I want to search for...
Permit #2023120205
Permit Details
Status: COED
| Parcel Id: 07-11-31-7013-00190-0500 |
| CONDITIONED SPACE: 1596 sqft |
| GARAGE: 398 sqft |
| OPENED PORCH (WITH ROOF) : 172 sqft |
| Total Square Footage: 2166 sqft |
| Block: 00190 |
| Subdivision: 2192 - SECTION 13-BELLE TERRE |
| Job Phone: 386-445-9009 |
| Location Address: 114 BRUNSWICK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/27/2023 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PKWY STE 7 PALM COAST, FL 32164 |
| Lot: 0500 |
| Contracted Stated Job Value: ¤300,944.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/18/2024 | FINAL APPROVED | JSTEWART |
| U-CROSS CONNECTION | 07/10/2024 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 07/10/2024 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 07/09/2024 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/09/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/09/2024 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 07/09/2024 | APPROVED | EMADISON |
| ROW- PRE-APRON (PRE-POUR) | 06/18/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 06/18/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| GRAVITY SEWER TEST | 06/18/2024 | APPROVED | LMILLER |
| SEWER TIE IN | 06/18/2024 | APPROVED | JSTEWART |
| ELECTRIC - EARLY POWER | 06/10/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 10am | |||
| LATH/BRICK/ WATER BARRIER | 05/09/2024 | APPROVED | FWILLIS |
| INSULATION | 04/23/2024 | APPROVED | FWILLIS |
| ALL ROUGH | 04/18/2024 | APPROVED | JSTEWART |
| ROOF VALLEY & METAL | 04/17/2024 | APPROVED | FWILLIS |
| Note: 4/16/2024 - PREVIOUS INSPECTION NOTES 4/16/24 - ENGINEERING REQUESTED FOR TRUSS TO8 (3/28/24) STILL NOT INSTALLED. Inspector Notes from Inspection 2460 3/28/24- Please install engineering 2X at T08A truss, highlighted in Mitek pack. will check at all rough. Inspector Notes from Inspection 2340 3/14/24-3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| ROOF VALLEY & METAL | 04/16/2024 | Disapproved - NO FEE | FWILLIS |
| Note: 4/16/24 - ENGINEERING REQUESTED FOR TRUSS TO8 (3/28/24) STILL NOT INSTALLED. Inspector Notes from Inspection 2460 3/28/24- Please install engineering 2X at T08A truss, highlighted in Mitek pack. will check at all rough. Inspector Notes from Inspection 2340 3/14/24-3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| WALL SHEATHING | 03/28/2024 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2340 3/14/24-3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/28/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 3/28/24- Please install engineering 2X at T08A truss, highlighted in Mitek pack. will check at all rough. Inspector Notes from Inspection 2340 3/14/24-3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| TIE BEAM / LINTEL | 03/14/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 3/14/24-3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/12/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/05/2024 | APPROVED | JSTEWART |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/29/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/26/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/12/2024 | 03/12/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/12/2024 | 03/12/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/13/2023 | 12/20/2023 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/13/2023 | 12/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/13/2023 | 12/13/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no zoning changes | |||
| BLD | COMPLETE | 12/06/2023 | 12/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/06/2023 | 12/07/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/06/2023 | 12/11/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/06/2023 | 12/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/06/2023 | 12/06/2023 |
| LOCATE | COMPLETE | 12/06/2023 | 12/07/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/06/2023 | 12/07/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 12/06/2023 | 12/12/2023 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1. Please indicate culvert material, size and inverts; typically 13"x17" CMP, but may also by a 15" HDPE round equivalent 2. Please provide a professional seal and signature on the survey & site plan Also, for your reference, see the uploaded stormwater checklist as well. | |||
| ZON | COMPLETE | 12/06/2023 | 12/06/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/06/2023 | 01/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤25.00 | 12/27/2023 |
| ADJUSTMENT 50% | (¤546.27) | 12/27/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/27/2023 |
| INSPECTION - RESIDENTIAL | ¤827.75 | 12/27/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤234.78 | 12/27/2023 |
| CONNECTION FEES | ¤1,187.26 | 12/27/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 12/27/2023 |
| IMPACT FEE FIRE | ¤428.09 | 12/27/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/27/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/27/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 12/27/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/27/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 12/27/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/27/2023 |
| SURCHARGE FS 533.721 | ¤5.46 | 12/27/2023 |
| SURCHARGE - FS 468.631 | ¤8.19 | 12/27/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/27/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/27/2023 |
| SW ENG PRE APRON | ¤30.00 | 12/27/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/27/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/27/2023 |
| SEWER CREDIT | (¤1,466.00) | 12/27/2023 |
| SEWER INSPECTION | ¤25.00 | 12/27/2023 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 12/27/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 12/27/2023 |
| SITE PLAN 30 | ¤30.00 | 12/27/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,210.79 |