Permit #2023120463

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00290-0210
CONDITIONED SPACE: 2052 sqft
GARAGE: 407 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
Total Square Footage: 2475 sqft
Block: 00290
Subdivision: 2191 - SECTION 23-WYNNFIELD
Job Phone: 904-268-7730
Location Address: 38 WHITE STAR DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/21/2023
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: FOCUS HOMES, LLC

Address

5220 SHAD RD

JACKSONVILLE, FL 32257

Lot: 0210
Contracted Stated Job Value: ¤210,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

FOCUS HOMES LLC OF FLORIDA
Status Location Address Mailing Address State License Number Phone
ACTIVE

5220 SHAD RD

JACKSONVILLE, FL 32257

# 202

JACKSONVILLE, FL 32257

CRC1332443 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
DANA SUE COOLEY
Status Location Address State License Number Phone
INACTIVE

PO BOX 1718

FLAGLER BEACH, FL 32136

CCC1333449 (Exp: 08/31/2026) 904-535-1680

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/23/2024 FINAL APPROVED AGAETANO
Note: 5/22/2024 - PREVIOUS INSPECTION NOTES 05-22-2024 Doors locked. Need access for inspection. 05-20-2024 notes not addressed. 5/20/2024 - PREVIOUS INSPECTION NOTES 5/20/24 Previous items not all repaired 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Range vent requires two points of attachment (screws and tape) 3. Disposal and dishwasher are not labeled properly in panel 5/17/2024 - PREVIOUS INSPECTION NOTES 05-17-2024 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Approved drawings not on site. 3. Anti tilt for stove not installed. Not ready for inspection.
BLD - BUILDING FINAL 05/22/2024 Disapproved - NO FEE AGAETANO
Note: 05-22-2024 Doors locked. Need access for inspection. 05-20-2024 notes not addressed. 5/20/2024 - PREVIOUS INSPECTION NOTES 5/20/24 Previous items not all repaired 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Range vent requires two points of attachment (screws and tape) 3. Disposal and dishwasher are not labeled properly in panel 5/17/2024 - PREVIOUS INSPECTION NOTES 05-17-2024 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Approved drawings not on site. 3. Anti tilt for stove not installed. Not ready for inspection.
U-CROSS CONNECTION 05/22/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/22/2024 11:24:14 AM *** no irr-no cross connection 5/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/17/2024 11:39:27 AM *** correction-irrigation meter in pit -irrigatin/landscape not yet installed-reschedule once all completed Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection
ROW - FINAL APRON (AFTER POUR) 05/21/2024 CANCELLED BY APPLICANT WEB
ROW - STORMWATER FINAL 05/21/2024 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 05/21/2024 CANCELLED BY APPLICANT WEB
Note: 5/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/17/2024 11:40:23 AM *** lower sewerclean out flush to sod when sod is installed Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection
U -UTILITY RESIDENTIAL FINAL 05/20/2024 FINAL APPROVED LFITZGERALD
Note: New inspection due to canceled inspection 5/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/17/2024 11:40:23 AM *** lower sewerclean out flush to sod when sod is installed Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection
ROW - STORMWATER FINAL 05/20/2024 APPROVED TPOLACEK
Note: 05/20/24 TPOLACEK*** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL APRON (AFTER POUR) 05/20/2024 APPROVED - AS NOTED TPOLACEK
Note: 05/20/24 TPOLACEK*** THERE ARE SEVERAL SPIDER CRACKS THROUGHOUT THE DRIVEWAU THAT I RECOMMEND BE SEALED. PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL APRON (AFTER POUR) 05/20/2024 CANCELLED BY APPLICANT WEB
ROW - STORMWATER FINAL 05/20/2024 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 05/20/2024 Disapproved -FEE REQUIRED MKRASKI
Note: 5/20/24 Previous items not all repaired 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Range vent requires two points of attachment (screws and tape) 3. Disposal and dishwasher are not labeled properly in panel 5/17/2024 - PREVIOUS INSPECTION NOTES 05-17-2024 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Approved drawings not on site. 3. Anti tilt for stove not installed. Not ready for inspection.
BLD - BUILDING FINAL 05/17/2024 Disapproved - NO FEE AGAETANO
Note: 05-17-2024 1. Laundry room receptacle WD not GFCI protected. Hot Neutral reversed. 2. Approved drawings not on site. 3. Anti tilt for stove not installed. Not ready for inspection.
U-CROSS CONNECTION 05/17/2024 Disapproved - NO FEE LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 11:39:27 AM *** correction-irrigation meter in pit -irrigatin/landscape not yet installed-reschedule once all completed Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection
U -UTILITY RESIDENTIAL FINAL 05/17/2024 Disapproved -FEE REQUIRED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 11:40:23 AM *** lower sewerclean out flush to sod when sod is installed Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/16/2024 APPROVED TPOLACEK
Note: 5/15/2024 - PREVIOUS INSPECTION NOTES 05/15/24 TPOLACEK** RECIEVED TEXT FROM DOYLE TO PLEASE CANCEL AS HE IS UPLOADING THE CORRECT SURVEY AND WILL RESUBMIT REQUEST FOR NEW SURVEY. Inspector Notes from Inspection 9270 *** NOTES ADDED BY TPOLACEK 5/3/2024 10:39:46 AM *** Spoke with James on site and explained right side driveway form needs to come up so driveway is not back pitched, side walk needs to be 36" minimum throughout AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING 5/2/2024 - PREVIOUS INSPECTION NOTES 05/02/24 MITERED END BOARD IS TOO FAR FROM CULVERT. MAX DISTANCE IS 6" FROM PIPE YOU HAVE 10" ON THE RIGHT SIDE. SIDEWALK IS STILL 35" AT DRIVEWAY MUST BE 36" MINIMUM. CULVER PIPE SHOULD BE BURIED 1/2 WAY AND PACKED. WHEN PIPE WAS MOVED IT WAS NOT REPACKED AFTER LAST INSPECTION. ------------------------------------------------------------------------------------------------------------------------------ 5/1/2024 - PREVIOUS INSPECTION NOTES 05/01/24 CULVERT MITERED ENDS ARE TOO FAR OFFSET. PIPE NEEDS TO SLIDE LEFT SO THERE IS A MAXIMUM OF 18" FROM EDGE OF DRIVEWAY TO TOP MITER CUT. PLEASE DOUBLE CHECK PIPE ELEVATION AFTER PIPE IS MOVED. NEED TO MOVE SIDEWALK FORM BOARD TO GET 36" WIDE PER ADA REQUIRMENTS.
ROW FIELD SURVEY /GRADING CERTIFICATION 05/16/2024 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/15/2024 CANCELLED BY APPLICANT TPOLACEK
Note: 05/15/24 TPOLACEK** RECIEVED TEXT FROM DOYLE TO PLEASE CANCEL AS HE IS UPLOADING THE CORRECT SURVEY AND WILL RESUBMIT REQUEST FOR NEW SURVEY. Inspector Notes from Inspection 9270 *** NOTES ADDED BY TPOLACEK 5/3/2024 10:39:46 AM *** Spoke with James on site and explained right side driveway form needs to come up so driveway is not back pitched, side walk needs to be 36" minimum throughout AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING 5/2/2024 - PREVIOUS INSPECTION NOTES 05/02/24 MITERED END BOARD IS TOO FAR FROM CULVERT. MAX DISTANCE IS 6" FROM PIPE YOU HAVE 10" ON THE RIGHT SIDE. SIDEWALK IS STILL 35" AT DRIVEWAY MUST BE 36" MINIMUM. CULVER PIPE SHOULD BE BURIED 1/2 WAY AND PACKED. WHEN PIPE WAS MOVED IT WAS NOT REPACKED AFTER LAST INSPECTION. ------------------------------------------------------------------------------------------------------------------------------ 5/1/2024 - PREVIOUS INSPECTION NOTES 05/01/24 CULVERT MITERED ENDS ARE TOO FAR OFFSET. PIPE NEEDS TO SLIDE LEFT SO THERE IS A MAXIMUM OF 18" FROM EDGE OF DRIVEWAY TO TOP MITER CUT. PLEASE DOUBLE CHECK PIPE ELEVATION AFTER PIPE IS MOVED. NEED TO MOVE SIDEWALK FORM BOARD TO GET 36" WIDE PER ADA REQUIRMENTS.
U-CROSS CONNECTION 05/13/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/13/2024 11:19:50 AM *** no irr-no cross connection
ROW- PRE-APRON (PRE-POUR) 05/03/2024 APPROVED - AS NOTED TPOLACEK
Note: *** NOTES ADDED BY TPOLACEK 5/3/2024 10:39:46 AM *** Spoke with James on site and explained right side driveway form needs to come up so driveway is not back pitched, side walk needs to be 36" minimum throughout AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING 5/2/2024 - PREVIOUS INSPECTION NOTES 05/02/24 MITERED END BOARD IS TOO FAR FROM CULVERT. MAX DISTANCE IS 6" FROM PIPE YOU HAVE 10" ON THE RIGHT SIDE. SIDEWALK IS STILL 35" AT DRIVEWAY MUST BE 36" MINIMUM. CULVER PIPE SHOULD BE BURIED 1/2 WAY AND PACKED. WHEN PIPE WAS MOVED IT WAS NOT REPACKED AFTER LAST INSPECTION. ------------------------------------------------------------------------------------------------------------------------------ 5/1/2024 - PREVIOUS INSPECTION NOTES 05/01/24 CULVERT MITERED ENDS ARE TOO FAR OFFSET. PIPE NEEDS TO SLIDE LEFT SO THERE IS A MAXIMUM OF 18" FROM EDGE OF DRIVEWAY TO TOP MITER CUT. PLEASE DOUBLE CHECK PIPE ELEVATION AFTER PIPE IS MOVED. NEED TO MOVE SIDEWALK FORM BOARD TO GET 36" WIDE PER ADA REQUIRMENTS.
ROW- PRE-APRON (PRE-POUR) 05/02/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 05/02/24 MITERED END BOARD IS TOO FAR FROM CULVERT. MAX DISTANCE IS 6" FROM PIPE YOU HAVE 10" ON THE RIGHT SIDE. SIDEWALK IS STILL 35" AT DRIVEWAY MUST BE 36" MINIMUM. CULVER PIPE SHOULD BE BURIED 1/2 WAY AND PACKED. WHEN PIPE WAS MOVED IT WAS NOT REPACKED AFTER LAST INSPECTION. ------------------------------------------------------------------------------------------------------------------------------ 5/1/2024 - PREVIOUS INSPECTION NOTES 05/01/24 CULVERT MITERED ENDS ARE TOO FAR OFFSET. PIPE NEEDS TO SLIDE LEFT SO THERE IS A MAXIMUM OF 18" FROM EDGE OF DRIVEWAY TO TOP MITER CUT. PLEASE DOUBLE CHECK PIPE ELEVATION AFTER PIPE IS MOVED. NEED TO MOVE SIDEWALK FORM BOARD TO GET 36" WIDE PER ADA REQUIRMENTS.
ROW- PRE-APRON (PRE-POUR) 05/01/2024 Disapproved - NO FEE TPOLACEK
Note: 05/01/24 CULVERT MITERED ENDS ARE TOO FAR OFFSET. PIPE NEEDS TO SLIDE LEFT SO THERE IS A MAXIMUM OF 18" FROM EDGE OF DRIVEWAY TO TOP MITER CUT. PLEASE DOUBLE CHECK PIPE ELEVATION AFTER PIPE IS MOVED. NEED TO MOVE SIDEWALK FORM BOARD TO GET 36" WIDE PER ADA REQUIRMENTS.
ELECTRIC - EARLY POWER 04/18/2024 APPROVED AGAETANO
Note: 4/17/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2200 Emailed FPL @ 1:40pm 04-17-2024 No ufer ground for eletrical panel and p-ring missing for access
ELECTRIC - EARLY POWER 04/17/2024 Disapproved - NO FEE AGAETANO
Note: Inspector Notes from Inspection 2200 Emailed FPL @ 1:40pm 04-17-2024 No ufer ground for eletrical panel and p-ring missing for access
SEWER TIE IN 04/11/2024 CANCELLED BY APPLICANT WEB
SEWER TIE IN 04/09/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
PEP TANK INSTALLATION REQUEST 03/18/2024 APPROVED CBOWERMASTER
INSULATION 03/15/2024 APPROVED MKRASKI
INSULATION 03/14/2024 Disapproved - NO FEE MKRASKI
Note: 1, Hole in top plate by AHU needs fire stop 2. Fire stop above eletrcial panel needs to seal 100%
LATH/BRICK/ WATER BARRIER 03/12/2024 APPROVED MKRASKI
ALL ROUGH 03/12/2024 APPROVED MKRASKI
LATH/BRICK/ WATER BARRIER 03/11/2024 Disapproved - NO FEE MKRASKI
Note: 1. Tape required around SGD 2. Silt fence needs to be repaired before re-inspection
ALL ROUGH 03/11/2024 Disapproved -FEE REQUIRED MKRASKI
Note: 3/11/24 No repairs made. All repairs must be made before calling in re-inspection, also silt fence needs to be repaired by re-inspection 3/8/2024 - PREVIOUS INSPECTION NOTES 1. No ufer ground for eletrical panel and p-ring missing for access 2. Master bathroom missing studs in wall 3. E-cals show two drops in master bathroom Stopped inspection not ready
LATH/BRICK/ WATER BARRIER 03/08/2024 Disapproved - NO FEE MKRASKI
Note: 1. Power feeding a/c needs to be sealed at wall sheathing 2. Hose bib by ODU needs ro be sealed at wall sheathing
ALL ROUGH 03/08/2024 Disapproved - NO FEE MKRASKI
Note: 1. No ufer ground for eletrical panel and p-ring missing for access 2. Master bathroom missing studs in wall 3. E-cals show two drops in master bathroom Stopped inspection not ready
ROOF VALLEY & METAL 02/29/2024 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/27/2024 APPROVED - AS NOTED MKRASKI
Note: 2/27/24 Page WS-S2 is not a page per super, Need a revision to plans showing the typo on plans. Check on all rough 2/26/2024 - PREVIOUS INSPECTION NOTES 2/26/24 Make all repaires before calling in re-inspection, stopped inspection 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 1. Missing page WS-S2 2. Missing 3/8''s anchors on each side of front door opening 3. Cant see screw for king truss in garage front hip, marked on print 4. Front entry Lid needs to be removed Stopped inspection did not check engineering 2/21/2024 - PREVIOUS INSPECTION NOTES 1. Bottom plate not flush to slab, marked on print 2. 2x4s same location cut short in load bearing exterior wall marked on print 3. Missing anchors per anchor layout Stopped inspection not ready
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/26/2024 Disapproved -FEE REQUIRED MKRASKI
Note: 2/26/24 Make all repaires before calling in re-inspection, stopped inspection 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 1. Missing page WS-S2 2. Missing 3/8''s anchors on each side of front door opening 3. Cant see screw for king truss in garage front hip, marked on print 4. Front entry Lid needs to be removed Stopped inspection did not check engineering 2/21/2024 - PREVIOUS INSPECTION NOTES 1. Bottom plate not flush to slab, marked on print 2. 2x4s same location cut short in load bearing exterior wall marked on print 3. Missing anchors per anchor layout Stopped inspection not ready
ELECTRIC-TUG 02/26/2024 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 1:40pm
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/23/2024 Disapproved -FEE REQUIRED MKRASKI
Note: 2/23/24 1. Missing page WS-S2 2. Missing 3/8''s anchors on each side of front door opening 3. Cant see screw for king truss in garage front hip, marked on print 4. Front entry Lid needs to be removed Stopped inspection did not check engineering 2/21/2024 - PREVIOUS INSPECTION NOTES 1. Bottom plate not flush to slab, marked on print 2. 2x4s same location cut short in load bearing exterior wall marked on print 3. Missing anchors per anchor layout Stopped inspection not ready
WALL SHEATHING 02/23/2024 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/23/2024 CANCELLED BY APPLICANT WEB
WALL SHEATHING 02/22/2024 CANCELLED BY APPLICANT WEB
Note: 2/21/2024 - PREVIOUS INSPECTION NOTES Joints have been taped remove tape to check nailling pattern
ROOF SHEATHING 02/22/2024 CANCELLED BY APPLICANT WEB
WALL SHEATHING 02/22/2024 CANCELLED BY APPLICANT WEB
WALL SHEATHING 02/21/2024 Disapproved - NO FEE MKRASKI
Note: Joints have been taped remove tape to check nailling pattern
ROOF SHEATHING 02/21/2024 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/21/2024 Disapproved - NO FEE MKRASKI
Note: 1. Bottom plate not flush to slab, marked on print 2. 2x4s same location cut short in load bearing exterior wall marked on print 3. Missing anchors per anchor layout Stopped inspection not ready
FOUND SURVEY APPROVED (OFFICE) 02/09/2024 APPROVED TBAKER
MONOLITHIC SLAB 02/08/2024 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 02/08/2024 APPROVED JSTEWART
Note: 2/7/2024 - PREVIOUS INSPECTION NOTES 2/7/24: * Dirt cave in at left front corner & left side footer needs to be cleaned out.
MONOLITHIC SLAB 02/07/2024 Disapproved - NO FEE RSIMS
Note: 2/7/24: * Dirt cave in at left front corner & left side footer needs to be cleaned out.
PLUMBING 1ST ROUGH UNDERGROUND 02/05/2024 APPROVED MGIBSON
GRAVITY SEWER TEST 02/05/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/11/2024 APPROVED BVITALE

Review History

Department Status Date In Date Out
BLD COMPLETE 02/28/2024 03/04/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/09/2024 02/09/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/08/2024 02/08/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/25/2024 01/26/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 01/25/2024 01/26/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/25/2024 01/25/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 01/08/2024 01/08/2024
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM CONTRACTOR LICENSE # INCORRECT FOR FOCUS HOMES
BADMIN INFORMATION 01/08/2024 01/08/2024
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM CONTRACTOR LICENSE # INCORRECT FOR FOCUS HOMES. CONTRACTOR LICENSE # PROVIDED IS FOR MARONDA HOMES, NOT FOR FOCUS
BADMIN INFORMATION 01/08/2024 01/08/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
BADMIN INFORMATION 01/08/2024 01/08/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
BADMIN INFORMATION 01/05/2024 01/05/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM a new permit application (signed and notarized) must be submitted with the new deed
ZON COMPLETE 12/20/2023 12/20/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 12/12/2023 12/19/2023
Note: Released By: JPI
CUSVC COMPLETE 12/12/2023 12/18/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 12/12/2023 12/14/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/12/2023 12/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 12/12/2023 12/13/2023
LOCATE COMPLETE 12/12/2023 12/14/2023
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 12/12/2023 12/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 12/12/2023 12/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 12/12/2023 12/13/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Color sheet : Shark fin LRV is incorrect it shows as 38. please correct the color page. Material shows as stucco but elevation proposes siding.
BADMIN COMPLETE 12/12/2023 12/20/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 12/12/2023 01/31/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 05/22/2024
REINSPECTION RESIDENTIAL ¤40.00 05/22/2024
REINSPECTION RESIDENTIAL ¤40.00 05/22/2024
REINSPECTION RESIDENTIAL ¤40.00 05/22/2024
CONTRACTOR CHANGE ¤20.00 05/22/2024
CONTRACTOR CHANGE ¤20.00 05/22/2024
CONTRACTOR CHANGE ¤20.00 05/22/2024
CONTRACTOR CHANGE ¤20.00 05/22/2024
SW ENG REINSPECTION 30 ¤30.00 05/22/2024
REINSPECTION FEE ¤40.00 05/22/2024
SURCHARGE FS 533.721 ¤6.65 12/21/2023
SURCHARGE - FS 468.631 ¤9.97 12/21/2023
SW ENG - FOUNDATION SURVEY ¤20.00 12/21/2023
SW ENG INSPECTION 80 ¤80.00 12/21/2023
SW ENG PRE APRON ¤30.00 12/21/2023
SW ENG - REVIEW 20 ¤20.00 12/21/2023
SW ENG RES REVIEW 200 ¤200.00 12/21/2023
SEWER CREDIT (¤1,147.00) 12/21/2023
SEWER INSPECTION ¤25.00 12/21/2023
SEWER CAPITAL FACILITY ¤5,441.03 12/21/2023
WATER CAPITAL FACILITY FEE ¤3,994.51 12/21/2023
SITE PLAN 30 ¤30.00 12/21/2023
FC IMPACT FEE EMS ¤62.00 12/21/2023
IMPACT FEE FIRE ¤428.09 12/21/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/21/2023
FC IMPACT FEE LIBRARY ¤268.00 12/21/2023
IMPACT FEE PARKS ¤1,800.99 12/21/2023
IMPACT FEE SCHOOL ¤5,450.00 12/21/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 12/21/2023
WATER -IRRIGATION INSPECTION ¤25.00 12/21/2023
CONNECTION FEES ¤1,187.26 12/21/2023
WATER- TURN ON ¤25.00 12/21/2023
ADJUSTMENT 50% (¤664.52) 12/21/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/21/2023
INSPECTION - RESIDENTIAL ¤1,012.00 12/21/2023
PLAN REVIEW - RESIDENTIAL ¤287.04 12/21/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,961.02