I want to search for...
Permit #2023120262
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00880-0160 |
| CONDITIONED SPACE: 1500 sqft |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 119 sqft |
| Total Square Footage: 2015 sqft |
| Block: 00880 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 202-494-2019 |
| Location Address: 7 ROBIN HOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/29/2023 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB BFR FUND 1 LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/20/2024 | FINAL APPROVED | AGAETANO |
| ROW - FINAL APRON (AFTER POUR) | 06/20/2024 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 06/20/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 06/20/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/31/2024 1:41:18 PM *** no nirr-no cross connection *** NOTES ADDED BY LFITZGERALD 5/31/2024 1:41:03 PM *** | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/18/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 06/18/24 TPOLACEK*** SPOKE WITH JACK DOYLE FROM WILCOX SURVEY. HE STATED THAT WHEN THE SITE PLAN WAS DONE THERE WAS A LOW AREA IN THE BACK YARD OF THE HOME ON THE RIGHT. THE SHOTS FROM THE SITE PLAN TO THE FINAL SURVEY ARE CORRECT AND WATER SHALL NOT IMPACT THE ADJACENT PROPERTY. I AM APPROVING THIS INSPECTION AS NOTED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/17/2024 - PREVIOUS INSPECTION NOTES 06/17/24 TPOLACEK*** SITE PLAN AND SURVEY ARE SHOWING DIFFERENT 10' OFF SHOTS IN BACK YARD TO THE RIGHT. THIS NUMBER IS VERY IMPORTANT AS IT SHOWS POSSIBLE NEG IMPACT. PLEASE CLARIFY. THERE IS ALMOST A 1' CHANGE IN ELEVATION WHERE THERE WAS NOT WORK CONDUCTED. PLEASE SEE ATTACHED PHOTOS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/12/2024 - PREVIOUS INSPECTION NOTES 1) ALL ELEVATIONS ON THE RIGHT OF WAY LINE/ FRONT PROPERTY LINE NEED TO EQUAL OR GREATER THAN EDGE OF PAVEMENT. 2) THE DRAINAGE ON THE RIGHT OF PROPERTY FROM AC TO THE FRONT RIGHT OF WAY LINE NEED TO BE A COMMON SWALE AS WAS PROPOSED ON THE SITE PLAN. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/18/2024 | APPROVED | TPOLACEK |
| Note: Inspector Notes from Inspection 9463 06/18/24 TPOLACEK*** SPOKE WITH JACK DOYLE FROM WILCOX SURVEY. HE STATED THAT WHEN THE SITE PLAN WAS DONE THERE WAS A LOW AREA IN THE BACK YARD OF THE HOME ON THE RIGHT. THE SHOTS FROM THE SITE PLAN TO THE FINAL SURVEY ARE CORRECT AND WATER SHALL NOT IMPACT THE ADJACENT PROPERTY. I AM APPROVING THIS INSPECTION AS NOTED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/17/2024 - PREVIOUS INSPECTION NOTES 06/17/24 TPOLACEK*** SITE PLAN AND SURVEY ARE SHOWING DIFFERENT 10' OFF SHOTS IN BACK YARD TO THE RIGHT. THIS NUMBER IS VERY IMPORTANT AS IT SHOWS POSSIBLE NEG IMPACT. PLEASE CLARIFY. THERE IS ALMOST A 1' CHANGE IN ELEVATION WHERE THERE WAS NOT WORK CONDUCTED. PLEASE SEE ATTACHED PHOTOS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/12/2024 - PREVIOUS INSPECTION NOTES 1) ALL ELEVATIONS ON THE RIGHT OF WAY LINE/ FRONT PROPERTY LINE NEED TO EQUAL OR GREATER THAN EDGE OF PAVEMENT. 2) THE DRAINAGE ON THE RIGHT OF PROPERTY FROM AC TO THE FRONT RIGHT OF WAY LINE NEED TO BE A COMMON SWALE AS WAS PROPOSED ON THE SITE PLAN. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/17/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 06/17/24 TPOLACEK*** SITE PLAN AND SURVEY ARE SHOWING DIFFERENT 10' OFF SHOTS IN BACK YARD TO THE RIGHT. THIS NUMBER IS VERY IMPORTANT AS IT SHOWS POSSIBLE NEG IMPACT. PLEASE CLARIFY. THERE IS ALMOST A 1' CHANGE IN ELEVATION WHERE THERE WAS NOT WORK CONDUCTED. PLEASE SEE ATTACHED PHOTOS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/12/2024 - PREVIOUS INSPECTION NOTES 1) ALL ELEVATIONS ON THE RIGHT OF WAY LINE/ FRONT PROPERTY LINE NEED TO EQUAL OR GREATER THAN EDGE OF PAVEMENT. 2) THE DRAINAGE ON THE RIGHT OF PROPERTY FROM AC TO THE FRONT RIGHT OF WAY LINE NEED TO BE A COMMON SWALE AS WAS PROPOSED ON THE SITE PLAN. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/12/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) ALL ELEVATIONS ON THE RIGHT OF WAY LINE/ FRONT PROPERTY LINE NEED TO EQUAL OR GREATER THAN EDGE OF PAVEMENT. 2) THE DRAINAGE ON THE RIGHT OF PROPERTY FROM AC TO THE FRONT RIGHT OF WAY LINE NEED TO BE A COMMON SWALE AS WAS PROPOSED ON THE SITE PLAN. | |||
| U-CROSS CONNECTION | 05/31/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/31/2024 1:41:18 PM *** no nirr-no cross connection *** NOTES ADDED BY LFITZGERALD 5/31/2024 1:41:03 PM *** | |||
| ROW- PRE-APRON (PRE-POUR) | 05/29/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ELECTRIC - EARLY POWER | 05/23/2024 | APPROVED | AGAETANO |
| INSULATION | 05/01/2024 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 04-26-2024 1. Mechanical layout not on site. 2. Address not posted. 3. P.A.S. indicates MI and PlyGem installed. Product Approval numbers do not match. Please submit a revision to the building department and have on site. Check at next inspection. | |||
| LATH/BRICK/ WATER BARRIER | 04/26/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 04-26-2024 Address not posted. Check at next inspection. | |||
| ALL ROUGH | 04/26/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 04-26-2024 1. Mechanical layout not on site. 2. Address not posted. 3. P.A.S. indicates MI and PlyGem installed. Product Approval numbers do not match. Please submit a revision to the building department and have on site. Check at next inspection. | |||
| ELECTRIC-TUG | 04/25/2024 | APPROVED | AGAETANO |
| GRAVITY SEWER TEST | 04/17/2024 | APPROVED | BTAYLOR |
| SEWER TIE IN | 04/17/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/10/2024 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2467 Roof sheathing approved. | |||
| ROOF VALLEY & METAL | 04/09/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: Roof sheathing approved. | |||
| WALL SHEATHING | 04/09/2024 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/09/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 04-09-2024 Truss layout not on site. Roof sheathing approved. | |||
| TIE BEAM / LINTEL | 04/01/2024 | APPROVED | AGAETANO |
| Note: 3/28/2024 - PREVIOUS INSPECTION NOTES 03-28-2024 Drawings are dirty and unorganized. Please provide a full set of approved draings and documents for all inspections. | |||
| TIE BEAM / LINTEL | 03/28/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 03-28-2024 Drawings are dirty and unorganized. Please provide a full set of approved draings and documents for all inspections. | |||
| TIE BEAM / LINTEL | 03/26/2024 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 03/20/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/14/2024 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 03/14/2024 | APPROVED | JSTEWART |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/12/2024 | APPROVED | MGIBSON |
| Note: 3/11/2024 - PREVIOUS INSPECTION NOTES 5' HEAD TEST NOT HOLDING | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/11/2024 | Disapproved - NO FEE | MGIBSON |
| Note: 5' HEAD TEST NOT HOLDING | |||
| WATER METER INSTALLATION REQUEST | 01/12/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/20/2024 | 03/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/20/2024 | 03/20/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 03/12/2024 | 03/13/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 03/12/2024 | 03/12/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/24/2024 | 01/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/08/2023 | 01/22/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/07/2023 | 12/12/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/07/2023 | 12/12/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/07/2023 | 12/11/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/07/2023 | 12/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/07/2023 | 12/12/2023 |
| LOCATE | COMPLETE | 12/07/2023 | 12/08/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/07/2023 | 12/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/07/2023 | 12/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/07/2023 | 12/08/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 12/07/2023 | 12/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤25.00 | 12/29/2023 |
| ADJUSTMENT 50% | (¤512.73) | 12/29/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/29/2023 |
| INSPECTION - RESIDENTIAL | ¤775.50 | 12/29/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤219.96 | 12/29/2023 |
| CONNECTION FEES | ¤1,187.26 | 12/29/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 12/29/2023 |
| IMPACT FEE FIRE | ¤428.09 | 12/29/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/29/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/29/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 12/29/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/29/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 12/29/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/29/2023 |
| SURCHARGE FS 533.721 | ¤5.13 | 12/29/2023 |
| SURCHARGE - FS 468.631 | ¤7.69 | 12/29/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/29/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/29/2023 |
| SW ENG PRE APRON | ¤30.00 | 12/29/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/29/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/29/2023 |
| SEWER CREDIT | (¤1,147.00) | 12/29/2023 |
| SEWER INSPECTION | ¤25.00 | 12/29/2023 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 12/29/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 12/29/2023 |
| SITE PLAN 30 | ¤30.00 | 12/29/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,495.43 |