I want to search for...

Permit #2023120649

Permit Details

Status: COED

Parcel Id: 07-11-31-7018-00010-0050
CONDITIONED SPACE: 2177 sqft
GARAGE: 743 sqft
OPENED PORCH (WITH ROOF) : 180 sqft
OPENED PORCH (WITH ROOF) : 80 sqft
Total Square Footage: 3180 sqft
Block: 00010
Subdivision: 2181 - SECTION 18-WYNNFIELD
Job Phone: (386)931-0785
Location Address: 2 WAGNER PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/16/2024
NOC: RECORDED
Applicant name: ROY CHARLES WALDHAUER
Owner: BY THE SHORE INC & BAV PROPERTIES

Address

164 ULYSSES TRAIL

PALM COAST, FL 32164

Lot: 0050
Contracted Stated Job Value: ¤375,000.00
Job Description: Single Family Residence
Type: CN

Contractor

BY THE SHORE INC.
Status Location Address State License Number Phone Fax
ACTIVE

1600 N STATE STREET # 102

,

CRC1327300 (Exp: 08/31/2026) 386-263-8272 386-263-8289

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/11/2024 FINAL APPROVED MKRASKI
BLD - BUILDING FINAL 09/09/2024 Disapproved - NO FEE MKRASKI
Note: 1. No hot water in home FBCR P2722.2 2. Breaker in meter main must be labeled NEC 408.4 3. Spare bedrooms require alight or switched outlet NEC 210.70
ROW - FINAL APRON (AFTER POUR) 09/03/2024 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 8/30/2024 - PREVIOUS INSPECTION NOTES 08/30/24 TPOLACEK** CULVERT HAS TOO MUCH SEDIMENT IN PIPE. AS STATED IN NOTE LEFT ON INSPECTION ON 08/29/24 YOU MUST CLEAN OUT PIPE PRIOR TO SCHEDULING INSPECTION. ++++++++++++++++++++++++++++++++++++++++++++++++++++ PLEASE MAKE AURE CULVERT IS CLEANED OUT BEFORE SCHEDULING AFTER POUR.
ROW - FINAL APRON (AFTER POUR) 08/30/2024 Disapproved - NO FEE TPOLACEK
Note: 08/30/24 TPOLACEK** CULVERT HAS TOO MUCH SEDIMENT IN PIPE. AS STATED IN NOTE LEFT ON INSPECTION ON 08/29/24 YOU MUST CLEAN OUT PIPE PRIOR TO SCHEDULING INSPECTION. ++++++++++++++++++++++++++++++++++++++++++++++++++++ PLEASE MAKE AURE CULVERT IS CLEANED OUT BEFORE SCHEDULING AFTER POUR.
U-CROSS CONNECTION 08/30/2024 APPROVED DHANEY
ROW - STORMWATER FINAL 08/30/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 08/30/2024 FINAL APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/29/2024 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 08/29/2024 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
SEWER TIE IN 08/01/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2075 Inspector Notes from Inspection 2060 NEED TO HAVE ADDRESS POSTED FOR ''911'' ON POST OR PERMIT BOARD, ALSO NEED SILT FENCE IN PLACE BEFORE NEXT INSPECTION 3307.1 PROTECTION OF PROPERTY SEWER LINE RAN SEWER TIE -IN NOT MADE YET THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 07/12/2024 APPROVED RSIMS
Note: 7/12/24: FPL emailed to release power.
ROW- PRE-APRON (PRE-POUR) 06/28/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
GRAVITY SEWER TEST 06/06/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 NEED TO HAVE ADDRESS POSTED FOR ''911'' ON POST OR PERMIT BOARD, ALSO NEED SILT FENCE IN PLACE BEFORE NEXT INSPECTION 3307.1 PROTECTION OF PROPERTY SEWER LINE RAN SEWER TIE -IN NOT MADE YET
WINDOW NAILING 05/09/2024 APPROVED MKRASKI
INSULATION 05/08/2024 APPROVED MKRASKI
INSULATION 05/07/2024 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2320 1. Windows do not match product approval (added window nailing) 2. Load bearing wall in garage is not sittin 100% on slab, slab needs to be extended out to carry the weight of the load 3. Exhaust fan ducts need to have two points of connection (a mechanical connection and a seal)
LATH/BRICK/ WATER BARRIER 05/02/2024 APPROVED - AS NOTED MKRASKI
Note: 1. Windows do not match product approval (added window nailing) 2. Load bearing wall in garage is not sittin 100% on slab, slab needs to be extended out to carry the weight of the load 3. Exhaust fan ducts need to have two points of connection (a mechanical connection and a seal)
ALL ROUGH 04/30/2024 APPROVED - AS NOTED MKRASKI
Note: 1. Windows do not match product approval (added window nailing) 2. Load bearing wall in garage is not sittin 100% on slab, slab needs to be extended out to carry the weight of the load 3. Exhaust fan ducts need to have two points of connection (a mechanical connection and a seal)
ROOF VALLEY & METAL 04/18/2024 APPROVED AGAETANO
Note: 4/16/2024 - PREVIOUS INSPECTION NOTES 1. First run of underlayment , near drip edge is required to have two layers of synthetic 2. 5x5 wall flashing is required to be sealed to CMU @ entry
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/16/2024 APPROVED - AS NOTED MKRASKI
Note: 4/16/24 1. Missing girder strap that was installed but has been covered up by insulation board 2. Load bearing was is not 100% sitting on slab and needs to be repaired Check both items at all rough 4/9/2024 - PREVIOUS INSPECTION NOTES 1. CMU to load bearing wall not per detail 2. Load bearing was has stud cut short and not touching bottom plate 3. Anchor in bottom plate of load bearing wall must be on each side of the splice 4. Back right bedroom girder missing second truss strap 5. SP4 in load bearing wall missing nails
ROOF VALLEY & METAL 04/16/2024 Disapproved -FEE REQUIRED MKRASKI
Note: 1. First run of underlayment , near drip edge is required to have two layers of synthetic 2. 5x5 wall flashing is required to be sealed to CMU @ entry
WALL SHEATHING 04/09/2024 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/09/2024 Disapproved - NO FEE MKRASKI
Note: 1. CMU to load bearing wall not per detail 2. Load bearing was has stud cut short and not touching bottom plate 3. Anchor in bottom plate of load bearing wall must be on each side of the splice 4. Back right bedroom girder missing second truss strap 5. SP4 in load bearing wall missing nails
TIE BEAM / LINTEL 03/26/2024 APPROVED MKRASKI
TIE BEAM / LINTEL 03/21/2024 Disapproved - NO FEE MKRASKI
Note: Bed joints can not be over 3/8'' FBC 606.3.1 Check all
FOUND SURVEY APPROVED (OFFICE) 03/12/2024 APPROVED TBAKER
MONOLITHIC SLAB 02/27/2024 APPROVED - AS NOTED MKRASKI
Note: Silt fence needs to be repaired by next inspection
PLUMBING 1ST ROUGH UNDERGROUND 02/22/2024 APPROVED - AS NOTED MGIBSON
Note: NEED TO HAVE ADDRESS POSTED FOR ''911'' ON POST OR PERMIT BOARD, ALSO NEED SILT FENCE IN PLACE BEFORE NEXT INSPECTION 3307.1 PROTECTION OF PROPERTY
WATER METER INSTALLATION REQUEST 02/05/2024 APPROVED BVITALE

Review History

Department Status Date In Date Out
BLD COMPLETE 05/03/2024 05/07/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/12/2024 03/12/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/12/2024 03/12/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 01/05/2024 01/05/2024
Note: Released By: JPI
BADMIN INFORMATION 01/04/2024 01/04/2024
Note: Marked INFORMATION By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM missing DIGITAL seal on truss layout
MECH COMPLETE 12/27/2023 01/04/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 12/27/2023 12/28/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 12/27/2023 12/27/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD HOLD 12/27/2023 12/28/2023
Note: Held By: JPI Repeating comment 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
BLD HOLD 12/18/2023 12/21/2023
Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. 2) The conditioned space in the energy calculations vary from what is shown in the living space SF table on Sheet 2. Please cure. 107.2.6
CUSVC COMPLETE 12/18/2023 12/19/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 12/18/2023 12/18/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Outlet located in laundry, garage, bathroom, kitchen, outsidemust be GFCI protected. NEC 2017 210.8 2. Need service outley by A/C unit. NEC 2017 210.63 3. Need correct outlet spacing on island. NEC 2017 210.52 (C) (2)
ENGIN1 COMPLETE 12/18/2023 12/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 12/18/2023 12/18/2023
LOCATE COMPLETE 12/18/2023 12/20/2023
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH HOLD 12/18/2023 12/18/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Square footage on Energy Calcs does not match the house plans
SW1 COMPLETE 12/18/2023 12/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 12/18/2023 12/18/2023
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM The size of this lot requires 5 trees. Please correct the exterior elevation page. Both side elevations are labeled the same - one should be left and the other right.
BADMIN COMPLETE 12/18/2023 12/22/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 12/18/2023 02/02/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 09/06/2024
CONTRACTOR CHANGE ¤20.00 09/06/2024
REINSPECTION RESIDENTIAL ¤40.00 09/06/2024
CONNECTION FEES ¤1,187.26 01/16/2024
WATER- TURN ON ¤25.00 01/16/2024
ADJUSTMENT 50% (¤766.89) 01/16/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/16/2024
INSPECTION - RESIDENTIAL ¤1,171.50 01/16/2024
PLAN REVIEW - RESIDENTIAL ¤332.28 01/16/2024
FC IMPACT FEE EMS ¤62.00 01/16/2024
IMPACT FEE FIRE ¤428.09 01/16/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/16/2024
FC IMPACT FEE LIBRARY ¤268.00 01/16/2024
IMPACT FEE PARKS ¤1,800.99 01/16/2024
IMPACT FEE SCHOOL ¤5,450.00 01/16/2024
IMPACT FEE TRANSPORTATION ¤1,812.00 01/16/2024
WATER -IRRIGATION INSPECTION ¤25.00 01/16/2024
SURCHARGE FS 533.721 ¤4.35 01/16/2024
SURCHARGE - FS 468.631 ¤6.52 01/16/2024
SW ENG - FOUNDATION SURVEY ¤20.00 01/16/2024
SW ENG INSPECTION 80 ¤80.00 01/16/2024
SW ENG PRE APRON ¤30.00 01/16/2024
SW ENG - REVIEW 20 ¤20.00 01/16/2024
SW ENG RES REVIEW 200 ¤200.00 01/16/2024
SEWER CREDIT (¤1,147.00) 01/16/2024
SEWER INSPECTION ¤25.00 01/16/2024
SEWER CAPITAL FACILITY ¤5,441.03 01/16/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 01/16/2024
SITE PLAN 30 ¤30.00 01/16/2024
Fees Total Due: ¤0.00 Total Paid: ¤20,827.64