I want to search for...
Permit #2023120140
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-1580 |
| CONDITIONED SPACE: 2815 sqft |
| GARAGE: 632 sqft |
| OPENED PORCH (WITH ROOF) : 387 sqft |
| OPENED PORCH (WITH ROOF) : 26 sqft |
| Total Square Footage: 3860 sqft |
| Block: 00000 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-237-0328 |
| Location Address: 335 HIBISCUS WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/12/2024 |
| NOC: RECORDED |
| Applicant name: JAMES JOSEPH ALBANO |
| Owner: USTILOVSKY ALEXANDER |
|
Address 200 OCEAN CREST DRIVE PALM COAST, FL 32137 |
|
Address UNIT 111 PALM COAST, FL 32137 |
| Lot: 1580 |
| Contracted Stated Job Value: ¤485,000.00 |
| Job Description: 2-Story, Single Family Residence |
| Type: CN |
Contractor
ALBANO DESIGNS STUDIOS, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
82 LEE DR PALM COAST, FL 32137 |
CBC050078 (Exp: 08/31/2026) | 386-237-0328 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
SCOTT DALE CRIDER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 353092 PALM COAST, FL 32137 |
CCC1333991 (Exp: 08/31/2026) | 386-276-0758 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 10/03/2024 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 10/02/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE -------------------------------------------------------------- 10/1/2024 - PREVIOUS INSPECTION NOTES Sec 300.01 E1 The construction site must have the address clearly displayed and the Builders Box | |||
| ROW - STORMWATER FINAL | 10/02/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PLEASE ADD MORE SEED AND STRAW ON THE BARE AREAS ALONG RIGHT, LEFT AND BACK PROPERTY LINES ------------------------------------------------------------------------ 10/1/2024 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE ADDRESS PRESENT OR THE PERMIT BOX WITH THE ADDRESS. Sec 300.01 E1 The construction site must have the address clearly displayed and the Builders Box. --------------------------------------------------------------------------- 9/24/2024 - PREVIOUS INSPECTION NOTES ** 09/24/24 LEFT SIDE AT PROPERTY LINE IN FRONT NEED TO REPAIR WASHOUT THAT IS AROUND THE WATER METER BOXES (PINK LIDS) ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 09/10/24 BEFORE FINAL ROW IS APPROVED ** LEFT FRONT POP-UP DRAIN NEED TO MOVE BACK A MINIMUM OF 5 FT FROM THE CURB ALSO NEED RAISE SO DRAIN IS ON TOP OF SOD NOT UNDERNEATH WHICH WILL CAUSE WASHOUTS ** RIGHT SIDE FRONT POP-UP DRAINAGE NEED TO RAISE ON TOP OF SOD ** BOTH REAR POP--UP DRAINS NEED TO BE RAISED SO THEY ARE ON TOP OF THE SOD NOT UNDERNEATH ** LEFT SIDE ALONG PROPERTY LINE NEAR A/C UNIT NEED TO PUT SOD TO CONTAIN THE BARK MULCH AND FOR ** RIGHT SIDE FRONT ALONG PROPERTY LINE AT TREE NEED TO PUT SOD | |||
| ROW - STORMWATER FINAL | 10/01/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO HAVE THE ADDRESS PRESENT OR THE PERMIT BOX WITH THE ADDRESS. Sec 300.01 E1 The construction site must have the address clearly displayed and the Builders Box. --------------------------------------------------------------------------- 9/24/2024 - PREVIOUS INSPECTION NOTES ** 09/24/24 LEFT SIDE AT PROPERTY LINE IN FRONT NEED TO REPAIR WASHOUT THAT IS AROUND THE WATER METER BOXES (PINK LIDS) ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 09/10/24 BEFORE FINAL ROW IS APPROVED ** LEFT FRONT POP-UP DRAIN NEED TO MOVE BACK A MINIMUM OF 5 FT FROM THE CURB ALSO NEED RAISE SO DRAIN IS ON TOP OF SOD NOT UNDERNEATH WHICH WILL CAUSE WASHOUTS ** RIGHT SIDE FRONT POP-UP DRAINAGE NEED TO RAISE ON TOP OF SOD ** BOTH REAR POP--UP DRAINS NEED TO BE RAISED SO THEY ARE ON TOP OF THE SOD NOT UNDERNEATH ** LEFT SIDE ALONG PROPERTY LINE NEAR A/C UNIT NEED TO PUT SOD TO CONTAIN THE BARK MULCH AND FOR ** RIGHT SIDE FRONT ALONG PROPERTY LINE AT TREE NEED TO PUT SOD | |||
| ROW - FINAL APRON (AFTER POUR) | 10/01/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: Sec 300.01 E1 The construction site must have the address clearly displayed and the Builders Box | |||
| BLD - BUILDING FINAL | 09/30/2024 | FINAL APPROVED | MCONTRYMAN |
| BLD - BUILDING FINAL | 09/24/2024 | CANCELLED BY APPLICANT | WEB |
| ROW - STORMWATER FINAL | 09/24/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/24/24 LEFT SIDE AT PROPERTY LINE IN FRONT NEED TO REPAIR WASHOUT THAT IS AROUND THE WATER METER BOXES (PINK LIDS) ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 09/10/24 BEFORE FINAL ROW IS APPROVED ** LEFT FRONT POP-UP DRAIN NEED TO MOVE BACK A MINIMUM OF 5 FT FROM THE CURB ALSO NEED RAISE SO DRAIN IS ON TOP OF SOD NOT UNDERNEATH WHICH WILL CAUSE WASHOUTS ** RIGHT SIDE FRONT POP-UP DRAINAGE NEED TO RAISE ON TOP OF SOD ** BOTH REAR POP--UP DRAINS NEED TO BE RAISED SO THEY ARE ON TOP OF THE SOD NOT UNDERNEATH ** LEFT SIDE ALONG PROPERTY LINE NEAR A/C UNIT NEED TO PUT SOD TO CONTAIN THE BARK MULCH AND FOR ** RIGHT SIDE FRONT ALONG PROPERTY LINE AT TREE NEED TO PUT SOD | |||
| U -UTILITY RESIDENTIAL FINAL | 09/24/2024 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/10/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/10/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/10/24 BEFORE FINAL ROW IS APPROVED ** LEFT FRONT POP-UP DRAIN NEED TO MOVE BACK A MINIMUM OF 5 FT FROM THE CURB ALSO NEED RAISE SO DRAIN IS ON TOP OF SOD NOT UNDERNEATH WHICH WILL CAUSE WASHOUTS ** RIGHT SIDE FRONT POP-UP DRAINAGE NEED TO RAISE ON TOP OF SOD ** BOTH REAR POP--UP DRAINS NEED TO BE RAISED SO THEY ARE ON TOP OF THE SOD NOT UNDERNEATH ** LEFT SIDE ALONG PROPERTY LINE NEAR A/C UNIT NEED TO PUT SOD TO CONTAIN THE BARK MULCH AND FOR ** RIGHT SIDE FRONT ALONG PROPERTY LINE AT TREE NEED TO PUT SOD | |||
| ROW- PRE-APRON (PRE-POUR) | 07/02/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 07/02/24 READY TO POUR APRON AND PAVER RESTRAINTS ** PAVER BASE HAS BEEN SPREAD AND COMPACTED CAN SET PAVERS AFTER CONCRETE HAS BEEN POURED ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW- PAVER RESTRAINTS | 07/02/2024 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9270 ** 07/02/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC-TUG | 06/14/2024 | APPROVED | JWALKER |
| GRAVITY SEWER TEST | 05/31/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 05/31/2024 | APPROVED | MGIBSON |
| INSULATION | 05/21/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 need the following by insulation 1. NEED PROPER NAIL PLATES FBC… R, M1308.2.1 PROTECTION FROM PHYSICAL DAMAGE… IF PIPE IS LESS THAN 1.5” FROM EDGE IT MUST BE PROTECTED WITH A MINIMUM OF 16 GAGE STEEL PLATE AND PLATE MUST EXTEND A MINIMUM OF 2” ABOVE THE SOLE PLATES AND BELOW THE TOP PLATES (plates need to extend 2 inches beyond the framing member at top and bottom plates). 2. NEED PROPER NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. (plates need to extend 2 inches beyond the framing member at top and bottom plates). | |||
| ALL ROUGH | 05/08/2024 | APPROVED - AS NOTED | LMILLER |
| Note: need the following by insulation 1. NEED PROPER NAIL PLATES FBC… R, M1308.2.1 PROTECTION FROM PHYSICAL DAMAGE… IF PIPE IS LESS THAN 1.5” FROM EDGE IT MUST BE PROTECTED WITH A MINIMUM OF 16 GAGE STEEL PLATE AND PLATE MUST EXTEND A MINIMUM OF 2” ABOVE THE SOLE PLATES AND BELOW THE TOP PLATES (plates need to extend 2 inches beyond the framing member at top and bottom plates). 2. NEED PROPER NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. (plates need to extend 2 inches beyond the framing member at top and bottom plates). | |||
| ROOF VALLEY & METAL | 05/07/2024 | APPROVED | FWILLIS |
| Note: 5/1/2024 - PREVIOUS INSPECTION NOTES | |||
| LATH/BRICK/ WATER BARRIER | 05/06/2024 | APPROVED | FWILLIS |
| Note: 5/3/2024 - PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/06/2024 | APPROVED | FWILLIS |
| Note: 5/6/24 - ALL CORRECTIONS MADE 5/3/2024 - PREVIOUS INSPECTION NOTES 4/26/2024 - PREVIOUS INSPECTION NOTES 4/26/24 Corrections listed from the previous inspection have been completed. 1. Please provide details showing Floor and roof truss connections to walls. Include girder truss connections. Common practice is to show achors of the truss pages. 2. Rear porch anchors and framing have been covered. Please uncover and expose all anchors and beams. 3. Could not locate interior bearing wall details. Please provide stud types, header size and all achoring requirements. Front proch and columns have been inspected. Plywood can be installed. Adding wall sheating inspection. 4/25/2024 - PREVIOUS INSPECTION NOTES Roof sheating bumped checked and approved. 1. Plan pages missing. Pages A 1.5, 2.0, 3.1, 4.0, and 4.1 Please have a full set of approved plans onsite for the reinspection. 2. Roof and Floor truss engineering was inspected. A) Truss A-08 missing engineering this is an I beam type. B) Where the over framing roof ridge beam meets the roof decking installing blocking below between truss and install anchor. Continous load path. C) Over framing anchors have not been fastened. D) Trusses C3S and C5S are missing the HTU26 buckets. See the truss engineering layout page. Floor truss engineering and HTU buckets inspected. Attachment to bearing walls and exterior wall not inspected. Inspection was stopped due to missing plan pages. Bearing walls anchoring, exterior walls, truss to wall connection need to be inspected at next reinspection. | |||
| LATH/BRICK/ WATER BARRIER | 05/03/2024 | CANCELLED BY APPLICANT | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/03/2024 | CANCELLED BY APPLICANT | JWALKER |
| Note: 4/26/2024 - PREVIOUS INSPECTION NOTES 4/26/24 Corrections listed from the previous inspection have been completed. 1. Please provide details showing Floor and roof truss connections to walls. Include girder truss connections. Common practice is to show achors of the truss pages. 2. Rear porch anchors and framing have been covered. Please uncover and expose all anchors and beams. 3. Could not locate interior bearing wall details. Please provide stud types, header size and all achoring requirements. Front proch and columns have been inspected. Plywood can be installed. Adding wall sheating inspection. 4/25/2024 - PREVIOUS INSPECTION NOTES Roof sheating bumped checked and approved. 1. Plan pages missing. Pages A 1.5, 2.0, 3.1, 4.0, and 4.1 Please have a full set of approved plans onsite for the reinspection. 2. Roof and Floor truss engineering was inspected. A) Truss A-08 missing engineering this is an I beam type. B) Where the over framing roof ridge beam meets the roof decking installing blocking below between truss and install anchor. Continous load path. C) Over framing anchors have not been fastened. D) Trusses C3S and C5S are missing the HTU26 buckets. See the truss engineering layout page. Floor truss engineering and HTU buckets inspected. Attachment to bearing walls and exterior wall not inspected. Inspection was stopped due to missing plan pages. Bearing walls anchoring, exterior walls, truss to wall connection need to be inspected at next reinspection. | |||
| ROOF VALLEY & METAL | 05/01/2024 | CANCELLED BY APPLICANT | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/26/2024 | Disapproved - NO FEE | JWALKER |
| Note: 4/26/24 Corrections listed from the previous inspection have been completed. 1. Please provide details showing Floor and roof truss connections to walls. Include girder truss connections. Common practice is to show achors of the truss pages. 2. Rear porch anchors and framing have been covered. Please uncover and expose all anchors and beams. 3. Could not locate interior bearing wall details. Please provide stud types, header size and all achoring requirements. Front proch and columns have been inspected. Plywood can be installed. Adding wall sheating inspection. 4/25/2024 - PREVIOUS INSPECTION NOTES Roof sheating bumped checked and approved. 1. Plan pages missing. Pages A 1.5, 2.0, 3.1, 4.0, and 4.1 Please have a full set of approved plans onsite for the reinspection. 2. Roof and Floor truss engineering was inspected. A) Truss A-08 missing engineering this is an I beam type. B) Where the over framing roof ridge beam meets the roof decking installing blocking below between truss and install anchor. Continous load path. C) Over framing anchors have not been fastened. D) Trusses C3S and C5S are missing the HTU26 buckets. See the truss engineering layout page. Floor truss engineering and HTU buckets inspected. Attachment to bearing walls and exterior wall not inspected. Inspection was stopped due to missing plan pages. Bearing walls anchoring, exterior walls, truss to wall connection need to be inspected at next reinspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/25/2024 | Disapproved - NO FEE | JWALKER |
| Note: Roof sheating bumped checked and approved. 1. Plan pages missing. Pages A 1.5, 2.0, 3.1, 4.0, and 4.1 Please have a full set of approved plans onsite for the reinspection. 2. Roof and Floor truss engineering was inspected. A) Truss A-08 missing engineering this is an I beam type. B) Where the over framing roof ridge beam meets the roof decking installing blocking below between truss and install anchor. Continous load path. C) Over framing anchors have not been fastened. D) Trusses C3S and C5S are missing the HTU26 buckets. See the truss engineering layout page. Floor truss engineering and HTU buckets inspected. Attachment to bearing walls and exterior wall not inspected. Inspection was stopped due to missing plan pages. Bearing walls anchoring, exterior walls, truss to wall connection need to be inspected at next reinspection. | |||
| LATH/BRICK/ WATER BARRIER | 04/25/2024 | CANCELLED BY APPLICANT | WEB |
| WINDOW NAILING | 04/16/2024 | APPROVED | FWILLIS |
| Note: LOOKED AT STRAPS ON THE POST'S IN THE REAR. ALSO H2.5 REPLACED BY H10'S. | |||
| WALL SHEATHING | 04/05/2024 | APPROVED | JWALKER |
| TIE BEAM / LINTEL | 04/05/2024 | CANCELLED BY INSPECTOR | JMUNSON |
| FOUND SURVEY APPROVED (OFFICE) | 03/27/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/14/2024 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/08/2024 | APPROVED | LMILLER |
| WATER METER INSTALLATION REQUEST | 03/08/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/29/2024 | 05/01/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/27/2024 | 03/27/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/27/2024 | 03/27/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/02/2024 | 02/02/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/02/2024 | 02/12/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/02/2024 | 02/09/2024 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/02/2024 | 02/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/02/2024 | 02/05/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/22/2024 | 01/23/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment Plans need to match the driveway angle changed and needs to be changed on the landscape plan also. Elevation page A.2.0 Faux windows not allowed as Per LDC. | |||
| SW1 | HOLD | 01/22/2024 | 02/02/2024 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Please show FF elv of garage show proposed elv's at corners of house 4" to 6" below FF | |||
| BLD | HOLD | 01/22/2024 | 01/29/2024 |
| Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM 1. OK. Plan Sheet A1.1 1. OK. 2. OK. 3. OK. 4. OK. 5. OK. 6. OK. 7. OK. 8. OK. 9. OK. Plan Sheet A.1.3 1. 1/29/24 3RD REPEAT COMMENT. THIS TIME PLAN SHEET A-1.3 HAS BEEN ELIMINATED AND NOT PROVIDED. COVER SHEET STILL IDENTIFIES IT AS BEING PART OF THE PLAN SET. THIS IS A REQUIRED PLAN SHEET AND MUST BE PROVIDED. REPEAT COMMENT. PREVIOUS PARTIAL FRAMING PLAN REMOVED FROM RESUBMITTED PLANS: 2nd floor framing plan incomplete. Identify means of supporting floor trusses adjacent to stairs. Identify means of supporting long trusses at connection with other trusses (girder requirements). Identify spans. Identify rim joist / truss closure materials. Identify load bearing wall locations. 2. REPEAT COMMENT: Provide structural design for 2nd floor framing to support load bearing walls and roof loads above for Bedroom 4 where walls are inset from exterior walls below. Garage door beam / girder design needs to account for loads as well. Plan Sheet A1.4 1. 1/29/24 3RD REPEAT COMMENT. THIS AND PREVIOUS COMMENTS ALSO APPLY TO NEW PLAN SHEET A-1.5. NUMEROUS STRUCTURAL DETAILS MISSING. THIS IS NOT A FLOOR AND ROOF TRUSS LAYOUT PLAN – THAT IS PROVIDED BY THE TRUSS MANUFACTURER. A FLOOR AND ROOF FRAMING PLAN IS REQUIRED. ARCHITECT TO IDENTIFY BEAM SIZES AND TYPES, ARCHITECT TO PROVIDE OVERHANG DETAILS AND CANNOT DEFER THOSE TO THE BUILDER. ARCHITECT TO PROVIDE LOAD PATH DESIGN TO THE FOUNDATION. IF ARCHITECT IS UNABLE TO PROVIDE DESIGN – THEN OBTAIN SERVICES OF FLORIDA LICENSED PROFESSIONAL ENGINEER. REPEAT COMMENT: Provide structural roof framing plan. Truss placement plan is not a structural roof framing plan. Numerous structural details missing. Truss placement plan is provided by truss manufacturer at time of truss submittal. 2. OK Plan Sheet A4.0 1. OK. 2. 1/29/24 3RD REPEAT COMMENT. NO DETAILS PROVIDED FOR COLUMNS AT GUEST ROOM FRONT WINDOW. PARTIAL REPEAT COMMENT. FRONT PORCH COLUMNS APPEAR TO BE BUILT UP AND STUCCO CLADDED. NEW FRAMING DETAILS SHOW SIMPLE 4" X 4" P.T. WOOD COLUMNS WITH NO DETAILS HOW THEY WILL BE BUILT OUT AND FINISHED. Provide framing details for front porch walls and built-up columns including attachment to footings and framing above. Provide the same details for the built-up columns at guest room front window. 3. OK. 4. 1/29//24 PARTIAL REPEAT COMMENT. PLAN SHEET INDICATE TRUSS COMPANY TO PROVIDE BEAM / GIRDER SIZES. THAT IS NOT THE CASE. THE REGISTERED DESIGN PROFESSIONAL IS RESPONSIBLE TO IDENTIFY ALL BEAMS / GIRDERS. REPEAT COMMENT. THE DETAIL TO THE RIGHT OF PLAN SHEET A4.1 SHOWS AN LVL BEAM NOT LOCATED UNDER LOAD BEARING WALL AND FLOOR FRAMING ABOVE: Provide garage beam / girder design above garage roll up door that also supports 2nd floor wall and roof loads and construction and attachment details. 5. OK. 6. OK. 7. OK. 8. OK. 9. OK. 10. OK. 11. OK. 12. OK. 13. OK. 14. OK. 15. OK. 16. 1/29/24 3RD REPEAT COMMENT. COMMENT REFERENCING SECTION R316 REMOVED FROM PLAN SHEET A-4.0 HOWEVER TYE OF VAPOR RETARDER STILL NOT PROVIDED. ALSO, REVISED PLAN SHEET A1.0 NOT PROVIDED AS REQUESTED. REPEAT COMMENT. REFERENCE TO R316 DOES NOT APPLY. R316 IS A SECTION COVERING FOAM PLASTICS: Provide interior vapor retarder type in exterior wall section. Add to Plan Sheet A1.0. 17. OK. 18. OK. 19. OK. . 20. 1/29/24 3RD REPEAT COMMENT. LIVE AND DEAD LOADS HAVE BEEN REMOVED FROM PLAN SHEET A-4.0 REPEAT COMMENT. ROOFING TILES COVERED BY FLORIDA PRODUCT APPROVAL NO. 17330.2 ALL APPEAR TO HAVE A PSF WEIGHT GREATER THAN THAT SHOWN ON PLAN SHEET A4.0: Correct roof top chord dead load to match roof tile plus roof sheathing p.s.f. weights. NEW COMMENT: PLAN SHEET A4.3 MISSING FROM LATEST SUBMITTAL. PLEASE PROVIDE. | |||
| URB | COMPLETE | 01/19/2024 | 01/19/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 01/18/2024 | 01/18/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Plans are to be uploaded under the 'plans' document type category. The digital seal cannot be verified. | |||
| BADMIN | INFORMATION | 01/17/2024 | 01/17/2024 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM missing digital seal on the plans | |||
| ZON | HOLD | 12/28/2023 | 12/28/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment: Site plan: Cover page can not be stamped as siteplan please add all site plan information on to the survey with all of the requested information below. Please provide all platted easments on both Map book and page is incorrect Width of walkway Elevation page A.2.0 Faux windows not allowed as Per LDC. Landscape plan: 7 gallons shrubs required for the mechanical equiptment screening showing 3 gallons on plan | |||
| MECH | COMPLETE | 12/28/2023 | 01/04/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| URB | HOLD | 12/28/2023 | 01/12/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 12/6/23 (JB) FOUNDATION SHRUBBERY (SCHEFFLERA ARBICOLA) "SA" ON THE PLAN ARE NON APPROVED TYPE AND WILL NEED TO BE REPLACED WITH PLANTS APPROVED FOR HARDINESS ZONE 9 A OR FROM THE CITY APPROVED SHRUBBERY LIST. | |||
| ELEC | COMPLETE | 12/28/2023 | 12/28/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 12/28/2023 | 01/05/2024 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/28/2023 | 01/05/2024 |
| Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM Plan Sheet A1.0 1. OK. Plan Sheet A1.1 1. OK. 2. OK. 3. OK. 4. OK. 5. OK. 6. OK. 7. OK. 8. REPEAT COMMENT: Show dimensions of attic access in upper roof and if lower roof has headroom clearance of 30 inches or more than show attic access(es) (may require more than 1) in location directly under area with 30 inches of headroom. 9. OK. Plan Sheet A.1.3 1. REPEAT COMMENT. PREVIOUS PARTIAL FRAMING PLAN REMOVED FROM RESUBMITTED PLANS: 2nd floor framing plan incomplete. Identify means of supporting floor trusses adjacent to stairs. Identify means of supporting long trusses at connection with other trusses (girder requirements). Identify spans. Identify rim joist / truss closure materials. Identify load bearing wall locations. 2. REPEAT COMMENT: Provide structural design for 2nd floor framing to support load bearing walls and roof loads above for Bedroom 4 where walls are inset from exterior walls below. Garage door beam / girder design needs to account for loads as well. Plan Sheet A1.4 1. REPEAT COMMENT: Provide structural roof framing plan. Truss placement plan is not a structural roof framing plan. Numerous structural details missing. Truss placement plan is provided by truss manufacturer at time of truss submittal. 2. REPEAT COMMENT. MASONRY UPLIFT CONNECTOR SCHEDULE NOT SUITABLE FOR WOOD FRAME CONSTRUCTION: Provide uplift reactions for roof framing plan and identify hold-down schedule on this plan sheet or make reference if located on other plan sheet. Plan Sheet A4.0 1. OK. 2. PARTIAL REPEAT COMMENT. FRONT PORCH COLUMNS APPEAR TO BE BUILT UP AND STUCCO CLADDED. NEW FRAMING DETAILS SHOW SIMPLE 4" X 4" P.T. WOOD COLUMNS WITH NO DETAILS HOW THEY WILL BE BUILT OUT AND FINISHED. Provide framing details for front porch walls and built-up columns including attachment to footings and framing above. Provide the same details for the built-up columns at guest room front window. 3. OK. 4. REPEAT COMMENT. THE DETAIL TO THE RIGHT OF PLAN SHEET A4.1 SHOWS AN LVL BEAM NOT LOCATED UNDER LOAD BEARING WALL AND FLOOR FRAMING ABOVE: Provide garage beam / girder design above garage roll up door that also supports 2nd floor wall and roof loads and construction and attachment details. 5. OK. 6. OK. 7. OK. 8. REPEAT COMMENT: Provide attic ventilation calculations. If vented soffits provide ventilation identify vented soffits on exterior wall sections on other plan sheets. If attic is to be conditioned and unvented then identify the attic as such. 9. OK. 10. OK. 11. OK. 12. REPEAT COMMENT: Provide stair framing attachment detail to floors (top and bottom) and at mid-point landing 13. REPEAT COMMENT: Provide stair mid-point landing attachment detail to framing. 14. PARTIAL REPEAT COMMENT. HANDRAIL DETAIL AND TYPE NOT PROVIDED: Provide stair guard height, opening limitations, handrail detail, handrail type, mounting height, clearances, etc. 15. OK. 16. REPEAT COMMENT. REFERENCE TO R316 DOES NOT APPLY. R316 IS A SECTION COVERING FOAM PLASTICS: Provide interior vapor retarder type in exterior wall section. Add to Plan Sheet A1.0. 17. OK. 18. OK. 19. OK. . 20. REPEAT COMMENT. ROOFING TILES COVERED BY FLORIDA PRODUCT APPROVAL NO. 17330.2 ALL APPEAR TO HAVE A PSF WEIGHT GREATER THAN THAT SHOWN ON PLAN SHEET A4.0: Correct roof top chord dead load to match roof tile plus roof sheathing p.s.f. weights. | |||
| BLD | HOLD | 12/05/2023 | 12/13/2023 |
| Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM Plan Sheet A1.0 1. Provide footing details for 6 foot privacy wall shown on Plan Sheet 2.0. Plan Sheet A1.1 1. Provide dimension of stair mid-point landing in the direction of travel. Landing dimension must be equal to width of stairs. 2. Identify at least one ground floor bathroom door as having a clear openable width of at least 29 inches. 3. Label window W02, W07 and W10 in window schedule as being tempered glass. 4. Provide dimension of front door landing in the direction of egress travel of at least 36 inches. 5. Provide width of stairs. 6. Identify house / garage door D01 and D11 types. 7. Identify house / garage fire resistive rated separation between garage and adjacent 1st floor and garage and 2nd floor above. Identify fire resistive rating for garage walls supporting 2nd floor above. 8. Show dimensions of attic access in upper roof and if lower roof has headroom clearance of 30 inches or more than show attic access(es) (may require more than 1) in location directly under area with 30 inches of headroom. 9. Identify rear porch ceiling materials. Plan Sheet A.1.3 1. 2nd floor framing plan incomplete. Identify means of supporting floor trusses adjacent to stairs. Identify means of supporting long trusses at connection with other trusses (girder requirements). Identify spans. Identify rim joist / truss closure materials. Identify load bearing wall locations. 2. Provide structural design for 2nd floor framing to support load bearing walls and roof loads above for Bedroom 4 where walls are inset from exterior walls below. Garage door beam / girder design needs to account for loads as well. Plan Sheet A1.4 1. Provide structural roof framing plan. Truss placement plan is not a structural roof framing plan. Numerous structural details missing. Truss placement plan is provided by truss manufacturer at time of truss submittal. 2. Provide uplift reactions for roof framing plan and identify hold-down schedule on this plan sheet or make reference if located on other plan sheet. Plan Sheet A4.0 1. Provide construction details for 6 foot privacy wall shown on Plan Sheets A1.1 and 2.0. Include attachment to foundation and all framing, sheathing and exterior finish details. 2. Provide framing details for front porch walls and built-up columns including attachment to footings and framing above. Provide the same details for the built-up columns at guest room front window. 3. Provide window header schedule. 4. Provide garage beam / girder design above garage roll up door thatalso supports 2nd floor wall and roof loadsand construction and attachment details. 5. Provide framing details for support of lower roof trusses including bearing materials, attachment to exterior wall details, etc. 6. Provide rear porch column specifications and attachment to footing and beam details 7. Provide rear porch beam specifications and attachment to porch column details. 8. Provide attic ventilation calculations. If vented soffits provide ventilation identify vented soffits on exterior wall sections on other plan sheets. If attic is to be conditioned and unvented then identify the attic as such. 9. Identify type of rim joist / band joist / floor truss closure in building section. Show on other building sections on other plan sheets. 10. Identify stair rise and run 11. Provide stair tread projection detail and stair tread nosing detail. 12. Provide stair framing attachment detail to floors (top and bottom) and at mid-point landing 13. Provide stair mid-point landing attachment detail to framing. 14. Provide stair guard height, opening limitations, handrail detail, handrail type, mounting height, clearances, etc. 15. Provide soffit framing and attachment detail. Add to Plan Sheet A1.0 16. Provide interior vapor retarder type in exterior wall section. Add to Plan Sheet A1.0. 17. Provide window and door flashing detail in exterior wall section. Add to Plan Sheet A1.0 18. Provide flashing details for lower roof connections to exterior walls. Add to Plan Sheet A1.0. 19. Provide floor sheathing type and thickness in building section view. Add to Plan Sheet A1.0. 20. Correct roof top chord dead load to match roof tile plus roof sheathing p.s.f. weights. | |||
| CUSVC | COMPLETE | 12/05/2023 | 12/11/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 12/05/2023 | 12/11/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1.Submit electrical load calcs. 2. Need smoke alarms in all bedrooms. FRC 2020 314 3. Need combo alarms outside of all bedrooms FRC 2020 314,315 | |||
| ENGIN1 | COMPLETE | 12/05/2023 | 12/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/05/2023 | 12/05/2023 |
| LOCATE | COMPLETE | 12/05/2023 | 12/06/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/05/2023 | 12/05/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on heatloads needs to be Daytona Beach to match the Energy calcs 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| SW1 | HOLD | 12/05/2023 | 12/12/2023 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM See below and also the posted stormwater checklist 1. Please show FFE of structure, including FFE of the garage 2. Please identify a site benchmark, referened to NAVD88 datum. 3. Please show proposed drainage (see checklist (Sec. C & D) for further detail) 4. Show appropriate sod elevations 4" below FFE for block and 6" below FFE for wood 5. Rear drainage from structure to be 6" min. slope for the first 10'. 6. Please include a signed/dated professional seal. Please be sure to review all checked boxes of the stormwater checklist and refer to the COPC technical manual as needed. | |||
| ZON | HOLD | 12/05/2023 | 12/05/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Survey / Site plan: Please provide all platted easments on both Map book and page is incorrect Width of walkway Landscape plan: 7 gallons shrubs required for the mechanical equiptment screening showing 3 gallons on plan Elevation Plan: Faux Building Features: It is prohibited to paint faux features or elements of structure such as, but not limited to Windows, doors, shutters or flower boxes Floor plan: Please know 30' depth is the max allowed Garage depth cannot exceed 30ft max. Adjust plans accordingly | |||
| URB | HOLD | 12/05/2023 | 12/06/2023 |
| Note: Held By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM 12/6/23 (JB) FOUNDATION SHRUBBERY (SCHEFFLERA ARBICOLA) "SA" ON THE PLAN ARE NON APPROVED TYPE AND WILL NEED TO BE REPLACED WITH PLANTS APPROVED FOR HARDINESS ZONE 9 A OR FROM THE CITY APPROVED SHRUBBERY LIST. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤65.00 | 10/03/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/03/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/12/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/12/2024 |
| SEWER INSPECTION | ¤25.00 | 02/12/2024 |
| SITE PLAN 30 | ¤30.00 | 02/12/2024 |
| WATER-METER | ¤514.49 | 02/12/2024 |
| ADJUSTMENT 50% | (¤957.51) | 02/12/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/12/2024 |
| INSPECTION - RESIDENTIAL | ¤1,468.50 | 02/12/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤416.52 | 02/12/2024 |
| CONNECTION FEES | ¤25.00 | 02/12/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 02/12/2024 |
| IMPACT FEE FIRE | ¤428.09 | 02/12/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/12/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/12/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 02/12/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/12/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 02/12/2024 |
| SURCHARGE FS 533.721 | ¤9.58 | 02/12/2024 |
| SURCHARGE - FS 468.631 | ¤14.36 | 02/12/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/12/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/12/2024 |
| SW ENG PRE APRON | ¤30.00 | 02/12/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,642.02 |