I want to search for...
Permit #2023120503
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00080-0480 |
| CONDITIONED SPACE: 2495 sqft |
| GARAGE: 470 sqft |
| OPENED PORCH (WITH ROOF) : 158 sqft |
| OPENED PORCH (WITH ROOF) : 83 sqft |
| Total Square Footage: 3206 sqft |
| Block: 00080 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 386-569-7882 |
| Location Address: 7 FORTUNE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/19/2024 |
| NOC: RECORDED |
| Applicant name: VLADIMIR V PEREPECHKIN |
| Owner: GEORGE LIASKOS |
|
Address 7 FORTUNE LANE PALM COAST, FL 32137 |
| Lot: 0480 |
| Contracted Stated Job Value: ¤450,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WISE CHOICE CUSTOM HOMES, INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
77 SOUTHLAKE DR PALM COAST, FL 32137 |
CRC1328738 (Exp: 08/31/2026) | 386-569-7882 |
Sub Contractors
ANDREW GONCALVES HOWARD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2 RYALL LANE PALM COAST, FL 32164 |
CCC1333989 (Exp: 08/31/2026) | 386-347-0366 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/08/2025 | FINAL APPROVED | HCAMACHO |
| ROW - STORMWATER FINAL | 01/07/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE TO HOT PATCH ------------------------------------------------------------ 12/6/2024 - PREVIOUS INSPECTION NOTES ** 12/06/24 BUILDER IS REQUIRED TO INSTALL A HOT ASPHALT ROAD REPAIR PATCH ACROSS THE ENTIRE APRON AS NOTED IN THE FIELD SURVEY CONDUCTED ON 12/05/24 SCHEDULE YOUR ROW STORMWATER FINAL ONCE YOUR HOT PATCH IS INSTALLED ____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 12/04/24 BUILDER NEEDS TO INSTALL A HOT PATCH ROAD REPAIR ACROSS THE ENTIRE EDGE OF THE DRIVEWAY APRON A MINIMUM OF 12" WIDE NOTE THE WHITE PAINT ON ROADWAY ON EITHER CORNER OF DRIVEWAY | |||
| ROW - STORMWATER FINAL | 12/06/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/06/24 BUILDER IS REQUIRED TO INSTALL A HOT ASPHALT ROAD REPAIR PATCH ACROSS THE ENTIRE APRON AS NOTED IN THE FIELD SURVEY CONDUCTED ON 12/05/24 SCHEDULE YOUR ROW STORMWATER FINAL ONCE YOUR HOT PATCH IS INSTALLED ____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 12/04/24 BUILDER NEEDS TO INSTALL A HOT PATCH ROAD REPAIR ACROSS THE ENTIRE EDGE OF THE DRIVEWAY APRON A MINIMUM OF 12" WIDE NOTE THE WHITE PAINT ON ROADWAY ON EITHER CORNER OF DRIVEWAY | |||
| ROW - FINAL APRON (AFTER POUR) | 12/06/2024 | APPROVED | EMADISON |
| Note: | |||
| U-CROSS CONNECTION | 12/05/2024 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 12/05/2024 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/04/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/04/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 12/04/24 BUILDER NEEDS TO INSTALL A HOT PATCH ROAD REPAIR ACROSS THE ENTIRE EDGE OF THE DRIVEWAY APRON A MINIMUM OF 12" WIDE NOTE THE WHITE PAINT ON ROADWAY ON EITHER CORNER OF DRIVEWAY | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/28/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/02/24 YOU HAVE SUBMITTED A SITE PLAN YOU NEED TO SUBMIT A FINAL SURVEY THE NEW FINAL SURVEY HAS PROPOSED ELEVATIONS CAN'T HAVE ANY PROPOSED ELEVATIONS ON THE FINAL SURVEY. ALSO YOU HAVE TO HAVE A COMMON SWALE ON THE RIGHT PROPERTY LINE DUE TO THE THE VACANT LOT. PER TECHINAL MANUAL 300.01 C8 The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation (Common Swale). --------------------------------------------------------------------------------------- 11/26/2024 - PREVIOUS INSPECTION NOTES STILL NEED A COMMON SWALE ON THE RIGHT ON THE VACANT 300.01 C8 The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation (Common Swale). ----------------------------------------------------------------------------- 11/8/2024 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY HAS PROPOSED ELEVATIONS CAN'T HAVE ANY PROPOSED ELEVATIONS ON THE FINAL SURVEY. ALSO YOU HAVE TO HAVE A COMMON SWALE ON THE RIGHT PROPERTY LINE DUE TO THE THE VACANT LOT. PER TECHINAL MANUAL 300.01 C8 The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation (Common Swale). --------------------------------------------------------------------------------------- 10/18/2024 - PREVIOUS INSPECTION NOTES ** 10/18/24 RIGHT SIDE BUILDER PROPOSED A COMMON SWALE ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. _____________________________________________________________________________________________________________________ 10/11/2024 - PREVIOUS INSPECTION NOTES City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/26/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED A COMMON SWALE ON THE RIGHT ON THE VACANT 300.01 C8 The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation (Common Swale). ----------------------------------------------------------------------------- 11/8/2024 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY HAS PROPOSED ELEVATIONS CAN'T HAVE ANY PROPOSED ELEVATIONS ON THE FINAL SURVEY. ALSO YOU HAVE TO HAVE A COMMON SWALE ON THE RIGHT PROPERTY LINE DUE TO THE THE VACANT LOT. PER TECHINAL MANUAL 300.01 C8 The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation (Common Swale). --------------------------------------------------------------------------------------- 10/18/2024 - PREVIOUS INSPECTION NOTES ** 10/18/24 RIGHT SIDE BUILDER PROPOSED A COMMON SWALE ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. _____________________________________________________________________________________________________________________ 10/11/2024 - PREVIOUS INSPECTION NOTES City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/08/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE NEW FINAL SURVEY HAS PROPOSED ELEVATIONS CAN'T HAVE ANY PROPOSED ELEVATIONS ON THE FINAL SURVEY. ALSO YOU HAVE TO HAVE A COMMON SWALE ON THE RIGHT PROPERTY LINE DUE TO THE THE VACANT LOT. PER TECHINAL MANUAL 300.01 C8 The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation (Common Swale). --------------------------------------------------------------------------------------- 10/18/2024 - PREVIOUS INSPECTION NOTES ** 10/18/24 RIGHT SIDE BUILDER PROPOSED A COMMON SWALE ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. _____________________________________________________________________________________________________________________ 10/11/2024 - PREVIOUS INSPECTION NOTES City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/18/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/18/24 RIGHT SIDE BUILDER PROPOSED A COMMON SWALE ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. _____________________________________________________________________________________________________________________ 10/11/2024 - PREVIOUS INSPECTION NOTES City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/11/2024 | Disapproved - NO FEE | EMADISON |
| Note: City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback | |||
| ELECTRIC - EARLY POWER | 09/19/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9am | |||
| ROW- PRE-APRON (PRE-POUR) | 08/12/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/12/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| GRAVITY SEWER TEST | 07/23/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 07/23/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 07/19/2024 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 1. Feeder wire from the meter can to the interior sub panel for 200 amp service is to be a minimum of 4/0 aluminum or 2/0 copper. 3/0 has been used. NEC 310.16 2. Bathroom exhaust fan duct is to be a minimum of 4". FBCM 1506.2 | |||
| ALL ROUGH | 07/17/2024 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Feeder wire from the meter can to the interior sub panel for 200 amp service is to be a minimum of 4/0 aluminum or 2/0 copper. 3/0 has been used. NEC 310.16 2. Bathroom exhaust fan duct is to be a minimum of 4". FBCM 1506.2 | |||
| LATH/BRICK/ WATER BARRIER | 06/20/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY JSTEWART 5/17/2024 1:58:36 PM *** previous notes rectified....Please submit the truss repair paperwork to the city. (inspector verified Paperwork and repair) please submit prior to next inspection. Inspector Notes from Inspection 2467 please reestablish silt fence by next inspection COPC LDC 9.04.06, FBC 3307.1 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/17/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 5/17/2024 1:58:36 PM *** previous notes rectified....Please submit the truss repair paperwork to the city. (inspector verified Paperwork and repair) please submit prior to next inspection. Inspector Notes from Inspection 2467 please reestablish silt fence by next inspection COPC LDC 9.04.06, FBC 3307.1 | |||
| ROOF VALLEY & METAL | 05/10/2024 | APPROVED - AS NOTED | LMILLER |
| Note: please reestablish silt fence by next inspection COPC LDC 9.04.06, FBC 3307.1 | |||
| WALL SHEATHING | 05/03/2024 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/26/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 4/26/24- Missing SP2's at left rear porch wall at TP to stud. Nails in straps at SGD right side. Missing anchors at BP at framed bearing walls Please submit fix letter for A06 broken truss. Plans call for threaded rod system page 6 detail 2F. Please install per plan or obtain a engineering letter for Bottom plate anchors used and submit to the city for approval. | |||
| ROOF VALLEY & METAL | 04/26/2024 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 03/12/2024 | APPROVED | AGAETANO |
| Note: 3/8/2024 - PREVIOUS INSPECTION NOTES missing dowil (marked on plan) | |||
| TIE BEAM / LINTEL | 03/08/2024 | Disapproved - NO FEE | LMILLER |
| Note: missing dowil (marked on plan) | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/06/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/23/2024 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/21/2024 | APPROVED | AGAETANO |
| WATER METER INSTALLATION REQUEST | 02/08/2024 | APPROVED | BVITALE |
| WILDLIFE CHECK - ENVIRONMENTAL | 12/14/2023 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/12/2024 | 11/21/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/12/2024 | 11/13/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 11/12/2024 | 11/12/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/19/2024 | 09/24/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/20/2024 | 05/23/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/22/2024 | 03/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/05/2024 | 03/05/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/16/2024 | 01/18/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/11/2024 | 01/11/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 01/09/2024 | 01/11/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need switch in bathroom by exterior door for outside light. NEC 2017 210.70 | |||
| ZON | HOLD | 01/09/2024 | 01/09/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Color sheet must state that siding color will be same color as stucco. Can only have one body color. | |||
| SWALE | COMPLETE | 12/14/2023 | 01/31/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/14/2023 | 12/19/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/14/2023 | 12/20/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 12/14/2023 | 12/15/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need switch in bathroom by exterior door for outside light. NEC 2017 210.70 | |||
| ENGIN1 | COMPLETE | 12/14/2023 | 12/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/14/2023 | 12/14/2023 |
| LOCATE | COMPLETE | 12/14/2023 | 12/18/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/14/2023 | 12/14/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/14/2023 | 12/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/14/2023 | 12/14/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad is encroaching in the 5ft easement Please check a box for accent colors on color sheet Color sheet must state that siding color will be same color as stucco. Can only have one body color. | |||
| BADMIN | COMPLETE | 12/14/2023 | 12/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 12/14/2023 | 12/14/2023 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 12/14/23 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/08/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/08/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/19/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/19/2024 |
| SEWER CREDIT | (¤850.00) | 01/19/2024 |
| SEWER INSPECTION | ¤25.00 | 01/19/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 01/19/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 01/19/2024 |
| SITE PLAN 30 | ¤30.00 | 01/19/2024 |
| CONNECTION FEES | ¤1,187.26 | 01/19/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 01/19/2024 |
| IMPACT FEE FIRE | ¤428.09 | 01/19/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/19/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/19/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 01/19/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/19/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 01/19/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/19/2024 |
| SURCHARGE FS 533.721 | ¤4.67 | 01/19/2024 |
| SURCHARGE - FS 468.631 | ¤7.01 | 01/19/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/19/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/19/2024 |
| SW ENG PRE APRON | ¤30.00 | 01/19/2024 |
| WATER- TURN ON | ¤25.00 | 01/19/2024 |
| ADJUSTMENT 50% | (¤825.14) | 01/19/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/19/2024 |
| INSPECTION - RESIDENTIAL | ¤1,262.25 | 01/19/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤358.02 | 01/19/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,156.19 |