I want to search for...
Permit #2023120463
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00290-0210 |
| CONDITIONED SPACE: 2052 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| Total Square Footage: 2475 sqft |
| Block: 00290 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 904-268-7730 |
| Location Address: 38 WHITE STAR DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/21/2023 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: FOCUS HOMES, LLC |
|
Address 5220 SHAD RD JACKSONVILLE, FL 32257 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤210,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FOCUS HOMES LLC OF FLORIDA
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
5220 SHAD RD JACKSONVILLE, FL 32257 |
# 202 JACKSONVILLE, FL 32257 |
CRC1332443 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/23/2024 | FINAL APPROVED | AGAETANO |
| Note: 5/22/2024 - PREVIOUS INSPECTION NOTES 05-22-2024 Doors locked. Need access for inspection. 05-20-2024 notes not addressed. 5/20/2024 - PREVIOUS INSPECTION NOTES 5/20/24 Previous items not all repaired 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Range vent requires two points of attachment (screws and tape) 3. Disposal and dishwasher are not labeled properly in panel 5/17/2024 - PREVIOUS INSPECTION NOTES 05-17-2024 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Approved drawings not on site. 3. Anti tilt for stove not installed. Not ready for inspection. | |||
| BLD - BUILDING FINAL | 05/22/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 05-22-2024 Doors locked. Need access for inspection. 05-20-2024 notes not addressed. 5/20/2024 - PREVIOUS INSPECTION NOTES 5/20/24 Previous items not all repaired 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Range vent requires two points of attachment (screws and tape) 3. Disposal and dishwasher are not labeled properly in panel 5/17/2024 - PREVIOUS INSPECTION NOTES 05-17-2024 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Approved drawings not on site. 3. Anti tilt for stove not installed. Not ready for inspection. | |||
| U-CROSS CONNECTION | 05/22/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/22/2024 11:24:14 AM *** no irr-no cross connection 5/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/17/2024 11:39:27 AM *** correction-irrigation meter in pit -irrigatin/landscape not yet installed-reschedule once all completed Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 05/21/2024 | CANCELLED BY APPLICANT | WEB |
| ROW - STORMWATER FINAL | 05/21/2024 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 05/21/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 5/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/17/2024 11:40:23 AM *** lower sewerclean out flush to sod when sod is installed Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 05/20/2024 | FINAL APPROVED | LFITZGERALD |
| Note: New inspection due to canceled inspection 5/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/17/2024 11:40:23 AM *** lower sewerclean out flush to sod when sod is installed Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection | |||
| ROW - STORMWATER FINAL | 05/20/2024 | APPROVED | TPOLACEK |
| Note: 05/20/24 TPOLACEK*** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 05/20/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 05/20/24 TPOLACEK*** THERE ARE SEVERAL SPIDER CRACKS THROUGHOUT THE DRIVEWAU THAT I RECOMMEND BE SEALED. PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 05/20/2024 | CANCELLED BY APPLICANT | WEB |
| ROW - STORMWATER FINAL | 05/20/2024 | CANCELLED BY APPLICANT | WEB |
| BLD - BUILDING FINAL | 05/20/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 5/20/24 Previous items not all repaired 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Range vent requires two points of attachment (screws and tape) 3. Disposal and dishwasher are not labeled properly in panel 5/17/2024 - PREVIOUS INSPECTION NOTES 05-17-2024 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Approved drawings not on site. 3. Anti tilt for stove not installed. Not ready for inspection. | |||
| BLD - BUILDING FINAL | 05/17/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 05-17-2024 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Approved drawings not on site. 3. Anti tilt for stove not installed. Not ready for inspection. | |||
| U-CROSS CONNECTION | 05/17/2024 | Disapproved - NO FEE | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 11:39:27 AM *** correction-irrigation meter in pit -irrigatin/landscape not yet installed-reschedule once all completed Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 05/17/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 11:40:23 AM *** lower sewerclean out flush to sod when sod is installed Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/16/2024 | APPROVED | TPOLACEK |
| Note: 5/15/2024 - PREVIOUS INSPECTION NOTES 05/15/24 TPOLACEK** RECIEVED TEXT FROM DOYLE TO PLEASE CANCEL AS HE IS UPLOADING THE CORRECT SURVEY AND WILL RESUBMIT REQUEST FOR NEW SURVEY. Inspector Notes from Inspection 9270 *** NOTES ADDED BY TPOLACEK 5/3/2024 10:39:46 AM *** Spoke with James on site and explained right side driveway form needs to come up so driveway is not back pitched, side walk needs to be 36" minimum throughout AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING 5/2/2024 - PREVIOUS INSPECTION NOTES 05/02/24 MITERED END BOARD IS TOO FAR FROM CULVERT. MAX DISTANCE IS 6" FROM PIPE YOU HAVE 10" ON THE RIGHT SIDE. SIDEWALK IS STILL 35" AT DRIVEWAY MUST BE 36" MINIMUM. CULVER PIPE SHOULD BE BURIED 1/2 WAY AND PACKED. WHEN PIPE WAS MOVED IT WAS NOT REPACKED AFTER LAST INSPECTION. ------------------------------------------------------------------------------------------------------------------------------ 5/1/2024 - PREVIOUS INSPECTION NOTES 05/01/24 CULVERT MITERED ENDS ARE TOO FAR OFFSET. PIPE NEEDS TO SLIDE LEFT SO THERE IS A MAXIMUM OF 18" FROM EDGE OF DRIVEWAY TO TOP MITER CUT. PLEASE DOUBLE CHECK PIPE ELEVATION AFTER PIPE IS MOVED. NEED TO MOVE SIDEWALK FORM BOARD TO GET 36" WIDE PER ADA REQUIRMENTS. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/16/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/15/2024 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 05/15/24 TPOLACEK** RECIEVED TEXT FROM DOYLE TO PLEASE CANCEL AS HE IS UPLOADING THE CORRECT SURVEY AND WILL RESUBMIT REQUEST FOR NEW SURVEY. Inspector Notes from Inspection 9270 *** NOTES ADDED BY TPOLACEK 5/3/2024 10:39:46 AM *** Spoke with James on site and explained right side driveway form needs to come up so driveway is not back pitched, side walk needs to be 36" minimum throughout AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING 5/2/2024 - PREVIOUS INSPECTION NOTES 05/02/24 MITERED END BOARD IS TOO FAR FROM CULVERT. MAX DISTANCE IS 6" FROM PIPE YOU HAVE 10" ON THE RIGHT SIDE. SIDEWALK IS STILL 35" AT DRIVEWAY MUST BE 36" MINIMUM. CULVER PIPE SHOULD BE BURIED 1/2 WAY AND PACKED. WHEN PIPE WAS MOVED IT WAS NOT REPACKED AFTER LAST INSPECTION. ------------------------------------------------------------------------------------------------------------------------------ 5/1/2024 - PREVIOUS INSPECTION NOTES 05/01/24 CULVERT MITERED ENDS ARE TOO FAR OFFSET. PIPE NEEDS TO SLIDE LEFT SO THERE IS A MAXIMUM OF 18" FROM EDGE OF DRIVEWAY TO TOP MITER CUT. PLEASE DOUBLE CHECK PIPE ELEVATION AFTER PIPE IS MOVED. NEED TO MOVE SIDEWALK FORM BOARD TO GET 36" WIDE PER ADA REQUIRMENTS. | |||
| U-CROSS CONNECTION | 05/13/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 05/03/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: *** NOTES ADDED BY TPOLACEK 5/3/2024 10:39:46 AM *** Spoke with James on site and explained right side driveway form needs to come up so driveway is not back pitched, side walk needs to be 36" minimum throughout AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING 5/2/2024 - PREVIOUS INSPECTION NOTES 05/02/24 MITERED END BOARD IS TOO FAR FROM CULVERT. MAX DISTANCE IS 6" FROM PIPE YOU HAVE 10" ON THE RIGHT SIDE. SIDEWALK IS STILL 35" AT DRIVEWAY MUST BE 36" MINIMUM. CULVER PIPE SHOULD BE BURIED 1/2 WAY AND PACKED. WHEN PIPE WAS MOVED IT WAS NOT REPACKED AFTER LAST INSPECTION. ------------------------------------------------------------------------------------------------------------------------------ 5/1/2024 - PREVIOUS INSPECTION NOTES 05/01/24 CULVERT MITERED ENDS ARE TOO FAR OFFSET. PIPE NEEDS TO SLIDE LEFT SO THERE IS A MAXIMUM OF 18" FROM EDGE OF DRIVEWAY TO TOP MITER CUT. PLEASE DOUBLE CHECK PIPE ELEVATION AFTER PIPE IS MOVED. NEED TO MOVE SIDEWALK FORM BOARD TO GET 36" WIDE PER ADA REQUIRMENTS. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/02/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 05/02/24 MITERED END BOARD IS TOO FAR FROM CULVERT. MAX DISTANCE IS 6" FROM PIPE YOU HAVE 10" ON THE RIGHT SIDE. SIDEWALK IS STILL 35" AT DRIVEWAY MUST BE 36" MINIMUM. CULVER PIPE SHOULD BE BURIED 1/2 WAY AND PACKED. WHEN PIPE WAS MOVED IT WAS NOT REPACKED AFTER LAST INSPECTION. ------------------------------------------------------------------------------------------------------------------------------ 5/1/2024 - PREVIOUS INSPECTION NOTES 05/01/24 CULVERT MITERED ENDS ARE TOO FAR OFFSET. PIPE NEEDS TO SLIDE LEFT SO THERE IS A MAXIMUM OF 18" FROM EDGE OF DRIVEWAY TO TOP MITER CUT. PLEASE DOUBLE CHECK PIPE ELEVATION AFTER PIPE IS MOVED. NEED TO MOVE SIDEWALK FORM BOARD TO GET 36" WIDE PER ADA REQUIRMENTS. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/01/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 05/01/24 CULVERT MITERED ENDS ARE TOO FAR OFFSET. PIPE NEEDS TO SLIDE LEFT SO THERE IS A MAXIMUM OF 18" FROM EDGE OF DRIVEWAY TO TOP MITER CUT. PLEASE DOUBLE CHECK PIPE ELEVATION AFTER PIPE IS MOVED. NEED TO MOVE SIDEWALK FORM BOARD TO GET 36" WIDE PER ADA REQUIRMENTS. | |||
| ELECTRIC - EARLY POWER | 04/18/2024 | APPROVED | AGAETANO |
| Note: 4/17/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2200 Emailed FPL @ 1:40pm 04-17-2024 No ufer ground for eletrical panel and p-ring missing for access | |||
| ELECTRIC - EARLY POWER | 04/17/2024 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2200 Emailed FPL @ 1:40pm 04-17-2024 No ufer ground for eletrical panel and p-ring missing for access | |||
| SEWER TIE IN | 04/11/2024 | CANCELLED BY APPLICANT | WEB |
| SEWER TIE IN | 04/09/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 03/18/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 03/15/2024 | APPROVED | MKRASKI |
| INSULATION | 03/14/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1, Hole in top plate by AHU needs fire stop 2. Fire stop above eletrcial panel needs to seal 100% | |||
| LATH/BRICK/ WATER BARRIER | 03/12/2024 | APPROVED | MKRASKI |
| ALL ROUGH | 03/12/2024 | APPROVED | MKRASKI |
| LATH/BRICK/ WATER BARRIER | 03/11/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Tape required around SGD 2. Silt fence needs to be repaired before re-inspection | |||
| ALL ROUGH | 03/11/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 3/11/24 No repairs made. All repairs must be made before calling in re-inspection, also silt fence needs to be repaired by re-inspection 3/8/2024 - PREVIOUS INSPECTION NOTES 1. No ufer ground for eletrical panel and p-ring missing for access 2. Master bathroom missing studs in wall 3. E-cals show two drops in master bathroom Stopped inspection not ready | |||
| LATH/BRICK/ WATER BARRIER | 03/08/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Power feeding a/c needs to be sealed at wall sheathing 2. Hose bib by ODU needs ro be sealed at wall sheathing | |||
| ALL ROUGH | 03/08/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. No ufer ground for eletrical panel and p-ring missing for access 2. Master bathroom missing studs in wall 3. E-cals show two drops in master bathroom Stopped inspection not ready | |||
| ROOF VALLEY & METAL | 02/29/2024 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/27/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 2/27/24 Page WS-S2 is not a page per super, Need a revision to plans showing the typo on plans. Check on all rough 2/26/2024 - PREVIOUS INSPECTION NOTES 2/26/24 Make all repaires before calling in re-inspection, stopped inspection 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 1. Missing page WS-S2 2. Missing 3/8''s anchors on each side of front door opening 3. Cant see screw for king truss in garage front hip, marked on print 4. Front entry Lid needs to be removed Stopped inspection did not check engineering 2/21/2024 - PREVIOUS INSPECTION NOTES 1. Bottom plate not flush to slab, marked on print 2. 2x4s same location cut short in load bearing exterior wall marked on print 3. Missing anchors per anchor layout Stopped inspection not ready | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/26/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 2/26/24 Make all repaires before calling in re-inspection, stopped inspection 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 1. Missing page WS-S2 2. Missing 3/8''s anchors on each side of front door opening 3. Cant see screw for king truss in garage front hip, marked on print 4. Front entry Lid needs to be removed Stopped inspection did not check engineering 2/21/2024 - PREVIOUS INSPECTION NOTES 1. Bottom plate not flush to slab, marked on print 2. 2x4s same location cut short in load bearing exterior wall marked on print 3. Missing anchors per anchor layout Stopped inspection not ready | |||
| ELECTRIC-TUG | 02/26/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 1:40pm | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/23/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 2/23/24 1. Missing page WS-S2 2. Missing 3/8''s anchors on each side of front door opening 3. Cant see screw for king truss in garage front hip, marked on print 4. Front entry Lid needs to be removed Stopped inspection did not check engineering 2/21/2024 - PREVIOUS INSPECTION NOTES 1. Bottom plate not flush to slab, marked on print 2. 2x4s same location cut short in load bearing exterior wall marked on print 3. Missing anchors per anchor layout Stopped inspection not ready | |||
| WALL SHEATHING | 02/23/2024 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/23/2024 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 02/22/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 2/21/2024 - PREVIOUS INSPECTION NOTES Joints have been taped remove tape to check nailling pattern | |||
| ROOF SHEATHING | 02/22/2024 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 02/22/2024 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 02/21/2024 | Disapproved - NO FEE | MKRASKI |
| Note: Joints have been taped remove tape to check nailling pattern | |||
| ROOF SHEATHING | 02/21/2024 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/21/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Bottom plate not flush to slab, marked on print 2. 2x4s same location cut short in load bearing exterior wall marked on print 3. Missing anchors per anchor layout Stopped inspection not ready | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/09/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/08/2024 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 02/08/2024 | APPROVED | JSTEWART |
| Note: 2/7/2024 - PREVIOUS INSPECTION NOTES 2/7/24: * Dirt cave in at left front corner & left side footer needs to be cleaned out. | |||
| MONOLITHIC SLAB | 02/07/2024 | Disapproved - NO FEE | RSIMS |
| Note: 2/7/24: * Dirt cave in at left front corner & left side footer needs to be cleaned out. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/05/2024 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 02/05/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/11/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/28/2024 | 03/04/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/09/2024 | 02/09/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/08/2024 | 02/08/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/25/2024 | 01/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/25/2024 | 01/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/25/2024 | 01/25/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 01/08/2024 | 01/08/2024 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM CONTRACTOR LICENSE # INCORRECT FOR FOCUS HOMES | |||
| BADMIN | INFORMATION | 01/08/2024 | 01/08/2024 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM CONTRACTOR LICENSE # INCORRECT FOR FOCUS HOMES. CONTRACTOR LICENSE # PROVIDED IS FOR MARONDA HOMES, NOT FOR FOCUS | |||
| BADMIN | INFORMATION | 01/08/2024 | 01/08/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator | |||
| BADMIN | INFORMATION | 01/08/2024 | 01/08/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator | |||
| BADMIN | INFORMATION | 01/05/2024 | 01/05/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM a new permit application (signed and notarized) must be submitted with the new deed | |||
| ZON | COMPLETE | 12/20/2023 | 12/20/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/12/2023 | 12/19/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/12/2023 | 12/18/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/12/2023 | 12/14/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/12/2023 | 12/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/12/2023 | 12/13/2023 |
| LOCATE | COMPLETE | 12/12/2023 | 12/14/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/12/2023 | 12/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/12/2023 | 12/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/12/2023 | 12/13/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Color sheet : Shark fin LRV is incorrect it shows as 38. please correct the color page. Material shows as stucco but elevation proposes siding. | |||
| BADMIN | COMPLETE | 12/12/2023 | 12/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/12/2023 | 01/31/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/22/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 05/22/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 05/22/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 05/22/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 05/22/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 05/22/2024 |
| REINSPECTION FEE | ¤40.00 | 05/22/2024 |
| SURCHARGE FS 533.721 | ¤6.65 | 12/21/2023 |
| SURCHARGE - FS 468.631 | ¤9.97 | 12/21/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/21/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/21/2023 |
| SW ENG PRE APRON | ¤30.00 | 12/21/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/21/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/21/2023 |
| SEWER CREDIT | (¤1,147.00) | 12/21/2023 |
| SEWER INSPECTION | ¤25.00 | 12/21/2023 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 12/21/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 12/21/2023 |
| SITE PLAN 30 | ¤30.00 | 12/21/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 12/21/2023 |
| IMPACT FEE FIRE | ¤428.09 | 12/21/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/21/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/21/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 12/21/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/21/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 12/21/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/21/2023 |
| CONNECTION FEES | ¤1,187.26 | 12/21/2023 |
| WATER- TURN ON | ¤25.00 | 12/21/2023 |
| ADJUSTMENT 50% | (¤664.52) | 12/21/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/21/2023 |
| INSPECTION - RESIDENTIAL | ¤1,012.00 | 12/21/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤287.04 | 12/21/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,961.02 |