I want to search for...
Permit #2023120175
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7037-00860-0100 |
| Block: 00860 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 786-512-4421 |
| Location Address: 23 LAKE SUCCESS DR |
| Type: DR - DRIVEWAY |
| Issue Date: 01/16/2024 |
| NOC: RECORDED |
| Applicant name: ABEL MENENDEZ |
| Owner: ASHTON OSWALD C & LYNETTE C H&W LIFE ESTATE |
|
Address 23 LAKE SUCCESS DRIVE PALM COAST, FL 32137 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤9,500.00 |
| Job Description: REPLACING CONCRETE DRIVEWAY WITH PAVERS |
| Type: CN |
Contractor
ROYAL TILE & PAVERS INC
| Status | Location Address | Phone |
| ACTIVE |
69 FLEETWOOD DR PALM COAST, FL 32137 |
786-512-4421 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 07/18/2024 | APPROVED | EMADISON |
| ROW - FINAL INSPECTION | 07/18/2024 | APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 07/18/2024 | FINAL APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 01/29/2024 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------- 1/19/2024 - PREVIOUS INSPECTION NOTES ** 01/19/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED | |||
| ROW- PAVER RESTRAINTS | 01/19/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/10/23 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/19/2024 | PARTIALLY APPROVED | EMADISON |
| Note: ** 01/19/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 01/09/2024 | 01/09/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/04/2024 | 01/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 01/04/2024 | 01/08/2024 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/04/2024 | 01/05/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please bring the Original ROW paperwork to our office in for recording. | |||
| UD1 | COMPLETE | 12/14/2023 | 12/18/2023 |
| Note: Released By: ALEXANDER BLAKE - - ABLAKE@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/14/2023 | 12/14/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/06/2023 | 12/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 12/06/2023 | 12/11/2023 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/06/2023 | 12/06/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway must meet a 5ft setback. Site plan states 4.37 If this is concrete no right of way is required. Appears the existing driveway is 20ft and you are replacing it with a 17ft. Please clarify |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤15.00) | 01/16/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/16/2024 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 01/16/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 01/16/2024 |
| SW ENG PRE APRON | ¤30.00 | 01/16/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/16/2024 |
| SITE PLAN 15 | ¤15.00 | 01/16/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤344.00 |