I want to search for...

Permit #2023120406

Permit Details

Status: INSPECT

Parcel Id: 06-12-31-5825-00000-001A
Block: 00000
Subdivision: 2350 - THE PROMENADE AT TOWN CENTER
Job Phone: 407-466-1805
Location Address: 890 CENTRAL AVE
Type: BC - BUILDING COMMERCIAL
Issue Date: 07/16/2024
NOC: RECORDED
Applicant name: ORLANDO ROBERT BOLLI
Owner: PC TOWN CENTER DEVELOPMENT II LLC

Address

300 LAMBERT AVENUE

FLAGLER BEACH, FL 32136

Lot: 001A
Contracted Stated Job Value: ¤50,000,000.00
Job Description: 204 UNIT MULTIFAMILY APARTMENTS & RETAIL (GROUND LEVEL)
Type: CN

Contractor

RLH CONSTRUCTION LLC
Status Location Address State License Number Phone
ACTIVE

5700 DOT COM CT, STE 1070

OVIEDO, FL 32765

CGC1520671 (Exp: 08/31/2026) 407-384-1908

Sub Contractors

PAUL LEONARD RICHARDS
Status Location Address State License Number Phone Fax
ACTIVE

671 BUSINESS PARK BLVD

WINTER GARDEN, FL 34787

CAC057235 (Exp: 08/31/2026) 407-877-8090 407-877-8479
MICHAEL TROY PORTER
Status Location Address State License Number Phone
ACTIVE

710 HAINES STREET

JACKONVILLE , FL 32202

CFC1426859 (Exp: 08/31/2026) 904-262-1066
TROY LANDIN GILBREATH
Status Location Address State License Number Phone
ACTIVE

6855 HANGING MOSS RD

ORLANDO, FL 32807

EC13013173 (Exp: 08/31/2026) 407-677-4080
ROBERT E BECKNER II
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 188

NOKOMIS, FL 34275

CCC1328613 (Exp: 08/31/2026) 941-412-4047 941-484-1322

Inspection History

Type Request Date Result Inspector
ELECTRIC - EARLY POWER 06/15/2026 RMARTIN
Note: 6/9/2026 - PREVIOUS INSPECTION NOTES 6/9/26 Building D 5/26/2026 - PREVIOUS INSPECTION NOTES 5/26/26 No power into units yet, keep mains locked out. Units still have outlets/switches out in kitchen counter areas, a couple restrooms had romex hanging out of ceiling not safed off, pendents in kitchen needs to be safed off. 5/21/26 Power into Electrical rooms D202 and D302, make sure 125a mains stay locked out until early power is scheduled for the interior units. 5/18/26 Power to Central Vault/MDP Keep door and mdp locked out, no power into units, Dead fronts need work to get conductors into the enclosure. 4/17/2026 - PREVIOUS INSPECTION NOTES Early power for MDP F,E,D only, Keep everything in Electrical room locked out until next early power inspection is passed.
HVAC ROUGH 06/10/2026 PARTIALLY APPROVED HCAMACHO
Note: Above ceiling inspection Building D lobby 5/19/2026 - PREVIOUS INSPECTION NOTES -RTU #2 damper and duct connections on 2nd and 3rd 5/6/2026 - PREVIOUS INSPECTION NOTES -RTU 3 damper and duct connections. - Heater on the bridge for water pipes between buildings C & D 4/27/2026 - PREVIOUS INSPECTION NOTES -RTU #5 and #6 duct and dampers on D 4th floor 4/23/2026 - PREVIOUS INSPECTION NOTES -1st floor Building A Lobby, equipment inside the soffit. -2 humidifiers, RTU 2 Wrap, and dampner. - Need Access for the grease duct inspection door, because it changes direction. 4/16/2026 - PREVIOUS INSPECTION NOTES RTU number 2 duct wrap inspection 4/14/2026 - PREVIOUS INSPECTION NOTES RTU 2 seam inspection -Still need Dampners RTU 3 wrap inspection 4/10/2026 - PREVIOUS INSPECTION NOTES 4th Floor A/B balcony rough 4/9/2026 - PREVIOUS INSPECTION NOTES 4/7/2026 - PREVIOUS INSPECTION NOTES -3rd floor B/A balcony rough. -4C balcony rough. 4/6/2026 - PREVIOUS INSPECTION NOTES 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FRAMING 06/10/2026 PARTIALLY APPROVED HCAMACHO
Note: Framing inspection Building B drive thru ceiling. Building F/E arcade 6/4/2026 - PREVIOUS INSPECTION NOTES 5/21/2026 - PREVIOUS INSPECTION NOTES Janitor rooms 2nd, 3rd 5/20/2026 - PREVIOUS INSPECTION NOTES 5/19/2026 - PREVIOUS INSPECTION NOTES 5/18/2026 - PREVIOUS INSPECTION NOTES Mechanical 2-4 final Janitor shaft liner 4th C415, 414 final C to B corridor 4th 1st B to A corridor 4th 1st B to A electrical closet 3rd 1st C to B corridor 3rd final C to B corridor 1st 5/14/2026 - PREVIOUS INSPECTION NOTES A303 final layer C414 first layer C415 first layer Corridor D 4th final layer Corridor D/E final layer 5/12/2026 - PREVIOUS INSPECTION NOTES Corridor D/E 4th 1st Corridor A/B 4th shaft C415 shaft liner 5/8/2026 - PREVIOUS INSPECTION NOTES A203, A209, Sunrise lounge, Corridor D/E 2nd floor finaled A303 first layer Corridor D/E 4th floor final 5/6/2026 - PREVIOUS INSPECTION NOTES Sunrise lounge 1st layer D/E 3rd floor final layer A309, A208, C214 final layer A209, D 2nd floor hallway, D/E 2nd floor hallway 1st layer 5/5/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
ELECTRIC - EARLY POWER 06/09/2026 PARTIALLY APPROVED RMARTIN
Note: 6/9/26 Building D 5/26/2026 - PREVIOUS INSPECTION NOTES 5/26/26 No power into units yet, keep mains locked out. Units still have outlets/switches out in kitchen counter areas, a couple restrooms had romex hanging out of ceiling not safed off, pendents in kitchen needs to be safed off. 5/21/26 Power into Electrical rooms D202 and D302, make sure 125a mains stay locked out until early power is scheduled for the interior units. 5/18/26 Power to Central Vault/MDP Keep door and mdp locked out, no power into units, Dead fronts need work to get conductors into the enclosure. 4/17/2026 - PREVIOUS INSPECTION NOTES Early power for MDP F,E,D only, Keep everything in Electrical room locked out until next early power inspection is passed.
ELECTRIC 2ND ROUGH 06/04/2026 PARTIALLY APPROVED RMARTIN
Note: 6/4/26 1st floor D building cloud good, not ready for 2nd and 3rd floor, need to remove temp lighting and have all boxes and equipment accessable. Also need to have roll up door motor accessable. 5/28/2026 - PREVIOUS INSPECTION NOTES A 306 and sun lounge cloud 5/18/2026 - PREVIOUS INSPECTION NOTES 5/7/2026 - PREVIOUS INSPECTION NOTES 5/7/26 Did this inspection on 5/6/26 4/30/2026 - PREVIOUS INSPECTION NOTES 4/30/26 Lower 2 pedestrian bridges 4/23/2026 - PREVIOUS INSPECTION NOTES 4/232/26 looked at soffits in areas that needed to be protected for the SER cable, D,E,F areas 4/21/2026 - PREVIOUS INSPECTION NOTES 4/21/26 1st floor A clouds in ceiling 4/15/2026 - P4REVIOUS INSPECTION NOTES 4/15/26 4th floor Sunrise cafe room 4/13/2026 - PREVIOUS INSPECTION NOTES 4/13/26 4th Floor A units, except ceilings in the last 8 units bathrooms missing framing/lights/vanity outlet 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 4Th floor B units 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FRAMING 06/04/2026 PARTIALLY APPROVED KSANDOE
Note: 5/21/2026 - PREVIOUS INSPECTION NOTES Janitor rooms 2nd, 3rd 5/20/2026 - PREVIOUS INSPECTION NOTES 5/19/2026 - PREVIOUS INSPECTION NOTES 5/18/2026 - PREVIOUS INSPECTION NOTES Mechanical 2-4 final Janitor shaft liner 4th C415, 414 final C to B corridor 4th 1st B to A corridor 4th 1st B to A electrical closet 3rd 1st C to B corridor 3rd final C to B corridor 1st 5/14/2026 - PREVIOUS INSPECTION NOTES A303 final layer C414 first layer C415 first layer Corridor D 4th final layer Corridor D/E final layer 5/12/2026 - PREVIOUS INSPECTION NOTES Corridor D/E 4th 1st Corridor A/B 4th shaft C415 shaft liner 5/8/2026 - PREVIOUS INSPECTION NOTES A203, A209, Sunrise lounge, Corridor D/E 2nd floor finaled A303 first layer Corridor D/E 4th floor final 5/6/2026 - PREVIOUS INSPECTION NOTES Sunrise lounge 1st layer D/E 3rd floor final layer A309, A208, C214 final layer A209, D 2nd floor hallway, D/E 2nd floor hallway 1st layer 5/5/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
ELECTRIC 2ND ROUGH 05/28/2026 PARTIALLY APPROVED RMARTIN
Note: A 306 and sun lounge cloud 5/18/2026 - PREVIOUS INSPECTION NOTES 5/7/2026 - PREVIOUS INSPECTION NOTES 5/7/26 Did this inspection on 5/6/26 4/30/2026 - PREVIOUS INSPECTION NOTES 4/30/26 Lower 2 pedestrian bridges 4/23/2026 - PREVIOUS INSPECTION NOTES 4/232/26 looked at soffits in areas that needed to be protected for the SER cable, D,E,F areas 4/21/2026 - PREVIOUS INSPECTION NOTES 4/21/26 1st floor A clouds in ceiling 4/15/2026 - P4REVIOUS INSPECTION NOTES 4/15/26 4th floor Sunrise cafe room 4/13/2026 - PREVIOUS INSPECTION NOTES 4/13/26 4th Floor A units, except ceilings in the last 8 units bathrooms missing framing/lights/vanity outlet 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 4Th floor B units 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
ELECTRIC - EARLY POWER 05/26/2026 Disapproved - NO FEE RMARTIN
Note: 5/26/26 No power into units yet, keep mains locked out. Units still have outlets/switches out in kitchen counter areas, a couple restrooms had romex hanging out of ceiling not safed off, pendents in kitchen needs to be safed off. 5/21/26 Power into Electrical rooms D202 and D302, make sure 125a mains stay locked out until early power is scheduled for the interior units. 5/18/26 Power to Central Vault/MDP Keep door and mdp locked out, no power into units, Dead fronts need work to get conductors into the enclosure. 4/17/2026 - PREVIOUS INSPECTION NOTES Early power for MDP F,E,D only, Keep everything in Electrical room locked out until next early power inspection is passed.
ELECTRIC - EARLY POWER 05/21/2026 APPROVED - AS NOTED RMARTIN
Note: 5/21/26 Power into Electrical rooms D202 and D302, make sure 125a mains stay locked out until early power is scheduled for the interior units. 5/18/26 Power to Central Vault/MDP Keep door and mdp locked out, no power into units, Dead fronts need work to get conductors into the enclosure. 4/17/2026 - PREVIOUS INSPECTION NOTES Early power for MDP F,E,D only, Keep everything in Electrical room locked out until next early power inspection is passed.
FRAMING 05/21/2026 PARTIALLY APPROVED KSANDOE
Note: Janitor rooms 2nd, 3rd 5/20/2026 - PREVIOUS INSPECTION NOTES 5/19/2026 - PREVIOUS INSPECTION NOTES 5/18/2026 - PREVIOUS INSPECTION NOTES Mechanical 2-4 final Janitor shaft liner 4th C415, 414 final C to B corridor 4th 1st B to A corridor 4th 1st B to A electrical closet 3rd 1st C to B corridor 3rd final C to B corridor 1st 5/14/2026 - PREVIOUS INSPECTION NOTES A303 final layer C414 first layer C415 first layer Corridor D 4th final layer Corridor D/E final layer 5/12/2026 - PREVIOUS INSPECTION NOTES Corridor D/E 4th 1st Corridor A/B 4th shaft C415 shaft liner 5/8/2026 - PREVIOUS INSPECTION NOTES A203, A209, Sunrise lounge, Corridor D/E 2nd floor finaled A303 first layer Corridor D/E 4th floor final 5/6/2026 - PREVIOUS INSPECTION NOTES Sunrise lounge 1st layer D/E 3rd floor final layer A309, A208, C214 final layer A209, D 2nd floor hallway, D/E 2nd floor hallway 1st layer 5/5/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FRAMING 05/20/2026 CANCELLED BY APPLICANT KSANDOE
Note: 5/19/2026 - PREVIOUS INSPECTION NOTES 5/18/2026 - PREVIOUS INSPECTION NOTES Mechanical 2-4 final Janitor shaft liner 4th C415, 414 final C to B corridor 4th 1st B to A corridor 4th 1st B to A electrical closet 3rd 1st C to B corridor 3rd final C to B corridor 1st 5/14/2026 - PREVIOUS INSPECTION NOTES A303 final layer C414 first layer C415 first layer Corridor D 4th final layer Corridor D/E final layer 5/12/2026 - PREVIOUS INSPECTION NOTES Corridor D/E 4th 1st Corridor A/B 4th shaft C415 shaft liner 5/8/2026 - PREVIOUS INSPECTION NOTES A203, A209, Sunrise lounge, Corridor D/E 2nd floor finaled A303 first layer Corridor D/E 4th floor final 5/6/2026 - PREVIOUS INSPECTION NOTES Sunrise lounge 1st layer D/E 3rd floor final layer A309, A208, C214 final layer A209, D 2nd floor hallway, D/E 2nd floor hallway 1st layer 5/5/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FRAMING 05/19/2026 PARTIALLY APPROVED KSANDOE
Note: 5/18/2026 - PREVIOUS INSPECTION NOTES Mechanical 2-4 final Janitor shaft liner 4th C415, 414 final C to B corridor 4th 1st B to A corridor 4th 1st B to A electrical closet 3rd 1st C to B corridor 3rd final C to B corridor 1st 5/14/2026 - PREVIOUS INSPECTION NOTES A303 final layer C414 first layer C415 first layer Corridor D 4th final layer Corridor D/E final layer 5/12/2026 - PREVIOUS INSPECTION NOTES Corridor D/E 4th 1st Corridor A/B 4th shaft C415 shaft liner 5/8/2026 - PREVIOUS INSPECTION NOTES A203, A209, Sunrise lounge, Corridor D/E 2nd floor finaled A303 first layer Corridor D/E 4th floor final 5/6/2026 - PREVIOUS INSPECTION NOTES Sunrise lounge 1st layer D/E 3rd floor final layer A309, A208, C214 final layer A209, D 2nd floor hallway, D/E 2nd floor hallway 1st layer 5/5/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FIREWALL PENETRATIONS 05/19/2026 PARTIALLY APPROVED KSANDOE
Note: 4/30/2026 - PREVIOUS INSPECTION NOTES Cross corridor SER FED 4/13/2026 - PREVIOUS INSPECTION NOTES 4th floor Building A units 4/8/2026 - PREVIOUS INSPECTION NOTES 4th floor Building B 3/31/2026 - PREVIOUS INSPECTION NOTES 4th floor Building C units. 3/27/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES 3rd floor A/B 3/17/2026 - PREVIOUS INSPECTION NOTES 3rd floor C 3/10/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor. Shaft penetrations FED 2/10/2026 - PREVIOUS INSPECTION NOTES FED except shaft spaces 2/6/2026 - PREVIOUS INSPECTION NOTES Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
HVAC ROUGH 05/19/2026 PARTIALLY APPROVED HCAMACHO
Note: -RTU #2 damper and duct connections on 2nd and 3rd 5/6/2026 - PREVIOUS INSPECTION NOTES -RTU 3 damper and duct connections. - Heater on the bridge for water pipes between buildings C & D 4/27/2026 - PREVIOUS INSPECTION NOTES -RTU #5 and #6 duct and dampers on D 4th floor 4/23/2026 - PREVIOUS INSPECTION NOTES -1st floor Building A Lobby, equipment inside the soffit. -2 humidifiers, RTU 2 Wrap, and dampner. - Need Access for the grease duct inspection door, because it changes direction. 4/16/2026 - PREVIOUS INSPECTION NOTES RTU number 2 duct wrap inspection 4/14/2026 - PREVIOUS INSPECTION NOTES RTU 2 seam inspection -Still need Dampners RTU 3 wrap inspection 4/10/2026 - PREVIOUS INSPECTION NOTES 4th Floor A/B balcony rough 4/9/2026 - PREVIOUS INSPECTION NOTES 4/7/2026 - PREVIOUS INSPECTION NOTES -3rd floor B/A balcony rough. -4C balcony rough. 4/6/2026 - PREVIOUS INSPECTION NOTES 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
ELECTRIC - EARLY POWER 05/18/2026 APPROVED - AS NOTED RMARTIN
Note: 5/18/26 Power to Central Vault/MDP Keep door and mdp locked out, no power into units, Dead fronts need work to get conductors into the enclosure. 4/17/2026 - PREVIOUS INSPECTION NOTES Early power for MDP F,E,D only, Keep everything in Electrical room locked out until next early power inspection is passed.
FRAMING 05/18/2026 PARTIALLY APPROVED KSANDOE
Note: Mechanical 2-4 final Janitor shaft liner 4th C415, 414 final C to B corridor 4th 1st B to A corridor 4th 1st B to A electrical closet 3rd 1st C to B corridor 3rd final C to B corridor 1st 5/14/2026 - PREVIOUS INSPECTION NOTES A303 final layer C414 first layer C415 first layer Corridor D 4th final layer Corridor D/E final layer 5/12/2026 - PREVIOUS INSPECTION NOTES Corridor D/E 4th 1st Corridor A/B 4th shaft C415 shaft liner 5/8/2026 - PREVIOUS INSPECTION NOTES A203, A209, Sunrise lounge, Corridor D/E 2nd floor finaled A303 first layer Corridor D/E 4th floor final 5/6/2026 - PREVIOUS INSPECTION NOTES Sunrise lounge 1st layer D/E 3rd floor final layer A309, A208, C214 final layer A209, D 2nd floor hallway, D/E 2nd floor hallway 1st layer 5/5/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
ELECTRIC 2ND ROUGH 05/18/2026 CANCELLED BY APPLICANT RMARTIN
Note: 5/7/2026 - PREVIOUS INSPECTION NOTES 5/7/26 Did this inspection on 5/6/26 4/30/2026 - PREVIOUS INSPECTION NOTES 4/30/26 Lower 2 pedestrian bridges 4/23/2026 - PREVIOUS INSPECTION NOTES 4/232/26 looked at soffits in areas that needed to be protected for the SER cable, D,E,F areas 4/21/2026 - PREVIOUS INSPECTION NOTES 4/21/26 1st floor A clouds in ceiling 4/15/2026 - P4REVIOUS INSPECTION NOTES 4/15/26 4th floor Sunrise cafe room 4/13/2026 - PREVIOUS INSPECTION NOTES 4/13/26 4th Floor A units, except ceilings in the last 8 units bathrooms missing framing/lights/vanity outlet 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 4Th floor B units 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
HORIZONTAL ASSEMB PENETRATIONS 05/15/2026 PARTIALLY APPROVED KSANDOE
Note: 3rd and 4th only 2/2/2026 - PREVIOUS INSPECTION NOTES Metro FED 2nd CBA 3RD 1/21/2026 - PREVIOUS INSPECTION NOTES 12/19/2025 - PREVIOUS INSPECTION NOTES In-wall penetrations for FED floors 2, 3, & 4 complete. 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 11/26/2025 - PREVIOUS INSPECTION NOTES D and E 4th floor plumbing 11/24/2025 - PREVIOUS INSPECTION NOTES D 3rd floor plumbing 11/19/2025 - PREVIOUS INSPECTION NOTES F and E 3rd floor plumbing 11/18/2025 - PREVIOUS INSPECTION NOTES 11/14/2025 - PREVIOUS INSPECTION NOTES D 2nd floor plumbing 11/12/2025 - PREVIOUS INSPECTION NOTES E 2nd floor Plumbing 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210 Plumbing
FRAMING 05/14/2026 PARTIALLY APPROVED KSANDOE
Note: A303 final layer C414 first layer C415 first layer Corridor D 4th final layer Corridor D/E final layer 5/12/2026 - PREVIOUS INSPECTION NOTES Corridor D/E 4th 1st Corridor A/B 4th shaft C415 shaft liner 5/8/2026 - PREVIOUS INSPECTION NOTES A203, A209, Sunrise lounge, Corridor D/E 2nd floor finaled A303 first layer Corridor D/E 4th floor final 5/6/2026 - PREVIOUS INSPECTION NOTES Sunrise lounge 1st layer D/E 3rd floor final layer A309, A208, C214 final layer A209, D 2nd floor hallway, D/E 2nd floor hallway 1st layer 5/5/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
EXTERIOR WALL SHEATHING / SHEARWALL 05/13/2026 APPROVED KSANDOE
FRAMING 05/12/2026 PARTIALLY APPROVED KSANDOE
Note: Corridor D/E 4th 1st Corridor A/B 4th shaft C415 shaft liner 5/8/2026 - PREVIOUS INSPECTION NOTES A203, A209, Sunrise lounge, Corridor D/E 2nd floor finaled A303 first layer Corridor D/E 4th floor final 5/6/2026 - PREVIOUS INSPECTION NOTES Sunrise lounge 1st layer D/E 3rd floor final layer A309, A208, C214 final layer A209, D 2nd floor hallway, D/E 2nd floor hallway 1st layer 5/5/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FRAMING 05/08/2026 PARTIALLY APPROVED KSANDOE
Note: A203, A209, Sunrise lounge, Corridor D/E 2nd floor finaled A303 first layer Corridor D/E 4th floor final 5/6/2026 - PREVIOUS INSPECTION NOTES Sunrise lounge 1st layer D/E 3rd floor final layer A309, A208, C214 final layer A209, D 2nd floor hallway, D/E 2nd floor hallway 1st layer 5/5/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
ELECTRIC 2ND ROUGH 05/07/2026 PARTIALLY APPROVED RMARTIN
Note: 5/7/26 Did this inspection on 5/6/26 4/30/2026 - PREVIOUS INSPECTION NOTES 4/30/26 Lower 2 pedestrian bridges 4/23/2026 - PREVIOUS INSPECTION NOTES 4/232/26 looked at soffits in areas that needed to be protected for the SER cable, D,E,F areas 4/21/2026 - PREVIOUS INSPECTION NOTES 4/21/26 1st floor A clouds in ceiling 4/15/2026 - P4REVIOUS INSPECTION NOTES 4/15/26 4th floor Sunrise cafe room 4/13/2026 - PREVIOUS INSPECTION NOTES 4/13/26 4th Floor A units, except ceilings in the last 8 units bathrooms missing framing/lights/vanity outlet 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 4Th floor B units 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FRAMING 05/06/2026 PARTIALLY APPROVED KSANDOE
Note: Sunrise lounge 1st layer D/E 3rd floor final layer A309, A208, C214 final layer A209, D 2nd floor hallway, D/E 2nd floor hallway 1st layer 5/5/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 05/06/2026 PARTIALLY APPROVED HCAMACHO
Note: -RTU 3 damper and duct connections. - Heater on the bridge for water pipes between buildings C & D 4/27/2026 - PREVIOUS INSPECTION NOTES -RTU #5 and #6 duct and dampers on D 4th floor 4/23/2026 - PREVIOUS INSPECTION NOTES -1st floor Building A Lobby, equipment inside the soffit. -2 humidifiers, RTU 2 Wrap, and dampner. - Need Access for the grease duct inspection door, because it changes direction. 4/16/2026 - PREVIOUS INSPECTION NOTES RTU number 2 duct wrap inspection 4/14/2026 - PREVIOUS INSPECTION NOTES RTU 2 seam inspection -Still need Dampners RTU 3 wrap inspection 4/10/2026 - PREVIOUS INSPECTION NOTES 4th Floor A/B balcony rough 4/9/2026 - PREVIOUS INSPECTION NOTES 4/7/2026 - PREVIOUS INSPECTION NOTES -3rd floor B/A balcony rough. -4C balcony rough. 4/6/2026 - PREVIOUS INSPECTION NOTES 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FRAMING 05/05/2026 CANCELLED BY APPLICANT KSANDOE
Note: 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
ELECTRIC 2ND ROUGH 04/30/2026 PARTIALLY APPROVED RMARTIN
Note: 4/30/26 Lower 2 pedestrian bridges 4/23/2026 - PREVIOUS INSPECTION NOTES 4/232/26 looked at soffits in areas that needed to be protected for the SER cable, D,E,F areas 4/21/2026 - PREVIOUS INSPECTION NOTES 4/21/26 1st floor A clouds in ceiling 4/15/2026 - P4REVIOUS INSPECTION NOTES 4/15/26 4th floor Sunrise cafe room 4/13/2026 - PREVIOUS INSPECTION NOTES 4/13/26 4th Floor A units, except ceilings in the last 8 units bathrooms missing framing/lights/vanity outlet 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 4Th floor B units 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FIREWALL PENETRATIONS 04/30/2026 PARTIALLY APPROVED KSANDOE
Note: Cross corridor SER FED 4/13/2026 - PREVIOUS INSPECTION NOTES 4th floor Building A units 4/8/2026 - PREVIOUS INSPECTION NOTES 4th floor Building B 3/31/2026 - PREVIOUS INSPECTION NOTES 4th floor Building C units. 3/27/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES 3rd floor A/B 3/17/2026 - PREVIOUS INSPECTION NOTES 3rd floor C 3/10/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor. Shaft penetrations FED 2/10/2026 - PREVIOUS INSPECTION NOTES FED except shaft spaces 2/6/2026 - PREVIOUS INSPECTION NOTES Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
FRAMING 04/29/2026 PARTIALLY APPROVED KSANDOE
Note: Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FRAMING 04/27/2026 PARTIALLY APPROVED KSANDOE
Note: BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 04/27/2026 PARTIALLY APPROVED HCAMACHO
Note: -RTU #5 and #6 duct and dampers on D 4th floor 4/23/2026 - PREVIOUS INSPECTION NOTES -1st floor Building A Lobby, equipment inside the soffit. -2 humidifiers, RTU 2 Wrap, and dampner. - Need Access for the grease duct inspection door, because it changes direction. 4/16/2026 - PREVIOUS INSPECTION NOTES RTU number 2 duct wrap inspection 4/14/2026 - PREVIOUS INSPECTION NOTES RTU 2 seam inspection -Still need Dampners RTU 3 wrap inspection 4/10/2026 - PREVIOUS INSPECTION NOTES 4th Floor A/B balcony rough 4/9/2026 - PREVIOUS INSPECTION NOTES 4/7/2026 - PREVIOUS INSPECTION NOTES -3rd floor B/A balcony rough. -4C balcony rough. 4/6/2026 - PREVIOUS INSPECTION NOTES 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FRAMING 04/24/2026 PARTIALLY APPROVED KSANDOE
Note: A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
ELECTRIC 2ND ROUGH 04/23/2026 PARTIALLY APPROVED RMARTIN
Note: 4/232/26 looked at soffits in areas that needed to be protected for the SER cable, D,E,F areas 4/21/2026 - PREVIOUS INSPECTION NOTES 4/21/26 1st floor A clouds in ceiling 4/15/2026 - P4REVIOUS INSPECTION NOTES 4/15/26 4th floor Sunrise cafe room 4/13/2026 - PREVIOUS INSPECTION NOTES 4/13/26 4th Floor A units, except ceilings in the last 8 units bathrooms missing framing/lights/vanity outlet 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 4Th floor B units 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FRAMING 04/23/2026 PARTIALLY APPROVED KSANDOE
Note: C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 04/23/2026 PARTIALLY APPROVED HCAMACHO
Note: -1st floor Building A Lobby, equipment inside the soffit. -2 humidifiers, RTU 2 Wrap, and dampner. - Need Access for the grease duct inspection door, because it changes direction. 4/16/2026 - PREVIOUS INSPECTION NOTES RTU number 2 duct wrap inspection 4/14/2026 - PREVIOUS INSPECTION NOTES RTU 2 seam inspection -Still need Dampners RTU 3 wrap inspection 4/10/2026 - PREVIOUS INSPECTION NOTES 4th Floor A/B balcony rough 4/9/2026 - PREVIOUS INSPECTION NOTES 4/7/2026 - PREVIOUS INSPECTION NOTES -3rd floor B/A balcony rough. -4C balcony rough. 4/6/2026 - PREVIOUS INSPECTION NOTES 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FRAMING 04/22/2026 PARTIALLY APPROVED KSANDOE
Note: A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FRAMING 04/21/2026 PARTIALLY APPROVED KSANDOE
Note: A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
ELECTRIC 2ND ROUGH 04/21/2026 PARTIALLY APPROVED RMARTIN
Note: 4/21/26 1st floor A clouds in ceiling 4/15/2026 - P4REVIOUS INSPECTION NOTES 4/15/26 4th floor Sunrise cafe room 4/13/2026 - PREVIOUS INSPECTION NOTES 4/13/26 4th Floor A units, except ceilings in the last 8 units bathrooms missing framing/lights/vanity outlet 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 4Th floor B units 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
ELECTRIC - EARLY POWER 04/17/2026 PARTIALLY APPROVED RMARTIN
Note: Early power for MDP F,E,D only, Keep everything in Electrical room locked out until next early power inspection is passed.
FRAMING 04/17/2026 PARTIALLY APPROVED KSANDOE
Note: Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
PLUMBING 2ND ROUGH 04/17/2026 PARTIALLY APPROVED HCAMACHO
Note: Section A 4th floor water and sanitary inspection for amenities. 4/7/2026 - PREVIOUS INSPECTION NOTES -The following Tubs/Showers are not complete. These are the same from the previous inspection. A201, A203, A206, A208, A209, A211, A212 Tubs NOT Complete A301, A302, A303, A306, A309, A311, A312, A314 Tubs NOT Complete A407, A408, A409, A411, A412, A413, A414 Tubs NOT Complete C314, C414, C415 Tubs NOT Complete *Please make sure the work is done before calling back for inspection.* 3/19/2026 - PREVIOUS INSPECTION NOTES A201, A203, A206, A208, A209, A211, A212 Tubs NOT Complete A301, A302, A303, A306, A309, A311, A312, A314 Tubs NOT Complete A407, A408, A409, A411, A412, A413, A414 Tubs NOT Complete C314, C414, C415 Tubs NOT Complete 2/2/2026 - PREVIOUS INSPECTION NOTES All tubs except units with incomplete shaft walls: F403 / D407 / D405 1/8/2026 - PREVIOUS INSPECTION NOTES 1/8/26: Partial inspection for 2nd/3rd floor tubs & showers in Buildings D/E/F. All tubs except units with incomplete shaft walls: F305 / F303 / D307 / D305 / D205 / D207 / F203 / F204 / F205. Unit D206 > Needs broken 'J' hook replaced at tub drain from unit above.
PLUMBING 1ST ROUGH 04/17/2026 CANCELLED BY APPLICANT HCAMACHO
Note: 3/16/2026 - PREVIOUS INSPECTION NOTES Building A Storm tie in, 3 locations. 6", 4", 10" Virtual Inspection 3/12/2026 - PREVIOUS INSPECTION NOTES 2/13/2026 - PREVIOUS INSPECTION NOTES Partial storm tie in on DEF (4 total) on the inside parking area. 2/2/2026 - PREVIOUS INSPECTION NOTES Partial Building A plumbing rough for sanitary and domestic water 2nd, 3rd, 4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 12/18/2025 - PREVIOUS INSPECTION NOTES 12/18/25: Partial Building B plumbing rough for sanitary and domestic 2nd-4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 1). UNIT B401 IS STILL IN PROGRESS. WILL NEED TO BE CHECKED ONCE WALLS ARE INSTALLED. (Also checked main storm water drain tie in at Buildings 'C' and 'B'). Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070. THIS WAS A PARTIAL INSPECTION ON SECTION ''C'' WING WASTE AND VENT WATER LINES AND ROOF VENTS, NO TUBS OR SHOWERS SET IN PLACE YET. NO RISER CLAMPS OR FIRE CAULKING COMPLEYTED YET. SOME ARE BUT NEED TO CHECK ALL AT EACH SECTION THIS WAS THE WRONG INSPECTION CALLED IN THIS INSPECTION WAS APPROVED ALREADY 11/14/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
HVAC ROUGH 04/16/2026 PARTIALLY APPROVED HCAMACHO
Note: RTU number 2 duct wrap inspection 4/14/2026 - PREVIOUS INSPECTION NOTES RTU 2 seam inspection -Still need Dampners RTU 3 wrap inspection 4/10/2026 - PREVIOUS INSPECTION NOTES 4th Floor A/B balcony rough 4/9/2026 - PREVIOUS INSPECTION NOTES 4/7/2026 - PREVIOUS INSPECTION NOTES -3rd floor B/A balcony rough. -4C balcony rough. 4/6/2026 - PREVIOUS INSPECTION NOTES 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FRAMING 04/16/2026 CANCELLED BY APPLICANT KSANDOE
Note: 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
ELECTRIC - EARLY POWER 04/15/2026 CANCELLED BY APPLICANT RMARTIN
ELECTRIC 2ND ROUGH 04/15/2026 PARTIALLY APPROVED RMARTIN
Note: 4/15/26 4th floor Sunrise cafe room 4/13/2026 - PREVIOUS INSPECTION NOTES 4/13/26 4th Floor A units, except ceilings in the last 8 units bathrooms missing framing/lights/vanity outlet 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 4Th floor B units 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FRAMING 04/15/2026 PARTIALLY APPROVED KSANDOE
Note: 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FRAMING 04/14/2026 PARTIALLY APPROVED KSANDOE
Note: Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 04/14/2026 PARTIALLY APPROVED HCAMACHO
Note: RTU 2 seam inspection -Still need Dampners RTU 3 wrap inspection 4/10/2026 - PREVIOUS INSPECTION NOTES 4th Floor A/B balcony rough 4/9/2026 - PREVIOUS INSPECTION NOTES 4/7/2026 - PREVIOUS INSPECTION NOTES -3rd floor B/A balcony rough. -4C balcony rough. 4/6/2026 - PREVIOUS INSPECTION NOTES 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
ELECTRIC PRE-DEMO 04/14/2026 CANCELLED BY INSPECTOR RMARTIN
FIREWALL PENETRATIONS 04/13/2026 PARTIALLY APPROVED KSANDOE
Note: 4th floor Building A units 4/8/2026 - PREVIOUS INSPECTION NOTES 4th floor Building B 3/31/2026 - PREVIOUS INSPECTION NOTES 4th floor Building C units. 3/27/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES 3rd floor A/B 3/17/2026 - PREVIOUS INSPECTION NOTES 3rd floor C 3/10/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor. Shaft penetrations FED 2/10/2026 - PREVIOUS INSPECTION NOTES FED except shaft spaces 2/6/2026 - PREVIOUS INSPECTION NOTES Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
ELECTRIC 2ND ROUGH 04/13/2026 PARTIALLY APPROVED RMARTIN
Note: 4/13/26 4th Floor A units, except ceilings in the last 8 units bathrooms missing framing/lights/vanity outlet 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 4Th floor B units 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FRAMING 04/10/2026 PARTIALLY APPROVED KSANDOE
Note: Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 04/10/2026 PARTIALLY APPROVED HCAMACHO
Note: 4th Floor A/B balcony rough 4/9/2026 - PREVIOUS INSPECTION NOTES 4/7/2026 - PREVIOUS INSPECTION NOTES -3rd floor B/A balcony rough. -4C balcony rough. 4/6/2026 - PREVIOUS INSPECTION NOTES 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
HVAC ROUGH 04/09/2026 CANCELLED BY APPLICANT HCAMACHO
Note: 4/7/2026 - PREVIOUS INSPECTION NOTES -3rd floor B/A balcony rough. -4C balcony rough. 4/6/2026 - PREVIOUS INSPECTION NOTES 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FIREWALL PENETRATIONS 04/08/2026 PARTIALLY APPROVED KSANDOE
Note: 4th floor Building B 3/31/2026 - PREVIOUS INSPECTION NOTES 4th floor Building C units. 3/27/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES 3rd floor A/B 3/17/2026 - PREVIOUS INSPECTION NOTES 3rd floor C 3/10/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor. Shaft penetrations FED 2/10/2026 - PREVIOUS INSPECTION NOTES FED except shaft spaces 2/6/2026 - PREVIOUS INSPECTION NOTES Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
PLUMBING 2ND ROUGH 04/07/2026 PARTIALLY APPROVED HCAMACHO
Note: -The following Tubs/Showers are not complete. These are the same from the previous inspection. A201, A203, A206, A208, A209, A211, A212 Tubs NOT Complete A301, A302, A303, A306, A309, A311, A312, A314 Tubs NOT Complete A407, A408, A409, A411, A412, A413, A414 Tubs NOT Complete C314, C414, C415 Tubs NOT Complete *Please make sure the work is done before calling back for inspection.* 3/19/2026 - PREVIOUS INSPECTION NOTES A201, A203, A206, A208, A209, A211, A212 Tubs NOT Complete A301, A302, A303, A306, A309, A311, A312, A314 Tubs NOT Complete A407, A408, A409, A411, A412, A413, A414 Tubs NOT Complete C314, C414, C415 Tubs NOT Complete 2/2/2026 - PREVIOUS INSPECTION NOTES All tubs except units with incomplete shaft walls: F403 / D407 / D405 1/8/2026 - PREVIOUS INSPECTION NOTES 1/8/26: Partial inspection for 2nd/3rd floor tubs & showers in Buildings D/E/F. All tubs except units with incomplete shaft walls: F305 / F303 / D307 / D305 / D205 / D207 / F203 / F204 / F205. Unit D206 > Needs broken 'J' hook replaced at tub drain from unit above.
HVAC ROUGH 04/07/2026 PARTIALLY APPROVED HCAMACHO
Note: -3rd floor B/A balcony rough. -4C balcony rough. 4/6/2026 - PREVIOUS INSPECTION NOTES 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
STOREFRONT 04/07/2026 CANCELLED BY APPLICANT WEB
Note: 3/24/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES Pans. Marked on plans 1/20/2026 - PREVIOUS INSPECTION NOTES 4th floor F south 1/15/2026 - PREVIOUS INSPECTION NOTES F4, A1, 4 1/13/2026 - PREVIOUS INSPECTION NOTES Frames A
HVAC ROUGH 04/06/2026 PARTIALLY APPROVED HCAMACHO
Note: 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
ELECTRIC 2ND ROUGH 04/06/2026 PARTIALLY APPROVED RMARTIN
Note: 4/6/26 4Th floor B units 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
HVAC ROUGH 04/02/2026 PARTIALLY APPROVED HCAMACHO
Note: -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FIREWALL PENETRATIONS 03/31/2026 PARTIALLY APPROVED KSANDOE
Note: 4th floor Building C units. 3/27/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES 3rd floor A/B 3/17/2026 - PREVIOUS INSPECTION NOTES 3rd floor C 3/10/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor. Shaft penetrations FED 2/10/2026 - PREVIOUS INSPECTION NOTES FED except shaft spaces 2/6/2026 - PREVIOUS INSPECTION NOTES Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
FIREWALL PENETRATIONS 03/27/2026 CANCELLED BY APPLICANT KSANDOE
Note: 3/19/2026 - PREVIOUS INSPECTION NOTES 3rd floor A/B 3/17/2026 - PREVIOUS INSPECTION NOTES 3rd floor C 3/10/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor. Shaft penetrations FED 2/10/2026 - PREVIOUS INSPECTION NOTES FED except shaft spaces 2/6/2026 - PREVIOUS INSPECTION NOTES Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
ELECTRIC 2ND ROUGH 03/27/2026 PARTIALLY APPROVED RMARTIN
Note: 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FRAMING 03/27/2026 PARTIALLY APPROVED KSANDOE
Note: 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FRAMING 03/26/2026 PARTIALLY APPROVED KSANDOE
Note: 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 03/26/2026 PARTIALLY APPROVED HCAMACHO
Note: -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
ELECTRIC 2ND ROUGH 03/26/2026 PARTIALLY APPROVED RMARTIN
Note: 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
HVAC ROUGH 03/25/2026 PARTIALLY APPROVED HCAMACHO
Note: -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FRAMING 03/25/2026 PARTIALLY APPROVED KSANDOE
Note: 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FRAMING 03/24/2026 PARTIALLY APPROVED KSANDOE
Note: C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
STOREFRONT 03/24/2026 PARTIALLY APPROVED KSANDOE
Note: 3/19/2026 - PREVIOUS INSPECTION NOTES Pans. Marked on plans 1/20/2026 - PREVIOUS INSPECTION NOTES 4th floor F south 1/15/2026 - PREVIOUS INSPECTION NOTES F4, A1, 4 1/13/2026 - PREVIOUS INSPECTION NOTES Frames A
STOREFRONT 03/19/2026 PARTIALLY APPROVED KSANDOE
Note: Pans. Marked on plans 1/20/2026 - PREVIOUS INSPECTION NOTES 4th floor F south 1/15/2026 - PREVIOUS INSPECTION NOTES F4, A1, 4 1/13/2026 - PREVIOUS INSPECTION NOTES Frames A
FRAMING 03/19/2026 PARTIALLY APPROVED KSANDOE
Note: A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FIREWALL PENETRATIONS 03/19/2026 PARTIALLY APPROVED KSANDOE
Note: 3rd floor A/B 3/17/2026 - PREVIOUS INSPECTION NOTES 3rd floor C 3/10/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor. Shaft penetrations FED 2/10/2026 - PREVIOUS INSPECTION NOTES FED except shaft spaces 2/6/2026 - PREVIOUS INSPECTION NOTES Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
ELECTRIC 2ND ROUGH 03/19/2026 PARTIALLY APPROVED RMARTIN
Note: 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FIREWALL DRYWALL NAILING 03/19/2026 PARTIALLY APPROVED KSANDOE
Note: 4th Floor A/B/C top 3/17/2026 - PREVIOUS INSPECTION NOTES Inside layer shaft walls 2nd floor C, B 3/2/2026 - PREVIOUS INSPECTION NOTES 2/12/2026 - PREVIOUS INSPECTION NOTES CBA 3rd floor 1/26/2026 - PREVIOUS INSPECTION NOTES 2nd floor A, B 1/21/2026 - PREVIOUS INSPECTION NOTES 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 12/10/2025 - PREVIOUS INSPECTION NOTES Soffits F 2nd floor 11/26/2025 - PREVIOUS INSPECTION NOTES Behind soffits 2nd floor F,E,D, 3rd floor F,E.
PLUMBING 2ND ROUGH 03/19/2026 PARTIALLY APPROVED HCAMACHO
Note: A201, A203, A206, A208, A209, A211, A212 Tubs NOT Complete A301, A302, A303, A306, A309, A311, A312, A314 Tubs NOT Complete A407, A408, A409, A411, A412, A413, A414 Tubs NOT Complete C314, C414, C415 Tubs NOT Complete 2/2/2026 - PREVIOUS INSPECTION NOTES All tubs except units with incomplete shaft walls: F403 / D407 / D405 1/8/2026 - PREVIOUS INSPECTION NOTES 1/8/26: Partial inspection for 2nd/3rd floor tubs & showers in Buildings D/E/F. All tubs except units with incomplete shaft walls: F305 / F303 / D307 / D305 / D205 / D207 / F203 / F204 / F205. Unit D206 > Needs broken 'J' hook replaced at tub drain from unit above.
HVAC ROUGH 03/19/2026 PARTIALLY APPROVED HCAMACHO
Note: A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
HVAC ROUGH 03/17/2026 PARTIALLY APPROVED HCAMACHO
Note: -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FIREWALL PENETRATIONS 03/17/2026 PARTIALLY APPROVED KSANDOE
Note: 3rd floor C 3/10/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor. Shaft penetrations FED 2/10/2026 - PREVIOUS INSPECTION NOTES FED except shaft spaces 2/6/2026 - PREVIOUS INSPECTION NOTES Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
ELECTRIC 2ND ROUGH 03/17/2026 PARTIALLY APPROVED RMARTIN
Note: 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FIREWALL DRYWALL NAILING 03/17/2026 PARTIALLY APPROVED KSANDOE
Note: Inside layer shaft walls 2nd floor C, B 3/2/2026 - PREVIOUS INSPECTION NOTES 2/12/2026 - PREVIOUS INSPECTION NOTES CBA 3rd floor 1/26/2026 - PREVIOUS INSPECTION NOTES 2nd floor A, B 1/21/2026 - PREVIOUS INSPECTION NOTES 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 12/10/2025 - PREVIOUS INSPECTION NOTES Soffits F 2nd floor 11/26/2025 - PREVIOUS INSPECTION NOTES Behind soffits 2nd floor F,E,D, 3rd floor F,E.
PLUMBING 1ST ROUGH 03/16/2026 PARTIALLY APPROVED HCAMACHO
Note: Building A Storm tie in, 3 locations. 6", 4", 10" Virtual Inspection 3/12/2026 - PREVIOUS INSPECTION NOTES 2/13/2026 - PREVIOUS INSPECTION NOTES Partial storm tie in on DEF (4 total) on the inside parking area. 2/2/2026 - PREVIOUS INSPECTION NOTES Partial Building A plumbing rough for sanitary and domestic water 2nd, 3rd, 4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 12/18/2025 - PREVIOUS INSPECTION NOTES 12/18/25: Partial Building B plumbing rough for sanitary and domestic 2nd-4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 1). UNIT B401 IS STILL IN PROGRESS. WILL NEED TO BE CHECKED ONCE WALLS ARE INSTALLED. (Also checked main storm water drain tie in at Buildings 'C' and 'B'). Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070. THIS WAS A PARTIAL INSPECTION ON SECTION ''C'' WING WASTE AND VENT WATER LINES AND ROOF VENTS, NO TUBS OR SHOWERS SET IN PLACE YET. NO RISER CLAMPS OR FIRE CAULKING COMPLEYTED YET. SOME ARE BUT NEED TO CHECK ALL AT EACH SECTION THIS WAS THE WRONG INSPECTION CALLED IN THIS INSPECTION WAS APPROVED ALREADY 11/14/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
PLUMBING 1ST ROUGH 03/12/2026 CANCELLED BY APPLICANT RSIMS
Note: 2/13/2026 - PREVIOUS INSPECTION NOTES Partial storm tie in on DEF (4 total) on the inside parking area. 2/2/2026 - PREVIOUS INSPECTION NOTES Partial Building A plumbing rough for sanitary and domestic water 2nd, 3rd, 4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 12/18/2025 - PREVIOUS INSPECTION NOTES 12/18/25: Partial Building B plumbing rough for sanitary and domestic 2nd-4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 1). UNIT B401 IS STILL IN PROGRESS. WILL NEED TO BE CHECKED ONCE WALLS ARE INSTALLED. (Also checked main storm water drain tie in at Buildings 'C' and 'B'). Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070. THIS WAS A PARTIAL INSPECTION ON SECTION ''C'' WING WASTE AND VENT WATER LINES AND ROOF VENTS, NO TUBS OR SHOWERS SET IN PLACE YET. NO RISER CLAMPS OR FIRE CAULKING COMPLEYTED YET. SOME ARE BUT NEED TO CHECK ALL AT EACH SECTION THIS WAS THE WRONG INSPECTION CALLED IN THIS INSPECTION WAS APPROVED ALREADY 11/14/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
BLD - SEWER TIE IN 03/11/2026 PARTIALLY APPROVED HCAMACHO
Note: 6" Storm Tie in Bld A 4" Drain Tie in Bld A 10" Storm Tie in Bld A 1/23/2026 - PREVIOUS INSPECTION NOTES Sewer tie in on D(3) & E(3) North side 1/13/2026 - PREVIOUS INSPECTION NOTES 1/13/26: Spoke to Plumbing Contractor who does not have any Sewer Tie-in ready for inspection. 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: Partial Inspection for North Elevation Building E. > RS 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25: PARTIAL APPROVAL FOR BUILDINGS B AND C ONLY. > RS 1). BUILDING A: TIE-IN NEEDS TO BE EXPOSED FOR INSPECTION. CURRENTLY BACKFILLED.
FRAMING 03/11/2026 PARTIALLY APPROVED KSANDOE
Note: 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FIREWALL PENETRATIONS 03/10/2026 PARTIALLY APPROVED KSANDOE
Note: ABC 2nd floor. Shaft penetrations FED 2/10/2026 - PREVIOUS INSPECTION NOTES FED except shaft spaces 2/6/2026 - PREVIOUS INSPECTION NOTES Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
HVAC ROUGH 03/10/2026 PARTIALLY APPROVED HCAMACHO
Note: -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
HVAC ROUGH 03/09/2026 PARTIALLY APPROVED HCAMACHO
Note: Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FRAMING 03/09/2026 PARTIALLY APPROVED KSANDOE
Note: 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FRAMING 03/06/2026 PARTIALLY APPROVED KSANDOE
Note: All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 03/06/2026 PARTIALLY APPROVED HCAMACHO
Note: RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FRAMING 03/04/2026 PARTIALLY APPROVED KSANDOE
Note: 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 03/03/2026 PARTIALLY APPROVED HCAMACHO
Note: -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
FIREWALL DRYWALL NAILING 03/02/2026 CANCELLED BY APPLICANT PKNAPIK
Note: 2/12/2026 - PREVIOUS INSPECTION NOTES CBA 3rd floor 1/26/2026 - PREVIOUS INSPECTION NOTES 2nd floor A, B 1/21/2026 - PREVIOUS INSPECTION NOTES 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 12/10/2025 - PREVIOUS INSPECTION NOTES Soffits F 2nd floor 11/26/2025 - PREVIOUS INSPECTION NOTES Behind soffits 2nd floor F,E,D, 3rd floor F,E.
ELECTRIC 2ND ROUGH 02/27/2026 PARTIALLY APPROVED RMARTIN
Note: 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FRAMING 02/27/2026 PARTIALLY APPROVED KSANDOE
Note: ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 02/27/2026 FINAL APPROVED HCAMACHO
Note: -3rd floor A/B/C rough. -2nd/3rd of Building D corridor rough. -Unit C308 needs fresh air finished. 2/26/2026 - PREVIOUS INSPECTION NOTES -3rd floor Building D corridor rough & Dampers -4th floor Building C fresh air seams -Dampers inspected ABC 2nd/3rd floor 2/24/2026 - PREVIOUS INSPECTION NOTES -B208, B209, B210 Crush duct/ Framing issues fixed -B202, A202 Exhaust Fan finished. -RTU 5 & 6 Fire/ Smoke Damper connected to duct in Corridor 2nd floor building D -Fire smoke dampers section A-C 2/20/2026 - PREVIOUS INSPECTION NOTES RTU 5 & 6 Fire/ Smoke Damper installed in Corridor 2nd floor building D 2/18/2026 - PREVIOUS INSPECTION NOTES Rough inspection on units F308-F310-F309 -Framed ceiling 2/17/2026 - PREVIOUS INSPECTION NOTES 4 Diswsher ducts attachment to dampers F,E, D, A 2/13/2026 - PREVIOUS INSPECTION NOTES 1. Fresh air pipe 3rd A/B/C 2. 2A & 2B All Rough -B208, B209, B210 Crush duct/ Framing issues. -B202, A202 Exhaust Fan not finished 2/10/2026 - PREVIOUS INSPECTION NOTES 2C All Rough & Balconies and 2E FSD(Mechanical Room) 2/6/2026 - PREVIOUS INSPECTION NOTES Fire smoke damper inspection building A. 2/3/2026 - PREVIOUS INSPECTION NOTES 4th floor balcony D,E,F 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor balcony vents F, E, D 2nd floor fresh air seams building B , A. 1/27/2026 - PREVIOUS INSPECTION NOTES Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
HVAC ROUGH 02/26/2026 PARTIALLY APPROVED HCAMACHO
Note: -3rd floor Building D corridor rough & Dampers -4th floor Building C fresh air seams -Dampers inspected ABC 2nd/3rd floor 2/24/2026 - PREVIOUS INSPECTION NOTES -B208, B209, B210 Crush duct/ Framing issues fixed -B202, A202 Exhaust Fan finished. -RTU 5 & 6 Fire/ Smoke Damper connected to duct in Corridor 2nd floor building D -Fire smoke dampers section A-C 2/20/2026 - PREVIOUS INSPECTION NOTES RTU 5 & 6 Fire/ Smoke Damper installed in Corridor 2nd floor building D 2/18/2026 - PREVIOUS INSPECTION NOTES Rough inspection on units F308-F310-F309 -Framed ceiling 2/17/2026 - PREVIOUS INSPECTION NOTES 4 Diswsher ducts attachment to dampers F,E, D, A 2/13/2026 - PREVIOUS INSPECTION NOTES 1. Fresh air pipe 3rd A/B/C 2. 2A & 2B All Rough -B208, B209, B210 Crush duct/ Framing issues. -B202, A202 Exhaust Fan not finished 2/10/2026 - PREVIOUS INSPECTION NOTES 2C All Rough & Balconies and 2E FSD(Mechanical Room) 2/6/2026 - PREVIOUS INSPECTION NOTES Fire smoke damper inspection building A. 2/3/2026 - PREVIOUS INSPECTION NOTES 4th floor balcony D,E,F 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor balcony vents F, E, D 2nd floor fresh air seams building B , A. 1/27/2026 - PREVIOUS INSPECTION NOTES Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
HVAC ROUGH 02/24/2026 PARTIALLY APPROVED HCAMACHO
Note: -B208, B209, B210 Crush duct/ Framing issues fixed -B202, A202 Exhaust Fan finished. -RTU 5 & 6 Fire/ Smoke Damper connected to duct in Corridor 2nd floor building D -Fire smoke dampers section A-C 2/20/2026 - PREVIOUS INSPECTION NOTES RTU 5 & 6 Fire/ Smoke Damper installed in Corridor 2nd floor building D 2/18/2026 - PREVIOUS INSPECTION NOTES Rough inspection on units F308-F310-F309 -Framed ceiling 2/17/2026 - PREVIOUS INSPECTION NOTES 4 Diswsher ducts attachment to dampers F,E, D, A 2/13/2026 - PREVIOUS INSPECTION NOTES 1. Fresh air pipe 3rd A/B/C 2. 2A & 2B All Rough -B208, B209, B210 Crush duct/ Framing issues. -B202, A202 Exhaust Fan not finished 2/10/2026 - PREVIOUS INSPECTION NOTES 2C All Rough & Balconies and 2E FSD(Mechanical Room) 2/6/2026 - PREVIOUS INSPECTION NOTES Fire smoke damper inspection building A. 2/3/2026 - PREVIOUS INSPECTION NOTES 4th floor balcony D,E,F 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor balcony vents F, E, D 2nd floor fresh air seams building B , A. 1/27/2026 - PREVIOUS INSPECTION NOTES Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
FRAMING 02/24/2026 CANCELLED BY APPLICANT KSANDOE
Note: New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FRAMING 02/20/2026 CANCELLED BY APPLICANT WEB
Note: 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 02/20/2026 PARTIALLY APPROVED HCAMACHO
Note: RTU 5 & 6 Fire/ Smoke Damper installed in Corridor 2nd floor building D 2/18/2026 - PREVIOUS INSPECTION NOTES Rough inspection on units F308-F310-F309 -Framed ceiling 2/17/2026 - PREVIOUS INSPECTION NOTES 4 Diswsher ducts attachment to dampers F,E, D, A 2/13/2026 - PREVIOUS INSPECTION NOTES 1. Fresh air pipe 3rd A/B/C 2. 2A & 2B All Rough -B208, B209, B210 Crush duct/ Framing issues. -B202, A202 Exhaust Fan not finished 2/10/2026 - PREVIOUS INSPECTION NOTES 2C All Rough & Balconies and 2E FSD(Mechanical Room) 2/6/2026 - PREVIOUS INSPECTION NOTES Fire smoke damper inspection building A. 2/3/2026 - PREVIOUS INSPECTION NOTES 4th floor balcony D,E,F 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor balcony vents F, E, D 2nd floor fresh air seams building B , A. 1/27/2026 - PREVIOUS INSPECTION NOTES Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
HVAC ROUGH 02/18/2026 PARTIALLY APPROVED HCAMACHO
Note: Rough inspection on units F308-F310-F309 -Framed ceiling 2/17/2026 - PREVIOUS INSPECTION NOTES 4 Diswsher ducts attachment to dampers F,E, D, A 2/13/2026 - PREVIOUS INSPECTION NOTES 1. Fresh air pipe 3rd A/B/C 2. 2A & 2B All Rough -B208, B209, B210 Crush duct/ Framing issues. -B202, A202 Exhaust Fan not finished 2/10/2026 - PREVIOUS INSPECTION NOTES 2C All Rough & Balconies and 2E FSD(Mechanical Room) 2/6/2026 - PREVIOUS INSPECTION NOTES Fire smoke damper inspection building A. 2/3/2026 - PREVIOUS INSPECTION NOTES 4th floor balcony D,E,F 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor balcony vents F, E, D 2nd floor fresh air seams building B , A. 1/27/2026 - PREVIOUS INSPECTION NOTES Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
ROOF SHEATHING / BRACE / TIE DOWN 02/18/2026 PARTIALLY APPROVED KSANDOE
Note: FED balconies 2/4/2026 - PREVIOUS INSPECTION NOTES Wall sheathing on parapet
HVAC ROUGH 02/17/2026 PARTIALLY APPROVED HCAMACHO
Note: 4 Diswsher ducts attachment to dampers F,E, D, A 2/13/2026 - PREVIOUS INSPECTION NOTES 1. Fresh air pipe 3rd A/B/C 2. 2A & 2B All Rough -B208, B209, B210 Crush duct/ Framing issues. -B202, A202 Exhaust Fan not finished 2/10/2026 - PREVIOUS INSPECTION NOTES 2C All Rough & Balconies and 2E FSD(Mechanical Room) 2/6/2026 - PREVIOUS INSPECTION NOTES Fire smoke damper inspection building A. 2/3/2026 - PREVIOUS INSPECTION NOTES 4th floor balcony D,E,F 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor balcony vents F, E, D 2nd floor fresh air seams building B , A. 1/27/2026 - PREVIOUS INSPECTION NOTES Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
HVAC ROUGH 02/13/2026 PARTIALLY APPROVED HCAMACHO
Note: 1. Fresh air pipe 3rd A/B/C 2. 2A & 2B All Rough -B208, B209, B210 Crush duct/ Framing issues. -B202, A202 Exhaust Fan not finished 2/10/2026 - PREVIOUS INSPECTION NOTES 2C All Rough & Balconies and 2E FSD(Mechanical Room) 2/6/2026 - PREVIOUS INSPECTION NOTES Fire smoke damper inspection building A. 2/3/2026 - PREVIOUS INSPECTION NOTES 4th floor balcony D,E,F 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor balcony vents F, E, D 2nd floor fresh air seams building B , A. 1/27/2026 - PREVIOUS INSPECTION NOTES Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
PLUMBING 1ST ROUGH 02/13/2026 PARTIALLY APPROVED HCAMACHO
Note: Partial storm tie in on DEF (4 total) on the inside parking area. 2/2/2026 - PREVIOUS INSPECTION NOTES Partial Building A plumbing rough for sanitary and domestic water 2nd, 3rd, 4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 12/18/2025 - PREVIOUS INSPECTION NOTES 12/18/25: Partial Building B plumbing rough for sanitary and domestic 2nd-4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 1). UNIT B401 IS STILL IN PROGRESS. WILL NEED TO BE CHECKED ONCE WALLS ARE INSTALLED. (Also checked main storm water drain tie in at Buildings 'C' and 'B'). Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070. THIS WAS A PARTIAL INSPECTION ON SECTION ''C'' WING WASTE AND VENT WATER LINES AND ROOF VENTS, NO TUBS OR SHOWERS SET IN PLACE YET. NO RISER CLAMPS OR FIRE CAULKING COMPLEYTED YET. SOME ARE BUT NEED TO CHECK ALL AT EACH SECTION THIS WAS THE WRONG INSPECTION CALLED IN THIS INSPECTION WAS APPROVED ALREADY 11/14/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
ELECTRIC 2ND ROUGH 02/13/2026 PARTIALLY APPROVED JMUNSON
Note: 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FIREWALL DRYWALL NAILING 02/12/2026 PARTIALLY APPROVED KSANDOE
Note: CBA 3rd floor 1/26/2026 - PREVIOUS INSPECTION NOTES 2nd floor A, B 1/21/2026 - PREVIOUS INSPECTION NOTES 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 12/10/2025 - PREVIOUS INSPECTION NOTES Soffits F 2nd floor 11/26/2025 - PREVIOUS INSPECTION NOTES Behind soffits 2nd floor F,E,D, 3rd floor F,E.
FIREWALL PENETRATIONS 02/10/2026 PARTIALLY APPROVED KSANDOE
Note: FED except shaft spaces 2/6/2026 - PREVIOUS INSPECTION NOTES Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
HVAC ROUGH 02/10/2026 PARTIALLY APPROVED HCAMACHO
Note: 2C All Rough & Balconies and 2E FSD(Mechanical Room) 2/6/2026 - PREVIOUS INSPECTION NOTES Fire smoke damper inspection building A. 2/3/2026 - PREVIOUS INSPECTION NOTES 4th floor balcony D,E,F 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor balcony vents F, E, D 2nd floor fresh air seams building B , A. 1/27/2026 - PREVIOUS INSPECTION NOTES Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
ELECTRIC 2ND ROUGH 02/06/2026 PARTIALLY APPROVED RMARTIN
Note: 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
HVAC ROUGH 02/06/2026 PARTIALLY APPROVED HCAMACHO
Note: Fire smoke damper inspection building A. 2/3/2026 - PREVIOUS INSPECTION NOTES 4th floor balcony D,E,F 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor balcony vents F, E, D 2nd floor fresh air seams building B , A. 1/27/2026 - PREVIOUS INSPECTION NOTES Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
FIREWALL PENETRATIONS 02/06/2026 PARTIALLY APPROVED KSANDOE
Note: Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
FIREWALL PENETRATIONS 02/05/2026 PARTIALLY APPROVED KSANDOE
Note: 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
FRAMING 02/05/2026 PARTIALLY APPROVED KSANDOE
Note: F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
ROOF SHEATHING / BRACE / TIE DOWN 02/04/2026 PARTIALLY APPROVED KSANDOE
Note: Wall sheathing on parapet
FIREWALL FRAMING 02/03/2026 PARTIALLY APPROVED KSANDOE
Note: Partial, 3rd floor Building ABC. 2/2/2026 - PREVIOUS INSPECTION NOTES CBA3rd 1/21/2026 - PREVIOUS INSPECTION NOTES 1/15/2026 - PREVIOUS INSPECTION NOTES C2 1/7/2026 - PREVIOUS INSPECTION NOTES 12/18/2025 - PREVIOUS INSPECTION NOTES 12/17/2025 - PREVIOUS INSPECTION NOTES A, B, C 4th floor 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2nd, 3rd, partial 4th 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super
FRAMING 02/03/2026 CANCELLED BY APPLICANT KSANDOE
Note: 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 02/03/2026 PARTIALLY APPROVED HCAMACHO
Note: 4th floor balcony D,E,F 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor balcony vents F, E, D 2nd floor fresh air seams building B , A. 1/27/2026 - PREVIOUS INSPECTION NOTES Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
PLUMBING 1ST ROUGH 02/02/2026 PARTIALLY APPROVED HCAMACHO
Note: Partial Building A plumbing rough for sanitary and domestic water 2nd, 3rd, 4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 12/18/2025 - PREVIOUS INSPECTION NOTES 12/18/25: Partial Building B plumbing rough for sanitary and domestic 2nd-4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 1). UNIT B401 IS STILL IN PROGRESS. WILL NEED TO BE CHECKED ONCE WALLS ARE INSTALLED. (Also checked main storm water drain tie in at Buildings 'C' and 'B'). Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070. THIS WAS A PARTIAL INSPECTION ON SECTION ''C'' WING WASTE AND VENT WATER LINES AND ROOF VENTS, NO TUBS OR SHOWERS SET IN PLACE YET. NO RISER CLAMPS OR FIRE CAULKING COMPLEYTED YET. SOME ARE BUT NEED TO CHECK ALL AT EACH SECTION THIS WAS THE WRONG INSPECTION CALLED IN THIS INSPECTION WAS APPROVED ALREADY 11/14/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
PLUMBING 2ND ROUGH 02/02/2026 PARTIALLY APPROVED HCAMACHO
Note: All tubs except units with incomplete shaft walls: F403 / D407 / D405 1/8/2026 - PREVIOUS INSPECTION NOTES 1/8/26: Partial inspection for 2nd/3rd floor tubs & showers in Buildings D/E/F. All tubs except units with incomplete shaft walls: F305 / F303 / D307 / D305 / D205 / D207 / F203 / F204 / F205. Unit D206 > Needs broken 'J' hook replaced at tub drain from unit above.
HORIZONTAL ASSEMB PENETRATIONS 02/02/2026 PARTIALLY APPROVED KSANDOE
Note: Metro FED 2nd CBA 3RD 1/21/2026 - PREVIOUS INSPECTION NOTES 12/19/2025 - PREVIOUS INSPECTION NOTES In-wall penetrations for FED floors 2, 3, & 4 complete. 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 11/26/2025 - PREVIOUS INSPECTION NOTES D and E 4th floor plumbing 11/24/2025 - PREVIOUS INSPECTION NOTES D 3rd floor plumbing 11/19/2025 - PREVIOUS INSPECTION NOTES F and E 3rd floor plumbing 11/18/2025 - PREVIOUS INSPECTION NOTES 11/14/2025 - PREVIOUS INSPECTION NOTES D 2nd floor plumbing 11/12/2025 - PREVIOUS INSPECTION NOTES E 2nd floor Plumbing 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210 Plumbing
FIREWALL FRAMING 02/02/2026 PARTIALLY APPROVED KSANDOE
Note: CBA3rd 1/21/2026 - PREVIOUS INSPECTION NOTES 1/15/2026 - PREVIOUS INSPECTION NOTES C2 1/7/2026 - PREVIOUS INSPECTION NOTES 12/18/2025 - PREVIOUS INSPECTION NOTES 12/17/2025 - PREVIOUS INSPECTION NOTES A, B, C 4th floor 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2nd, 3rd, partial 4th 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super
FIREWALL PENETRATIONS 01/30/2026 PARTIALLY APPROVED KSANDOE
Note: 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
FIREWALL PENETRATIONS 01/29/2026 PARTIALLY APPROVED KSANDOE
Note: 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
HVAC ROUGH 01/29/2026 PARTIALLY APPROVED HCAMACHO
Note: 3rd floor balcony vents F, E, D 2nd floor fresh air seams building B , A. 1/27/2026 - PREVIOUS INSPECTION NOTES Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
ELECTRIC 2ND ROUGH 01/28/2026 PARTIALLY APPROVED RMARTIN
Note: 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
FIREWALL PENETRATIONS 01/28/2026 PARTIALLY APPROVED KSANDOE
Note: 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
HOOD DUCT AND LIGHTING TEST 01/27/2026 PARTIALLY APPROVED HCAMACHO
Note: Light test on the connections on the 1st floor building A 1/21/2026 - PREVIOUS INSPECTION NOTES Light test on the seams, on grease duct on building A 1/13/2026 - PREVIOUS INSPECTION NOTES Light test on the seams after duct was installed on building A up to the 1st floor 1/7/2026 - PREVIOUS INSPECTION NOTES Light test on the seams after duct was installed on building F and D. Also looked at the insualtion on the diswasher duct on building E and D 12/30/2025 - PREVIOUS INSPECTION NOTES Light Test on the seams after duct was installed on Building E 12/17/2025 - PREVIOUS INSPECTION NOTES Inspected 2nd set of duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/25/2025 - PREVIOUS INSPECTION NOTES Inspected all duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/19/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Building D 11/12/2025 - PREVIOUS INSPECTION NOTES 10/30/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Inspect all duct on ground . will need to inspect seams as it is put together in the shaft SectionE
ELECTRIC 2ND ROUGH 01/27/2026 CANCELLED BY APPLICANT RMARTIN
Note: 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
HVAC ROUGH 01/27/2026 PARTIALLY APPROVED HCAMACHO
Note: Seal inspection on ducts for D lobby. Also looked at wrap on duct in the wall. 1/26/2026 - PREVIOUS INSPECTION NOTES Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
HVAC ROUGH 01/26/2026 PARTIALLY APPROVED HCAMACHO
Note: Partial fire smoke damper D/F 2nd floor. 1st floor D lobby (duct seal). 1/23/2026 - PREVIOUS INSPECTION NOTES 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
FIREWALL DRYWALL NAILING 01/26/2026 PARTIALLY APPROVED KSANDOE
Note: 2nd floor A, B 1/21/2026 - PREVIOUS INSPECTION NOTES 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 12/10/2025 - PREVIOUS INSPECTION NOTES Soffits F 2nd floor 11/26/2025 - PREVIOUS INSPECTION NOTES Behind soffits 2nd floor F,E,D, 3rd floor F,E.
HVAC ROUGH 01/23/2026 PARTIALLY APPROVED HCAMACHO
Note: 1. Building C 2nd floor fresh air seams. 2. Partial seams for RTU 5/6. 3. RTU 8/7 wrap. 1/20/2026 - PREVIOUS INSPECTION NOTES 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
BLD - SEWER TIE IN 01/23/2026 PARTIALLY APPROVED HCAMACHO
Note: Sewer tie in on D(3) & E(3) North side 1/13/2026 - PREVIOUS INSPECTION NOTES 1/13/26: Spoke to Plumbing Contractor who does not have any Sewer Tie-in ready for inspection. 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: Partial Inspection for North Elevation Building E. > RS 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25: PARTIAL APPROVAL FOR BUILDINGS B AND C ONLY. > RS 1). BUILDING A: TIE-IN NEEDS TO BE EXPOSED FOR INSPECTION. CURRENTLY BACKFILLED.
HOOD DUCT AND LIGHTING TEST 01/21/2026 PARTIALLY APPROVED HCAMACHO
Note: Light test on the seams, on grease duct on building A 1/13/2026 - PREVIOUS INSPECTION NOTES Light test on the seams after duct was installed on building A up to the 1st floor 1/7/2026 - PREVIOUS INSPECTION NOTES Light test on the seams after duct was installed on building F and D. Also looked at the insualtion on the diswasher duct on building E and D 12/30/2025 - PREVIOUS INSPECTION NOTES Light Test on the seams after duct was installed on Building E 12/17/2025 - PREVIOUS INSPECTION NOTES Inspected 2nd set of duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/25/2025 - PREVIOUS INSPECTION NOTES Inspected all duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/19/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Building D 11/12/2025 - PREVIOUS INSPECTION NOTES 10/30/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Inspect all duct on ground . will need to inspect seams as it is put together in the shaft SectionE
GAS ROUGH 01/21/2026 PARTIALLY APPROVED HCAMACHO
Note: Partial gas verticals Building ABC all the awy to the roof. 1/16/2026 - PREVIOUS INSPECTION NOTES 1/16/26: Partial approval for gas risers in Buildings D/E/F. 9/19/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR FIRST FLOOR ONLY ON BUILDINGS F-E-D ONLY AND FOR FUTURE GAS IF WARRANT FOR OCCUPENT 8/18/2025 - PREVIOUS INSPECTION NOTES THIS INSPECTION ''3240 IS FOR WHAT NEEDS TO BE SCHEDUALED FROM NOW ON UNTIL ALL GAS ROUGH INSPECTION ARE COPLETED'' NOT FIRST ROUGH, OR GREASE INTERCEPTOR
FIREWALL DRYWALL NAILING 01/21/2026 PARTIALLY APPROVED KSANDOE
Note: 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 12/10/2025 - PREVIOUS INSPECTION NOTES Soffits F 2nd floor 11/26/2025 - PREVIOUS INSPECTION NOTES Behind soffits 2nd floor F,E,D, 3rd floor F,E.
FIREWALL FRAMING 01/21/2026 PARTIALLY APPROVED KSANDOE
Note: 1/15/2026 - PREVIOUS INSPECTION NOTES C2 1/7/2026 - PREVIOUS INSPECTION NOTES 12/18/2025 - PREVIOUS INSPECTION NOTES 12/17/2025 - PREVIOUS INSPECTION NOTES A, B, C 4th floor 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2nd, 3rd, partial 4th 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super
HORIZONTAL ASSEMB PENETRATIONS 01/21/2026 PARTIALLY APPROVED KSANDOE
Note: 12/19/2025 - PREVIOUS INSPECTION NOTES In-wall penetrations for FED floors 2, 3, & 4 complete. 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 11/26/2025 - PREVIOUS INSPECTION NOTES D and E 4th floor plumbing 11/24/2025 - PREVIOUS INSPECTION NOTES D 3rd floor plumbing 11/19/2025 - PREVIOUS INSPECTION NOTES F and E 3rd floor plumbing 11/18/2025 - PREVIOUS INSPECTION NOTES 11/14/2025 - PREVIOUS INSPECTION NOTES D 2nd floor plumbing 11/12/2025 - PREVIOUS INSPECTION NOTES E 2nd floor Plumbing 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210 Plumbing
STOREFRONT 01/20/2026 PARTIALLY APPROVED KSANDOE
Note: 4th floor F south 1/15/2026 - PREVIOUS INSPECTION NOTES F4, A1, 4 1/13/2026 - PREVIOUS INSPECTION NOTES Frames A
ELECTRIC FINAL 01/20/2026 Disapproved - NO FEE JMUNSON
Note: Wrong inspection called in. This was supposed to be Electrical 2nd Rough.
ELECTRIC 2ND ROUGH 01/20/2026 PARTIALLY APPROVED JMUNSON
Note: 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
HOOD DUCT FIRE WRAP 01/20/2026 PARTIALLY APPROVED HCAMACHO
Note: Building A 1st layer fire wrap on grease duct 1/15/2026 - PREVIOUS INSPECTION NOTES Grease duct wrap 2nd layer building D/F 1/12/2026 - PREVIOUS INSPECTION NOTES Grease duct wrap 1st layer building D/E 1/8/2026 - PREVIOUS INSPECTION NOTES Partial on Grease Duct wrap Building F Dishwasher duct wrap Building F
HVAC ROUGH 01/20/2026 PARTIALLY APPROVED HCAMACHO
Note: 2nd floor DEF balcony rough/section E and F fire smoke dampeners 1/16/2026 - PREVIOUS INSPECTION NOTES RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
HVAC ROUGH 01/16/2026 PARTIALLY APPROVED HCAMACHO
Note: RTU's and fresh air building F &D 1/15/2026 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
GAS ROUGH 01/16/2026 PARTIALLY APPROVED RSIMS
Note: 1/16/26: Partial approval for gas risers in Buildings D/E/F. 9/19/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR FIRST FLOOR ONLY ON BUILDINGS F-E-D ONLY AND FOR FUTURE GAS IF WARRANT FOR OCCUPENT 8/18/2025 - PREVIOUS INSPECTION NOTES THIS INSPECTION ''3240 IS FOR WHAT NEEDS TO BE SCHEDUALED FROM NOW ON UNTIL ALL GAS ROUGH INSPECTION ARE COPLETED'' NOT FIRST ROUGH, OR GREASE INTERCEPTOR
HOOD DUCT FIRE WRAP 01/15/2026 PARTIALLY APPROVED HCAMACHO
Note: Grease duct wrap 2nd layer building D/F 1/12/2026 - PREVIOUS INSPECTION NOTES Grease duct wrap 1st layer building D/E 1/8/2026 - PREVIOUS INSPECTION NOTES Partial on Grease Duct wrap Building F Dishwasher duct wrap Building F
HVAC ROUGH 01/15/2026 CANCELLED BY APPLICANT HCAMACHO
Note: Not ready for inspection. 1/13/2026 - PREVIOUS INSPECTION NOTES 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
FIREWALL FRAMING 01/15/2026 PARTIALLY APPROVED KSANDOE
Note: C2 1/7/2026 - PREVIOUS INSPECTION NOTES 12/18/2025 - PREVIOUS INSPECTION NOTES 12/17/2025 - PREVIOUS INSPECTION NOTES A, B, C 4th floor 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2nd, 3rd, partial 4th 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super
FIREWALL PENETRATIONS 01/15/2026 PARTIALLY APPROVED KSANDOE
Note: D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
STOREFRONT 01/15/2026 PARTIALLY APPROVED KSANDOE
Note: F4, A1, 4 1/13/2026 - PREVIOUS INSPECTION NOTES Frames A
FRAMING 01/14/2026 PARTIALLY APPROVED KSANDOE
Note: FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HVAC ROUGH 01/13/2026 PARTIALLY APPROVED HCAMACHO
Note: 1. 1. HVAC Rough on buidings F, E & D 4th floor. E 315, E307,E305,E303,E304. Unit E215 has Crush Duct. 12/23/2025 - PREVIOUS INSPECTION NOTES 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
BLD - SEWER TIE IN 01/13/2026 Disapproved - NO FEE RSIMS
Note: 1/13/26: Spoke to Plumbing Contractor who does not have any Sewer Tie-in ready for inspection. 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: Partial Inspection for North Elevation Building E. > RS 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25: PARTIAL APPROVAL FOR BUILDINGS B AND C ONLY. > RS 1). BUILDING A: TIE-IN NEEDS TO BE EXPOSED FOR INSPECTION. CURRENTLY BACKFILLED.
HOOD DUCT AND LIGHTING TEST 01/13/2026 PARTIALLY APPROVED HCAMACHO
Note: Light test on the seams after duct was installed on building A up to the 1st floor 1/7/2026 - PREVIOUS INSPECTION NOTES Light test on the seams after duct was installed on building F and D. Also looked at the insualtion on the diswasher duct on building E and D 12/30/2025 - PREVIOUS INSPECTION NOTES Light Test on the seams after duct was installed on Building E 12/17/2025 - PREVIOUS INSPECTION NOTES Inspected 2nd set of duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/25/2025 - PREVIOUS INSPECTION NOTES Inspected all duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/19/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Building D 11/12/2025 - PREVIOUS INSPECTION NOTES 10/30/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Inspect all duct on ground . will need to inspect seams as it is put together in the shaft SectionE
STOREFRONT 01/13/2026 PARTIALLY APPROVED KSANDOE
Note: Frames A
STOREFRONT 01/13/2026 APPROVED KSANDOE
Note: 1/12/2026 - PREVIOUS INSPECTION NOTES 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES Remaining Pans for Store fronts on all the buildings. 12/29/2025 - PREVIOUS INSPECTION NOTES Looked at the pans on All the buildings for storefronts. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/4/2025 - PREVIOUS INSPECTION NOTES 1 window 4th floor 11/24/2025 - PREVIOUS INSPECTION NOTES 1st floor door and window B 4th floor mezz 11/21/2025 - PREVIOUS INSPECTION NOTES Floor pan entry B Sill pan 4th floor A mezz 11/12/2025 - PREVIOUS INSPECTION NOTES 3 bays 4th floor building F 1 window 3rd floor 1 window 2nd floor 1 window 1st floor 11/6/2025 - PREVIOUS INSPECTION NOTES 11/4/2025 - PREVIOUS INSPECTION NOTES 1 Window on Building A , and 3 windows on building B
STOREFRONT 01/12/2026 CANCELLED BY APPLICANT KSANDOE
Note: 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES Remaining Pans for Store fronts on all the buildings. 12/29/2025 - PREVIOUS INSPECTION NOTES Looked at the pans on All the buildings for storefronts. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/4/2025 - PREVIOUS INSPECTION NOTES 1 window 4th floor 11/24/2025 - PREVIOUS INSPECTION NOTES 1st floor door and window B 4th floor mezz 11/21/2025 - PREVIOUS INSPECTION NOTES Floor pan entry B Sill pan 4th floor A mezz 11/12/2025 - PREVIOUS INSPECTION NOTES 3 bays 4th floor building F 1 window 3rd floor 1 window 2nd floor 1 window 1st floor 11/6/2025 - PREVIOUS INSPECTION NOTES 11/4/2025 - PREVIOUS INSPECTION NOTES 1 Window on Building A , and 3 windows on building B
HOOD DUCT FIRE WRAP 01/12/2026 PARTIALLY APPROVED HCAMACHO
Note: Grease duct wrap 1st layer building D/E 1/8/2026 - PREVIOUS INSPECTION NOTES Partial on Grease Duct wrap Building F Dishwasher duct wrap Building F
ELECTRIC 2ND ROUGH 01/09/2026 PARTIALLY APPROVED RMARTIN
Note: 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
ELECTRIC 1ST ROUGH 01/09/2026 APPROVED - AS NOTED RMARTIN
Note: 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building
FIREWALL PENETRATIONS 01/09/2026 CANCELLED BY APPLICANT KSANDOE
Note: 1/8/2026 - PREVIOUS INSPECTION NOTES
FIREWALL PENETRATIONS 01/08/2026 CANCELLED BY APPLICANT KSANDOE
HOOD DUCT FIRE WRAP 01/08/2026 PARTIALLY APPROVED HCAMACHO
Note: Partial on Grease Duct wrap Building F Dishwasher duct wrap Building F
PLUMBING 2ND ROUGH 01/08/2026 PARTIALLY APPROVED RSIMS
Note: 1/8/26: Partial inspection for 2nd/3rd floor tubs & showers in Buildings D/E/F. All tubs except units with incomplete shaft walls: F305 / F303 / D307 / D305 / D205 / D207 / F203 / F204 / F205. Unit D206 > Needs broken 'J' hook replaced at tub drain from unit above.
HOOD DUCT AND LIGHTING TEST 01/07/2026 PARTIALLY APPROVED HCAMACHO
Note: Light test on the seams after duct was installed on building F and D. Also looked at the insualtion on the diswasher duct on building E and D 12/30/2025 - PREVIOUS INSPECTION NOTES Light Test on the seams after duct was installed on Building E 12/17/2025 - PREVIOUS INSPECTION NOTES Inspected 2nd set of duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/25/2025 - PREVIOUS INSPECTION NOTES Inspected all duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/19/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Building D 11/12/2025 - PREVIOUS INSPECTION NOTES 10/30/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Inspect all duct on ground . will need to inspect seams as it is put together in the shaft SectionE
FIREWALL FRAMING 01/07/2026 CANCELLED BY APPLICANT KSANDOE
Note: 12/18/2025 - PREVIOUS INSPECTION NOTES 12/17/2025 - PREVIOUS INSPECTION NOTES A, B, C 4th floor 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2nd, 3rd, partial 4th 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super
FRAMING 01/05/2026 PARTIALLY APPROVED KSANDOE
Note: 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
STOREFRONT 01/05/2026 PARTIALLY APPROVED KSANDOE
Note: 12/30/2025 - PREVIOUS INSPECTION NOTES Remaining Pans for Store fronts on all the buildings. 12/29/2025 - PREVIOUS INSPECTION NOTES Looked at the pans on All the buildings for storefronts. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/4/2025 - PREVIOUS INSPECTION NOTES 1 window 4th floor 11/24/2025 - PREVIOUS INSPECTION NOTES 1st floor door and window B 4th floor mezz 11/21/2025 - PREVIOUS INSPECTION NOTES Floor pan entry B Sill pan 4th floor A mezz 11/12/2025 - PREVIOUS INSPECTION NOTES 3 bays 4th floor building F 1 window 3rd floor 1 window 2nd floor 1 window 1st floor 11/6/2025 - PREVIOUS INSPECTION NOTES 11/4/2025 - PREVIOUS INSPECTION NOTES 1 Window on Building A , and 3 windows on building B
STOREFRONT 12/30/2025 PARTIALLY APPROVED HCAMACHO
Note: Remaining Pans for Store fronts on all the buildings. 12/29/2025 - PREVIOUS INSPECTION NOTES Looked at the pans on All the buildings for storefronts. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/4/2025 - PREVIOUS INSPECTION NOTES 1 window 4th floor 11/24/2025 - PREVIOUS INSPECTION NOTES 1st floor door and window B 4th floor mezz 11/21/2025 - PREVIOUS INSPECTION NOTES Floor pan entry B Sill pan 4th floor A mezz 11/12/2025 - PREVIOUS INSPECTION NOTES 3 bays 4th floor building F 1 window 3rd floor 1 window 2nd floor 1 window 1st floor 11/6/2025 - PREVIOUS INSPECTION NOTES 11/4/2025 - PREVIOUS INSPECTION NOTES 1 Window on Building A , and 3 windows on building B
FRAMING 12/30/2025 PARTIALLY APPROVED HCAMACHO
Note: F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
HOOD DUCT AND LIGHTING TEST 12/30/2025 PARTIALLY APPROVED HCAMACHO
Note: Light Test on the seams after duct was installed on Building E 12/17/2025 - PREVIOUS INSPECTION NOTES Inspected 2nd set of duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/25/2025 - PREVIOUS INSPECTION NOTES Inspected all duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/19/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Building D 11/12/2025 - PREVIOUS INSPECTION NOTES 10/30/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Inspect all duct on ground . will need to inspect seams as it is put together in the shaft SectionE
STOREFRONT 12/29/2025 PARTIALLY APPROVED HCAMACHO
Note: Looked at the pans on All the buildings for storefronts. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/4/2025 - PREVIOUS INSPECTION NOTES 1 window 4th floor 11/24/2025 - PREVIOUS INSPECTION NOTES 1st floor door and window B 4th floor mezz 11/21/2025 - PREVIOUS INSPECTION NOTES Floor pan entry B Sill pan 4th floor A mezz 11/12/2025 - PREVIOUS INSPECTION NOTES 3 bays 4th floor building F 1 window 3rd floor 1 window 2nd floor 1 window 1st floor 11/6/2025 - PREVIOUS INSPECTION NOTES 11/4/2025 - PREVIOUS INSPECTION NOTES 1 Window on Building A , and 3 windows on building B
STOREFRONT 12/26/2025 CANCELLED BY APPLICANT PKNAPIK
Note: 12/4/2025 - PREVIOUS INSPECTION NOTES 1 window 4th floor 11/24/2025 - PREVIOUS INSPECTION NOTES 1st floor door and window B 4th floor mezz 11/21/2025 - PREVIOUS INSPECTION NOTES Floor pan entry B Sill pan 4th floor A mezz 11/12/2025 - PREVIOUS INSPECTION NOTES 3 bays 4th floor building F 1 window 3rd floor 1 window 2nd floor 1 window 1st floor 11/6/2025 - PREVIOUS INSPECTION NOTES 11/4/2025 - PREVIOUS INSPECTION NOTES 1 Window on Building A , and 3 windows on building B
ELECTRIC 2ND ROUGH 12/23/2025 PARTIALLY APPROVED RMARTIN
Note: E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
BLD - SEWER TIE IN 12/23/2025 PARTIALLY APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 12/23/2025 10:06:31 AM *** 12/23/25: Partial Inspection for North Elevation Building E. > RS 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25: PARTIAL APPROVAL FOR BUILDINGS B AND C ONLY. > RS 1). BUILDING A: TIE-IN NEEDS TO BE EXPOSED FOR INSPECTION. CURRENTLY BACKFILLED.
HVAC ROUGH 12/23/2025 PARTIALLY APPROVED HCAMACHO
Note: 1. HVAC Rough on buidings E & D 3rd floor. E 315 is not finished in 3rd floor. 12/22/2025 - PREVIOUS INSPECTION NOTES 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
HVAC ROUGH 12/22/2025 PARTIALLY APPROVED HCAMACHO
Note: 1. 4th floor D fresh air seam inspection ok. 2. 2nd floor E/D rough inspection ok, except Unit E215 is not finished. 12/18/2025 - PREVIOUS INSPECTION NOTES 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
ELECTRIC 1ST ROUGH 12/22/2025 PARTIALLY APPROVED MKRASKI
Note: 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building
ELECTRIC 2ND ROUGH 12/22/2025 PARTIALLY APPROVED MKRASKI
Note: 12/22/25 2nd rough approved only in unit D211
BLD - SEWER TIE IN 12/19/2025 PARTIALLY APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 12/19/2025 10:18:15 AM *** 12/19/25: PARTIAL APPROVAL FOR BUILDINGS B AND C ONLY. 1). BUILDING A: TIE-IN NEEDS TO BE EXPOSED FOR INSPECTION. CURRENTLY BACKFILLED.
HORIZONTAL ASSEMB PENETRATIONS 12/19/2025 PARTIALLY APPROVED KSANDOE
Note: In-wall penetrations for FED floors 2, 3, & 4 complete. 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 11/26/2025 - PREVIOUS INSPECTION NOTES D and E 4th floor plumbing 11/24/2025 - PREVIOUS INSPECTION NOTES D 3rd floor plumbing 11/19/2025 - PREVIOUS INSPECTION NOTES F and E 3rd floor plumbing 11/18/2025 - PREVIOUS INSPECTION NOTES 11/14/2025 - PREVIOUS INSPECTION NOTES D 2nd floor plumbing 11/12/2025 - PREVIOUS INSPECTION NOTES E 2nd floor Plumbing 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210 Plumbing
FIREWALL FRAMING 12/18/2025 CANCELLED BY APPLICANT KSANDOE
Note: 12/17/2025 - PREVIOUS INSPECTION NOTES A, B, C 4th floor 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2nd, 3rd, partial 4th 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super
HVAC ROUGH 12/18/2025 PARTIALLY APPROVED HCAMACHO
Note: 2nd Flr F All the rough HVAC. 12/16/2025 - PREVIOUS INSPECTION NOTES 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
PLUMBING 1ST ROUGH 12/18/2025 PARTIALLY APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 12/18/2025 9:48:27 AM *** 12/18/25: Partial Building B plumbing rough for sanitary and domestic 2nd-4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 1). UNIT B401 IS STILL IN PROGRESS. WILL NEED TO BE CHECKED ONCE WALLS ARE INSTALLED. (Also checked main storm water drain tie in at Buildings 'C' and 'B'). Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070. THIS WAS A PARTIAL INSPECTION ON SECTION ''C'' WING WASTE AND VENT WATER LINES AND ROOF VENTS, NO TUBS OR SHOWERS SET IN PLACE YET. NO RISER CLAMPS OR FIRE CAULKING COMPLEYTED YET. SOME ARE BUT NEED TO CHECK ALL AT EACH SECTION THIS WAS THE WRONG INSPECTION CALLED IN THIS INSPECTION WAS APPROVED ALREADY 11/14/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
FIREWALL FRAMING 12/17/2025 PARTIALLY APPROVED KSANDOE
Note: A, B, C 4th floor 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2nd, 3rd, partial 4th 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super
HOOD DUCT AND LIGHTING TEST 12/17/2025 PARTIALLY APPROVED HCAMACHO
Note: Inspected 2nd set of duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/25/2025 - PREVIOUS INSPECTION NOTES Inspected all duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/19/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Building D 11/12/2025 - PREVIOUS INSPECTION NOTES 10/30/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Inspect all duct on ground . will need to inspect seams as it is put together in the shaft SectionE
HVAC ROUGH 12/16/2025 PARTIALLY APPROVED HCAMACHO
Note: 1. Unit E415 has the Fresh air exinting at the same location as the exhaust. It needs to be moved. Fresh air pipe seams, and exhaust 4th floor, F, E and partial D(5 Units not done at the end) 12/8/2025 - PREVIOUS INSPECTION NOTES 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
WINDOW NAILING 12/11/2025 APPROVED KSANDOE
FIREWALL FRAMING 12/11/2025 PARTIALLY APPROVED KSANDOE
Note: FED 2nd, 3rd, partial 4th 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super
HORIZONTAL ASSEMB PENETRATIONS 12/11/2025 PARTIALLY APPROVED KSANDOE
Note: FED 2,3 partial 4 11/26/2025 - PREVIOUS INSPECTION NOTES D and E 4th floor plumbing 11/24/2025 - PREVIOUS INSPECTION NOTES D 3rd floor plumbing 11/19/2025 - PREVIOUS INSPECTION NOTES F and E 3rd floor plumbing 11/18/2025 - PREVIOUS INSPECTION NOTES 11/14/2025 - PREVIOUS INSPECTION NOTES D 2nd floor plumbing 11/12/2025 - PREVIOUS INSPECTION NOTES E 2nd floor Plumbing 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210 Plumbing
FIREWALL DRYWALL NAILING 12/11/2025 PARTIALLY APPROVED KSANDOE
Note: FED 2,3 partial 4 12/10/2025 - PREVIOUS INSPECTION NOTES Soffits F 2nd floor 11/26/2025 - PREVIOUS INSPECTION NOTES Behind soffits 2nd floor F,E,D, 3rd floor F,E.
FRAMING 12/10/2025 PARTIALLY APPROVED KSANDOE
Note: Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
ROOF IN PROGRESS 12/10/2025 PARTIALLY APPROVED KSANDOE
Note: BLD A 11/12/2025 - PREVIOUS INSPECTION NOTES BLD B 11/5/2025 - PREVIOUS INSPECTION NOTES Looked at building C roof. 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25 - INSPECTED ROOF TO THE "A" BUILDING. "A" HAS NOT STARTED YET. 10/7/2025 - PREVIOUS INSPECTION NOTES 10/7/25 - ON TOP OF BUILDINGS "D" AND "E" 10/2/2025 - PREVIOUS INSPECTION NOTES
FIREWALL FRAMING 12/10/2025 PARTIALLY APPROVED KSANDOE
Note: Missing screws noted with super
MONOLITHIC SLAB 12/10/2025 APPROVED - AS NOTED KSANDOE
Note: See ECS notes for 3rd party inspections
HORIZONTAL ASSEMB FRAMING 12/10/2025 PARTIALLY APPROVED KSANDOE
Note: Missing screws noted with super
FIREWALL DRYWALL NAILING 12/10/2025 PARTIALLY APPROVED KSANDOE
Note: Soffits F 2nd floor 11/26/2025 - PREVIOUS INSPECTION NOTES Behind soffits 2nd floor F,E,D, 3rd floor F,E.
HVAC ROUGH 12/08/2025 PARTIALLY APPROVED HCAMACHO
Note: 3rd floor D fresh air seams, & chase on building D & E seams. 12/4/2025 - PREVIOUS INSPECTION NOTES 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
HVAC ROUGH 12/04/2025 PARTIALLY APPROVED HCAMACHO
Note: 3rd floor buildings E&F exhaust and fresh air seams. *Also noticed that the lenght of the dryer duck in some units is over 100'-120' with elbows. Please submit dryer details showing that it can push the exhaust that far, or booster fans need to be added.* 11/24/2025 - PREVIOUS INSPECTION NOTES 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
STOREFRONT 12/04/2025 PARTIALLY APPROVED KSANDOE
Note: 1 window 4th floor 11/24/2025 - PREVIOUS INSPECTION NOTES 1st floor door and window B 4th floor mezz 11/21/2025 - PREVIOUS INSPECTION NOTES Floor pan entry B Sill pan 4th floor A mezz 11/12/2025 - PREVIOUS INSPECTION NOTES 3 bays 4th floor building F 1 window 3rd floor 1 window 2nd floor 1 window 1st floor 11/6/2025 - PREVIOUS INSPECTION NOTES 11/4/2025 - PREVIOUS INSPECTION NOTES 1 Window on Building A , and 3 windows on building B
PLUMBING 1ST ROUGH 12/03/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 3070. THIS WAS A PARTIAL INSPECTION ON SECTION ''C'' WING WASTE AND VENT WATER LINES AND ROOF VENTS, NO TUBS OR SHOWERS SET IN PLACE YET. NO RISER CLAMPS OR FIRE CAULKING COMPLEYTED YET. SOME ARE BUT NEED TO CHECK ALL AT EACH SECTION THIS WAS THE WRONG INSPECTION CALLED IN THIS INSPECTION WAS APPROVED ALREADY 11/14/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
BLD - SEWER TIE IN 12/03/2025 APPROVED - AS NOTED MGIBSON
Note: ALL SEWERS ARE COMPLETED PER PLAN 12/2/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS A PARTIAL INSPECTION ON 3 SEWER TIE IN ON NORTH SIDE, OTHERS WILL BE DONE AT ALATER DATE THIS INSPECTION WAS APPROVED ALREADY 11/14/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
ELECTRIC 1ST ROUGH 12/03/2025 Disapproved - NO FEE RMARTIN
Note: Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building
BLD - SEWER TIE IN 12/02/2025 PARTIALLY APPROVED MGIBSON
Note: Inspector Notes from Inspection 3070 THIS WAS A PARTIAL INSPECTION ON 3 SEWER TIE IN ON NORTH SIDE, OTHERS WILL BE DONE AT ALATER DATE THIS INSPECTION WAS APPROVED ALREADY 11/14/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
HORIZONTAL ASSEMB FINAL 12/02/2025 PARTIALLY APPROVED KSANDOE
Note: Plumbing 4th floor F
PLUMBING 1ST ROUGH 12/01/2025 APPROVED - AS NOTED MGIBSON
Note: THIS INSPECTION WAS APPROVED ALREADY 11/14/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
FIREWALL DRYWALL NAILING 11/26/2025 PARTIALLY APPROVED KSANDOE
Note: Behind soffits 2nd floor F,E,D, 3rd floor F,E.
HORIZONTAL ASSEMB PENETRATIONS 11/26/2025 PARTIALLY APPROVED KSANDOE
Note: D and E 4th floor plumbing 11/24/2025 - PREVIOUS INSPECTION NOTES D 3rd floor plumbing 11/19/2025 - PREVIOUS INSPECTION NOTES F and E 3rd floor plumbing 11/18/2025 - PREVIOUS INSPECTION NOTES 11/14/2025 - PREVIOUS INSPECTION NOTES D 2nd floor plumbing 11/12/2025 - PREVIOUS INSPECTION NOTES E 2nd floor Plumbing 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210 Plumbing
HOOD DUCT AND LIGHTING TEST 11/25/2025 PARTIALLY APPROVED CPISCITELLI
Note: Inspected all duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/19/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Building D 11/12/2025 - PREVIOUS INSPECTION NOTES 10/30/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Inspect all duct on ground . will need to inspect seams as it is put together in the shaft SectionE
HVAC ROUGH 11/24/2025 PARTIALLY APPROVED CPISCITELLI
Note: 2nd floor building E seams for exhaust and fresh air 11/21/2025 - PREVIOUS INSPECTION NOTES 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
FOUNDATION SURVEY - OFFICE USE ONLY 11/24/2025 APPROVED DLEAP
HORIZONTAL ASSEMB PENETRATIONS 11/24/2025 PARTIALLY APPROVED KSANDOE
Note: D 3rd floor plumbing 11/19/2025 - PREVIOUS INSPECTION NOTES F and E 3rd floor plumbing 11/18/2025 - PREVIOUS INSPECTION NOTES 11/14/2025 - PREVIOUS INSPECTION NOTES D 2nd floor plumbing 11/12/2025 - PREVIOUS INSPECTION NOTES E 2nd floor Plumbing 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210 Plumbing
STOREFRONT 11/24/2025 PARTIALLY APPROVED KSANDOE
Note: 1st floor door and window B 4th floor mezz 11/21/2025 - PREVIOUS INSPECTION NOTES Floor pan entry B Sill pan 4th floor A mezz 11/12/2025 - PREVIOUS INSPECTION NOTES 3 bays 4th floor building F 1 window 3rd floor 1 window 2nd floor 1 window 1st floor 11/6/2025 - PREVIOUS INSPECTION NOTES 11/4/2025 - PREVIOUS INSPECTION NOTES 1 Window on Building A , and 3 windows on building B
STOREFRONT 11/21/2025 PARTIALLY APPROVED KSANDOE
Note: Floor pan entry B Sill pan 4th floor A mezz 11/12/2025 - PREVIOUS INSPECTION NOTES 3 bays 4th floor building F 1 window 3rd floor 1 window 2nd floor 1 window 1st floor 11/6/2025 - PREVIOUS INSPECTION NOTES 11/4/2025 - PREVIOUS INSPECTION NOTES 1 Window on Building A , and 3 windows on building B
HVAC ROUGH 11/21/2025 PARTIALLY APPROVED HCAMACHO
Note: 1. 2nd floor Building F Fresh Air Duct seams. 11/4/2025 - PREVIOUS INSPECTION NOTES Goose necks, stands and 3 Curbs on buildings A,B & C
HOOD DUCT AND LIGHTING TEST 11/19/2025 PARTIALLY APPROVED HCAMACHO
Note: Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Building D 11/12/2025 - PREVIOUS INSPECTION NOTES 10/30/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Inspect all duct on ground . will need to inspect seams as it is put together in the shaft SectionE
HORIZONTAL ASSEMB PENETRATIONS 11/19/2025 PARTIALLY APPROVED KSANDOE
Note: F and E 3rd floor plumbing 11/18/2025 - PREVIOUS INSPECTION NOTES 11/14/2025 - PREVIOUS INSPECTION NOTES D 2nd floor plumbing 11/12/2025 - PREVIOUS INSPECTION NOTES E 2nd floor Plumbing 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210 Plumbing
HORIZONTAL ASSEMB PENETRATIONS 11/18/2025 CANCELLED BY APPLICANT KSANDOE
Note: 11/14/2025 - PREVIOUS INSPECTION NOTES D 2nd floor plumbing 11/12/2025 - PREVIOUS INSPECTION NOTES E 2nd floor Plumbing 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210 Plumbing
FRAMING 11/17/2025 PARTIALLY APPROVED KSANDOE
Note: BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
PLUMBING 1ST ROUGH 11/14/2025 PARTIALLY APPROVED MGIBSON
Note: THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
HORIZONTAL ASSEMB PENETRATIONS 11/14/2025 PARTIALLY APPROVED KSANDOE
Note: D 2nd floor plumbing 11/12/2025 - PREVIOUS INSPECTION NOTES E 2nd floor Plumbing 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210 Plumbing
HORIZONTAL ASSEMB PENETRATIONS 11/12/2025 PARTIALLY APPROVED KSANDOE
Note: E 2nd floor 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210
ROOF IN PROGRESS 11/12/2025 PARTIALLY APPROVED KSANDOE
Note: BLD B 11/5/2025 - PREVIOUS INSPECTION NOTES Looked at building C roof. 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25 - INSPECTED ROOF TO THE "A" BUILDING. "A" HAS NOT STARTED YET. 10/7/2025 - PREVIOUS INSPECTION NOTES 10/7/25 - ON TOP OF BUILDINGS "D" AND "E" 10/2/2025 - PREVIOUS INSPECTION NOTES
STOREFRONT 11/12/2025 PARTIALLY APPROVED KSANDOE
Note: 3 bays 4th floor building F 1 window 3rd floor 1 window 2nd floor 1 window 1st floor 11/6/2025 - PREVIOUS INSPECTION NOTES 11/4/2025 - PREVIOUS INSPECTION NOTES 1 Window on Building A , and 3 windows on building B
HOOD DUCT AND LIGHTING TEST 11/12/2025 PARTIALLY APPROVED CPISCITELLI
Note: 10/30/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Inspect all duct on ground . will need to inspect seams as it is put together in the shaft SectionE
HORIZONTAL ASSEMB PENETRATIONS 11/07/2025 PARTIALLY APPROVED KSANDOE
Note: E215, F203-210
STOREFRONT 11/06/2025 PARTIALLY APPROVED KSANDOE
Note: 11/4/2025 - PREVIOUS INSPECTION NOTES 1 Window on Building A , and 3 windows on building B
ROOF IN PROGRESS 11/05/2025 PARTIALLY APPROVED HCAMACHO
Note: Looked at building C roof. 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25 - INSPECTED ROOF TO THE "A" BUILDING. "A" HAS NOT STARTED YET. 10/7/2025 - PREVIOUS INSPECTION NOTES 10/7/25 - ON TOP OF BUILDINGS "D" AND "E" 10/2/2025 - PREVIOUS INSPECTION NOTES
HVAC ROUGH 11/04/2025 PARTIALLY APPROVED HCAMACHO
Note: Goose necks, stands and 3 Curbs on buildings A,B & C
STOREFRONT 11/04/2025 PARTIALLY APPROVED HCAMACHO
Note: 1 Window on Building A , and 3 windows on building B
HOOD DUCT AND LIGHTING TEST 10/30/2025 PARTIALLY APPROVED CPISCITELLI
Note: Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft
STOREFRONT 10/29/2025 APPROVED FWILLIS
Note: 10/29/25 - INSPECTED PANS 15, 16 AND 42 SECOND AND THIRD FLOORS. 10/27/2025 - PREVIOUS INSPECTION NOTES 10/27/25 BUILDING "A", ONE FRAME FIRST FLOOR BACK SIDE AND THREE FRAMES 4TH FLOOR WEST SIDE. 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25 - STOREFRONT IN BUILDING "D" HAS SEVERAL FRAMES ON THE JAMS WITH OVER SIZE REVEALS. WILL PARTIAL THE INSPECTION AND LOOK AT THE FIX AT A LATER DATE. 10/22/2025 - PREVIOUS INSPECTION NOTES 10/22/2025 - INSPECTED BUILDINGS B,C,D,E FIRST FLOOR ON THE PARKING LOT SIDE. 10/10/2025 - PREVIOUS INSPECTION NOTES 10/10/25 - BUILDINGS A, B, AND C STOREFRONT 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS. 10/2/2025 - PREVIOUS INSPECTION NOTES 10/2/25 - BUILDINGS D AND A. 9/29/2025 - PREVIOUS INSPECTION NOTES 9/29/25 - STOREFRONT FRAMES ON BUILDINGS A,B,C,D,E. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25 - FIRST, 2ND, 3RD AND 4TH FLOORS WINDOWS AND BOTTOM PAN. 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 - BOTTOM FLOOR ONLY (Restaurants) STORE FRONT. HIGHLIGHTED ON APPROVED DRAWINGS. 9/23/2025 - PREVIOUS INSPECTION NOTES GROUND FLOOR FDUTURE RESTAURANTS AREA.
STOREFRONT 10/27/2025 PARTIALLY APPROVED FWILLIS
Note: 10/27/25 BUILDING "A", ONE FRAME FIRST FLOOR BACK SIDE AND THREE FRAMES 4TH FLOOR WEST SIDE. 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25 - STOREFRONT IN BUILDING "D" HAS SEVERAL FRAMES ON THE JAMS WITH OVER SIZE REVEALS. WILL PARTIAL THE INSPECTION AND LOOK AT THE FIX AT A LATER DATE. 10/22/2025 - PREVIOUS INSPECTION NOTES 10/22/2025 - INSPECTED BUILDINGS B,C,D,E FIRST FLOOR ON THE PARKING LOT SIDE. 10/10/2025 - PREVIOUS INSPECTION NOTES 10/10/25 - BUILDINGS A, B, AND C STOREFRONT 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS. 10/2/2025 - PREVIOUS INSPECTION NOTES 10/2/25 - BUILDINGS D AND A. 9/29/2025 - PREVIOUS INSPECTION NOTES 9/29/25 - STOREFRONT FRAMES ON BUILDINGS A,B,C,D,E. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25 - FIRST, 2ND, 3RD AND 4TH FLOORS WINDOWS AND BOTTOM PAN. 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 - BOTTOM FLOOR ONLY (Restaurants) STORE FRONT. HIGHLIGHTED ON APPROVED DRAWINGS. 9/23/2025 - PREVIOUS INSPECTION NOTES GROUND FLOOR FDUTURE RESTAURANTS AREA.
STOREFRONT 10/24/2025 PARTIALLY APPROVED FWILLIS
Note: 10/24/25 - STOREFRONT IN BUILDING "D" HAS SEVERAL FRAMES ON THE JAMS WITH OVER SIZE REVEALS. WILL PARTIAL THE INSPECTION AND LOOK AT THE FIX AT A LATER DATE. 10/22/2025 - PREVIOUS INSPECTION NOTES 10/22/2025 - INSPECTED BUILDINGS B,C,D,E FIRST FLOOR ON THE PARKING LOT SIDE. 10/10/2025 - PREVIOUS INSPECTION NOTES 10/10/25 - BUILDINGS A, B, AND C STOREFRONT 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS. 10/2/2025 - PREVIOUS INSPECTION NOTES 10/2/25 - BUILDINGS D AND A. 9/29/2025 - PREVIOUS INSPECTION NOTES 9/29/25 - STOREFRONT FRAMES ON BUILDINGS A,B,C,D,E. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25 - FIRST, 2ND, 3RD AND 4TH FLOORS WINDOWS AND BOTTOM PAN. 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 - BOTTOM FLOOR ONLY (Restaurants) STORE FRONT. HIGHLIGHTED ON APPROVED DRAWINGS. 9/23/2025 - PREVIOUS INSPECTION NOTES GROUND FLOOR FDUTURE RESTAURANTS AREA.
ROOF IN PROGRESS 10/24/2025 PARTIALLY APPROVED FWILLIS
Note: 10/24/25 - INSPECTED ROOF TO THE "A" BUILDING. "A" HAS NOT STARTED YET. 10/7/2025 - PREVIOUS INSPECTION NOTES 10/7/25 - ON TOP OF BUILDINGS "D" AND "E" 10/2/2025 - PREVIOUS INSPECTION NOTES
STOREFRONT 10/22/2025 PARTIALLY APPROVED FWILLIS
Note: 10/22/2025 - INSPECTED BUILDINGS B,C,D,E FIRST FLOOR ON THE PARKING LOT SIDE. 10/10/2025 - PREVIOUS INSPECTION NOTES 10/10/25 - BUILDINGS A, B, AND C STOREFRONT 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS. 10/2/2025 - PREVIOUS INSPECTION NOTES 10/2/25 - BUILDINGS D AND A. 9/29/2025 - PREVIOUS INSPECTION NOTES 9/29/25 - STOREFRONT FRAMES ON BUILDINGS A,B,C,D,E. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25 - FIRST, 2ND, 3RD AND 4TH FLOORS WINDOWS AND BOTTOM PAN. 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 - BOTTOM FLOOR ONLY (Restaurants) STORE FRONT. HIGHLIGHTED ON APPROVED DRAWINGS. 9/23/2025 - PREVIOUS INSPECTION NOTES GROUND FLOOR FDUTURE RESTAURANTS AREA.
PLUMBING 1ST ROUGH 10/21/2025 PARTIALLY APPROVED MGIBSON
Note: THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
WINDOW NAILING 10/14/2025 PARTIALLY APPROVED FWILLIS
Note: 10/14/25 - WINDOW FRAMES ON FLOORS 2,3 AND 4 BUILDING E AND D. 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 - INSPECTED BUILDINGS, 2ND AND 3RD FLOORS, WINDOW FRAMING ANCHORS ON F, E, D. HIGLIGHTED ON APPROVED DRAWINGS.
STOREFRONT 10/10/2025 PARTIALLY APPROVED FWILLIS
Note: 10/10/25 - BUILDINGS A, B, AND C STOREFRONT 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS. 10/2/2025 - PREVIOUS INSPECTION NOTES 10/2/25 - BUILDINGS D AND A. 9/29/2025 - PREVIOUS INSPECTION NOTES 9/29/25 - STOREFRONT FRAMES ON BUILDINGS A,B,C,D,E. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25 - FIRST, 2ND, 3RD AND 4TH FLOORS WINDOWS AND BOTTOM PAN. 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 - BOTTOM FLOOR ONLY (Restaurants) STORE FRONT. HIGHLIGHTED ON APPROVED DRAWINGS. 9/23/2025 - PREVIOUS INSPECTION NOTES GROUND FLOOR FDUTURE RESTAURANTS AREA.
PLUMBING 1ST ROUGH 10/08/2025 PARTIALLY APPROVED MGIBSON
Note: ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
PLUMBING 1ST ROUGH 10/07/2025 PARTIALLY APPROVED MGIBSON
Note: Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
ROOF IN PROGRESS 10/07/2025 PARTIALLY APPROVED FWILLIS
Note: 10/7/25 - ON TOP OF BUILDINGS "D" AND "E" 10/2/2025 - PREVIOUS INSPECTION NOTES
STOREFRONT 10/06/2025 PARTIALLY APPROVED FWILLIS
Note: 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS. 10/2/2025 - PREVIOUS INSPECTION NOTES 10/2/25 - BUILDINGS D AND A. 9/29/2025 - PREVIOUS INSPECTION NOTES 9/29/25 - STOREFRONT FRAMES ON BUILDINGS A,B,C,D,E. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25 - FIRST, 2ND, 3RD AND 4TH FLOORS WINDOWS AND BOTTOM PAN. 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 - BOTTOM FLOOR ONLY (Restaurants) STORE FRONT. HIGHLIGHTED ON APPROVED DRAWINGS. 9/23/2025 - PREVIOUS INSPECTION NOTES GROUND FLOOR FDUTURE RESTAURANTS AREA.
FRAMING 10/06/2025 PARTIALLY APPROVED FWILLIS
Note: 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
ROOF IN PROGRESS 10/02/2025 CANCELLED BY APPLICANT FWILLIS
STOREFRONT 10/02/2025 PARTIALLY APPROVED FWILLIS
Note: 10/2/25 - BUILDINGS D AND A. 9/29/2025 - PREVIOUS INSPECTION NOTES 9/29/25 - STOREFRONT FRAMES ON BUILDINGS A,B,C,D,E. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25 - FIRST, 2ND, 3RD AND 4TH FLOORS WINDOWS AND BOTTOM PAN. 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 - BOTTOM FLOOR ONLY (Restaurants) STORE FRONT. HIGHLIGHTED ON APPROVED DRAWINGS. 9/23/2025 - PREVIOUS INSPECTION NOTES GROUND FLOOR FDUTURE RESTAURANTS AREA.
STOREFRONT 09/29/2025 PARTIALLY APPROVED FWILLIS
Note: 9/29/25 - STOREFRONT FRAMES ON BUILDINGS A,B,C,D,E. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25 - FIRST, 2ND, 3RD AND 4TH FLOORS WINDOWS AND BOTTOM PAN. 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 - BOTTOM FLOOR ONLY (Restaurants) STORE FRONT. HIGHLIGHTED ON APPROVED DRAWINGS. 9/23/2025 - PREVIOUS INSPECTION NOTES GROUND FLOOR FDUTURE RESTAURANTS AREA.
INSULATION 09/29/2025 CANCELLED BY APPLICANT FWILLIS
Note: RAIN STORM
STOREFRONT 09/26/2025 PARTIALLY APPROVED FWILLIS
Note: 9/26/25 - FIRST, 2ND, 3RD AND 4TH FLOORS WINDOWS AND BOTTOM PAN. 9/24/2025 - PREVIOUS INSPECTION NOTES 9/24/25 - BOTTOM FLOOR ONLY (Restaurants) STORE FRONT. HIGHLIGHTED ON APPROVED DRAWINGS. 9/23/2025 - PREVIOUS INSPECTION NOTES GROUND FLOOR FDUTURE RESTAURANTS AREA.
STOREFRONT 09/24/2025 PARTIALLY APPROVED FWILLIS
Note: 9/24/25 - BOTTOM FLOOR ONLY (Restaurants) STORE FRONT. HIGHLIGHTED ON APPROVED DRAWINGS. 9/23/2025 - PREVIOUS INSPECTION NOTES GROUND FLOOR FDUTURE RESTAURANTS AREA.
WINDOW NAILING 09/24/2025 PARTIALLY APPROVED FWILLIS
Note: 9/24/25 - INSPECTED BUILDINGS, 2ND AND 3RD FLOORS, WINDOW FRAMING ANCHORS ON F, E, D. HIGLIGHTED ON APPROVED DRAWINGS.
STOREFRONT 09/23/2025 PARTIALLY APPROVED FWILLIS
Note: GROUND FLOOR FDUTURE RESTAURANTS AREA.
GAS ROUGH 09/19/2025 PARTIALLY APPROVED MGIBSON
Note: THIS WAS FOR FIRST FLOOR ONLY ON BUILDINGS F-E-D ONLY AND FOR FUTURE GAS IF WARRANT FOR OCCUPENT 8/18/2025 - PREVIOUS INSPECTION NOTES THIS INSPECTION ''3240 IS FOR WHAT NEEDS TO BE SCHEDUALED FROM NOW ON UNTIL ALL GAS ROUGH INSPECTION ARE COPLETED'' NOT FIRST ROUGH, OR GREASE INTERCEPTOR
ROOF SHEATHING / BRACE / TIE DOWN 09/17/2025 APPROVED FWILLIS
Note: *** NOTES ADDED BY FWILLIS 9/17/2025 12:43:38 PM *** WALL SHEATHING NAILING, A/C STANDS BOLTED DOWN. PARAPET WALL WOOD CAP WAS CONTINUED. 9/15/2025 - PREVIOUS INSPECTION NOTES PARTIAL SHATHING ON PARAPET WALL BUILDINGS D,E AND F.
ROOF SHEATHING / BRACE / TIE DOWN 09/15/2025 PARTIALLY APPROVED FWILLIS
Note: PARTIAL SHATHING ON PARAPET WALL BUILDINGS D,E AND F.
GAS ROUGH 08/18/2025 PARTIALLY APPROVED MGIBSON
Note: THIS INSPECTION ''3240 IS FOR WHAT NEEDS TO BE SCHEDUALED FROM NOW ON UNTIL ALL GAS ROUGH INSPECTION ARE COPLETED'' NOT FIRST ROUGH, OR GREASE INTERCEPTOR
PLUMBING 1ST ROUGH 08/18/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
ELECTRIC 1ST ROUGH 07/25/2025 APPROVED - AS NOTED RMARTIN
Note: 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building
ELECTRIC 1ST ROUGH 06/23/2025 APPROVED - AS NOTED RMARTIN
Note: 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building
ELECTRIC 1ST ROUGH 05/06/2025 PARTIALLY APPROVED RMARTIN
Note: 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building
PLUMBING 1ST ROUGH 04/30/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS
ELECTRIC 1ST ROUGH 04/25/2025 PARTIALLY APPROVED RMARTIN
Note: 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building
ELECTRIC 1ST ROUGH 03/28/2025 PARTIALLY APPROVED RMARTIN
Note: service feeders under slab A building
PLUMBING 1ST ROUGH 02/26/2025 APPROVED - AS NOTED MGIBSON
Note: 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS
ELECTRIC TEMP POLE 02/25/2025 Disapproved - NO FEE RMARTIN
Note: *** NOTES ADDED BY RMARTIN 2/25/2025 4:24:57 PM *** Need to get a Commercial Electrical Permit with a one line diagram.
PLUMBING 1ST ROUGH 01/08/2025 PARTIALLY APPROVED MGIBSON
Note: 12/27/2024 - PREVIOUS INSPECTION NOTES 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING
PLUMBING 1ST ROUGH 12/27/2024 PARTIALLY APPROVED MGIBSON
Note: 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED
PLUMBING 1ST ROUGH 12/26/2024 PARTIALLY APPROVED MGIBSON
Note: 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED
PLUMBING 1ST ROUGH 12/23/2024 CANCELLED BY APPLICANT MGIBSON
Note: 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL
PLUMBING 1ST ROUGH 12/19/2024 CANCELLED BY APPLICANT MGIBSON
Note: RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL
BLD - GREASE INTERCEPTOR PRE-INSTALLATION 11/12/2024 PARTIALLY APPROVED MGIBSON
Note: THIS WAS APPROVED FOR GB1000 GREASE INTERCEPTORS BY UTILITY DEPART MENT, 3 WERE ON SITE TWO MORE AND A OIL INTERCEPTOR WILL APPRIVE AT A LATER DATE,. BUILDING DEPARTMENT WILL APPROVE THESE THREE ON SITE HOW EVER AT THE TIME OF INSPECTION IT WAS KNOWN AS TO WHAT TYPE OF RESTURANT WAS GOING INTO EACH UNIT.
PLUMBING 1ST ROUGH 10/31/2024 APPROVED MGIBSON
Note: SEE PLANS
PLUMBING 1ST ROUGH 10/30/2024 APPROVED AWATERS
Note: All DWV under slab inspected. Partial 2nd plumbing rough until all rough complete.
HVAC ROUGH
Note: 6/10/2026 - PREVIOUS INSPECTION NOTES Above ceiling inspection Building D lobby 5/19/2026 - PREVIOUS INSPECTION NOTES -RTU #2 damper and duct connections on 2nd and 3rd 5/6/2026 - PREVIOUS INSPECTION NOTES -RTU 3 damper and duct connections. - Heater on the bridge for water pipes between buildings C & D 4/27/2026 - PREVIOUS INSPECTION NOTES -RTU #5 and #6 duct and dampers on D 4th floor 4/23/2026 - PREVIOUS INSPECTION NOTES -1st floor Building A Lobby, equipment inside the soffit. -2 humidifiers, RTU 2 Wrap, and dampner. - Need Access for the grease duct inspection door, because it changes direction. 4/16/2026 - PREVIOUS INSPECTION NOTES RTU number 2 duct wrap inspection 4/14/2026 - PREVIOUS INSPECTION NOTES RTU 2 seam inspection -Still need Dampners RTU 3 wrap inspection 4/10/2026 - PREVIOUS INSPECTION NOTES 4th Floor A/B balcony rough 4/9/2026 - PREVIOUS INSPECTION NOTES 4/7/2026 - PREVIOUS INSPECTION NOTES -3rd floor B/A balcony rough. -4C balcony rough. 4/6/2026 - PREVIOUS INSPECTION NOTES 3rd / 4th floor C balcony rough inspection 4/2/2026 - PREVIOUS INSPECTION NOTES -4B and 4A HVAC rough inspection 3/26/2026 - PREVIOUS INSPECTION NOTES -4C HVAC rough inspection. -RTU #3 duct seal inspection. 3/25/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct wrap inspection. 3/19/2026 - PREVIOUS INSPECTION NOTES A207, A209, A211 Balcony not done 3/17/2026 - PREVIOUS INSPECTION NOTES -RTU #1 duct seams inspection. -RTU #4 duct wrap inspection. 3/10/2026 - PREVIOUS INSPECTION NOTES -RTU #4 duct inspectionseams, -4th floor Building B freash air seams 3/9/2026 - PREVIOUS INSPECTION NOTES Duct wrap for make up air risers in A208/A211 stack. 3/6/2026 - PREVIOUS INSPECTION NOTES RTU #7 duct wrap inspection. 3/3/2026 - PREVIOUS INSPECTION NOTES -RTU 7 Duct installed and sealed Building E - Buildidng C 2nd floor Balconies fresh air and exhaust.
BLD - SEWER TIE IN
Note: 3/11/2026 - PREVIOUS INSPECTION NOTES 6" Storm Tie in Bld A 4" Drain Tie in Bld A 10" Storm Tie in Bld A 1/23/2026 - PREVIOUS INSPECTION NOTES Sewer tie in on D(3) & E(3) North side 1/13/2026 - PREVIOUS INSPECTION NOTES 1/13/26: Spoke to Plumbing Contractor who does not have any Sewer Tie-in ready for inspection. 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: Partial Inspection for North Elevation Building E. > RS 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25: PARTIAL APPROVAL FOR BUILDINGS B AND C ONLY. > RS 1). BUILDING A: TIE-IN NEEDS TO BE EXPOSED FOR INSPECTION. CURRENTLY BACKFILLED.
PLUMBING 2ND ROUGH
Note: 4/17/2026 - PREVIOUS INSPECTION NOTES Section A 4th floor water and sanitary inspection for amenities. 4/7/2026 - PREVIOUS INSPECTION NOTES -The following Tubs/Showers are not complete. These are the same from the previous inspection. A201, A203, A206, A208, A209, A211, A212 Tubs NOT Complete A301, A302, A303, A306, A309, A311, A312, A314 Tubs NOT Complete A407, A408, A409, A411, A412, A413, A414 Tubs NOT Complete C314, C414, C415 Tubs NOT Complete *Please make sure the work is done before calling back for inspection.* 3/19/2026 - PREVIOUS INSPECTION NOTES A201, A203, A206, A208, A209, A211, A212 Tubs NOT Complete A301, A302, A303, A306, A309, A311, A312, A314 Tubs NOT Complete A407, A408, A409, A411, A412, A413, A414 Tubs NOT Complete C314, C414, C415 Tubs NOT Complete 2/2/2026 - PREVIOUS INSPECTION NOTES All tubs except units with incomplete shaft walls: F403 / D407 / D405 1/8/2026 - PREVIOUS INSPECTION NOTES 1/8/26: Partial inspection for 2nd/3rd floor tubs & showers in Buildings D/E/F. All tubs except units with incomplete shaft walls: F305 / F303 / D307 / D305 / D205 / D207 / F203 / F204 / F205. Unit D206 > Needs broken 'J' hook replaced at tub drain from unit above.
PLUMBING 1ST ROUGH
Note: 4/17/2026 - PREVIOUS INSPECTION NOTES 3/16/2026 - PREVIOUS INSPECTION NOTES Building A Storm tie in, 3 locations. 6", 4", 10" Virtual Inspection 3/12/2026 - PREVIOUS INSPECTION NOTES 2/13/2026 - PREVIOUS INSPECTION NOTES Partial storm tie in on DEF (4 total) on the inside parking area. 2/2/2026 - PREVIOUS INSPECTION NOTES Partial Building A plumbing rough for sanitary and domestic water 2nd, 3rd, 4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 12/18/2025 - PREVIOUS INSPECTION NOTES 12/18/25: Partial Building B plumbing rough for sanitary and domestic 2nd-4th floor. NOTE: NO TUBS OR SHOWERS SET YET. 1). UNIT B401 IS STILL IN PROGRESS. WILL NEED TO BE CHECKED ONCE WALLS ARE INSTALLED. (Also checked main storm water drain tie in at Buildings 'C' and 'B'). Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070. THIS WAS A PARTIAL INSPECTION ON SECTION ''C'' WING WASTE AND VENT WATER LINES AND ROOF VENTS, NO TUBS OR SHOWERS SET IN PLACE YET. NO RISER CLAMPS OR FIRE CAULKING COMPLEYTED YET. SOME ARE BUT NEED TO CHECK ALL AT EACH SECTION THIS WAS THE WRONG INSPECTION CALLED IN THIS INSPECTION WAS APPROVED ALREADY 11/14/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR ''D'' UNITS ALL, ROOF DRAINS AND OVER FLOW 10/21/2025 - PREVIOUS INSPECTION NOTES THIS WAS ALL OF ''E'' UNITS FOR ROOF DRAINS,DWV WATER LINES, NO TUBS 10/8/2025 - PREVIOUS INSPECTION NOTES ALL''F'' UNIT IS APPROVED FOR WASTE AND VENT INSPECTION ONLY, TUBS IN ''F'' UNITS TO BE SET AT A LATER DATE 10/7/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS FOR WASTE AND VENT AND WATER DISTRIBUTION LINES AND ROOF DRAINS ON ALL OF ''F''UNIT ALL FLOORS . WALKKED ALL FLOORS PLUMBER TO MAKE CORRECTIONS FOR NEXT INSPECTION Inspector Notes from Inspection 3070 Inspector Notes from Inspection 3070 1/8/2025 - PREVIOUS INSPECTION NOTES 12/27/2024 - PREVIOUS INSPECTION NOTES THISWAS A VIRTUAL INSPECTION 12/26/2024 - PREVIOUS INSPECTION NOTES 12/23/2024 - PREVIOUS INSPECTION NOTES 12/19/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT MESSAGE FROM ALPHANET TO CANCEL. BUILDING C&B ARE APPROVED AND HIGHLIGHTED EXCEPT WHERE PLUMBING WAS ROLLED UP AND WENT OVER STORM DRAIN STORM DRAIN IS APPROVED ALONG WITH PARTIAL HIGH LIGHTED WHAT WAS APPROVED IS MARKED AND HI-LITED ON PLANS AND ADTED. THIS WAS FOR SMALL GREASE INTERCEPTOR AND SCH. 80 WATER MAIN STUBBED INTO BUILDING THIS COMPLETED UNDER GROUND PLUMBING FOR BUILDING ''A''HIGHLIGHTED ON PLANS ALL UNDER GROUND PLUMBING INSIDE OF BUILDING IS COMPLETED. NO MORE FIRST ROUGH UNLESS NEEDED
PLUMBING FINAL
HOOD DUCT AND LIGHTING TEST
Note: 1/27/2026 - PREVIOUS INSPECTION NOTES Light test on the connections on the 1st floor building A 1/21/2026 - PREVIOUS INSPECTION NOTES Light test on the seams, on grease duct on building A 1/13/2026 - PREVIOUS INSPECTION NOTES Light test on the seams after duct was installed on building A up to the 1st floor 1/7/2026 - PREVIOUS INSPECTION NOTES Light test on the seams after duct was installed on building F and D. Also looked at the insualtion on the diswasher duct on building E and D 12/30/2025 - PREVIOUS INSPECTION NOTES Light Test on the seams after duct was installed on Building E 12/17/2025 - PREVIOUS INSPECTION NOTES Inspected 2nd set of duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/25/2025 - PREVIOUS INSPECTION NOTES Inspected all duct on ground. Will need to inspect seams as it is put together in the shaft Building A 11/19/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Building D 11/12/2025 - PREVIOUS INSPECTION NOTES 10/30/2025 - PREVIOUS INSPECTION NOTES Inspect all duct on ground. Will need to inspect seams as it is put together in the shaft Inspect all duct on ground . will need to inspect seams as it is put together in the shaft SectionE
HOOD DUCT FIRE WRAP
Note: 1/20/2026 - PREVIOUS INSPECTION NOTES Building A 1st layer fire wrap on grease duct 1/15/2026 - PREVIOUS INSPECTION NOTES Grease duct wrap 2nd layer building D/F 1/12/2026 - PREVIOUS INSPECTION NOTES Grease duct wrap 1st layer building D/E 1/8/2026 - PREVIOUS INSPECTION NOTES Partial on Grease Duct wrap Building F Dishwasher duct wrap Building F
HVAC FINAL
ELECTRIC 2ND ROUGH
Note: 6/4/2026 - PREVIOUS INSPECTION NOTES 6/4/26 1st floor D building cloud good, not ready for 2nd and 3rd floor, need to remove temp lighting and have all boxes and equipment accessable. Also need to have roll up door motor accessable. 5/28/2026 - PREVIOUS INSPECTION NOTES A 306 and sun lounge cloud 5/18/2026 - PREVIOUS INSPECTION NOTES 5/7/2026 - PREVIOUS INSPECTION NOTES 5/7/26 Did this inspection on 5/6/26 4/30/2026 - PREVIOUS INSPECTION NOTES 4/30/26 Lower 2 pedestrian bridges 4/23/2026 - PREVIOUS INSPECTION NOTES 4/232/26 looked at soffits in areas that needed to be protected for the SER cable, D,E,F areas 4/21/2026 - PREVIOUS INSPECTION NOTES 4/21/26 1st floor A clouds in ceiling 4/15/2026 - P4REVIOUS INSPECTION NOTES 4/15/26 4th floor Sunrise cafe room 4/13/2026 - PREVIOUS INSPECTION NOTES 4/13/26 4th Floor A units, except ceilings in the last 8 units bathrooms missing framing/lights/vanity outlet 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 4Th floor B units 3/27/2026 - PREVIOUS INSPECTION NOTES 3/27/26 all 4 stairwells 3/26/2026 - PREVIOUS INSPECTION NOTES 3/26/26 4th Floor C units and corridor 3/19/2026 - PREVIOUS INSPECTION NOTES 3/19/26 3rd Floor A,B, Units and Corridor A,B,C also 2nd Floor Corridor A,B,C with fire alarm 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 3rd floor C only 2/27/2026 - PREVIOUS INSPECTION NOTES 2/27/26 A,B,C 2nd floor units only 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/2026- Partial in-wall rough inspection for E201, E301, E401, 3rd floor FED corridor and Fire Alarm 2/6/2026 - PREVIOUS INSPECTION NOTES 2/6/26 2nd floor corridor D,E,F 1st floor shell spaces, what is missing will be surface mounted check at later date. 1/28/2026 - PREVIOUS INSPECTION NOTES 1/28/26 4th floor D,E,F Marked on print 1/27/2026 - PREVIOUS INSPECTION NOTES 1/20/2026 12:05:24 PM- PREVIOUS INSPECTION NOTES 1/20/2026 - 3rd floor units only Buildings D,E,F. Still need to see unit 301 1/9/2026 - PREVIOUS INSPECTION NOTES 1/9/26 1st floor A, 2nd floor D,E, F Marked on print 1/9/26 Need to schedule 2nd rough for walls please not 1st rough 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 1. This inspection was for a second rough, added 2nd rough for contractor 12/3/25 Need to schedule 2nd rough for walls, walls not ready at this time 7/25/25 ufer grounding connections 6/23/25 under ground up to including C 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 service conduits between buildings in common area 4/25/2025 - PREVIOUS INSPECTION NOTES 4/25/25 Service feeders in slab B & C 3/28/2025 - PREVIOUS INSPECTION NOTES service feeders under slab A building 12/23/2025 - PREVIOUS INSPECTION NOTES E211 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 2nd rough approved only in unit D211
GAS ROUGH
Note: 1/21/2026 - PREVIOUS INSPECTION NOTES Partial gas verticals Building ABC all the awy to the roof. 1/16/2026 - PREVIOUS INSPECTION NOTES 1/16/26: Partial approval for gas risers in Buildings D/E/F. 9/19/2025 - PREVIOUS INSPECTION NOTES THIS WAS FOR FIRST FLOOR ONLY ON BUILDINGS F-E-D ONLY AND FOR FUTURE GAS IF WARRANT FOR OCCUPENT 8/18/2025 - PREVIOUS INSPECTION NOTES THIS INSPECTION ''3240 IS FOR WHAT NEEDS TO BE SCHEDUALED FROM NOW ON UNTIL ALL GAS ROUGH INSPECTION ARE COPLETED'' NOT FIRST ROUGH, OR GREASE INTERCEPTOR
ELECTRIC FINAL
Note: 1/20/2026 12:06:29 PM- PREVIOUS INSPECTION NOTES Wrong inspection called in. This was supposed to be Electrical 2nd Rough.
GAS FINAL
FRAMING
Note: 6/10/2026 - PREVIOUS INSPECTION NOTES Framing inspection Building B drive thru ceiling. Building F/E arcade 6/4/2026 - PREVIOUS INSPECTION NOTES 5/21/2026 - PREVIOUS INSPECTION NOTES Janitor rooms 2nd, 3rd 5/20/2026 - PREVIOUS INSPECTION NOTES 5/19/2026 - PREVIOUS INSPECTION NOTES 5/18/2026 - PREVIOUS INSPECTION NOTES Mechanical 2-4 final Janitor shaft liner 4th C415, 414 final C to B corridor 4th 1st B to A corridor 4th 1st B to A electrical closet 3rd 1st C to B corridor 3rd final C to B corridor 1st 5/14/2026 - PREVIOUS INSPECTION NOTES A303 final layer C414 first layer C415 first layer Corridor D 4th final layer Corridor D/E final layer 5/12/2026 - PREVIOUS INSPECTION NOTES Corridor D/E 4th 1st Corridor A/B 4th shaft C415 shaft liner 5/8/2026 - PREVIOUS INSPECTION NOTES A203, A209, Sunrise lounge, Corridor D/E 2nd floor finaled A303 first layer Corridor D/E 4th floor final 5/6/2026 - PREVIOUS INSPECTION NOTES Sunrise lounge 1st layer D/E 3rd floor final layer A309, A208, C214 final layer A209, D 2nd floor hallway, D/E 2nd floor hallway 1st layer 5/5/2026 - PREVIOUS INSPECTION NOTES 4/29/2026 - PREVIOUS INSPECTION NOTES Shaft wall ABC, Pedestrian Bridge Framing, Elevator F infills 4/27/2026 - PREVIOUS INSPECTION NOTES BLD A corridor Elevator F infill 4/24/2026 - PREVIOUS INSPECTION NOTES A409, A308, C314 2ND LAYER 4/23/2026 - PREVIOUS INSPECTION NOTES C214 1ST LAYER CORRIDOR SHAFTS C-B INITIAL LAYER ALL FLOORS C314 2ND LAYER A309 1ST LAYER A408 2ND LAYER A409 1ST LAYER F LOUNGE INITIAL LAYER 3RD FLOOR CORRIDORS FED 1ST LAYEER 2ND FL ELEVATOR SHAFT INITIAL LAYER F 1ST LAYER CORRIDOR E-D 2ND FLOOR 2ND FLOOR 1ST LAYER D CORRIDOR 4/22/2026 - PREVIOUS INSPECTION NOTES A411 2ND LAYER A412 2ND LAYER 4/21/2026 - PREVIOUS INSPECTION NOTES A408 BATH 1ST LAYER A411 SHAFT LINER A412 1ST LAYER A311 2ND LAYEER A312 2ND LAYER A201 2ND LAYER A211 2ND LAYER A408 BATH ND LAYER A408 CLOSET 1ST LAYER A411 1ST LAYER MECH ROOM E 2ND, 3RD, 4TH 1ST LAYER 4/17/2026 - PREVIOUS INSPECTION NOTES Shaft walls section ABC Marked on plans 4/16/2026 - PREVIOUS INSPECTION NOTES 4/15/2026 - PREVIOUS INSPECTION NOTES 1st layer A201, 203, 301, 303, 308 4/14/2026 - PREVIOUS INSPECTION NOTES Shaft wall inside layer 2/3 floors select 4/10/2026 - PREVIOUS INSPECTION NOTES Shaft walls ABC 3/27/2026 - PREVIOUS INSPECTION NOTES 4th floor ABC 3/26/2026 - PREVIOUS INSPECTION NOTES 4th floor Building F shaft walls. 3/25/2026 - PREVIOUS INSPECTION NOTES 3/24/2026 - PREVIOUS INSPECTION NOTES C3, F4 3/19/2026 - PREVIOUS INSPECTION NOTES A209, A211, A212 1st ext layer 3/11/2026 - PREVIOUS INSPECTION NOTES 1st layer shaft walls noted on plans 3/9/2026 - PREVIOUS INSPECTION NOTES 3/6/2026 - PREVIOUS INSPECTION NOTES All layers, shaft wall, FED 2nd floor 3/4/2026 - PREVIOUS INSPECTION NOTES 1st layer, 2nd floor fed 2/27/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor framing FED 2nd floor shaft walls 2/24/2026 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 2/5/2026 - PREVIOUS INSPECTION NOTES F lounge 2/3/2026 - PREVIOUS INSPECTION NOTES 1/14/2026 - PREVIOUS INSPECTION NOTES FED interior framing 1/6/2026 - PREVIOUS INSPECTION NOTES 12/30/2025 - PREVIOUS INSPECTION NOTES F209 framing in front of exhust fan in kit. F205 shaft walls not framed F203 Shatf walls not framed E213 framing in front of exhaust fan in kit. D209 Soffit framing not finished D207 Shat walls not framed D206 Plumbing trap below ceiling frame D206 Shaft walls not framed D203 Soffit framing not finished Building D Lobby Column near bathroom needs framing. 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super 11/17/2025 - PREVIOUS INSPECTION NOTES BLD A mezzanine 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 - AREAS HIGHLIGHTED ON DRAWINGS.
FIREWALL FRAMING
Note: 2/3/2026 - PREVIOUS INSPECTION NOTES Partial, 3rd floor Building ABC. 2/2/2026 - PREVIOUS INSPECTION NOTES CBA3rd 1/21/2026 - PREVIOUS INSPECTION NOTES 1/15/2026 - PREVIOUS INSPECTION NOTES C2 1/7/2026 - PREVIOUS INSPECTION NOTES 12/18/2025 - PREVIOUS INSPECTION NOTES 12/17/2025 - PREVIOUS INSPECTION NOTES A, B, C 4th floor 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2nd, 3rd, partial 4th 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super
FIREWALL FINAL
ROOF SHEATHING / BRACE / TIE DOWN
Note: 2/18/2026 - PREVIOUS INSPECTION NOTES FED balconies 2/4/2026 - PREVIOUS INSPECTION NOTES Wall sheathing on parapet
ROOF IN PROGRESS
Note: 12/10/2025 - PREVIOUS INSPECTION NOTES BLD A 11/12/2025 - PREVIOUS INSPECTION NOTES BLD B 11/5/2025 - PREVIOUS INSPECTION NOTES Looked at building C roof. 10/24/2025 - PREVIOUS INSPECTION NOTES 10/24/25 - INSPECTED ROOF TO THE "A" BUILDING. "A" HAS NOT STARTED YET. 10/7/2025 - PREVIOUS INSPECTION NOTES 10/7/25 - ON TOP OF BUILDINGS "D" AND "E" 10/2/2025 - PREVIOUS INSPECTION NOTES
HORIZONTAL ASSEMB FRAMING
Note: 12/10/2025 - PREVIOUS INSPECTION NOTES Missing screws noted with super
FIREWALL DRYWALL NAILING
Note: 3/19/2026 - PREVIOUS INSPECTION NOTES 4th Floor A/B/C top 3/17/2026 - PREVIOUS INSPECTION NOTES Inside layer shaft walls 2nd floor C, B 3/2/2026 - PREVIOUS INSPECTION NOTES 2/12/2026 - PREVIOUS INSPECTION NOTES CBA 3rd floor 1/26/2026 - PREVIOUS INSPECTION NOTES 2nd floor A, B 1/21/2026 - PREVIOUS INSPECTION NOTES 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 12/10/2025 - PREVIOUS INSPECTION NOTES Soffits F 2nd floor 11/26/2025 - PREVIOUS INSPECTION NOTES Behind soffits 2nd floor F,E,D, 3rd floor F,E.
FIREWALL PENETRATIONS
Note: 5/19/2026 - PREVIOUS INSPECTION NOTES 4/30/2026 - PREVIOUS INSPECTION NOTES Cross corridor SER FED 4/13/2026 - PREVIOUS INSPECTION NOTES 4th floor Building A units 4/8/2026 - PREVIOUS INSPECTION NOTES 4th floor Building B 3/31/2026 - PREVIOUS INSPECTION NOTES 4th floor Building C units. 3/27/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES 3rd floor A/B 3/17/2026 - PREVIOUS INSPECTION NOTES 3rd floor C 3/10/2026 - PREVIOUS INSPECTION NOTES ABC 2nd floor. Shaft penetrations FED 2/10/2026 - PREVIOUS INSPECTION NOTES FED except shaft spaces 2/6/2026 - PREVIOUS INSPECTION NOTES Through F, E402 2/5/2026 - PREVIOUS INSPECTION NOTES 4th floor F 1/30/2026 - PREVIOUS INSPECTION NOTES 3rd floor D 1/29/2026 - PREVIOUS INSPECTION NOTES 3rd floor F through D306 1/28/2026 - PREVIOUS INSPECTION NOTES 3rd floor F, E309-15 1/15/2026 - PREVIOUS INSPECTION NOTES D204, 206, 207, F204, 210 need core holes filled D214 Plumbing wall fill E201 Wall detail missing drywall 1/9/2026 - PREVIOUS INSPECTION NOTES 1/8/2026 - PREVIOUS INSPECTION NOTES
HORIZONTAL ASSEMB PENETRATIONS
Note: 5/15/2026 - PREVIOUS INSPECTION NOTES 3rd and 4th only 2/2/2026 - PREVIOUS INSPECTION NOTES Metro FED 2nd CBA 3RD 1/21/2026 - PREVIOUS INSPECTION NOTES 12/19/2025 - PREVIOUS INSPECTION NOTES In-wall penetrations for FED floors 2, 3, & 4 complete. 12/11/2025 - PREVIOUS INSPECTION NOTES FED 2,3 partial 4 11/26/2025 - PREVIOUS INSPECTION NOTES D and E 4th floor plumbing 11/24/2025 - PREVIOUS INSPECTION NOTES D 3rd floor plumbing 11/19/2025 - PREVIOUS INSPECTION NOTES F and E 3rd floor plumbing 11/18/2025 - PREVIOUS INSPECTION NOTES 11/14/2025 - PREVIOUS INSPECTION NOTES D 2nd floor plumbing 11/12/2025 - PREVIOUS INSPECTION NOTES E 2nd floor Plumbing 11/7/2025 - PREVIOUS INSPECTION NOTES E215, F203-210 Plumbing
HORIZONTAL ASSEMB FINAL
Note: 12/2/2025 - PREVIOUS INSPECTION NOTES Plumbing 4th floor F
INSULATION
Note: 9/29/2025 - PREVIOUS INSPECTION NOTES RAIN STORM
HORIZONTAL ASSEMB DRYWALL
STOREFRONT
Note: New inspection due to canceled inspection 3/24/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES Pans. Marked on plans 1/20/2026 - PREVIOUS INSPECTION NOTES 4th floor F south 1/15/2026 - PREVIOUS INSPECTION NOTES F4, A1, 4 1/13/2026 - PREVIOUS INSPECTION NOTES Frames A
BUILDING FINAL
FIRE FINAL
EXTERIOR ARCHITECTURAL FEATURES
WATER METER INSTALLATION REQUEST
U-CROSS CONNECTION
U - UTILITY COMMERCIAL FINAL
U - SEWER TIE IN
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
BLD PENDING 06/03/2026
PLENG CANCEL 05/21/2026 05/22/2026
BLD COMPLETE 04/28/2026 04/29/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 03/25/2026 03/25/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 03/11/2026 03/23/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC CANCEL 03/11/2026 03/18/2026
PLENG CANCEL 03/11/2026 03/18/2026
PLENG COMPLETE 02/12/2026 02/13/2026
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
BADMIN INFORMATION 02/02/2026 02/02/2026
Note: Marked INFORMATION By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM Revision form submitted is blank and no updated/revised documents uploaded for review.
ELEC COMPLETE 01/12/2026 01/15/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 01/12/2026 01/20/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 01/12/2026 01/20/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 11/25/2025 12/04/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC HOLD 11/25/2025 12/04/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to submit all the electrical pages mentioned in the letter.
FI1 COMPLETE 11/25/2025 12/04/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
GAS COMPLETE 11/25/2025 12/04/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 11/25/2025 12/04/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 11/25/2025 12/04/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLENG COMPLETE 11/24/2025 11/24/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
BLD COMPLETE 04/07/2025 04/17/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 02/06/2025 02/24/2025
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA STATUTES (FS) AND FLORIDA ADMINISTRATIVE CODE (FAC). 1. OK Item No. 2 - Frontage Area Increases. 2. Ok. 3. REPEAT COMMENT. YOU MUST USE EQUATION 5-3 AS OUTLINED IN FBCB SECTION 506.2.4. IF YOU DO NOT BELEIVE THIS IS THE CORRECT CODE SECTION AND EQUATION, YOU WILL NEED TO CLEARLY AND COMPLETELY STATE YOUR ARGUMENT AND JUSTIFICATION. Second paragraph references FBCB Section 506.2.3. Section 506.2.3 applies only to single-occupancy, multistory buildings. These buildings are mixed-occupancy, multistory buildings. The correct section is FBCB Section 506.2.4. Recalculate using this section and Equation 5-3. Identify that you are using Equation 5-3 immediately ahead of the calculation. 4. OK. THIS COMMENT WAS INCORRECT IN THE PREVIOUS REVIEW. BUILDING A QUALIFIES FOR A 70% INCREASE AND BUILDIGN B QUALIFIES FOR A 68% INCREASE. Item No. 3 - Additional Items to be Evaluated 5. OK.
BLD HOLD 01/08/2025 01/27/2025
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA STATUTES (FS) AND FLORIDA ADMINISTRATIVE CODE (FAC). 1. Construction Type Reclassification Request letter not signed and sealed by Florida licensed Architect. Future letters and similar documents shall be signed and sealed in accordance with FS 481.221 and a verifiable digital seal in accordance with FAC 61G1-16.005. Ensure future submittals include compliant signature and seal. Item No. 2 - Frontage Area Increases. 2. 1st paragraph indicates frontage area increase calculation is not necessary; however, the formula used does include a frontage increase for both Building A and Building B. Please clarify. It appears to me the frontage area increase is necessary. 3. Second paragraph references FBCB Section 506.2.3. Section 506.2.3 applies only to single-occupancy, multistory buildings. These buildings are mixed-occupancy, multistory buildings. The correct section is FBCB Section 506.2.4. Recalculate using this section and Equation 5-3. Identify that you are using Equation 5-3 immediately ahead of the calculation. 4. BUILDING A AND BUILDING B Frontage Calculation. It appears the maximum frontage increase factor for each building is limited to not more than .50 based on the percentage of building perimeter surrounded by open space of 30 feet or greater. Revise and resubmit calculations. Factor shall be interpolated based on actual percent of perimeter. Item No. 3 - Additional Items to be Evaluated 5. Item c. Revise statement to reflect both buildings will be provided with a full NFPA 13 fire sprinkler systems.
BLD COMPLETE 07/30/2024 08/12/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN COMPLETE 07/15/2024 07/15/2024
Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Approved to allow permit to be issued. Inspection hold will be placed on the permit.
FI1 INFORMATION 07/10/2024 07/10/2024
Note: Marked INFORMATION By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM We will need to have a revision for the following prior to installation of any door locking hardware. Please show the required door locking arrangements per FFPC 7th Edition (2020) 101: section 30.2.2
BADMIN HOLD 07/10/2024 07/10/2024
Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Subcontractors must be added before permit can be made ready for issuance.
BLD COMPLETE 07/09/2024 07/09/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 07/08/2024 07/08/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 06/18/2024 06/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC HOLD 06/18/2024 06/27/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 13. Need smoke alarms and combo alarms inside and outside of all bedrooms. FRC 2020 314,315
FI1 HOLD 06/18/2024 07/03/2024
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM The response addresses only 1 of the 10 comments in the latest review. Please submit a response letter that address each of the comments from the review and give direction to the plan sheet for each of the responses and include clouded changes for review. A complete response letter is needed for further review.
BLD HOLD 06/18/2024 06/27/2024
Note: Held By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM 1. All plan review comments in this, and other plan reviews shall be responded to in letter format signed and sealed by the registered design professionals responsible for addressing the comments. In addition, all plan sheets where revisions are made based on review comments shall be clouded indicating the presence of a plan revision. 6. REPEAT COMMENT - All architectural plan sheets shall contain an architect’s title block with business qualifier’s license number. F.A.C. 61G1-16.004. 8. REPEAT COMMENT (PART 2 OF COMMENT 7 FROM RESPONSE 2 COMMENTS) - Engineering specifications and calculations shall include an index sheet and shall be signed, dated, and sealed (including verifiable digital seals if transmitted electronically) by each engineer in responsible charge of the production and preparation for each section of the engineering specifications and calculations. Alternative Materials and Methods 1. REPEAT COMMENT - FBCB Section 104.11. Cannot locate ICC ESR - please resubmit. Instructions to General Contractor 1. REPEAT COMMENT - The plan is subject to review and approval by the Palm Coast Fire Marshal. Threshold Building 2. REPEAT COMMENT (PART 3) A list of all special inspectors by firm name and individual name and license number that are approved to conduct special inspections by the architect and / or professional engineer of record. F.S. Chapter 471, 481. REPEAT COMMENT (PART 4) A list of Testing Agencies licensed as professional engineers in Florida per F.S. Chapter 471 4. REPEAT COMMENT Provide a copy of an executed contract between the fee owner of the building and the special inspector(s). FBC Section 110.8.3. Attached document is a proposal. The proposal contains the information below. Contract to indicate the costs of employing the special inspector shall be paid for by the fee owner. Contract to include a statement the special inspector is responsible to the enforcement agency - the City of Palm Coast Building Division. Contract shall be by and between the fee owner and a person certified, licensed or registered under F.S. Chapter 471 as a professional engineer or under F.S. Chapter 481 as a licensed architect or both. Contract shall be by and between the fee owner and a person certified, licensed or registered under F.S. Chapter 471 as a professional engineer or under F.S. Chapter 481 as a licensed architect or both. Plan Sheet R101 9. REPEAT COMMENT Floor areas shown in Occupant Load Tables do not reconcile with floor areas shown in the Code Summary Section - Chapter 5 General Building Heights and Areas. Please reconcile. Plan Sheet R102 7. REPEAT COMMENT Provide exit width calculation for corridors, stairs and exit doors based on occupant load served and cumulative occupant load where necessary. Show required width for exit components including stairways, doors, and corridors. Show width in inches. Show required width and number of occupants served at egress convergence areas and each floor at enclosed interior stairways as well as the exit discharge doors. FBCB Sections 1005.3.1, 1005.3.2, 1005.4, 1005.5, 1005.6. Show calculations please.
DSD COMPLETE 05/07/2024 05/28/2024
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
MECH HOLD 05/07/2024 05/21/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide a response letter explaining all corrections/revisions and cloud plans for corresponding changes. 1. OK 2. OK REPEAT COMMENT: 3. Provide UL details showing membrane and through penetrations for refrigerant piping, condensate piping, ductwork and etc... per Chapter 7 FBC Building 2020 7th edition ( IT IS THE RESPONSIBILITY OF THE ARCHITECT TO PROVIDE THE UL DETAILS. PROVIDE DETAILS OR PUT NOTE ON PLANS FOR DEFFERRED SUBMITTAL. THE SUBMITTAL NEEDS TO BE SUBMITTED ON THIS PERMIT AND APPROVED PRIOR TO INSPECTION) PARTIAL REPEAT COMMENT: 4. Provide details and show location of ceiling radiation dampers on plans or show ductwork below fire separation on plans by shading area per 607.6.2.1 FBC Mechanical 2020 7th edition. (SHADE CEILING AREA TO SHOW THAT DUCTWORK IS BELOW CEILING) 5. OK REPEAT COMMENT: 6. Provide locations and details on permanent roof access per 306.5 FBC Mechanical 2020 7th edition (UNABLE TO LOCATE LADDER FROM 4TH FLOOR TO ROOF ON PLANS. PROVIDE LOCATION AND PROVIDE DETAILS FOR LADDER OR PUT NOTE ON PLANS FOR DEFFERED SUBMITTAL) 7. OK PARTIAL REPEAT COMMENT: 8. Provide specs on Grease hood duct for future use. Provide engineering to show section view of duct running through building, changes in direction, clean outs, cleanout access in shaft, sizing, material type, clearances and termination locations clearances. If welded duct provide fire wrap manufacturer's specs for reduced clearances per 506.3.1 to 506.3.13.3 FBC Mechanical 2020 7th edition (PROVIDE MANUFACTURERS SPECS FOR FIREWRAP OR PUT NOTE ON PLANS FOR DEFFERED SUBMITTAL) 9. OK 10. OK 11. OK 12. OK
PLUM COMPLETE 05/07/2024 05/21/2024
Note: Released By: JIM WALKER - (386)529-4112 - JWALKER@PALMCOASTGOV.COM
ELEC HOLD 05/07/2024 05/21/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. ok 2. Submit fire penetration details. That is for you to provide not the GC 3. Need to show that all panels and switchgear will have the proper clearance. NEC 2017 110.26 4. Need to show location of meters 501 and 502 are just risers. Not an actual location of meters on the building. 5. Panels, Meters etc need to have Arc Flash Warnings. NEC 2017 110.16 Need to show this. 6. Need to show where panels are rated 800 amps are more will have proper panic hardware. NEC 2017 110.26 (B) (3). You need to show on your electrical plans where you have these panel that it has the hardware. 7. Need to show location of all Tenant interior panels and overcurrent devices. This includes your commercial spaces down stairs NEC 2017 240.24 8. ok 9. Need correct outlet spacing on kitchen islands. NEC 2017 210.52 (C) 10. ok 11. ok 12. ok 13. Need smoke alarms and combo alarms inside and outside of all bedrooms. FRC 2020 314,315 14. ok 15. ok 16. Need to show location of timeclock controlling all the outside lights. FBC Energy 2020 C405.2.6.4 17. Separate circuits shall be provided for elevator pit lighting and outlets. NEC 2017 620.24 (A) 18. Light switch for the pit lighting shall be located at the pit door. NEC 2017 620.24 (B) 19. ok 20. All key notes need to be for that page and that page only. You need to show what pages yoiur changes are on and also not just say acknowledge.
FI1 HOLD 05/07/2024 05/21/2024
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code and / or the 2020 Florida Building Code-Building Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets and add page locations for each response. 1. The area chosen for the Knox Box is not approved by the fire marshal, please remove the knox box location and place the following note on the plans per AHJ. and FFPC 8th edition (2023) 1, 16.4.4.2.1 [241:7.5.2.1] Please select FLAGLER COUNTY DEPT. of EMERGENCY MANAGEMENT, for jurisdiction or agency even though it is going in the city. This way it will get it keyed correctly. https://www.knoxbox.com/Products/Commercial-KnoxBoxes Please call Fire Marshal, Randy Holmes at: 386-986-2303 for proper placement and verification of proper design and notification for the Fire Fighters Safety Building Marking System prior to placement. 2. Repeat comment. (Still need to add the deferred submittal comment to the plans regarding deferred submittals and indicate page number for comment). Note: If it is the intent of the engineer of record to design the fire alarm, BDA, stand pipe system, and sprinkler systems, the EOR needs to submit fully compliant systems for each for review. If the EOR plans to design the system for submittal by the individual fire contractors at a later time the design can be deferred until submittal by the qualified fire contractors, (each of these systems require separate permits). (Provide system documents or indicate deferred submittals). 3. Repeat comment. (Still need to add the deferred submittal comment to the plans regarding deferred submittals and indicate page number for comment). Please provide Fire Alarm Riser Diagram and be certain the riser matches the 1 – line fire alarm floor plan drawings for device locations ant types per FBC 107.3 (or indicate deferred submittals). 4. Repeat comment. (Still need to add the deferred submittal comment to the plans regarding deferred submittals and indicate page number for comment). Alarm device locations on floor plans need to have 1 – line drawings and they need to match the fire alarm riser diagram per FBC 107.3 (or indicate deferred submittals). 5. Repeat comment. (Still need to add the deferred submittal comment to the plans regarding deferred submittals and indicate page number for comment). Need to show all devices on the code plan per FBC 107.3 (or indicate deferred submittals). 6. Repeat comment. (Still need to add the deferred submittal comment to the plans regarding deferred submittals and indicate page number for comment). Need to show riser diagram, floor plan, Design criteria, and layout for fire sprinklers per FBC 107.3 (or indicate deferred submittals). 7. Repeat comment… Still need to add missing areas (check all). Need to add exit signage at the ends of hallways/corridors to indicate the way to an exit in at least two directions Per FFPC 7th Edition (2020) 14.11.3.2 8. Repeat comment. (Still need to add the deferred submittal comment to the plans regarding deferred submittals and indicate page number for comment). Please show the required Identification for stairways per FFPC 7th Edition (2020) 101: 7.2.2.5.4.1 (A) through (P) 9. Repeat comment. (Please give the page numbers for the clouded responses). Please show the required door locking arrangements per FFPC 7th Edition (2020) 101: section 30.2.2 10. Repeat comment. (Provide detail on plans for the requested Fire Fighters Safety Marking System per Florida Administrative Code 69A-3.012 and Florida Statutes 633.027 Additional comments are likely after resubmittal.
BLD HOLD 05/07/2024 05/22/2024
Note: Held By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM 1.REPEAT COMMENT All plan review comments in this and other plan reviews shall be responded to in letter format signed and sealed by the registered design professionals responsible for addressing the comments. In addition, all plan sheets where revisions are made based on review comments shall be clouded indicating the presence of a plan revision. 4. REPEAT COMMENT All plan sheets signed and sealed by Florida licensed professional engineers shall contain verifiable digital signatures and seals per F.S. 471.025 and F.A.C. 61G15-23.004 including the required statement in 61G15-23.004 (3) (d) 6. REPEAT COMMENT All architectural plan sheets shall contain an architect’s title block with firm name and telephone number, business qualifier’s license number, date prepared, a space for the architect’s signature and digital seal, the printed name and license / registration number of the person sealing the documents and the date(s) plans are revised. F.A.C. 61G1-16.004. 7. REPEAT COMMENT All plan sheets signed and sealed by Florida licensed professional engineers shall contain an engineer’s title block with printed name, address and license number of the engineer who sealed the plan sheet. If the engineer who seals the plans is practicing through a duly authorized qualified engineering business organization, the title block shall contain the printed name and address of the engineering business. The engineer’s title block shall include identification of the project by complete address including City of Palm Coast. F.A.C. 61G15-23.001 (1), (4), (a) 1. 2., (b) 1. 2., (a), (b), (c). 8. REPEAT COMMENT Engineering specifications and calculations shall include an index sheet and shall be signed, dated and sealed (including verifiable digital seals if transmitted electronically) by each engineer in responsible charge of the production and preparation for each section of the engineering specifications and calculations. 9. REPEAT COMMENT Plans shall include complete design, construction and assembly details for all fire-resistive rated construction. References to ASTM E119, UL263 or other approved fire-resistance design methods listed in FBCB Section 703.3 shall be included. Plans shall also include complete details for all opening protectives, through and membrane penetration fire-stop and fire-resistant joint systems. Complete details means, by way of example, the entire UL, ASTM (or other approved design) file or other design documents on plan sheets and clearly indicating complete details of materials, assembly, construction and /or installation. For opening protectives, through and membrane penetration systems and similar, complete details means the manufacturer’s complete installation instructions and specifications. The purpose of this standard is for the registered design professional to take design responsibility of fire resistive rated construction on the plans where a record is created and designs are signed and sealed in accordance with Florida Statutes. It is also intended to ensure contractors are provided with all details required for constructability and building inspectors are provided complete details necessary for inspection. FBCB Section 107.3.5. As an alternative to plan sheets containing the documentation described above, a separate specification manual may be provided with a cover sheet and index signed and sealed in accordance with verifiable digital signatures and seals per F.S. 481.221 and F.A.C. 61G1-16.005. If no cover sheet is provided, then all design sheets shall be signed and sealed. Revisions to fire-resistive rated construction shall be submitted in the same manner. If these documents are not ready for submittal, the architect can list them on the plans as a deferred submittal. FBCB Sections 107.3.4.1, 703, 707, 710, 711, 712, 712, 713, 714, 715, 716, 717, 718. Please denote deferred sumbittal on plans. Fire Protection Systems Design 1. REPEAT COMMENT Provide engineering design for fire sprinkler systems and fire alarm systems as part of these submitted plans. A Florida licensed professional engineer is responsible to establish design concepts established through the Responsibility Rules adopted by the Florida Board of Professional Engineers. F.S. 633.102 (19). Layout of risers, cross mains, branch lines, sprinkler heads, sizing of pipe, hanger locations, and hydraulic calculations in accordance with the design concepts established by the engineer are provided by the licensed fire protection contractor under separate building permit for installation of fire sprinkler and fire alarm systems. Please denote deferred sumbittal on plans. Alternative Materials and Methods 1. REPEAT COMMENT Architect to provide International Code Council Evaluation Services Reports for all alternative construction materials and methods not automatically recognized in the body of the Florida Building Code. Items such as Insulated Concrete Forms (ICF’s) shall only be approved by the Palm Coast Building Division if issued an ICC-ESR specific to the product and further provided the product conforms to the conditions of use for this building type. FBCB Section 104.11. Instructions to General Contractor 1. REPEAT COMMENT Prior to issuance of any building permit for this project, the general contractor will provide a written "fire safety" or "safeguards during construction" plan in accordance with the Florida Fire Prevention Code Chapter 16 (see Fire plan review comments) and FBCB Chapter 33. The plan, at a minimum, shall include details for fire extinguishers per FBCB Section 3309, means of egress per FBCB Section 3310, standpipes per Section 3311, and water supply for fire protection per FBCB Section 3313. The plan shall also address, at a minimum, housekeeping, on-site security, pre-fire planning, access for fire-fighting, stairs, standpipes and fire protection during construction. The plan is subject to review and approval by the Palm Coast Fire Marshal. 2. REPEAT COMMENT Prior to issuance of any building permit for this project, the general contractor shall provide a written plan for pedestrian protection per FBCB Section 3306, protection of adjoining public and private property and address the applicable details of FBCB Section 3307 and temporary use of streets and public property per FBCB Section 3308. Please be advised, due to the sparseness of nearby occupied buildings adjacent to this site, the City is not necessarily requesting pedestrian barricades or overhead protection and will consider temporary closure of public sidewalks and public parking directly contiguous to the property; however, in order to consider closures, a written plan accompanied by graphics indicating sidewalk closure, barricade type and location and directional signage plans shall be provided for review and approval by the City. The City will not consider use of public streets and sidewalks for placement of construction trailers, storage of equipment or materials during construction. Threshold Building 2. REPEAT COMMENT Revise Note No. 2 to include a statement indicating the location where logs and reports will be maintained on the job site and that reports are open for inspection to the City of Palm Coast Building Official at any time. AHJ. Please indicate location where logs will be maintained on the job site. A list of all special inspectors by firm name and individual name and license number that are approved to conduct special inspections by the architect and / or professional engineer of record. F.S. Chapter 471, 481. A list of Testing Agencies licensed as professional engineers in Florida per F.S. Chapter 471. 3. REPEAT COMMENT General contractor shall provide a separate statement on company letterhead indicating they have; 1.) read and understand the special inspection plan; 2.) understand their obligations to call and schedule all required special inspections, both periodic and continuous as designated in the special inspection plan; 3.) they will not cover, conceal or otherwise proceed with any work beyond the work requiring special inspection approval by the special inspector(s); 4.) understand any work covered or concealed without the special inspectors approval is subject to removal of any finish or other construction material to expose the work for special inspection approval upon order of the Palm Coast Building Official; 5.) that no work requiring special inspection will be performed by anyone other than the approved special inspector(s). 4. REPEAT COMMENT Provide a copy of an executed contract between the fee owner of the building and the special inspector(s). FBC Section 110.8.3. Contract to indicate the costs of employing the special inspector shall be paid for by the fee owner. Contract to include a statement the special inspector is responsible to the enforcement agency - the City of Palm Coast Building Division. Contract shall be by and between the fee owner and a person certified, licensed or registered under F.S. Chapter 471 as a professional engineer or under F.S. Chapter 481 as a licensed architect or both. 5. REPEAT COMMENT Provide copies of State of Florida licenses for all special inspectors that indicate they are licensed architects per F.S. 481, licensed professional engineers per F.S. 471 and are also approved special inspectors by the State of Florida. 7. REPEAT COMMENT Provide AWS certificates for personnel performing welding. Plan Sheet R101 5. REPEAT COMMENT I do not see any design details for areas of refuge and believe they are required per Section 1007 of the 2003 IBC as referenced in FBCA Section 105.2.4 (see also Advisory 105.2.4). Two accessible means of egress required where more than one means of egress is required. Accessible means of egress may be by exit stairways or evacuation elevators when provided in conjunction with horizontal exits or areas of refuge. The 2003 IBC provides requirements for areas of refuge which are fire-rated spaces on levels above or below the exit discharge level. See 2003 IBC Section 1007.1 through 1007.8.3 and provide design of areas of refuge according to applicable code provisions. Applicable to 2nd- 4th floors. 9. REPEAT COMMENT Floor areas shown in Occupant Load Tables do not reconcile with floor areas shown in the Code Summary Section - Chapter 5 General Building Heights and Areas. 15. REPEAT COMMENT Code Summary Chapter 9 - Fire Protection and Life Safety Systems. Add a section outlining the general requirements of required standpipe systems per FBCB Section 905 including Class type, required locations. See also Fire Inspector plan review comments as the Florida Fire Prevention Code may have different criteria as to when standpipe systems are required. Please denote a deferred submittal on the plans. 16. REPEAT COMMENT Code Summary Chapter 9 - Fire Protection and Life Safety Systems. Add a section outlining the general requirements of fire alarm and detection systems per FBCB Section 907. No R001 submitted. Plan Sheet R102 5. REPEAT COMMENT I do not see any design details for areas of refuge and believe they are required per Section 1007 of the 2003 IBC as referenced in FBCA Section 105.2.4 (see also Advisory 105.2.4). Two accessible means of egress required where more than one means of egress is required. Accessible means of egress may be by exit stairways or evacuation elevators when provided in conjunction with horizontal exits or areas of refuge. The 2003 IBC provides requirements for areas of refuge which are fire-rated spaces on levels above or below the exit discharge level. See 2003 IBC Section 1007.1 through 1007.8.3 and provide design of areas of refuge according to applicable code provisions. This is a Florida Specific Requirement. Applicable to 2nd- 4th floors. 7. REPEAT COMMENT Provide exit width calculation for corridors, stairs and exit doors based on occupant load served and cumulative occupant load where necessary. Show required width for exit components including stairways, doors and corridors. Show width in inches. Show required width and number of occupants served at egress convergence areas and each floor at enclosed interior stairways as well as the exit discharge doors. FBCB Sections 1005.3.1, 1005.3.2, 1005.4, 1005.5, 1005.6. Show calculations please. 8. REPEAT COMMENT Interior exit stairways must lead directly to the exterior of the building or shall extend to the exterior of the building with an exit passageway conforming to FBCB Section 1024 except as permitted by Section 1028.1. FBCB Section 1023.1. Section 1028.1 requires that the exit discharge not reenter a building. Exceptions allow not more than 50% of the required number and minimum width of interior exit stairways to egress through areas (rooms / spaces) on the level of exit discharge provided all of the conditions in 1.1, 1.2, 1.3 and 1.4 are met. I believe you meet the 50% rule as stair ST-C1 and ST-F1appear to be discharging either through the rated stair enclosure (ST-C1) or a rated exit passageway (ST-F1) but I do not believe compliance with 1.1 has been demonstrated as free and unobstructed path of travel to an exterior door through and entry lobby D100 for ST-D1 and restaurant lobby A100 for ST-A1has been provided. Please provide distance between the last tread of the exit access stairway and exit discharge door per 1028.2 exception 1 item1.4 Plan Sheet R103 5. REPEAT COMMENT I do not see any design details for areas of refuge and believe they are required per Section 1007 of the 2003 IBC as referenced in FBCA Section 105.2.4 (see also Advisory 105.2.4). Two accessible means of egress required where more than one means of egress is required. Accessible means of egress may be by exit stairways or evacuation elevators when provided in conjunction with horizontal exits or areas of refuge. The 2003 IBC provides requirements for areas of refuge which are fire-rated spaces on levels above or below the exit discharge level. See 2003 IBC Section 1007.1 through 1007.8.3 and provide design of areas of refuge according to applicable code provisions. This is a Florida Specific Requirement. Applicable to 2nd- 4th floors. Plan Sheet R104 5. I do not see any design details for areas of refuge and believe they are required per Section 1007 of the 2003 IBC as referenced in FBCA Section 105.2.4 (see also Advisory 105.2.4). Two accessible means of egress required where more than one means of egress is required. Accessible means of egress may be by exit stairways or evacuation elevators when provided in conjunction with horizontal exits or areas of refuge. The 2003 IBC provides requirements for areas of refuge which are fire-rated spaces on levels above or below the exit discharge level. See 2003 IBC Section 1007.1 through 1007.8.3 and provide design of areas of refuge according to applicable code provisions. This is a Florida Specific Requirement. Applicable to 2nd- 4th floors.
ARCHR COMPLETE 12/11/2023 12/20/2023
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD HOLD 12/11/2023 02/05/2024
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM COMMENTS PER THE 2020 FLORIDA BUILDING CODE-BUILDING, FLORIDA BUILDING CODE-ACCESSIBILITY, FLORIDA BUILDING CODE-PLUMBING, FLORIDA STATUTES (F.S.) AND FLORIDA ADMINISTRATIVE CODE (F.A.C.) AND / OR AUTHORITY HAVING JURISDICTION – CITY OF PALM COAST / CITY OF PALM COAST BUILDING DIVISION (A.H.J.) General / All Plan Sheets / Specification Manuals 1. All plan review comments in this and other plan reviews shall be responded to in letter format signed and sealed by the registered design professionals responsible for addressing the comments. In addition, all plan sheets where revisions are made based on review comments shall be clouded indicating the presence of a plan revision. 2. Only those plan sheets containing revisions shall be uploaded to the permit portal. Previous plan sheets replaced with new plan sheets will be "rejected" by the Building Division so as not to be printed or issued with the approved set of plans. DO NOT SUBMIT A FULL PLAN SET. 3. Site Development Plans including Civil Construction Plans, Landscaping Plans and any other plans not specifically mentioned here and that are associated with the Development Application have been rejected and shall not be a part of the building permit record. Be sure not to resubmit ANY of these plans on permit resubmittal. References to these plans shall be removed from the Plan Index sheet G.002 and any other location they may be referenced. 4. All plan sheets signed and sealed by Florida licensed professional engineers shall contain verifiable digital signatures and seals per F.S. 471.025 and F.A.C. 61G15-23.004 including the required statement in 61G15-23.004 (3) (d). 5. All plan sheets signed and sealed by Florida licensed architects shall contain verifiable digital signatures and seals per F.S. 481.221 and F.A.C. 61G1-16.005. 6. All architectural plan sheets shall contain an architect’s title block with firm name and telephone number, business qualifier’s license number, date prepared, a space for the architect’s signature and digital seal, the printed name and license / registration number of the person sealing the documents and the date(s) plans are revised. F.A.C. 61G1-16.004. 7. All plan sheets signed and sealed by Florida licensed professional engineers shall contain an engineer’s title block with printed name, address and license number of the engineer who sealed the plan sheet. If the engineer who seals the plans is practicing through a duly authorized qualified engineering business organization, the title block shall contain the printed name and address of the engineering business. The engineer’s title block shall include identification of the project by complete address including City of Palm Coast. F.A.C. 61G15-23.001 (1), (4), (a) 1. 2., (b) 1. 2., (a), (b), (c). 8. Engineering specifications and calculations shall include an index sheet and shall be signed, dated and sealed (including verifiable digital seals if transmitted electronically) by each engineer in responsible charge of the production and preparation for each section of the engineering specifications and calculations. 9. Plans shall include complete design, construction and assembly details for all fire-resistive rated construction. References to ASTM E119, UL263 or other approved fire-resistance design methods listed in FBCB Section 703.3 shall be included. Plans shall also include complete details for all opening protectives, through and membrane penetration fire-stop and fire-resistant joint systems. Complete details means, by way of example, the entire UL, ASTM (or other approved design) file or other design documents on plan sheets and clearly indicating complete details of materials, assembly, construction and /or installation. For opening protectives, through and membrane penetration systems and similar, complete details means the manufacturer’s complete installation instructions and specifications. The purpose of this standard is for the registered design professional to take design responsibility of fire resistive rated construction on the plans where a record is created and designs are signed and sealed in accordance with Florida Statutes. It is also intended to ensure contractors are provided with all details required for constructability and building inspectors are provided complete details necessary for inspection. FBCB Section 107.3.5. As an alternative to plan sheets containing the documentation described above, a separate specification manual may be provided with a cover sheet and index signed and sealed in accordance with verifiable digital signatures and seals per F.S. 481.221 and F.A.C. 61G1-16.005. If no cover sheet is provided, then all design sheets shall be signed and sealed. Revisions to fire-resistive rated construction shall be submitted in the same manner. If these documents are not ready for submittal, the architect can list them on the plans as a deferred submittal. FBCB Sections 107.3.4.1, 703, 707, 710, 711, 712, 712, 713, 714, 715, 716, 717, 718. 10. Plans shall include a design statement by the architect of record certifying design compliance with accessibility provisions of the Florida Building Code-Accessibility; and / or, where necessary, the Department of Housing and Urban Development under Section 504 of the Rehabilitation Act of 1973. • A statement confirming the project is subject to compliance with Section 504 of the Rehabilitation Act of 1973. Statement to also address: o Residential dwelling units with mobility features complying with FBCA Sections 809.2 through 809.4 in the numbers required by applicable HUD regulations have been provided. FBCA Section 233.2. o Residential dwelling units required to provide mobility features are located on an accessible route per FBCA Section 206. o Residential dwelling units are provided with communication features complying with FBCA Section 809.5 in numbers required by HUD. Or; • A statement confirming the project is subject to compliance with FBCA Section 233.3. Statement to also address: o Residential dwelling units with mobility features complying with FBCA Sections 809.2 through 809.4 have been provided in the numbers required. FBCA Section 233.3.1.1. o Residential dwelling units required to provide mobility features are located on an accessible route per FBCA Section 206. o Residential dwelling units with communication features complying with FBCA 809.5 in the numbers required by FBCA Section 233.3.1.2. o Residential dwelling units required to provide mobility features complying with FBCA Sections 809.2 through 809.4 and dwelling units required to provide communication features complying with Section 809.5 are a.) dispersed among the various types of residential dwelling units provided in the facility and b.) provide choices of residential dwelling units comparable to, and integrated with, those available to other residents. • Whether accessibility design is intended to comply with Section 504 of the Rehabilitation Act of 1973 or Section 233.3 of the FBCA provide statement regarding vertical accessibility and compliance with F.S. 553.509 and FBCA Section 201.1.1. The design statements above shall be included in a conspicuous location on plans, preferably the plan cover sheet and shall be accompanied by a matrix or other means of identifying and cataloging accessible dwelling units, mobility and communication features and dispersion in accordance with these sections. 11. Plan sheets include numerous references to the IBC, IMC, IPC, IFGC and IECC. Each reference shall be removed and replaced with the appropriate 2020 Florida Building Codes. All code sections referenced under the International Codes shall be revised to the corresponding 2020 Florida Building Code Sections and wording, where used, shall be revised to match the exact wording in the 2020 Florida Building Codes. 12. Plan Sheet G.001 and in accordance with the above, shall include the business qualifier’s license number for each architectural and engineering firm providing plans for this project. Palm Coast Product Approval and Roofing Worksheets 1. Provide completed City of Palm Coats Product Approval and Roofing Worksheets for all exterior cladding and components and roofing materials. Deferred Submittals 1. Architect to provide a complete list of deferred submittals per FBCB Section 107.3.4.1 including a list of any items listed by the structural engineer of record on their accompanying plan sheets. Fire Protection Systems Design 1. Provide engineering design for fire sprinkler systems and fire alarm systems as part of these submitted plans. A Florida licensed professional engineer is responsible to establish design concepts established through the Responsibility Rules adopted by the Florida Board of Professional Engineers. F.S. 633.102 (19). Layout of risers, cross mains, branch lines, sprinkler heads, sizing of pipe, hanger locations, and hydraulic calculations in accordance with the design concepts established by the engineer are provided by the licensed fire protection contractor under separate building permit for installation of fire sprinkler and fire alarm systems. Alternative Materials and Methods 1. Architect to provide International Code Council Evaluation Services Reports for all alternative construction materials and methods not automatically recognized in the body of the Florida Building Code. Items such as Insulated Concrete Forms (ICF’s) shall only be approved by the Palm Coast Building Division if issued an ICC – ESR specific to the product and further provided the product conforms to the conditions of use for this building type. FBCB Section 104.11. Instructions to General Contractor 1. Prior to issuance of any building permit for this project, the general contractor will provide a written "fire safety" or "safeguards during construction" plan in accordance with the Florida Fire Prevention Code Chapter 16 (see Fire plan review comments) and FBCB Chapter 33. The plan, at a minimum, shall include details for fire extinguishers per FBCB Section 3309, means of egress per FBCB Section 3310, standpipes per Section 3311, and water supply for fire protection per FBCB Section 3313. The plan shall also address, at a minimum, housekeeping, on-site security, pre-fire planning, access for fire-fighting, stairs, standpipes and fire protection during construction. The plan is subject to review and approval by the Palm Coast Fire Marshal. 2. Prior to issuance of any building permit for this project, the general contractor shall provide a written plan for pedestrian protection per FBCB Section 3306, protection of adjoining public and private property and address the applicable details of FBCB Section 3307 and temporary use of streets and public property per FBCB Section 3308. Please be advised, due to the sparseness of nearby occupied buildings adjacent to this site, the City is not necessarily requesting pedestrian barricades or overhead protection and will consider temporary closure of public sidewalks and public parking directly contiguous to the property; however, in order to consider closures, a written plan accompanied by graphics indicating sidewalk closure, barricade type and location and directional signage plans shall be provided for review and approval by the City. The City will not consider use of public streets and sidewalks for placement of construction trailers, storage of equipment or materials during construction. Threshold Building 1. This is a threshold building by FBCB definition and is subject to Section 110.8. All plan sheets signed and sealed by the architect and engineer of record shall include the statement (without modification) in Section 110.8.4.4. The statement shall appear adjacent and / or in close proximity to each digital signature and seal on each plan sheet. 2. Plan Sheet S003 contains a structural special inspection plan. Provide the following revisions within the special inspection plan: • A statement referencing a final special inspection report is required and must include a signed and sealed statement in substantial form in FBCB Section 110.8.4.1. Statement shall indicate final report to be provided to the Palm Coast Building Official in compliance with FBC Section 110.8.4.1. • Revise Note No. 1 by removing the reference to the IBC and replacing with the Florida Building Code-Building. • Revise Note No. 2 to include a statement indicating the location where logs and reports will be maintained on the job site and that reports are open for inspection to the City of Palm Coast Building Official at any time. AHJ. • A statement referencing compliance with FBCB Section 110.8.4.2. • A statement referencing compliance with FBCB Section 110.8.4.3 (as may be necessary). • A statement indicating all construction work requiring special inspection shall remain open, accessible and exposed for special inspection and testing purposes until the special inspector authorizes work to be covered or concealed. AHJ. • A statement indicating all special inspectors are responsible to the enforcement agency – the City of Palm Coast Building Division, and shall report any and all deviations from the special inspection plan immediately in writing to the Palm Coast Building Official at pbuckley@palmcoastgov.com. • A statement indicating all special inspectors approved to conduct special inspections shall be architects and / or professional engineers with licenses authorizing them to perform special inspections per F.S. Chapters 471, 481. • A list of all special inspectors by firm name and individual name and license number that are approved to conduct special inspections by the architect and / or professional engineer of record. F.S. Chapter 471, 481. • A list of Testing Agencies licensed as professional engineers in Florida per F.S. Chapter 471. 3. General contractor shall provide a separate statement on company letterhead indicating they have; 1.) read and understand the special inspection plan; 2.) understand their obligations to call and schedule all required special inspections, both periodic and continuous as designated in the special inspection plan; 3.) they will not cover, conceal or otherwise proceed with any work beyond the work requiring special inspection approval by the special inspector(s); 4.) understand any work covered or concealed without the special inspectors approval is subject to removal of any finish or other construction material to expose the work for special inspection approval upon order of the Palm Coast Building Official; 5.) that no work requiring special inspection will be performed by anyone other than the approved special inspector(s). 4. Provide a copy of an executed contract between the fee owner of the building and the special inspector(s). FBC Section 110.8.3. • Contract to indicate the costs of employing the special inspector shall be paid for by the fee owner. • Contract to include a statement the special inspector is responsible to the enforcement agency – the City of Palm Coast Building Division. • Contract shall be by and between the fee owner and a person certified, licensed or registered under F.S. Chapter 471 as a professional engineer or under F.S. Chapter 481 as a licensed architect or both. 5. Provide copies of State of Florida licenses for all special inspectors that indicate they are licensed architects per F.S. 481, licensed professional engineers per F.S. 471 and are also approved special inspectors by the State of Florida. 6. The Florida Building Code does not provide a list or any guidance regarding required special inspections, testing or procedures. Please refer to the International Building Code Chapter 17 (2018 IBC cited for the purpose of completing this section) for various special inspections listed in Sections 1705.1.1 through 1705.18. • Designate required structural observations using Section 1704.6 as a guideline. • Designate submittals for the building official using Section 1704.5 as a guideline. • Designate required tests in Sections 1706, 1707, 1708 and 1709 as guidelines. • Indicate special inspections requiring period inspection or continuous inspection using Tables 1705.2.3, 1705.6, 1705.7 and 1705.8 as guidelines. 7. Provide AWS certificates for personnel performing welding. Plan Sheet R101 1. Tenant 4 area in plan view and occupant load table Level 1 (C110 through D110) uses the term “Institutional”. Occupant load table seems to allude to a 150 sq ft. OLF – which to me, indicates “B occupancies. Please reconcile or add the occupant load to the B-Business section of the table and remove the word institutional from both the occupant load table and the floor plan. Otherwise please explain if you intend to keep this terminology. 2. Under Code Plan – Level 1, West, Chapter 4 - add references to Sections 420.5 and 420.6. 3. Occupant Load Table: Why are many of the individual areas / rooms / uses left blank? The assembly section is not? Please reconcile. 4. Round up all occupant loads to next full number. You can’t have a .2 or .5 (for example) number of occupants. Recalculate all occupant loads at various locations along means of egress system based on full numbers. FBCB Section 1004. 5. I do not see any design details for areas of refuge and believe they are required per Section 1007 of the 2003 IBC as referenced in FBCA Section 105.2.4 (see also Advisory 105.2.4). Two accessible means of egress required where more than one means of egress is required. Accessible means of egress may be by exit stairways or evacuation elevators when provided in conjunction with horizontal exits or areas of refuge. The 2003 IBC provides requirements for areas of refuge which are fire-rated spaces on levels above or below the exit discharge level. See 2003 IBC Section 1007.1 through 1007.8.3 and provide design of areas of refuge according to applicable code provisions. 6. Please clarify Occupant Load – Level 1 table. Table indicates 8,666 square feet of residential space and an occupant load of 4.5 yet it appears no floor area is designated residential on level 1. Occupant load total indicates 65,459 square feet and an occupant load of 1,634.5. Please revise. 7. Please add (mercantile) to those grey box areas using an OLF of 60 as you have done for the restaurant areas. 8. Please provide a chart or other means of providing complete total building occupant load. In addition, in accordance with other comments regarding Plans Sheets R102 through R104 please show the total number of occupants arriving at grade level exit discharge points along with required exit widths in inches and exit width provided. 9. Floor areas shown in Occupant Load Tables do not reconcile with floor areas shown in the Code Summary Section – Chapter 5 General Building Heights and Areas. 10. Code Summary Chapter 6 – Types of Construction. Provide fire-resistance rating of exterior non-bearing walls based on fire separation distance. Information correctly references source of requirements but does not specifically call out the required fire-resistive rating based on the FSD. If no rating is required then state that. 11. Code Summary Chapter 7 – Fire and Smoke Protection Features. Remove Exception Note No. 2 as it only applies to Type IIB, IIIB and VB construction. This building is proposed to be Type IB Construction. FBCB Section 708.3. 12. Code Summary Chapter 7 – Fire and Smoke Protection Features. Check required fire-resistance ratings between the occupancies listed. In plan view on Plan Sheet R101, R102, R103 and R104, identify location of fire-resistive rated occupancy separation walls, horizontal occupancy separations, duct shaft enclosures as has been done for the stair enclosures and elevator shafts. FBCB Section 508.4, Table 508.4, Sections 711, 713. 13. Code Summary Chapter 9 – Fire Protection and Life Safety Systems. Add a section concerning fire sprinkler requirements for the Group M occupancies. Indicate which occupancy – Group A-2 or M is controlling. FBCB Section 903.2.7. 14. Code Summary Chapter 9 – Fire Protection and Life Safety Systems. Add note to the section concerning fire sprinkler requirements for the Group R occupancy clarifying whether it is intended to provide a NFPA 13 system throughout the entire building including the Group R “ fire area” in accordance with FBCB Section 903.3.1.1 or an NFPA 13R system per FBCB Section 903.3.1.2 serving just the Group R fire area. 15. Code Summary Chapter 9 – Fire Protection and Life Safety Systems. Add a section outlining the general requirements of required standpipe systems per FBCB Section 905 including Class type, required locations. See also Fire Inspector plan review comments as the Florida Fire Prevention Code may have different criteria as to when standpipe systems are required. 16. Code Summary Chapter 9 – Fire Protection and Life Safety Systems. Add a section outlining the general requirements of fire alarm and detection systems per FBCB Section 907. 17. Remove all references to the IBC and replace with appropriate sections of the FBCB. Plan Sheet R102 1. Explain red and yellow highlights on occupant load charts. AHJ. 2. Occupant Load Table: Why are many of the individual areas / rooms / uses left blank? Please reconcile. FBCB Section 1004. 3. Residential occupant load calculations are based on gross floor area of the R occupancy. Corridors, stairways and other rooms and spaces within the R occupancy area that are not independently classified as another occupancy or are exempted spaces (shafts with no opening / interior courts) are part of the gross floor area of the R occupancy. Please confirm by note or other means the entire gross floor area is being used to determine the occupant load. See definition of “Floor Area, Gross in Section 202. Revise occupant load and cumulative occupant loads as may be necessary. Please verify all components of the means of egress design accommodates the increased number of occupants. Section 1004.1, 1004.5, Table 1004.5. Additionally, some of the corridor areas are left blank – no occupant load included – please explain. 4. Round up all occupant loads to next full number. You can’t have a .2 or .5 (for example) number of occupants. Recalculate all occupant loads at various locations along means of egress system based on full numbers. FBCB Section 1004. 5. I do not see any design details for areas of refuge and believe they are required per Section 1007 of the 2003 IBC as referenced in FBCA Section 105.2.4 (see also Advisory 105.2.4). Two accessible means of egress required where more than one means of egress is required. Accessible means of egress may be by exit stairways or evacuation elevators when provided in conjunction with horizontal exits or areas of refuge. The 2003 IBC provides requirements for areas of refuge which are fire-rated spaces on levels above or below the exit discharge level. See 2003 IBC Section 1007.1 through 1007.8.3 and provide design of areas of refuge according to applicable code provisions. 6. Room A404 has an occupant load of greater than 50 and requires two exits. One compliant exit is shown. Room A401 also requires to exits. Two are shown but one exits into the adjoining room. FBCB Section 1006.2.1, Table 1006.2.1 7. Provide exit width calculation for corridors, stairs and exit doors based on occupant load served and cumulative occupant load where necessary. Show required width for exit components including stairways, doors and corridors. Show width in inches. Show required width and number of occupants served at egress convergence areas and each floor at enclosed interior stairways as well as the exit discharge doors. FBCB Sections 1005.3.1, 1005.3.2, 1005.4, 1005.5, 1005.6. 8. Interior exit stairways must lead directly to the exterior of the building or shall extend to the exterior of the building with an exit passageway conforming to FBCB Section 1024 except as permitted by Section 1028.1. FBCB Section 1023.1. Section 1028.1 requires that the exit discharge not reenter a building. Exceptions allow not more than 50% of the required number and minimum width of interior exit stairways to egress through areas (rooms / spaces) on the level of exit discharge provided all of the conditions in 1.1, 1.2, 1.3 and 1.4 are met. I believe you meet the 50% rule as stair ST-C1 and ST-F1appear to be discharging either through the rated stair enclosure (ST-C1) or a rated exit passageway (ST-F1) but I do not believe compliance with 1.1 has been demonstrated as free and unobstructed path of travel to an exterior door through and entry lobby D100 for ST-D1 and restaurant lobby A100 for ST-A1has been provided. 9. Remove all references to the IBC and replace with the appropriate sections of the FBCB. Plan Sheet R103 1. Explain red and yellow highlights on occupant load charts. AHJ. 2. Occupant Load Table: Why are many of the individual areas / rooms / uses left blank? Please reconcile. 3. Residential occupant load calculations are based on gross floor area of the R occupancy. Corridors, stairways and other rooms and spaces within the R occupancy area that are not independently classified as another occupancy or are exempted spaces (shafts with no openings / interior courts) are part of the gross floor area of the R occupancy. Please confirm by note or other means the entire gross floor area is being used to determine the occupant load. See definition of “Floor Area, Gross in Section 202. Revise occupant load and cumulative occupant loads as necessary. Please verify all components of the means of egress design accommodates the increased number of occupants. Section 1004.1, 1004.5, Table 1004.5. Additionally, some of the corridor areas are left blank – no occupant load included – please explain. 4. Round up all occupant loads to next full number. You can’t have a .2 or .5 (for example) number of occupants. Recalculate all occupant loads at various locations along means of egress system based on full numbers. FBCB Section 1004. 5. I do not see any design details for areas of refuge and believe they are required per Section 1007 of the 2003 IBC as referenced in FBCA Section 105.2.4 (see also Advisory 105.2.4). Two accessible means of egress required where more than one means of egress is required. Accessible means of egress may be by exit stairways or evacuation elevators when provided in conjunction with horizontal exits or areas of refuge. The 2003 IBC provides requirements for areas of refuge which are fire-rated spaces on levels above or below the exit discharge level. See 2003 IBC Section 1007.1 through 1007.8.3 and provide design of areas of refuge according to applicable code provisions. 6. Remove all references to the IBC and replace with appropriate sections of the FBCB. Plan Sheet R104 1. Explain red and yellow highlights on occupant load charts. AHJ. 2. Occupant Load Table: Why are many of the individual areas / rooms / uses left blank? Please reconcile. 3. Residential occupant load calculations are based on gross floor area of the R occupancy. Corridors, stairways and other rooms and spaces within the R occupancy area that are not independently classified as another occupancy or are exempted spaces (shafts with no openings / interior courts) are part of the gross floor area of the R occupancy. Please confirm by note or other means the entire gross floor area is being used to determine the occupant load. See definition of “Floor Area, Gross in Section 202. Revise occupant load and cumulative occupant loads as necessary. Please verify all components of the means of egress design accommodates the increased number of occupants. Section 1004.1, 1004.5, Table 1004.5. Additionally, some of the corridor areas are left blank – no occupant load included – please explain. 4. Round up all occupant loads to next full number. You can’t have a .2 or .5 (for example) number of occupants. Recalculate all occupant loads at various locations along means of egress system based on full numbers. FBCB Section 1004 5. I do not see any design details for areas of refuge and believe they are required per Section 1007 of the 2003 IBC as referenced in FBCA Section 105.2.4 (see also Advisory 105.2.4). Two accessible means of egress required where more than one means of egress is required. Accessible means of egress may be by exit stairways or evacuation elevators when provided in conjunction with horizontal exits or areas of refuge. The 2003 IBC provides requirements for areas of refuge which are fire-rated spaces on levels above or below the exit discharge level. See 2003 IBC Section 1007.1 through 1007.8.3 and provide design of areas of refuge according to applicable code provisions. 6. Room A401 requires two exits. One exit is through the adjacent Room A404. FBCB Section 1016.2 No. 2. 7. Show occupant load at door from Room A401 door entering Room A404. Show occupant load at door to corridor from A404. 8. Room A404 requires two exits. One compliant exit provided. Door swinging into A404 from A401 is not a compliant second exit as the door swings the wrong direction. 9. Exit 3 from Room A401 occupant load is far more than 52 occupants. Half of A401, half of A404, all of Room A405 and A406 and A403 must be included. Re-calculate. 10. Room F410 and F407 is one room – combine the occupant loads for a single total occupant load. Combined occupant load combined with occupant load from F411 exceeds 50 – second exit required. 11. Remove all references to the IBC and replace with the appropriate sections of the FBCB. Plan Sheet S002 1. In the Design Codes and Standards Section remove the reference to the 2018 International Building Code and replace with 2020 Florida Building Code-Building. Remove reference to “adopted by the City of Palm Coast, FL”. FBCB Section 1603. 2. Provide design live loads for the following: elevator machine rooms; handrails, guards and grab bars and occupied roofs. FBCB Section 1607.1, Table 1607.1 3. Provide soil bearing values from geotechnical investigation report. Cite source (company and report number). FBCB Section 1603.1.6. 4. Provide roof rain load data. FBCB Section 1603.1.9. 5. Provide rain design loads based on the roof primary drainage system is blocked plus the uniform load caused by water that rises above the inlets of the secondary drainage system at its design flow. Design rainfall to be based on the 100-year hourly rainfall rates or other rainfall rated determined from approved local weather data. FBCB Section 1611.1, Figure 1611.1., Section 1611.2, 1611.3. 6. Provide interior partition wall loads. FBCB Section 1607.14. 7. Provide concentrated loads for those items listed in FBCB Table 1607.1. FBCB 1607.4. Plumbing Plan Sheets 1. Where can I find design information for the roof drainage systems including the roof drain flow rates, sizing of conductors, leaders and storm drains, sizing of secondary drains, calculations, rainfall rates. FBCP Sections 1106.1, 1106,2, Figure 1106.1, Table 1106.2, Table 1106.3, Sections 1106.5, 1108.1, 1108.2, 1108.3.
DSD HOLD 12/11/2023 12/18/2023
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Development Order Approval has not been granted. Utility agreement has not be executed, Capacity fee payment has not been received. Site Development Permit has not been applied for and issued.
ELEC HOLD 12/11/2023 01/04/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Plans need to be digitally signed and sealed 2. Submit fire penetration details 3. Need to show that all panels and switchgear will have the proper clearance. NEC 2017 110.26 4. Need to show location of meters 5. Panels, Meters etc need to have Arc Flash Warnings. NEC 2017 110.16 6. Need to show where panels are rated 800 amps are more will have proper panic hardware. NEC 2017 110.26 (B) (3) 7. Need to show location of all Tenant interior panels and overcurrent devices. NEC 2017 240.24 8. Need note stating that all overcurrent devices will be under building management supervision. NEC 2017 240.24 9. Need correct outlet spacing on kitchen islands. NEC 2017 210.52 (C) 10. Outlet in bathroom 2br-2f needs to be GFCI protected. NEC 2017 210.8 11. Need correct outlet spacing in spare bedroom 2br-2f. NEC 2017 210.52 12. Need to show location of electrical panel in unit 2br-2e 13. Need smoke alarms and combo alarms inside and outside of all bedrooms. FRC 2020 314,315 14. Submit panel schedule and load calc for all units. 15. Need to show location of light switch in storage room C102 16. Need to show location of timeclock controlling all the outside lights. FBC Energy 2020 C405.2.6.4 17. Separate circuits shall be provided for elevator pit lighting and outlets. NEC 2017 620.24 (A) 18. Light switch for the pit lighting shall be located at the pit door. NEC 2017 620.24 (B) 19. Lights on 1st floor say F4 / 15. There are no key notes for 15. Key notes only goes to 13. 20. All key notes need to be for that page and that page only.
FI1 HOLD 12/11/2023 01/10/2024
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code and / or the 2020 Florida Building Code-Building Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets and add page locations for each response. 1. Plans submitted online must be digitally signed and sealed for review. http://docs.palmcoastgov.com/departments/building/online/digital-signatures.pdf 2. Please include FFPC 7th edition (2020) in the code analysis on sheet R101 3. Please include FBC 7th edition (2020) in the code analysis on sheet R101, 4. Please remove reference to the IBC on sheet R101, R102, R103, R104, and anywhere it appears in notes, details, or any of the numerous locations on the plans that it appears (This is not the applicable code in Florida). 5. Please provide location for the knox box for rapid entry access of fire department and if canopies will be installed please place a note on the cover sheet indicating canopies and or awnings will have a minimum clearance of 13ft. 6in along the access pathway per NFPA 1, 18.2.2.2, FFPC 1 - 18.2.3.4.1.2 and AHJ. 6. Note: If it is the intent of the engineer of record to design the fire alarm, BDA, Stand pipe system, and sprinkler systems, the EOR needs to submit fully compliant systems for each for review. If the EOR plans to design the system for submittal by the individual fire contractors at a later time the design can be deferred until submittal by the qualified fire contractors, (each of these systems require separate permits). (Provide system documents or indicate deferred submittals). 7. Please provide Fire Alarm Riser Diagram and be certain the riser matches the 1 - line fire alarm floor plan drawings for device locations and types per FBC 107.3 (or indicate deferred submittals). 8. Alarm device locations on floor plans need to have 1 - line drawings and they need to match the fire alarm riser diagram per FBC 107.3 (or indicate deferred submittals). 9. Need to show all devices on the code plan per FBC 107.3 (or indicate deferred submittals). 10. Need to show riser diagram, floor plan, Design criteria, and layout for fire sprinklers per FBC 107.3 (or indicate deferred submittals). 11. Please show the minimum required 1/2 hr rating for corridors with sprinkler protection per FFPC 7th edition (2020) 101: Table 8.3.3.2.2 12. Please reconcile firewalls between units (Some are shown as 1 hr others are sown as ½ hr). 13. Need to add exit signage at the ends of hallways/corridors to indicate the way to an exit in at least two directions Per FFPC 7th Edition (2020) 14.11.3.2 14. Please provide emergency lighting in compliance with FFPC 7th edition (2020) 101: 30.2.9 15. Please add FFPC separation requirements at occupancy separations vertically and horizontally per FFPC 7th edition (2020) 1 fire code 6.1.14.4.1 (2 hour separation is required unless the entire building is protected via a sprinkler system in compliance with NFPA 13). (Please show the results on sheet R101). 16. Plans are quoting IBC codes, the prevailing code is the FBC 7th edition (2020) and the FFPC 7th edition (2020), Please remove all reference to the IBC and insert the appropriate FBC or FFPC codes. 17. Please show draft stops in compliance with FFPC 7th edition (2020) 101: 8.6.11 18. Please show the required Identification for stairways per FFPC 7th Edition (2020) 101: 7.2.2.5.4.1 (A) through (P) 19. Please show the required door locking arrangements per FFPC 7th Edition (2020) 101: section 30.2.2 20. Please provide detail for Fire Fighter Safety Building Marking System per Florida Administrative Code 69A-3.012 and Florida Statutes 633.027 And place the following note on the cover sheet: Please call Fire Marshal, Randy Holmes at: 386-986-2303 for proper placement and verification of proper design and notification for the Fire Fighters Safety Building Marking System prior to placement. Additional comments are likely after resubmittal.
GAS COMPLETE 12/11/2023 12/14/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 12/11/2023 12/19/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide a response letter explaining all corrections/revisions and cloud plans for corresponding changes. 1. All plan sheets need to be digitally signed and sealed with a verifiable signature per F.S. 471.025 2. Provide Heat-load Calculation per C403.2.1 FBC Energy Conservation 2020 7th edition 3. Provide UL details showing membrane and through penetrations for refrigerant piping, condensate piping, ductwork and etc... per Chapter 7 FBC Building 2020 7th edition 4. Provide details and show location of ceiling radiation dampers on plans or show ductwork below fire separation on plans by shading area per 607.6.2.1 FBC Mechanical 2020 7th edition. 5. Provide note on plans saying condensate from RTU's/ Package units to route to storm drains or scupper per 307.2.1 FBC Mechanical 2020 7th edition 6. Provide locations and details on permanent roof access per 306.5 FBC Mechanical 2020 7th edition 7. Provide notes on plans for system commissioning per C408.2 and a note for documentation requirements per C408.2.5 FBC Energy Conservation 2020 7th edition 8. Provide specs on Grease hood duct for future use. Provide engineering to show section view of duct running through building, changes in direction, clean outs, cleanout access in shaft, sizing, material type, clearances and termination locations clearances. If welded duct provide fire wrap manufacturer's specs for reduced clearances per 506.3.1 to 506.3.13.3 FBC Mechanical 2020 7th edition 9. Provide termination details on plans for dishwasher duct and make-up air duct for future use. Include clearances on roof per 401.4/ 506.4.2 FBC Mechanical 2020 7th edition 10. Provide manufacturer's specs/ details and mounting details on roof mounted hurricane stands per 107.2.1 FBC Building 2020 7th edition 11. Remove notes on mechanical plan sheets that say to install balancing damper in duct when required by local code or AHJ. Balancing dampers are required in supply branch ducts per 603.8 FBC Mechanical 2020 7th edition 12. Plan sheet M802. Revise ventilation schedule and code year to current ASHRAE 62.1 and 62.2 standard per 107.2.1 FBC Building 2020 7th edition Additional comments may be generated after resubmittal response
UD1 COMPLETE 12/11/2023 12/21/2023
Note: Released By: GREG DEGLER - - GDEGLER@PALMCOASTGOV.COM
PLUM HOLD 12/11/2023 12/26/2023
Note: Held By: JPI 1. Sheets P404, P405 & P406 are included on the Sheet Index of Sheet G002, however these sheets are NOT included in the submission on Plumbing Drawings. 2. General Plumbing Note #3- reference 2020 FBC- Plumbing, 7 th Edition, Chapter 7 for appropriate drainage piping installation required by code. 3. General- provide ALL sanitary, vent, domestic and storm plumbing pipe sizes on ALL the plans throughout the submission- several omitted on the plans. Overall plans may be too small to include and enlarged plans may be required, especially pertaining to ALL tenant spaces, residential units (all types), mechanical spaces, public restrooms, public spaces (lounges on upper levels), etc.; these enlarged drawings shall be identified on ALL of the plans with detail indicators. 4. General- coordinate ALL pipe sizes with notes identifying the specific sizes; some of these notes are NOT coordinated with the pipe size identified on the plans. 5. General- provide index/schedule for boxed identifiers (i.e. W19) that are indicated on the plans and/or reference appropriate sheet where the index/schedule is located and describes what these indicators represent. Provide leaders with arrows for ALL boxed identifiers pointing to specific location; some of these are omitted. 6. General- ADD General Note regarding slope of condensate lines- reference 2020 FBC- Mechanical, 7 th Edition, Chapter 3. 7. General- primary and secondary roof drains are identified on the “COVERED PATIOS A411 & F411” where occupants will be utilizing; safety and trip hazard. 8. General- Pool and Fire Protection Plumbing drawings NOT included in this submission for review. 9. Sht. P100A: 1. Drawing identifies “ 4” W” drain line, but note states “ 6” W drain line, route to 6” pool standpipe in pool equipment storage, see architectural for location. Field coordinate exact invert and location with civil”; coordinate correct size and revise. 10. Sht. P100E: 1. Keynote #6 omitted from Key Note Legend, but identifier is located on the plan. 2. Drawing identifies “ 4” W” drain line, but note states “ 6” sanitary coordinate exact invert and location with civil”; coordinate correct size and revise. 3. Drawing identifies “ 6” W” drain line, but note states “ 4” sanitary coordinate exact invert and location with civil”; coordinate correct size and revise. 11. Sht. P101F: Keynote #4 omitted from Key Note Legend, but identifier is located on the plan. 12. Sht. P101G: Identify enlarged plan on drawings with indicator referencing 2/P301. 13. Sht. P101J: Identify enlarged plan on drawings; provide enlarged plan in drawings of UNISEX D107. 14. Sht. P105A: 1. Keynote #1 references “Detail X/PXXX”; identify corresponding detail and location in drawings. 2. Identify location of Keynote #3 on plan. 15. Sht. P100E: 1. Provide piping sizes for ALL RTUs on the plan. 2. Identify location of Keynote #3 on plan. 3. Keynote #1 references “Detail X/PXXX”; identify corresponding detail location in drawings. 16. Sht. P105C: 1. Provide piping sizes for ALL RTUs on the plan. 2. Identify location of Keynote #3 on plan. 3. Keynote #1 references “Detail X/PXXX”; identify corresponding detail location in drawings. 4. Keynote #2 references “Detail X/PXX”; identify corresponding detail location in drawings. 17. Sht. P105D: 1. Provide piping sizes for ALL RTUs on the plan. 2. Identify location of Keynote #3 on plan. 3. Keynote #1 references “Detail X/PXXX”; identify corresponding detail location in drawings. 4. Keynote #2 references “Detail X/PXX”; identify corresponding detail location in drawings. 18. Sht. P105E: 1. Provide piping sizes for ALL RTUs on the plan. 2. Identify location of Keynote #3 on plan. 3. Keynote #1 references “Detail X/PXXX”; identify corresponding detail location in drawings. 4. Keynote #2 references “Detail X/PXX”; identify corresponding detail location in drawings. 19. Sht. P105F: 1. Provide piping sizes for ALL RTUs on the plan. 2. Identify location of Keynote #3 on plan. 3. Keynote #1 references “Detail X/PXXX”; identify corresponding detail location in drawings. 4. Keynote #2 references “Detail X/PXX”; identify corresponding detail location in drawings. 20. Sht. P301: 1. Include enlarged plan for UNISEX D107 and reference to Sheet P101J. 2. Identify ALL equipment on enlarged plan 1/P301; these shall include but not be limited to backflow preventer, valves and pumps. 3. Identify size and routing of ALL plumbing piping; appears domestic water (CW and/or HW) has not been provided to lavatories. 21. Sht. P105C: 1. Incomplete; provide complete enlarged plumbing plans which include ALL routing, sizes, etc. for domestic water (CW & HW), sanitary and venting. 2. Provide enlarged plumbing plans with the pertinent information listed in item #1 above: SUNSET LOUNGE A404, UNISEX A418 & A419, JAN A417, SUNRISE TV LOUNGE F410 and UNISEX F408 & F409.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 50% (¤89,037.50) 07/16/2024
ADMINISTRATIVE - COMMERCIAL ¤75.00 07/16/2024
INSPECTION COMMERCIAL ¤100,000.00 07/16/2024
INSPECTION - FIRE COMMERCIAL ¤8,000.00 07/16/2024
PLAN REVIEW - COMMERCIAL ¤70,000.00 07/16/2024
CONTRACTOR CHANGE ¤20.00 07/16/2024
FC IMPACT FEE EMS ¤5,590.98 07/16/2024
FC IMPACT FEE EMS ¤6,528.00 07/16/2024
FC IMPACT FEE LAW ENFORCEMENT ¤22,644.00 07/16/2024
FC IMPACT FEE LAW ENFORCEMENT ¤21,556.99 07/16/2024
FC IMPACT FEE LIBRARY ¤28,356.00 07/16/2024
IMPACT FEE SCHOOL ¤277,440.00 07/16/2024
SURCHARGE FS 533.721 ¤2,162.88 07/16/2024
SURCHARGE - FS 468.631 ¤3,244.31 07/16/2024
SITE PLAN 30 ¤30.00 07/16/2024
IMPACT FEE TRANSPORTATION ¤400,248.00
IMPACT FEE TRANSPORTATION ¤298,915.85
IMPACT FEE PARKS ¤367,401.96
IMPACT FEE FIRE ¤87,330.36
IMPACT FEE FIRE ¤39,770.91
PLAN REVIEW - REVISION ¤32.50
PLAN REVIEW - REVISION ¤32.50
PLAN REVIEW - REVISION ¤32.50
PLAN REVIEW - REVISION ¤32.50
PLAN REVIEW - REVISION ¤65.00
PLAN REVIEW - REVISION ¤65.00
CONTRACTOR CHANGE ¤20.00
CONTRACTOR CHANGE ¤20.00
CONTRACTOR CHANGE ¤20.00
Fees Total Due: ¤1,193,987.08 Total Paid: ¤456,610.66