOCK OF BUILDINGS. FOLLOW UP INSPECTION FRIDAY 3/7/25 Inspector Notes from Inspection 9210 2/14/25 SILT FENCE HAS BEEN PARTIALLY INSTALLED. HYDROSEED ALONG LAKE BANK SCHEDULED PER DISCUSSION FOLLOW UP INSPECTION IN ONE MONTH 2/7/2025 3:19:01 PM- PREVIOUS INSPECTION NOTES 2/7/25 INLET PROTECTION HAS BEEN CLEANED AND RE-INSTALLED. SILT FENCE STILL REQUIRED ALONG LAKE. FOLLOW UP INSPECTION ON FRIDAY 2/14/25 2/4/2025 5:08:14 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE REQUIRED ALONG LAKE. INLET PROTECTION NEEDS TO BE CLEANED AND RE-INSTALLED. FULL SWPPP LOG BOOK AND PLANS REQUIRED ON-SITE. FOLLOW UP INSPECTION FRIDAY 2/7/25
UC-DRAINAGE STRUCT PLACMNT 10/07/2025 APPROVED - AS NOTED LFITZGERALD
Note: inspected =approved per Don-past city inspector with no notes
UC-DRAINAGE PIPE PLACEMENT/LAMPING 10/07/2025 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9113 inspected =approved per Don-past city inspector with no notes same notes above for this inspection
LANDSCAPE PRE-CONSTRUCTION MEETING 07/09/2025 APPROVED RPICATAGI
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 07/09/2025 PARTIALLY APPROVED JMYERS
Note: 7/9/25 NEW CURB INLET PROTECTIONS HAVE BEEN INSTALLED. THESE SHALL BE MAINTAINED THROUGHOUT THE REMAINDER OF CONSTRUCTION AS WELL AS ALL OTHER SWPPP REQUIREMENTS. FOLLOW UP INSPECTION NEXT MONTH. 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 CURB INLET PROTECTIONS NEED TO BE CLEANED AND RE-INSTALLED. ALL TRASH NEEDS TO BE PICKED UP. FOLLOW UP INSPECTION ON FRIDAY 5/9/25 4/1/2025 - PREVIOUS INSPECTION NOTES 4/1/25 ROAD AND INLET PROTECTIONS NEED TO BE CLEANED. FOLLOW UP INSPECTION IN ONE MONTH 3/11/2025 - PREVIOUS INSPECTION NOTES 3/11/25 SILT FENCE REPAIRS IN PROGRESS 3/7/2025 - PREVIOUS INSPECTION NOTES 3/7/25 INLETS TOWARDS THE SOUTHERN PORTION OF THE SITE STILL NEED PROTECTION, AND PERIMETER SILT FENCE NEEDS REPAIRS. FOLLOW UP INSPECTION ON TUESDAY 3/11/25 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 SOME CURB INLETS ARE MISSING INLET PROTECTION CLOSER TO EMERGENCY ACCESS, NEED TO INSTALL. SILT FENCE NEEDS REPAIR AROUND SOUTHERN BLOCK OF BUILDINGS. FOLLOW UP INSPECTION FRIDAY 3/7/25 Inspector Notes from Inspection 9210 2/14/25 SILT FENCE HAS BEEN PARTIALLY INSTALLED. HYDROSEED ALONG LAKE BANK SCHEDULED PER DISCUSSION FOLLOW UP INSPECTION IN ONE MONTH 2/7/2025 3:19:01 PM- PREVIOUS INSPECTION NOTES 2/7/25 INLET PROTECTION HAS BEEN CLEANED AND RE-INSTALLED. SILT FENCE STILL REQUIRED ALONG LAKE. FOLLOW UP INSPECTION ON FRIDAY 2/14/25 2/4/2025 5:08:14 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE REQUIRED ALONG LAKE. INLET PROTECTION NEEDS TO BE CLEANED AND RE-INSTALLED. FULL SWPPP LOG BOOK AND PLANS REQUIRED ON-SITE. FOLLOW UP INSPECTION FRIDAY 2/7/25
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/06/2025 Disapproved - NO FEE JMYERS
Note: 5/6/25 CURB INLET PROTECTIONS NEED TO BE CLEANED AND RE-INSTALLED. ALL TRASH NEEDS TO BE PICKED UP. FOLLOW UP INSPECTION ON FRIDAY 5/9/25 4/1/2025 - PREVIOUS INSPECTION NOTES 4/1/25 ROAD AND INLET PROTECTIONS NEED TO BE CLEANED. FOLLOW UP INSPECTION IN ONE MONTH 3/11/2025 - PREVIOUS INSPECTION NOTES 3/11/25 SILT FENCE REPAIRS IN PROGRESS 3/7/2025 - PREVIOUS INSPECTION NOTES 3/7/25 INLETS TOWARDS THE SOUTHERN PORTION OF THE SITE STILL NEED PROTECTION, AND PERIMETER SILT FENCE NEEDS REPAIRS. FOLLOW UP INSPECTION ON TUESDAY 3/11/25 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 SOME CURB INLETS ARE MISSING INLET PROTECTION CLOSER TO EMERGENCY ACCESS, NEED TO INSTALL. SILT FENCE NEEDS REPAIR AROUND SOUTHERN BLOCK OF BUILDINGS. FOLLOW UP INSPECTION FRIDAY 3/7/25 Inspector Notes from Inspection 9210 2/14/25 SILT FENCE HAS BEEN PARTIALLY INSTALLED. HYDROSEED ALONG LAKE BANK SCHEDULED PER DISCUSSION FOLLOW UP INSPECTION IN ONE MONTH 2/7/2025 3:19:01 PM- PREVIOUS INSPECTION NOTES 2/7/25 INLET PROTECTION HAS BEEN CLEANED AND RE-INSTALLED. SILT FENCE STILL REQUIRED ALONG LAKE. FOLLOW UP INSPECTION ON FRIDAY 2/14/25 2/4/2025 5:08:14 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE REQUIRED ALONG LAKE. INLET PROTECTION NEEDS TO BE CLEANED AND RE-INSTALLED. FULL SWPPP LOG BOOK AND PLANS REQUIRED ON-SITE. FOLLOW UP INSPECTION FRIDAY 2/7/25
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 04/01/2025 PARTIALLY APPROVED JMYERS
Note: 4/1/25 ROAD AND INLET PROTECTIONS NEED TO BE CLEANED. FOLLOW UP INSPECTION IN ONE MONTH 3/11/2025 - PREVIOUS INSPECTION NOTES 3/11/25 SILT FENCE REPAIRS IN PROGRESS 3/7/2025 - PREVIOUS INSPECTION NOTES 3/7/25 INLETS TOWARDS THE SOUTHERN PORTION OF THE SITE STILL NEED PROTECTION, AND PERIMETER SILT FENCE NEEDS REPAIRS. FOLLOW UP INSPECTION ON TUESDAY 3/11/25 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 SOME CURB INLETS ARE MISSING INLET PROTECTION CLOSER TO EMERGENCY ACCESS, NEED TO INSTALL. SILT FENCE NEEDS REPAIR AROUND SOUTHERN BLOCK OF BUILDINGS. FOLLOW UP INSPECTION FRIDAY 3/7/25 Inspector Notes from Inspection 9210 2/14/25 SILT FENCE HAS BEEN PARTIALLY INSTALLED. HYDROSEED ALONG LAKE BANK SCHEDULED PER DISCUSSION FOLLOW UP INSPECTION IN ONE MONTH 2/7/2025 3:19:01 PM- PREVIOUS INSPECTION NOTES 2/7/25 INLET PROTECTION HAS BEEN CLEANED AND RE-INSTALLED. SILT FENCE STILL REQUIRED ALONG LAKE. FOLLOW UP INSPECTION ON FRIDAY 2/14/25 2/4/2025 5:08:14 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE REQUIRED ALONG LAKE. INLET PROTECTION NEEDS TO BE CLEANED AND RE-INSTALLED. FULL SWPPP LOG BOOK AND PLANS REQUIRED ON-SITE. FOLLOW UP INSPECTION FRIDAY 2/7/25
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/11/2025 PARTIALLY APPROVED JMYERS
Note: 3/11/25 SILT FENCE REPAIRS IN PROGRESS 3/7/2025 - PREVIOUS INSPECTION NOTES 3/7/25 INLETS TOWARDS THE SOUTHERN PORTION OF THE SITE STILL NEED PROTECTION, AND PERIMETER SILT FENCE NEEDS REPAIRS. FOLLOW UP INSPECTION ON TUESDAY 3/11/25 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 SOME CURB INLETS ARE MISSING INLET PROTECTION CLOSER TO EMERGENCY ACCESS, NEED TO INSTALL. SILT FENCE NEEDS REPAIR AROUND SOUTHERN BLOCK OF BUILDINGS. FOLLOW UP INSPECTION FRIDAY 3/7/25 Inspector Notes from Inspection 9210 2/14/25 SILT FENCE HAS BEEN PARTIALLY INSTALLED. HYDROSEED ALONG LAKE BANK SCHEDULED PER DISCUSSION FOLLOW UP INSPECTION IN ONE MONTH 2/7/2025 3:19:01 PM- PREVIOUS INSPECTION NOTES 2/7/25 INLET PROTECTION HAS BEEN CLEANED AND RE-INSTALLED. SILT FENCE STILL REQUIRED ALONG LAKE. FOLLOW UP INSPECTION ON FRIDAY 2/14/25 2/4/2025 5:08:14 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE REQUIRED ALONG LAKE. INLET PROTECTION NEEDS TO BE CLEANED AND RE-INSTALLED. FULL SWPPP LOG BOOK AND PLANS REQUIRED ON-SITE. FOLLOW UP INSPECTION FRIDAY 2/7/25
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/07/2025 Disapproved - NO FEE JMYERS
Note: 3/7/25 INLETS TOWARDS THE SOUTHERN PORTION OF THE SITE STILL NEED PROTECTION, AND PERIMETER SILT FENCE NEEDS REPAIRS. FOLLOW UP INSPECTION ON TUESDAY 3/11/25 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 SOME CURB INLETS ARE MISSING INLET PROTECTION CLOSER TO EMERGENCY ACCESS, NEED TO INSTALL. SILT FENCE NEEDS REPAIR AROUND SOUTHERN BLOCK OF BUILDINGS. FOLLOW UP INSPECTION FRIDAY 3/7/25 Inspector Notes from Inspection 9210 2/14/25 SILT FENCE HAS BEEN PARTIALLY INSTALLED. HYDROSEED ALONG LAKE BANK SCHEDULED PER DISCUSSION FOLLOW UP INSPECTION IN ONE MONTH 2/7/2025 3:19:01 PM- PREVIOUS INSPECTION NOTES 2/7/25 INLET PROTECTION HAS BEEN CLEANED AND RE-INSTALLED. SILT FENCE STILL REQUIRED ALONG LAKE. FOLLOW UP INSPECTION ON FRIDAY 2/14/25 2/4/2025 5:08:14 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE REQUIRED ALONG LAKE. INLET PROTECTION NEEDS TO BE CLEANED AND RE-INSTALLED. FULL SWPPP LOG BOOK AND PLANS REQUIRED ON-SITE. FOLLOW UP INSPECTION FRIDAY 2/7/25
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/05/2025 PARTIALLY APPROVED JMYERS
Note: 3/5/25 SOME CURB INLETS ARE MISSING INLET PROTECTION CLOSER TO EMERGENCY ACCESS, NEED TO INSTALL. SILT FENCE NEEDS REPAIR AROUND SOUTHERN BLOCK OF BUILDINGS. FOLLOW UP INSPECTION FRIDAY 3/7/25 Inspector Notes from Inspection 9210 2/14/25 SILT FENCE HAS BEEN PARTIALLY INSTALLED. HYDROSEED ALONG LAKE BANK SCHEDULED PER DISCUSSION FOLLOW UP INSPECTION IN ONE MONTH 2/7/2025 3:19:01 PM- PREVIOUS INSPECTION NOTES 2/7/25 INLET PROTECTION HAS BEEN CLEANED AND RE-INSTALLED. SILT FENCE STILL REQUIRED ALONG LAKE. FOLLOW UP INSPECTION ON FRIDAY 2/14/25 2/4/2025 5:08:14 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE REQUIRED ALONG LAKE. INLET PROTECTION NEEDS TO BE CLEANED AND RE-INSTALLED. FULL SWPPP LOG BOOK AND PLANS REQUIRED ON-SITE. FOLLOW UP INSPECTION FRIDAY 2/7/25
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/14/2025 APPROVED - AS NOTED JMYERS
Note: 2/14/25 SILT FENCE HAS BEEN PARTIALLY INSTALLED. HYDROSEED ALONG LAKE BANK SCHEDULED PER DISCUSSION FOLLOW UP INSPECTION IN ONE MONTH 2/7/2025 3:19:01 PM- PREVIOUS INSPECTION NOTES 2/7/25 INLET PROTECTION HAS BEEN CLEANED AND RE-INSTALLED. SILT FENCE STILL REQUIRED ALONG LAKE. FOLLOW UP INSPECTION ON FRIDAY 2/14/25 2/4/2025 5:08:14 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE REQUIRED ALONG LAKE. INLET PROTECTION NEEDS TO BE CLEANED AND RE-INSTALLED. FULL SWPPP LOG BOOK AND PLANS REQUIRED ON-SITE. FOLLOW UP INSPECTION FRIDAY 2/7/25
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/07/2025 PARTIALLY APPROVED JMYERS
Note: 2/7/25 INLET PROTECTION HAS BEEN CLEANED AND RE-INSTALLED. SILT FENCE STILL REQUIRED ALONG LAKE. FOLLOW UP INSPECTION ON FRIDAY 2/14/25 2/4/2025 5:08:14 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE REQUIRED ALONG LAKE. INLET PROTECTION NEEDS TO BE CLEANED AND RE-INSTALLED. FULL SWPPP LOG BOOK AND PLANS REQUIRED ON-SITE. FOLLOW UP INSPECTION FRIDAY 2/7/25
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/04/2025 Disapproved - NO FEE JMYERS
Note: 2/4/25 SILT FENCE REQUIRED ALONG LAKE. INLET PROTECTION NEEDS TO BE CLEANED AND RE-INSTALLED. FULL SWPPP LOG BOOK AND PLANS REQUIRED ON-SITE. FOLLOW UP INSPECTION FRIDAY 2/7/25
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 11/22/2024 PARTIALLY APPROVED DHANEY
Note: *** NOTES ADDED BY DHANEY 11/22/2024 2:14:19 PM *** 1st main section from Backflow
U-SEWER FORCE MAIN INSTALL/TESTING 11/22/2024 APPROVED DHANEY
UC-CONSTRUCTION ENTRANCE 11/07/2024 APPROVED DHANEY
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 11/07/2024 APPROVED DHANEY
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 09/06/2024 APPROVED DHANEY
Note: 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/26/2024 1:45:04 PM *** 16" Water Tap completed . (approved)
U-WATER MAIN DISINFECTION 09/06/2024 APPROVED DHANEY
Note: *** NOTES ADDED BY DHANEY 9/6/2024 8:14:49 AM *** In progress , sample's have been sent .
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 06/26/2024 PARTIALLY APPROVED DHANEY
Note: *** NOTES ADDED BY DHANEY 6/26/2024 1:45:04 PM *** 16" Water Tap completed . (approved)
PLAN - PRE-CON 386-986-3750 06/17/2024 FINAL APPROVED DHANEY
Note: 6/14/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/14/2024 6:46:21 PM *** resheduled for 6-17-24
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 06/17/2024 CANCELLED BY APPLICANT DHANEY
PLAN - PRE-CON 386-986-3750 06/14/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/14/2024 6:46:21 PM *** resheduled for 6-17-24
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY
IRRIGATION AFFIDAVIT
LDSC-IRRIGATION FINAL
LDSC- LANDSCAPE / IRRIGATION AS-BUILT
LDSC- LANDSCAPE FINAL
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS
BLD- ADA PARKING
BLD- ADA SIGNAGECONTROL
BLD- ADA VEHICULAR WAY
BLD - UNDERGROUND SITE LIGHTING CONDUITS
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION
BLD - SITE LIGHTING-POLE SET/FIXTURE
CLOSE OUT DOCUMENTS
U - UTILITY COMMERCIAL FINAL

Review History

Department Status Date In Date Out
BLD COMPLETE 12/05/2023 12/05/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 12/05/2023 12/05/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 12/05/2023 12/05/2023
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 12/05/2023 12/05/2023
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 12/05/2023 12/05/2023
Note: Released By: ALEXANDER BLAKE - - ABLAKE@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE- SITE DEVELOP ¤125.00 06/11/2024
SITE INSPECTION ¤840.00 06/11/2024
SITE PLAN 30 ¤30.00 06/11/2024
Fees Total Due: ¤0.00 Total Paid: ¤995.00