Permit #2023120705
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7028-00150-0290 |
| Block: 00150 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 386-503-0666 |
| Location Address: 36 PONCE DELEON DR |
| Type: DR - DRIVEWAY |
| Issue Date: 01/05/2024 |
| NOC: Unknown |
| Applicant name: ANTONIO M PAIVA |
| Owner: PAIVA ANTONIO M & LICINIA S H&W |
|
Address 68 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤2,400.00 |
| Job Description: CIRCULAR DRIVEWAY |
| Type: CN |
Contractor
AVANTI CONCRETE PUMPING INC
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 351743 SATSUMA, FL 32189 |
386-503-0666 | 386-586-7687 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 04/02/2024 | APPROVED | TPOLACEK |
| Note: 04/02/24 PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL INSPECTION | 04/02/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/02/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- PRE-APRON (PRE-POUR) | 02/16/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 12/19/2023 | 12/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 12/19/2023 | 12/22/2023 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/19/2023 | 12/19/2023 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤15.00) | 01/05/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/05/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 01/05/2024 |
| SW ENG PRE APRON | ¤30.00 | 01/05/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/05/2024 |
| SITE PLAN 15 | ¤15.00 | 01/05/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤300.00 |