I want to search for...

Permit #2023120656

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00700-0150
CONDITIONED SPACE: 1392 sqft
GARAGE: 450 sqft
SCREEN PORCH (SOLID ROOF) : 130 sqft
SCREEN PORCH (SOLID ROOF) : 72 sqft
CONDITIONED SPACE: 1392 sqft
GARAGE: 450 sqft
SCREEN PORCH (SOLID ROOF) : 130 sqft
SCREEN PORCH (SOLID ROOF) : 72 sqft
Total Square Footage: 4088 sqft
Block: 00700
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 386-627-0430
Location Address: 4 SEBASTIAN CT
Type: DU - DUPLEX
Issue Date: 01/05/2024
NOC: RECORDED
Applicant name: ANNA WIKTORIA LISOWSKI
Owner: SEBASTIAN SIEDLECKI & MARTA PYCIA

Address

27 SCHOOL HOUSE ROAD

LEVITTOWN, NY 11756

Lot: 0150
Contracted Stated Job Value: ¤360,000.00
Job Description: Duplex
Type: CN

Contractor

GOLDEN FOX HOME REMODELING, INC
Status Location Address State License Number Phone
ACTIVE

72 HERNANDEZ AVE

PALM COAST, FL 32137

CBC1259266 (Exp: 08/31/2026) 386-627-0430

Sub Contractors

DANIEL J LUSINSKI
Status Location Address Mailing Address State License Number Phone
ACTIVE

389 PALM COAST PARKWAY SW

PALM COAST, FL 32137

#4

PALM COAST, FL 32137

CCC1330133 (Exp: 08/31/2026) 386-338-7926
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
SCOTT H STILLWELL
Status Location Address State License Number Phone
ACTIVE

4500 US 1 UNIT 206

BUNNELL, FL 32110

CAC1819433 (Exp: 08/31/2026) 386-864-4404
WILLIAM TODD SIKES
Status Location Address State License Number Phone
ACTIVE

83 PORT ROYAL DR

ST AUGUSTINE, FL 32084

EC0002726 (Exp: 08/31/2026) 904-762-8762

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/19/2024 FINAL APPROVED BTAYLOR
U-CROSS CONNECTION 11/14/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/14/2024 9:26:04 AM *** no irr-no cross connection
U -UTILITY RESIDENTIAL FINAL 11/14/2024 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 11/05/2024 APPROVED - AS NOTED FSLADISH
Note: 11/5/24 CORRECTION REQUIRED COMPLETED AT THE TIME OF THIS INSPECTION. APPROVING THIS FIELD SURVEY AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES 10/21/24 UPON WALKING PROPERTY DETERMINED THAT ON THE RIGHT SIDE PROPERTY LINE YOU ARE SHOWING A COMMON SWALE ON YOUR FINAL SURVEY AND YOUR SITE PLAN. IT THE FIELD THIS IS NOT PRESENT, YOU DO NOT HAVE A COMMON SWALE AS INDICATED ON BOTH. YOU WILL NEED TO RESLOPE THIS RIGHT SIDE AND MAKE A COMMON SWALE AS INDICATED ON BOTH YOUR SITE PLAN AND FINAL SURVEY. YOU WILL ALSO BE REQUIRED TO REMOVE ALL OF THE DIRT/SEDIMENT THAT HAS WASHED INTO THE COPC DRAINAGE CONVEYANCE IN THE REAR AND LAY SOD TO THE BOTTOM OF THE BANK. THER IS A BREAK IN THE BERM ON THE LEFT SIDE PROPERTY LINE NEAR THE AC UNIT THAT WILL NEED TO BE REESTABLISHED TO FLOW FORWARD AS WELL.
ROW - FINAL INSPECTION 11/05/2024 APPROVED FSLADISH
Note: 11/5/24 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL APRON (AFTER POUR) 11/05/2024 APPROVED FSLADISH
Note: 11/5/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 11/5/24 CORRECTION REQUIRED COMPLETED AT THE TIME OF THIS INSPECTION. APPROVING THIS FIELD SURVEY AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES 10/21/24 UPON WALKING PROPERTY DETERMINED THAT ON THE RIGHT SIDE PROPERTY LINE YOU ARE SHOWING A COMMON SWALE ON YOUR FINAL SURVEY AND YOUR SITE PLAN. IT THE FIELD THIS IS NOT PRESENT, YOU DO NOT HAVE A COMMON SWALE AS INDICATED ON BOTH. YOU WILL NEED TO RESLOPE THIS RIGHT SIDE AND MAKE A COMMON SWALE AS INDICATED ON BOTH YOUR SITE PLAN AND FINAL SURVEY. YOU WILL ALSO BE REQUIRED TO REMOVE ALL OF THE DIRT/SEDIMENT THAT HAS WASHED INTO THE COPC DRAINAGE CONVEYANCE IN THE REAR AND LAY SOD TO THE BOTTOM OF THE BANK. THER IS A BREAK IN THE BERM ON THE LEFT SIDE PROPERTY LINE NEAR THE AC UNIT THAT WILL NEED TO BE REESTABLISHED TO FLOW FORWARD AS WELL.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/21/2024 APPROVED FSLADISH
Note: Inspector Notes from Inspection 9270 8/22/24 At this time due to site specific conditions after confering with parren we have determined that this wil be passed atas noted that you could not get a full 5" of concrete over the culvert pipe and the driveway apron angle will be steeper than normal. Ready to pour. With rain predicted, it is the builders responsibilty to double check pipe elevation before pouring. We also communicated with the concrete subcontrctor to make sure he starts transitioning the concrete screeding a bit further back to try to lessen the slope to the road edge as much as possible. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/21/2024 - PREVIOUS INSPECTION NOTES 8/21/24 SPOKE WITH CONCRETE SUBCONTRACTIOR AND LET HIM KNOW THAT THEY WILL NEED TO RAISE THE FORMBOARD FROM THE FRONTSIDE OF THE MITERED ENDS 2" ON BOTH SIDES AND ALSO TO RAISE THE EDGE OF ROAD FORMBOARDS 2" TO GET AS MUCH CONCRETE COVERAGE OVER THE CULVERT PIPE AS POSSIBLE WHILE KEEPING THE SLOPE EVEN TO ITS CURRENT SLOPE.
ROW FIELD SURVEY /GRADING CERTIFICATION 10/21/2024 Disapproved - NO FEE FSLADISH
Note: 10/21/24 UPON WALKING PROPERTY DETERMINED THAT ON THE RIGHT SIDE PROPERTY LINE YOU ARE SHOWING A COMMON SWALE ON YOUR FINAL SURVEY AND YOUR SITE PLAN. IT THE FIELD THIS IS NOT PRESENT, YOU DO NOT HAVE A COMMON SWALE AS INDICATED ON BOTH. YOU WILL NEED TO RESLOPE THIS RIGHT SIDE AND MAKE A COMMON SWALE AS INDICATED ON BOTH YOUR SITE PLAN AND FINAL SURVEY. YOU WILL ALSO BE REQUIRED TO REMOVE ALL OF THE DIRT/SEDIMENT THAT HAS WASHED INTO THE COPC DRAINAGE CONVEYANCE IN THE REAR AND LAY SOD TO THE BOTTOM OF THE BANK. THER IS A BREAK IN THE BERM ON THE LEFT SIDE PROPERTY LINE NEAR THE AC UNIT THAT WILL NEED TO BE REESTABLISHED TO FLOW FORWARD AS WELL.
ELECTRIC - EARLY POWER 09/10/2024 APPROVED - AS NOTED KSANDOE
Note: Release Power
ELECTRIC - EARLY POWER 09/03/2024 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 08/22/2024 APPROVED - AS NOTED FSLADISH
Note: 8/22/24 At this time due to site specific conditions after confering with parren we have determined that this wil be passed atas noted that you could not get a full 5" of concrete over the culvert pipe and the driveway apron angle will be steeper than normal. Ready to pour. With rain predicted, it is the builders responsibilty to double check pipe elevation before pouring. We also communicated with the concrete subcontrctor to make sure he starts transitioning the concrete screeding a bit further back to try to lessen the slope to the road edge as much as possible. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/21/2024 - PREVIOUS INSPECTION NOTES 8/21/24 SPOKE WITH CONCRETE SUBCONTRACTIOR AND LET HIM KNOW THAT THEY WILL NEED TO RAISE THE FORMBOARD FROM THE FRONTSIDE OF THE MITERED ENDS 2" ON BOTH SIDES AND ALSO TO RAISE THE EDGE OF ROAD FORMBOARDS 2" TO GET AS MUCH CONCRETE COVERAGE OVER THE CULVERT PIPE AS POSSIBLE WHILE KEEPING THE SLOPE EVEN TO ITS CURRENT SLOPE.
ROW- PRE-APRON (PRE-POUR) 08/21/2024 Disapproved - NO FEE FSLADISH
Note: 8/21/24 SPOKE WITH CONCRETE SUBCONTRACTIOR AND LET HIM KNOW THAT THEY WILL NEED TO RAISE THE FORMBOARD FROM THE FRONTSIDE OF THE MITERED ENDS 2" ON BOTH SIDES AND ALSO TO RAISE THE EDGE OF ROAD FORMBOARDS 2" TO GET AS MUCH CONCRETE COVERAGE OVER THE CULVERT PIPE AS POSSIBLE WHILE KEEPING THE SLOPE EVEN TO ITS CURRENT SLOPE.
GRAVITY SEWER TEST 08/08/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 08/08/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 07/30/2024 APPROVED BTAYLOR
Note: 7/29/2024 - PREVIOUS INSPECTION NOTES 7-29-24 1. Unit A needs fire blocking in laundry room at ceiling.
FIREWALL FINAL 07/29/2024 APPROVED BTAYLOR
Note: 7/26/2024 - PREVIOUS INSPECTION NOTES
INSULATION 07/29/2024 Disapproved - NO FEE BTAYLOR
Note: 7-29-24 1. Unit A needs fire blocking in laundry room at ceiling.
FIREWALL FINAL 07/26/2024 CANCELLED BY APPLICANT MKRASKI
ALL ROUGH 07/25/2024 APPROVED KSANDOE
Note: 7/24/2024 - PREVIOUS INSPECTION NOTES Need fireblocking (fire rated drywall) between front entry and the rest of the house to maintain fire rating. 7/19/2024 - PREVIOUS INSPECTION NOTES R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted R302.4.1 Through penetrations. Through penetrations of fire-resistance-rated wall or floor assemblies shall comply with Section R302.4.1.1 or R302.4.1.2
FIREWALL DRYWALL NAILING 07/25/2024 APPROVED KSANDOE
Note: 7/24/2024 - PREVIOUS INSPECTION NOTES Need fireblocking (fire rated drywall) between front entry and the rest of the house to maintain fire rating. 7/19/2024 - PREVIOUS INSPECTION NOTES R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted
FIREWALL DRYWALL NAILING 07/24/2024 Disapproved - NO FEE KSANDOE
Note: Need fireblocking (fire rated drywall) between front entry and the rest of the house to maintain fire rating. 7/19/2024 - PREVIOUS INSPECTION NOTES R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted
ALL ROUGH 07/24/2024 Disapproved -FEE REQUIRED KSANDOE
Note: Need fireblocking (fire rated drywall) between front entry and the rest of the house to maintain fire rating. 7/19/2024 - PREVIOUS INSPECTION NOTES R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted R302.4.1 Through penetrations. Through penetrations of fire-resistance-rated wall or floor assemblies shall comply with Section R302.4.1.1 or R302.4.1.2
FIREWALL DRYWALL NAILING 07/19/2024 Disapproved - NO FEE KSANDOE
Note: R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted
ALL ROUGH 07/19/2024 Disapproved - NO FEE KSANDOE
Note: R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted R302.4.1 Through penetrations. Through penetrations of fire-resistance-rated wall or floor assemblies shall comply with Section R302.4.1.1 or R302.4.1.2
FIREWALL FRAMING 07/15/2024 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 07/15/2024 APPROVED BTAYLOR
ROOF VALLEY & METAL 06/24/2024 APPROVED BTAYLOR
Note: 6/21/2024 - PREVIOUS INSPECTION NOTES 6-21-24 1. This inspection can not be passed until roof sheeting, tie down and down cells has been approved.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/24/2024 APPROVED BTAYLOR
Note: 6/21/2024 - PREVIOUS INSPECTION NOTES 6/20/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 5-29-24 1. Silt fence needs to be repaired before next inspection. 6-20-24 1. Missing engineering. 2. Overframing needs to have straps at both ends. 6-21-24 1. Overframing needs to have straps at both ends.
ROOF VALLEY & METAL 06/21/2024 Disapproved - NO FEE BTAYLOR
Note: 6-21-24 1. This inspection can not be passed until roof sheeting, tie down and down cells has been approved.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/21/2024 Disapproved - NO FEE BTAYLOR
Note: 6/20/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 5-29-24 1. Silt fence needs to be repaired before next inspection. 6-20-24 1. Missing engineering. 2. Overframing needs to have straps at both ends. 6-21-24 1. Overframing needs to have straps at both ends.
WALL SHEATHING 06/20/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2340 5-29-24 1. Silt fence needs to be repaired before next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/20/2024 Disapproved - NO FEE BTAYLOR
Note: Inspector Notes from Inspection 2340 5-29-24 1. Silt fence needs to be repaired before next inspection. 6-20-24 1. Missing engineering. 2. Overframing needs to have straps at both ends.
TIE BEAM / LINTEL 05/29/2024 APPROVED - AS NOTED BTAYLOR
Note: 5-29-24 1. Silt fence needs to be repaired before next inspection.
FOUND SURVEY APPROVED (OFFICE) 05/28/2024 APPROVED TBAKER
MONOLITHIC SLAB 04/30/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 04/25/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 04/02/2024 APPROVED BVITALE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 05/24/2024 05/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/24/2024 05/24/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 12/22/2023 12/23/2023
Note: Released By: JPI
BLD HOLD 12/18/2023 12/20/2023
Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 12/18/2023 12/20/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 12/18/2023 12/18/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/18/2023 12/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 12/18/2023 12/18/2023
LOCATE COMPLETE 12/18/2023 12/20/2023
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 12/18/2023 12/18/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 12/18/2023 12/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/18/2023 12/18/2023
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BADMIN COMPLETE 12/18/2023 12/22/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 12/18/2023 02/02/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 01/03/2025
CONNECTION FEES ¤2,374.52 01/05/2024
FC IMPACT FEE EMS ¤124.00 01/05/2024
IMPACT FEE FIRE ¤856.18 01/05/2024
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 01/05/2024
FC IMPACT FEE LIBRARY ¤536.00 01/05/2024
IMPACT FEE PARKS ¤3,600.18 01/05/2024
IMPACT FEE SCHOOL ¤10,900.00 01/05/2024
IMPACT FEE TRANSPORTATION ¤2,812.00 01/05/2024
WATER -IRRIGATION INSPECTION ¤50.00 01/05/2024
SURCHARGE FS 533.721 ¤9.77 01/05/2024
SURCHARGE - FS 468.631 ¤14.66 01/05/2024
SW ENG - FOUNDATION SURVEY ¤20.00 01/05/2024
SW ENG INSPECTION 80 ¤80.00 01/05/2024
SW ENG PRE APRON ¤30.00 01/05/2024
SW ENG - REVIEW 20 ¤20.00 01/05/2024
SW ENG RES REVIEW 200 ¤200.00 01/05/2024
SEWER INSPECTION ¤25.00 01/05/2024
SEWER CAPITAL FACILITY ¤10,882.06 01/05/2024
WATER CAPITAL FACILITY FEE ¤7,989.02 01/05/2024
SITE PLAN 30 ¤30.00 01/05/2024
WATER- TURN ON ¤50.00 01/05/2024
ADJUSTMENT 50% (¤976.93) 01/05/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/05/2024
INSPECTION - RESIDENTIAL ¤1,498.75 01/05/2024
PLAN REVIEW - RESIDENTIAL ¤425.10 01/05/2024
Fees Total Due: ¤0.00 Total Paid: ¤42,056.31