I want to search for...
Permit #2023120281
Permit Details
Status: COED
| Parcel Id: 07-11-31-7013-00070-0610 |
| CONDITIONED SPACE: 1903 sqft |
| GARAGE: 648 sqft |
| OPENED PORCH (WITH ROOF) : 182 sqft |
| OPENED PORCH (WITH ROOF) : 70 sqft |
| Total Square Footage: 2803 sqft |
| Block: 00070 |
| Subdivision: 2192 - SECTION 13-BELLE TERRE |
| Job Phone: 202-494-2019 |
| Location Address: 21 BREWSTER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/26/2023 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB FUND 2 LLC |
|
Address 3670 MAGUIRE BOULEVARD SUITE 220 ORLANDO, FL 32803 |
| Lot: 0610 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/17/2024 | FINAL APPROVED | JSTEWART |
| ROW - FINAL APRON (AFTER POUR) | 06/17/2024 | APPROVED | TPOLACEK |
| Note: 06/17/24 TPOLACEK*** PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 ** 06/13/24 RIGHT SIDE PROPERTY LINE IN ROAD SIDE SWALE NEED TO REMOVE HIGH SPOT TO ALLOW FOR THE FLOW OF STORM WATER ( BEFORE ROW STORMWATER FINAL) | |||
| ROW - STORMWATER FINAL | 06/17/2024 | APPROVED | TPOLACEK |
| Note: 06/17/24 TPOLACEK*** CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 ** 06/13/24 RIGHT SIDE PROPERTY LINE IN ROAD SIDE SWALE NEED TO REMOVE HIGH SPOT TO ALLOW FOR THE FLOW OF STORM WATER ( BEFORE ROW STORMWATER FINAL) | |||
| U -UTILITY RESIDENTIAL FINAL | 06/17/2024 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 No IRR | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/13/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/13/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 06/13/24 RIGHT SIDE PROPERTY LINE IN ROAD SIDE SWALE NEED TO REMOVE HIGH SPOT TO ALLOW FOR THE FLOW OF STORM WATER ( BEFORE ROW STORMWATER FINAL) | |||
| U-CROSS CONNECTION | 06/12/2024 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR | |||
| ROW- PRE-APRON (PRE-POUR) | 04/26/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/26/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________ 4/25/2024 - PREVIOUS INSPECTION NOTES ** 04/25/24 NEED A MINIMUM OF 6 INCHES OF CONCRETE ALONG THE EDGE OF ROADWAY AND ENTIRE APRON ** LEFT SIDE FOOTER NEEDS TO BE DUG OUT A MINIMUM OF 6" X 6" X 18" ** NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE IN ENTIRE DRIVEWAY POUR AREA ABOVE THE ROW CHIP AWAY OVER POURED CONCRETE IN FRONT OF GARAGE OPENING AND BETWEEN BOTH OPENING ** COMPACT MATERIAL IN ROW TOO SOFT | |||
| ROW- PRE-APRON (PRE-POUR) | 04/25/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/25/24 NEED A MINIMUM OF 6 INCHES OF CONCRETE ALONG THE EDGE OF ROADWAY AND ENTIRE APRON ** LEFT SIDE FOOTER NEEDS TO BE DUG OUT A MINIMUM OF 6" X 6" X 18" ** NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE IN ENTIRE DRIVEWAY POUR AREA ABOVE THE ROW CHIP AWAY OVER POURED CONCRETE IN FRONT OF GARAGE OPENING AND BETWEEN BOTH OPENING ** COMPACT MATERIAL IN ROW TOO SOFT | |||
| ELECTRIC - EARLY POWER | 04/24/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 3/19/24- Authorize release of email to FPL @ 8:57a 4-24-24 1. Emailed FPL at 11:13. | |||
| INSULATION | 03/26/2024 | APPROVED | JSTEWART |
| LATH/BRICK/ WATER BARRIER | 03/21/2024 | APPROVED | FWILLIS |
| ALL ROUGH | 03/20/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 3/20/24- Please seal Dryer duct at Joints/seams connections. M1601.4.1 Joints, seams and connections. Please install a mechanical fastener at exhaust duct connection to the fan assembly.FBC M1601.4.1 Joints, seams and connections....Duct connections to flanges of air distribution system equipment shall be sealed and mechanically fastened. | |||
| ELECTRIC-TUG | 03/19/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 3/19/24- Authorize release of email to FPL @ 8:57a | |||
| ROOF VALLEY & METAL | 03/12/2024 | APPROVED | JSTEWART |
| WALL SHEATHING | 03/07/2024 | APPROVED | JSTEWART |
| Note: 3/5/2024 - PREVIOUS INSPECTION NOTES 3/5/2024- (5th NOTICE)....3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. Inspector Notes from Inspection 2340 2/23/24- 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. (4th Notice) 2/22/2024 - PREVIOUS INSPECTION NOTES 2/22/24- Previous notes Partially rectified....2. Garage wall toward front entry drop dowels need to be tied off to horizontal reinforcement. R404.1.3.3.7.4 Support and cover. 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. (3rd Notice) 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24- 1. Multiple footing dowels need to be relocated for embedment min. R606.3.4 CLEARANCE FROM MASONRY 2. Garage wall toward front entry drop dowels need to be tied off to horizontal reinforcement. R404.1.3.3.7.4 Support and cover. 3. corner of garage requires 2 drop dowels to match footing dowels, need to seperate footing dowels to next space per plans (highlighted on plans). 2/16/2024 - PREVIOUS INSPECTION NOTES 2-16-24 Need to tidy up site and remove debris or place in dumpster by this inspection as requested prior FBC 3302.2 Inspector Notes from Inspection 2250 1. Silt fence needs to be repaired before next inspection 2. Trash needs to be cleaned up before next inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/07/2024 | APPROVED | JSTEWART |
| WALL SHEATHING | 03/05/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 3/5/2024- (5th NOTICE)....3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. Inspector Notes from Inspection 2340 2/23/24- 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. (4th Notice) 2/22/2024 - PREVIOUS INSPECTION NOTES 2/22/24- Previous notes Partially rectified....2. Garage wall toward front entry drop dowels need to be tied off to horizontal reinforcement. R404.1.3.3.7.4 Support and cover. 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. (3rd Notice) 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24- 1. Multiple footing dowels need to be relocated for embedment min. R606.3.4 CLEARANCE FROM MASONRY 2. Garage wall toward front entry drop dowels need to be tied off to horizontal reinforcement. R404.1.3.3.7.4 Support and cover. 3. corner of garage requires 2 drop dowels to match footing dowels, need to seperate footing dowels to next space per plans (highlighted on plans). 2/16/2024 - PREVIOUS INSPECTION NOTES 2-16-24 Need to tidy up site and remove debris or place in dumpster by this inspection as requested prior FBC 3302.2 Inspector Notes from Inspection 2250 1. Silt fence needs to be repaired before next inspection 2. Trash needs to be cleaned up before next inspection | |||
| ROOF SHEATHING | 03/05/2024 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2340 2/23/24- 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. (4th Notice) 2/22/2024 - PREVIOUS INSPECTION NOTES 2/22/24- Previous notes Partially rectified....2. Garage wall toward front entry drop dowels need to be tied off to horizontal reinforcement. R404.1.3.3.7.4 Support and cover. 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. (3rd Notice) 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24- 1. Multiple footing dowels need to be relocated for embedment min. R606.3.4 CLEARANCE FROM MASONRY 2. Garage wall toward front entry drop dowels need to be tied off to horizontal reinforcement. R404.1.3.3.7.4 Support and cover. 3. corner of garage requires 2 drop dowels to match footing dowels, need to seperate footing dowels to next space per plans (highlighted on plans). 2/16/2024 - PREVIOUS INSPECTION NOTES 2-16-24 Need to tidy up site and remove debris or place in dumpster by this inspection as requested prior FBC 3302.2 Inspector Notes from Inspection 2250 1. Silt fence needs to be repaired before next inspection 2. Trash needs to be cleaned up before next inspection | |||
| TIE BEAM / LINTEL | 02/23/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 2/23/24- 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. (4th Notice) 2/22/2024 - PREVIOUS INSPECTION NOTES 2/22/24- Previous notes Partially rectified....2. Garage wall toward front entry drop dowels need to be tied off to horizontal reinforcement. R404.1.3.3.7.4 Support and cover. 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. (3rd Notice) 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24- 1. Multiple footing dowels need to be relocated for embedment min. R606.3.4 CLEARANCE FROM MASONRY 2. Garage wall toward front entry drop dowels need to be tied off to horizontal reinforcement. R404.1.3.3.7.4 Support and cover. 3. corner of garage requires 2 drop dowels to match footing dowels, need to seperate footing dowels to next space per plans (highlighted on plans). 2/16/2024 - PREVIOUS INSPECTION NOTES 2-16-24 Need to tidy up site and remove debris or place in dumpster by this inspection as requested prior FBC 3302.2 Inspector Notes from Inspection 2250 1. Silt fence needs to be repaired before next inspection 2. Trash needs to be cleaned up before next inspection | |||
| TIE BEAM / LINTEL | 02/22/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 2/22/24- Previous notes Partially rectified....2. Garage wall toward front entry drop dowels need to be tied off to horizontal reinforcement. R404.1.3.3.7.4 Support and cover. 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. (3rd Notice) 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24- 1. Multiple footing dowels need to be relocated for embedment min. R606.3.4 CLEARANCE FROM MASONRY 2. Garage wall toward front entry drop dowels need to be tied off to horizontal reinforcement. R404.1.3.3.7.4 Support and cover. 3. corner of garage requires 2 drop dowels to match footing dowels, need to seperate footing dowels to next space per plans (highlighted on plans). 2/16/2024 - PREVIOUS INSPECTION NOTES 2-16-24 Need to tidy up site and remove debris or place in dumpster by this inspection as requested prior FBC 3302.2 Inspector Notes from Inspection 2250 1. Silt fence needs to be repaired before next inspection 2. Trash needs to be cleaned up before next inspection | |||
| TIE BEAM / LINTEL | 02/20/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 2/20/24- 1. Multiple footing dowels need to be relocated for embedment min. R606.3.4 CLEARANCE FROM MASONRY 2. Garage wall toward front entry drop dowels need to be tied off to horizontal reinforcement. R404.1.3.3.7.4 Support and cover. 3. corner of garage requires 2 drop dowels to match footing dowels, need to seperate footing dowels to next space per plans (highlighted on plans). 2/16/2024 - PREVIOUS INSPECTION NOTES 2-16-24 Need to tidy up site and remove debris or place in dumpster by this inspection as requested prior FBC 3302.2 Inspector Notes from Inspection 2250 1. Silt fence needs to be repaired before next inspection 2. Trash needs to be cleaned up before next inspection | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/20/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/16/2024 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 2-16-24 Need to tidy up site and remove debris or place in dumpster by this inspection as requested prior FBC 3302.2 Inspector Notes from Inspection 2250 1. Silt fence needs to be repaired before next inspection 2. Trash needs to be cleaned up before next inspection | |||
| SEWER TIE IN | 02/13/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 02/13/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| MONOLITHIC SLAB | 02/07/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Silt fence needs to be repaired before next inspection 2. Trash needs to be cleaned up before next inspection | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/02/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/11/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/31/2024 | 06/05/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/20/2024 | 02/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/20/2024 | 02/20/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 02/06/2024 | 02/07/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 02/06/2024 | 02/06/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/24/2024 | 01/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/08/2023 | 12/11/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/08/2023 | 12/13/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/08/2023 | 12/11/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/08/2023 | 12/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/08/2023 | 12/12/2023 |
| LOCATE | COMPLETE | 12/08/2023 | 12/08/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/08/2023 | 12/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/08/2023 | 12/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/08/2023 | 12/08/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 12/08/2023 | 12/12/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/08/2023 | 01/22/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/17/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/17/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/17/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/17/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/17/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/17/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/26/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/26/2023 |
| SEWER CREDIT | (¤2,465.75) | 12/26/2023 |
| SEWER INSPECTION | ¤25.00 | 12/26/2023 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 12/26/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 12/26/2023 |
| SITE PLAN 30 | ¤30.00 | 12/26/2023 |
| WATER- TURN ON | ¤25.00 | 12/26/2023 |
| ADJUSTMENT 50% | (¤675.11) | 12/26/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/26/2023 |
| INSPECTION - RESIDENTIAL | ¤1,028.50 | 12/26/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤291.72 | 12/26/2023 |
| CONNECTION FEES | ¤1,187.26 | 12/26/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 12/26/2023 |
| IMPACT FEE FIRE | ¤428.09 | 12/26/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/26/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/26/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 12/26/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/26/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 12/26/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/26/2023 |
| SURCHARGE FS 533.721 | ¤6.75 | 12/26/2023 |
| SURCHARGE - FS 468.631 | ¤10.13 | 12/26/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/26/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/26/2023 |
| SW ENG PRE APRON | ¤30.00 | 12/26/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,565.62 |