I want to search for...
Permit #2023120532
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0930 |
| CONDITIONED SPACE: 3054 sqft |
| GARAGE: 478 sqft |
| OPENED PORCH (WITH ROOF) : 395 sqft |
| OPENED PORCH (WITH ROOF) : 29 sqft |
| Total Square Footage: 3956 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-236-4133 |
| Location Address: 14 BLUE OAK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/29/2024 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: VOLUSIA RESIDENTIAL CONSTRUCTION LLC |
|
Address 2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
| Lot: 0930 |
| Contracted Stated Job Value: ¤323,148.00 |
| Job Description: Single family residence |
| Type: CN |
Contractor
VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1262114 (Exp: 08/31/2026) | 386-236-4133 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
EDWARD DOUGLAS TENNANT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE ST. AUGUSTINE , FL 32092 |
CAC1813372 (Exp: 08/31/2026) | (904)829-8898 | (904)829-6587 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
HUGH MACDONALD
| Status | Location Address | State License Number |
| INACTIVE |
10825 TOM FOLSOM ROAD, SUITE A THONOTOSASSA, FL 33592 |
CCC1329562 (Exp: 08/31/2024) |
Inspection History
| Type | Request Date | Result | Inspector |
| ELEVATION CERTIFICATE-FINAL APPROVAL | 12/27/2024 | APPROVED | JMYERS |
| BLD - BUILDING FINAL | 12/27/2024 | FINAL APPROVED | KSANDOE |
| U -UTILITY RESIDENTIAL FINAL | 12/27/2024 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 reuse water for irr. no cc | |||
| U-CROSS CONNECTION | 12/26/2024 | APPROVED - AS NOTED | BWRIGHT |
| Note: reuse water for irr. no cc | |||
| ROW - FINAL APRON (AFTER POUR) | 12/20/2024 | APPROVED | FSLADISH |
| Note: 12/20/24 PAVERS GLUED. NO CHIPPED, CRACKED, OR BROKEN PAVERS OBSERVED BY THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/20/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/20/2024 | APPROVED | FSLADISH |
| Note: 12/20/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 12/20/2024 | APPROVED | FSLADISH |
| Note: 12/20/24 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/16/2024 | APPROVED | FSLADISH |
| Note: 12/16/24 YOU ARE APPRIVED TO POUR YOUR SIDEWALK AT THE TIME OF THIS INSPECTION. BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/25/2024 | APPROVED | FSLADISH |
| Note: 11/25/24 You are approved to lay your pavers at the time of this inspection. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9271 11/1/24 AFTER I RESULTED THIS INSPECTION CM ARRIVED AND I DETERMINED THAT DUE TO THE PAVER DETAIL IN THE SYSTEM WITH OPTION I WILL PARTIALLY APPROVE THIS INSPECTION TO POUR DRIVEWAY APRON AND PAVER RESTRAINT. BUILDER WILL NEED TO REVISE SITE PLAN SHOWING PAVER DRIVEWAY. ALSO A SECONDARY PREPOUR WILL BE CREATED AFTER PAVER DRIVEWAY IS COPLETED FOR THE SIDEWALK AS IT WILL NOT BE POURED AT THE TIME OF THIS PREPOUR INSPECTION.. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS. | |||
| ELECTRIC - EARLY POWER | 11/25/2024 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2200 Release Power | |||
| ROW- PRE-APRON (PRE-POUR) | 11/01/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 11/1/24 YOUR SITE PLAN SHOWS A CONCRETE DRIVEWAY WITH A SIDEWALK. UPON WALKING SITE YOU ARE SET UP TO DO A PAVER FRIVEWAY AND THE LEFT HAND SIDE SIDEWALK IS NOT FORMED UP TO POUR AT THE TIME OF THIS INSPECTION. YOU WILL NEED TO REVISE YOUR SITE PLAN TO INDICATE PAVER DRIVEWAY AND ADD A PAVER DETAIL SHEET INDICATING WHICH OPTION YOU INTEND TO USE. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/01/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 11/1/24 AFTER I RESULTED THIS INSPECTION CM ARRIVED AND I DETERMINED THAT DUE TO THE PAVER DETAIL IN THE SYSTEM WITH OPTION I WILL PARTIALLY APPROVE THIS INSPECTION TO POUR DRIVEWAY APRON AND PAVER RESTRAINT. BUILDER WILL NEED TO REVISE SITE PLAN SHOWING PAVER DRIVEWAY. ALSO A SECONDARY PREPOUR WILL BE CREATED AFTER PAVER DRIVEWAY IS COPLETED FOR THE SIDEWALK AS IT WILL NOT BE POURED AT THE TIME OF THIS PREPOUR INSPECTION.. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS. 11/1/2024 - PREVIOUS INSPECTION NOTES 11/1/24 YOUR SITE PLAN SHOWS A CONCRETE DRIVEWAY WITH A SIDEWALK. UPON WALKING SITE YOU ARE SET UP TO DO A PAVER FRIVEWAY AND THE LEFT HAND SIDE SIDEWALK IS NOT FORMED UP TO POUR AT THE TIME OF THIS INSPECTION. | |||
| ROW- PAVER RESTRAINTS | 11/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/1/24 AFTER I RESULTED THIS INSPECTION CM ARRIVED AND I DETERMINED THAT DUE TO THE PAVER DETAIL IN THE SYSTEM WITH OPTION I WILL PARTIALLY APPROVE THIS INSPECTION TO POUR DRIVEWAY APRON AND PAVER RESTRAINT. BUILDER WILL NEED TO REVISE SITE PLAN SHOWING PAVER DRIVEWAY. ALSO A SECONDARY PREPOUR WILL BE CREATED AFTER PAVER DRIVEWAY IS COPLETED FOR THE SIDEWALK AS IT WILL NOT BE POURED AT THE TIME OF THIS PREPOUR INSPECTION.. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS. | |||
| INSULATION | 10/01/2024 | APPROVED | HCAMACHO |
| LATH/BRICK/ WATER BARRIER | 09/25/2024 | APPROVED | HCAMACHO |
| Note: See notes at Insulation Inspector Notes from Inspection 2420 9-23-24 1. Missing gaskets on return ducts. 2. Smoke alarm outside guest bath needs three feet of clerance. 3. Bathroom exhaust fans need two points of connection. | |||
| ALL ROUGH | 09/23/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9-23-24 1. Missing gaskets on return ducts. 2. Smoke alarm outside guest bath needs three feet of clerance. 3. Bathroom exhaust fans need two points of connection. | |||
| WALL SHEATHING | 09/20/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2340 7/8/2024 - PREVIOUS INSPECTION NOTES Right side wall. A door opening has been added. Plans do not show a door opening. Please submit a revision to the building department showing the newly added exterior door opening and lintel size. 7-30-24 1. Revision will be submitted for extra door. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/20/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2340 7/8/2024 - PREVIOUS INSPECTION NOTES Right side wall. A door opening has been added. Plans do not show a door opening. Please submit a revision to the building department showing the newly added exterior door opening and lintel size. 7-30-24 1. Revision will be submitted for extra door. | |||
| ROOF VALLEY & METAL | 09/20/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2340 7/8/2024 - PREVIOUS INSPECTION NOTES Right side wall. A door opening has been added. Plans do not show a door opening. Please submit a revision to the building department showing the newly added exterior door opening and lintel size. 7-30-24 1. Revision will be submitted for extra door. | |||
| ELEV CERT-FOUNDATION APPROVAL | 09/19/2024 | APPROVED - AS NOTED | JMYERS |
| Note: The Foundation elevation certificate has been approved. However, at Final, please only have comments in Section D that are relevant; ex. "Certificate contains 2 pages" is no longer accurate. | |||
| GRAVITY SEWER TEST | 09/05/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTRUAL INSPECTION | |||
| SEWER TIE IN | 09/05/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/04/2024 | APPROVED | TBAKER |
| ELECTRIC-TUG | 08/27/2024 | APPROVED - AS NOTED | KSANDOE |
| Note: Release Power | |||
| TIE BEAM / LINTEL | 07/30/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 7/8/2024 - PREVIOUS INSPECTION NOTES Right side wall. A door opening has been added. Plans do not show a door opening. Please submit a revision to the building department showing the newly added exterior door opening and lintel size. 7-30-24 1. Revision will be submitted for extra door. | |||
| TIE BEAM / LINTEL | 07/08/2024 | Disapproved - NO FEE | JWALKER |
| Note: Right side wall. A door opening has been added. Plans do not show a door opening. Please submit a revision to the building department showing the newly added exterior door opening and lintel size. | |||
| MONOLITHIC SLAB | 06/24/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/18/2024 | APPROVED | BTAYLOR |
| WATER METER INSTALLATION REQUEST | 06/05/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 12/27/2024 | 12/27/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLFM | CANCEL | 12/27/2024 | 12/27/2024 |
| PLFM | HOLD | 12/26/2024 | 12/27/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A9 b-e need to be 0 not N/A per the FEMA instructions, but A9f may remain N/A. | |||
| SW1 | COMPLETE | 12/04/2024 | 12/11/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/04/2024 | 12/09/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 12/04/2024 | 12/04/2024 |
| Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Please rename your files according to the file naming requirements. | |||
| ZON | COMPLETE | 12/04/2024 | 12/04/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 11/22/2024 | 12/04/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Revised site plan is missing proposed grades | |||
| SW1 | HOLD | 11/22/2024 | 12/04/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Revised site plan is missing proposed grades. | |||
| ZON | COMPLETE | 11/22/2024 | 11/22/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 09/18/2024 | 09/19/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. However, at Final, please only have comments in Section D that are relevant; ex. "Certificate contains 2 pages" is no longer accurate. | |||
| PLFM | HOLD | 09/12/2024 | 09/13/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM C1, the box for Finished Construction has now been checked instead of Building Under Construction, please revise. Photos attached are of a different house, please remove. | |||
| ENGIN1 | COMPLETE | 08/30/2024 | 09/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 08/30/2024 | 09/10/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A8b needs to be N/A not No. A9f needs to be N/A. C2f and g are missing measurement box checked. All pages of the elevation certificate need to be submitted. | |||
| ZON | COMPLETE | 08/30/2024 | 08/30/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/27/2024 | 08/30/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/06/2024 | 08/12/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to submit new floor plan and electrical plan showing the door. 2. Will need light and switch by new exterior door. NEC 2020 210.70 | |||
| ELEC | COMPLETE | 01/19/2024 | 01/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/19/2024 | 01/22/2024 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 01/19/2024 | 01/24/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. However, if at Foundation C2f and g do not have measurement boxes checked it will be disapproved. Also, the grades directly outside of the garage are higher than the proposed FFE of the garage; this will also need to be rectified. | |||
| ENGIN1 | COMPLETE | 01/19/2024 | 01/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/19/2024 | 01/19/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/04/2024 | 01/05/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/04/2024 | 01/09/2024 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Please show proposed grade elevations at house corners 4" to 6" below Fin Floor Show proposed grade elevations mid lot at grade breaks Lot Grade Plan elv's don't seem feasible with existing adjioning homes grade elv's please show proposed elv's that will work | |||
| ELEC | HOLD | 01/04/2024 | 01/05/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 2. Storage outlets all have to be GFCI protected. NEC 2017 210.8 (A) | |||
| PLFM | HOLD | 01/04/2024 | 01/10/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A9f needs to be N/A not 0 per FEMA instructions. C2d, there is no FFE for the garage shown on site plan so it cannot be verified, please revise. C2f and g, no proposed grades are shown on the site plan so it cannot be verified, please revise. | |||
| ENGIN1 | COMPLETE | 01/04/2024 | 01/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/14/2023 | 12/19/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/14/2023 | 12/19/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 12/14/2023 | 12/15/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electric load calcs do not match the living space of the house. 2. Storage are outlets all have to be GFCI protected. NEC 2017 210.8 (A) | |||
| ENGIN1 | COMPLETE | 12/14/2023 | 12/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/14/2023 | 12/14/2023 |
| LOCATE | COMPLETE | 12/14/2023 | 12/14/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/14/2023 | 12/14/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 12/14/2023 | 12/14/2023 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Please show proposed elv's next to bldg corners 4"to 6" below Fin Floor. Show Mid Lot proposed elv's on prop lines, I don't believe the Lot Grading Plan for the subdivision will work with existing grades on Lot 94 /93 prop line show how this will be graded | |||
| ZON | HOLD | 12/14/2023 | 12/14/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide width and material of walkway on site plan/survey | |||
| BADMIN | COMPLETE | 12/14/2023 | 12/21/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 12/14/2023 | 12/15/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site Plan, the entire lot falls within a Special Flood Hazard Area. Elevation Certificates are required at Construction Drawings, Foundation, and Final. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/27/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/29/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/29/2024 |
| SEWER INSPECTION | ¤25.00 | 01/29/2024 |
| SITE PLAN 30 | ¤30.00 | 01/29/2024 |
| WATER-METER | ¤514.49 | 01/29/2024 |
| WATER-METER | ¤427.42 | 01/29/2024 |
| ADJUSTMENT 50% | (¤1,010.46) | 01/29/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/29/2024 |
| INSPECTION - RESIDENTIAL | ¤1,551.00 | 01/29/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤439.92 | 01/29/2024 |
| CONNECTION FEES | ¤25.00 | 01/29/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 01/29/2024 |
| IMPACT FEE FIRE | ¤428.09 | 01/29/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/29/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/29/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 01/29/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/29/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 01/29/2024 |
| SURCHARGE FS 533.721 | ¤5.71 | 01/29/2024 |
| SURCHARGE - FS 468.631 | ¤8.56 | 01/29/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/29/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/29/2024 |
| SW ENG PRE APRON | ¤30.00 | 01/29/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,057.72 |