I want to search for...
Permit #2023120279
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-01230-0150 |
| CONDITIONED SPACE: 1650 sqft |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2158 sqft |
| Block: 01230 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 202-494-2019 |
| Location Address: 233 BIRD OF PARADISE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/05/2024 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB BFR FUND 1 LLC |
|
Address 3760 MAGUIRE BOULEVARD SUITE 220 ORLANDO, FL 32803 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/26/2024 | FINAL APPROVED | JSTEWART |
| Note: 6/25/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 6/25/2024 2:45:04 PM *** 1. Please seal at AHU and plenum connection. 2. Please repair spare bath tub spout, water blowing out back of spout when under shower preassure. and please seal fixture to wall. Inspector Notes from Inspection 2320 3/27/24-3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/26/2024 | FINAL APPROVED | DHANEY |
| Note: 6/25/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/25/2024 7:55:24 AM *** No power to Pep tank or Pep panel ,need turned on. Posible off at fuse panel [ house locked, no code] 6/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/24/2024 8:19:28 AM *** Need sewer clean out lowerd to ground level . | |||
| BLD - BUILDING FINAL | 06/25/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 6/25/2024 2:45:04 PM *** 1. Please seal at AHU and plenum connection. 2. Please repair spare bath tub spout, water blowing out back of spout when under shower preassure. and please seal fixture to wall. Inspector Notes from Inspection 2320 3/27/24-3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/25/2024 | Disapproved - NO FEE | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 6/25/2024 7:55:24 AM *** No power to Pep tank or Pep panel ,need turned on. Posible off at fuse panel [ house locked, no code] 6/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/24/2024 8:19:28 AM *** Need sewer clean out lowerd to ground level . | |||
| U -UTILITY RESIDENTIAL FINAL | 06/24/2024 | Disapproved - NO FEE | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 6/24/2024 8:19:28 AM *** Need sewer clean out lowerd to ground level . | |||
| U-CROSS CONNECTION | 06/24/2024 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 06/21/2024 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/21/2024 | APPROVED | TPOLACEK |
| Note: Inspector Notes from Inspection 9270 ** 05/29/24 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/28/24 CULVERT WAS SET TOO DEEP, NEED TO BE SET IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN DETAIL ___________________________________________________________________________________________________________________ 5/22/2024 - PREVIOUS INSPECTION NOTES 5/21/2024 - PREVIOUS INSPECTION NOTES 5/20/2024 - PREVIOUS INSPECTION NOTES 5/17/2024 - PREVIOUS INSPECTION NOTES ** 05/17/24 CULVERT PIPE IS OUT OF TOLERANCE ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place _____________________________________________________________________________________________________________________ 5/15/2024 - PREVIOUS INSPECTION NOTES ** 05/15/24 CANCELLED BY APPLICANT AS POUR AREA IS FULL OF WATER | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/21/2024 | APPROVED | TPOLACEK |
| Note: 06/21/24 TPOLACEK*** UPON WALKING PROPERTY AFTER THE RAIN TODAY FOUND DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 06/21/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 05/29/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 05/29/24 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/28/24 CULVERT WAS SET TOO DEEP, NEED TO BE SET IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN DETAIL ___________________________________________________________________________________________________________________ 5/22/2024 - PREVIOUS INSPECTION NOTES 5/21/2024 - PREVIOUS INSPECTION NOTES 5/20/2024 - PREVIOUS INSPECTION NOTES 5/17/2024 - PREVIOUS INSPECTION NOTES ** 05/17/24 CULVERT PIPE IS OUT OF TOLERANCE ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place _____________________________________________________________________________________________________________________ 5/15/2024 - PREVIOUS INSPECTION NOTES ** 05/15/24 CANCELLED BY APPLICANT AS POUR AREA IS FULL OF WATER | |||
| ROW- PRE-APRON (PRE-POUR) | 05/28/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/28/24 CULVERT WAS SET TOO DEEP, NEED TO BE SET IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN DETAIL ___________________________________________________________________________________________________________________ 5/22/2024 - PREVIOUS INSPECTION NOTES 5/21/2024 - PREVIOUS INSPECTION NOTES 5/20/2024 - PREVIOUS INSPECTION NOTES 5/17/2024 - PREVIOUS INSPECTION NOTES ** 05/17/24 CULVERT PIPE IS OUT OF TOLERANCE ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place _____________________________________________________________________________________________________________________ 5/15/2024 - PREVIOUS INSPECTION NOTES ** 05/15/24 CANCELLED BY APPLICANT AS POUR AREA IS FULL OF WATER | |||
| ROW- PRE-APRON (PRE-POUR) | 05/22/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: 5/21/2024 - PREVIOUS INSPECTION NOTES 5/20/2024 - PREVIOUS INSPECTION NOTES 5/17/2024 - PREVIOUS INSPECTION NOTES ** 05/17/24 CULVERT PIPE IS OUT OF TOLERANCE ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place _____________________________________________________________________________________________________________________ 5/15/2024 - PREVIOUS INSPECTION NOTES ** 05/15/24 CANCELLED BY APPLICANT AS POUR AREA IS FULL OF WATER | |||
| ROW- PRE-APRON (PRE-POUR) | 05/21/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: 5/20/2024 - PREVIOUS INSPECTION NOTES 5/17/2024 - PREVIOUS INSPECTION NOTES ** 05/17/24 CULVERT PIPE IS OUT OF TOLERANCE ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place _____________________________________________________________________________________________________________________ 5/15/2024 - PREVIOUS INSPECTION NOTES ** 05/15/24 CANCELLED BY APPLICANT AS POUR AREA IS FULL OF WATER | |||
| ROW- PRE-APRON (PRE-POUR) | 05/20/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: 5/17/2024 - PREVIOUS INSPECTION NOTES ** 05/17/24 CULVERT PIPE IS OUT OF TOLERANCE ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place _____________________________________________________________________________________________________________________ 5/15/2024 - PREVIOUS INSPECTION NOTES ** 05/15/24 CANCELLED BY APPLICANT AS POUR AREA IS FULL OF WATER | |||
| ROW- PRE-APRON (PRE-POUR) | 05/17/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/17/24 CULVERT PIPE IS OUT OF TOLERANCE ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place _____________________________________________________________________________________________________________________ 5/15/2024 - PREVIOUS INSPECTION NOTES ** 05/15/24 CANCELLED BY APPLICANT AS POUR AREA IS FULL OF WATER | |||
| ROW- PRE-APRON (PRE-POUR) | 05/15/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 05/15/24 CANCELLED BY APPLICANT AS POUR AREA IS FULL OF WATER | |||
| ELECTRIC - EARLY POWER | 05/06/2024 | APPROVED | JSTEWART |
| GRAVITY SEWER TEST | 04/16/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 04/16/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 04/02/2024 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 03/27/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 3/27/24-3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| INSULATION | 03/25/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 3/20/24- Please install mechanical faster at duct connection to fbathroom fan assembly. FBC M1601.4.1 Joints, seams and connections...Duct connections to flanges of air distribution system equipment shall be sealed and mechanically fastened. Please install steel plate at dryer top plate that extends 6" each side of cut member. R602.6.1 Drilling and notching of top plate....a galvanized metal tie not less than 0.054 inch thick (1.37 mm) (16ga) and 1 1/2 inches ...The metal tie must extend not less than 6 inches past the opening. will check at insulation. | |||
| ALL ROUGH | 03/20/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 3/20/24- Please install mechanical faster at duct connection to fbathroom fan assembly. FBC M1601.4.1 Joints, seams and connections...Duct connections to flanges of air distribution system equipment shall be sealed and mechanically fastened. Please install steel plate at dryer top plate that extends 6" each side of cut member. R602.6.1 Drilling and notching of top plate....a galvanized metal tie not less than 0.054 inch thick (1.37 mm) (16ga) and 1 1/2 inches ...The metal tie must extend not less than 6 inches past the opening. will check at insulation. | |||
| ELECTRIC-TUG | 03/14/2024 | APPROVED | RMARTIN |
| ROOF VALLEY & METAL | 03/12/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/29/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING | 02/28/2024 | APPROVED | FWILLIS |
| WALL SHEATHING | 02/28/2024 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 02/20/2024 | APPROVED | JSTEWART |
| FOUND SURVEY APPROVED (OFFICE) | 02/20/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/09/2024 | APPROVED | JSTEWART |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/07/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/17/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/14/2024 | 06/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/15/2024 | 02/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/15/2024 | 02/15/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/24/2024 | 01/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/13/2023 | 12/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/08/2023 | 12/11/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/08/2023 | 12/13/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/08/2023 | 12/11/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/08/2023 | 12/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/08/2023 | 12/12/2023 |
| LOCATE | COMPLETE | 12/08/2023 | 12/08/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/08/2023 | 12/12/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition | |||
| SW1 | COMPLETE | 12/08/2023 | 12/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/08/2023 | 12/08/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 12/08/2023 | 12/12/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/08/2023 | 01/22/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/21/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/21/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/21/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/05/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/05/2024 |
| SEWER CREDIT | (¤850.00) | 01/05/2024 |
| SEWER INSPECTION | ¤25.00 | 01/05/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 01/05/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 01/05/2024 |
| SITE PLAN 30 | ¤30.00 | 01/05/2024 |
| CONNECTION FEES | ¤1,187.26 | 01/05/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 01/05/2024 |
| IMPACT FEE FIRE | ¤428.09 | 01/05/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/05/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/05/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 01/05/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/05/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 01/05/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/05/2024 |
| SURCHARGE FS 533.721 | ¤5.55 | 01/05/2024 |
| SURCHARGE - FS 468.631 | ¤8.33 | 01/05/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/05/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/05/2024 |
| SW ENG PRE APRON | ¤30.00 | 01/05/2024 |
| WATER- TURN ON | ¤25.00 | 01/05/2024 |
| ADJUSTMENT 50% | (¤555.09) | 01/05/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/05/2024 |
| INSPECTION - RESIDENTIAL | ¤841.50 | 01/05/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤238.68 | 01/05/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,928.35 |