I want to search for...
Permit #2023120656
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00700-0150 |
| CONDITIONED SPACE: 1392 sqft |
| GARAGE: 450 sqft |
| SCREEN PORCH (SOLID ROOF) : 130 sqft |
| SCREEN PORCH (SOLID ROOF) : 72 sqft |
| CONDITIONED SPACE: 1392 sqft |
| GARAGE: 450 sqft |
| SCREEN PORCH (SOLID ROOF) : 130 sqft |
| SCREEN PORCH (SOLID ROOF) : 72 sqft |
| Total Square Footage: 4088 sqft |
| Block: 00700 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 386-627-0430 |
| Location Address: 4 SEBASTIAN CT |
| Type: DU - DUPLEX |
| Issue Date: 01/05/2024 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: SEBASTIAN SIEDLECKI & MARTA PYCIA |
|
Address 27 SCHOOL HOUSE ROAD LEVITTOWN, NY 11756 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤360,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
SCOTT H STILLWELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4500 US 1 UNIT 206 BUNNELL, FL 32110 |
CAC1819433 (Exp: 08/31/2026) | 386-864-4404 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/19/2024 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 11/14/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/14/2024 9:26:04 AM *** no irr-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 11/14/2024 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/05/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/5/24 CORRECTION REQUIRED COMPLETED AT THE TIME OF THIS INSPECTION. APPROVING THIS FIELD SURVEY AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES 10/21/24 UPON WALKING PROPERTY DETERMINED THAT ON THE RIGHT SIDE PROPERTY LINE YOU ARE SHOWING A COMMON SWALE ON YOUR FINAL SURVEY AND YOUR SITE PLAN. IT THE FIELD THIS IS NOT PRESENT, YOU DO NOT HAVE A COMMON SWALE AS INDICATED ON BOTH. YOU WILL NEED TO RESLOPE THIS RIGHT SIDE AND MAKE A COMMON SWALE AS INDICATED ON BOTH YOUR SITE PLAN AND FINAL SURVEY. YOU WILL ALSO BE REQUIRED TO REMOVE ALL OF THE DIRT/SEDIMENT THAT HAS WASHED INTO THE COPC DRAINAGE CONVEYANCE IN THE REAR AND LAY SOD TO THE BOTTOM OF THE BANK. THER IS A BREAK IN THE BERM ON THE LEFT SIDE PROPERTY LINE NEAR THE AC UNIT THAT WILL NEED TO BE REESTABLISHED TO FLOW FORWARD AS WELL. | |||
| ROW - FINAL INSPECTION | 11/05/2024 | APPROVED | FSLADISH |
| Note: 11/5/24 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/05/2024 | APPROVED | FSLADISH |
| Note: 11/5/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 11/5/24 CORRECTION REQUIRED COMPLETED AT THE TIME OF THIS INSPECTION. APPROVING THIS FIELD SURVEY AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES 10/21/24 UPON WALKING PROPERTY DETERMINED THAT ON THE RIGHT SIDE PROPERTY LINE YOU ARE SHOWING A COMMON SWALE ON YOUR FINAL SURVEY AND YOUR SITE PLAN. IT THE FIELD THIS IS NOT PRESENT, YOU DO NOT HAVE A COMMON SWALE AS INDICATED ON BOTH. YOU WILL NEED TO RESLOPE THIS RIGHT SIDE AND MAKE A COMMON SWALE AS INDICATED ON BOTH YOUR SITE PLAN AND FINAL SURVEY. YOU WILL ALSO BE REQUIRED TO REMOVE ALL OF THE DIRT/SEDIMENT THAT HAS WASHED INTO THE COPC DRAINAGE CONVEYANCE IN THE REAR AND LAY SOD TO THE BOTTOM OF THE BANK. THER IS A BREAK IN THE BERM ON THE LEFT SIDE PROPERTY LINE NEAR THE AC UNIT THAT WILL NEED TO BE REESTABLISHED TO FLOW FORWARD AS WELL. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/21/2024 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 8/22/24 At this time due to site specific conditions after confering with parren we have determined that this wil be passed atas noted that you could not get a full 5" of concrete over the culvert pipe and the driveway apron angle will be steeper than normal. Ready to pour. With rain predicted, it is the builders responsibilty to double check pipe elevation before pouring. We also communicated with the concrete subcontrctor to make sure he starts transitioning the concrete screeding a bit further back to try to lessen the slope to the road edge as much as possible. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/21/2024 - PREVIOUS INSPECTION NOTES 8/21/24 SPOKE WITH CONCRETE SUBCONTRACTIOR AND LET HIM KNOW THAT THEY WILL NEED TO RAISE THE FORMBOARD FROM THE FRONTSIDE OF THE MITERED ENDS 2" ON BOTH SIDES AND ALSO TO RAISE THE EDGE OF ROAD FORMBOARDS 2" TO GET AS MUCH CONCRETE COVERAGE OVER THE CULVERT PIPE AS POSSIBLE WHILE KEEPING THE SLOPE EVEN TO ITS CURRENT SLOPE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/21/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 10/21/24 UPON WALKING PROPERTY DETERMINED THAT ON THE RIGHT SIDE PROPERTY LINE YOU ARE SHOWING A COMMON SWALE ON YOUR FINAL SURVEY AND YOUR SITE PLAN. IT THE FIELD THIS IS NOT PRESENT, YOU DO NOT HAVE A COMMON SWALE AS INDICATED ON BOTH. YOU WILL NEED TO RESLOPE THIS RIGHT SIDE AND MAKE A COMMON SWALE AS INDICATED ON BOTH YOUR SITE PLAN AND FINAL SURVEY. YOU WILL ALSO BE REQUIRED TO REMOVE ALL OF THE DIRT/SEDIMENT THAT HAS WASHED INTO THE COPC DRAINAGE CONVEYANCE IN THE REAR AND LAY SOD TO THE BOTTOM OF THE BANK. THER IS A BREAK IN THE BERM ON THE LEFT SIDE PROPERTY LINE NEAR THE AC UNIT THAT WILL NEED TO BE REESTABLISHED TO FLOW FORWARD AS WELL. | |||
| ELECTRIC - EARLY POWER | 09/10/2024 | APPROVED - AS NOTED | KSANDOE |
| Note: Release Power | |||
| ELECTRIC - EARLY POWER | 09/03/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 08/22/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/22/24 At this time due to site specific conditions after confering with parren we have determined that this wil be passed atas noted that you could not get a full 5" of concrete over the culvert pipe and the driveway apron angle will be steeper than normal. Ready to pour. With rain predicted, it is the builders responsibilty to double check pipe elevation before pouring. We also communicated with the concrete subcontrctor to make sure he starts transitioning the concrete screeding a bit further back to try to lessen the slope to the road edge as much as possible. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/21/2024 - PREVIOUS INSPECTION NOTES 8/21/24 SPOKE WITH CONCRETE SUBCONTRACTIOR AND LET HIM KNOW THAT THEY WILL NEED TO RAISE THE FORMBOARD FROM THE FRONTSIDE OF THE MITERED ENDS 2" ON BOTH SIDES AND ALSO TO RAISE THE EDGE OF ROAD FORMBOARDS 2" TO GET AS MUCH CONCRETE COVERAGE OVER THE CULVERT PIPE AS POSSIBLE WHILE KEEPING THE SLOPE EVEN TO ITS CURRENT SLOPE. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/21/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 8/21/24 SPOKE WITH CONCRETE SUBCONTRACTIOR AND LET HIM KNOW THAT THEY WILL NEED TO RAISE THE FORMBOARD FROM THE FRONTSIDE OF THE MITERED ENDS 2" ON BOTH SIDES AND ALSO TO RAISE THE EDGE OF ROAD FORMBOARDS 2" TO GET AS MUCH CONCRETE COVERAGE OVER THE CULVERT PIPE AS POSSIBLE WHILE KEEPING THE SLOPE EVEN TO ITS CURRENT SLOPE. | |||
| GRAVITY SEWER TEST | 08/08/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 08/08/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 07/30/2024 | APPROVED | BTAYLOR |
| Note: 7/29/2024 - PREVIOUS INSPECTION NOTES 7-29-24 1. Unit A needs fire blocking in laundry room at ceiling. | |||
| FIREWALL FINAL | 07/29/2024 | APPROVED | BTAYLOR |
| Note: 7/26/2024 - PREVIOUS INSPECTION NOTES | |||
| INSULATION | 07/29/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 7-29-24 1. Unit A needs fire blocking in laundry room at ceiling. | |||
| FIREWALL FINAL | 07/26/2024 | CANCELLED BY APPLICANT | MKRASKI |
| ALL ROUGH | 07/25/2024 | APPROVED | KSANDOE |
| Note: 7/24/2024 - PREVIOUS INSPECTION NOTES Need fireblocking (fire rated drywall) between front entry and the rest of the house to maintain fire rating. 7/19/2024 - PREVIOUS INSPECTION NOTES R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted R302.4.1 Through penetrations. Through penetrations of fire-resistance-rated wall or floor assemblies shall comply with Section R302.4.1.1 or R302.4.1.2 | |||
| FIREWALL DRYWALL NAILING | 07/25/2024 | APPROVED | KSANDOE |
| Note: 7/24/2024 - PREVIOUS INSPECTION NOTES Need fireblocking (fire rated drywall) between front entry and the rest of the house to maintain fire rating. 7/19/2024 - PREVIOUS INSPECTION NOTES R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted | |||
| FIREWALL DRYWALL NAILING | 07/24/2024 | Disapproved - NO FEE | KSANDOE |
| Note: Need fireblocking (fire rated drywall) between front entry and the rest of the house to maintain fire rating. 7/19/2024 - PREVIOUS INSPECTION NOTES R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted | |||
| ALL ROUGH | 07/24/2024 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Need fireblocking (fire rated drywall) between front entry and the rest of the house to maintain fire rating. 7/19/2024 - PREVIOUS INSPECTION NOTES R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted R302.4.1 Through penetrations. Through penetrations of fire-resistance-rated wall or floor assemblies shall comply with Section R302.4.1.1 or R302.4.1.2 | |||
| FIREWALL DRYWALL NAILING | 07/19/2024 | Disapproved - NO FEE | KSANDOE |
| Note: R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted | |||
| ALL ROUGH | 07/19/2024 | Disapproved - NO FEE | KSANDOE |
| Note: R302.3 Two-family dwellings firewall penetrations by trusses, strongbacks, and overframing are not permitted R302.4.1 Through penetrations. Through penetrations of fire-resistance-rated wall or floor assemblies shall comply with Section R302.4.1.1 or R302.4.1.2 | |||
| FIREWALL FRAMING | 07/15/2024 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 07/15/2024 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 06/24/2024 | APPROVED | BTAYLOR |
| Note: 6/21/2024 - PREVIOUS INSPECTION NOTES 6-21-24 1. This inspection can not be passed until roof sheeting, tie down and down cells has been approved. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/24/2024 | APPROVED | BTAYLOR |
| Note: 6/21/2024 - PREVIOUS INSPECTION NOTES 6/20/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 5-29-24 1. Silt fence needs to be repaired before next inspection. 6-20-24 1. Missing engineering. 2. Overframing needs to have straps at both ends. 6-21-24 1. Overframing needs to have straps at both ends. | |||
| ROOF VALLEY & METAL | 06/21/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 6-21-24 1. This inspection can not be passed until roof sheeting, tie down and down cells has been approved. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/21/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 6/20/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 5-29-24 1. Silt fence needs to be repaired before next inspection. 6-20-24 1. Missing engineering. 2. Overframing needs to have straps at both ends. 6-21-24 1. Overframing needs to have straps at both ends. | |||
| WALL SHEATHING | 06/20/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 5-29-24 1. Silt fence needs to be repaired before next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/20/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 5-29-24 1. Silt fence needs to be repaired before next inspection. 6-20-24 1. Missing engineering. 2. Overframing needs to have straps at both ends. | |||
| TIE BEAM / LINTEL | 05/29/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 5-29-24 1. Silt fence needs to be repaired before next inspection. | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/28/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/30/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/25/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 04/02/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/24/2024 | 05/28/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/24/2024 | 05/24/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/22/2023 | 12/23/2023 |
| Note: Released By: JPI | |||
| BLD | HOLD | 12/18/2023 | 12/20/2023 |
| Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 12/18/2023 | 12/20/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/18/2023 | 12/18/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/18/2023 | 12/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/18/2023 | 12/18/2023 |
| LOCATE | COMPLETE | 12/18/2023 | 12/20/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/18/2023 | 12/18/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/18/2023 | 12/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/18/2023 | 12/18/2023 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 12/18/2023 | 12/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/18/2023 | 02/02/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/03/2025 |
| CONNECTION FEES | ¤2,374.52 | 01/05/2024 |
| FC IMPACT FEE EMS | ¤124.00 | 01/05/2024 |
| IMPACT FEE FIRE | ¤856.18 | 01/05/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 01/05/2024 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 01/05/2024 |
| IMPACT FEE PARKS | ¤3,600.18 | 01/05/2024 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 01/05/2024 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 01/05/2024 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 01/05/2024 |
| SURCHARGE FS 533.721 | ¤9.77 | 01/05/2024 |
| SURCHARGE - FS 468.631 | ¤14.66 | 01/05/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/05/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/05/2024 |
| SW ENG PRE APRON | ¤30.00 | 01/05/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/05/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/05/2024 |
| SEWER INSPECTION | ¤25.00 | 01/05/2024 |
| SEWER CAPITAL FACILITY | ¤10,882.06 | 01/05/2024 |
| WATER CAPITAL FACILITY FEE | ¤7,989.02 | 01/05/2024 |
| SITE PLAN 30 | ¤30.00 | 01/05/2024 |
| WATER- TURN ON | ¤50.00 | 01/05/2024 |
| ADJUSTMENT 50% | (¤976.93) | 01/05/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/05/2024 |
| INSPECTION - RESIDENTIAL | ¤1,498.75 | 01/05/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤425.10 | 01/05/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤42,056.31 |