Permit #2023120764
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00180-0040 |
| CONDITIONED SPACE: 1589 sqft |
| GARAGE: 427 sqft |
| OPENED PORCH (WITH ROOF) : 163 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| CONDITIONED SPACE: 1589 sqft |
| GARAGE: 427 sqft |
| OPENED PORCH (WITH ROOF) : 163 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| Total Square Footage: 4464 sqft |
| Block: 00180 |
| Subdivision: - |
| Job Phone: 386-237-1210 |
| Location Address: 7 SEATTLE TR |
| Type: DU - DUPLEX |
| Issue Date: 02/02/2024 |
| NOC: RECORDED |
| Applicant name: ANDREW POPOV |
| Owner: SEAWAY UNITED LLC |
|
Address 7 SEATTLE TRAIL PALM COAST, FL 32164 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤425,000.00 |
| Job Description: duplex |
| Type: CN |
Contractor
SILVER BREEZE HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1 SEATHORN PATH UNIT A PALM COAST, FL 32164 |
RR282812121 (Exp: 08/31/2027) | 386-237-7700 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/28/2025 | FINAL APPROVED | BTAYLOR |
| Note: 1/9/2025 - PREVIOUS INSPECTION NOTES 1. ODU are required to be a min of 3'' off grade 2. Drain line for sink on lanis have not been installed properly 3. Attic access ladder needs to be installed properly 4. Down spouts and condensation line must be a min of 12'' of home ' 5. Counter top left of fridge B side requires an outlet 6. No E-cals on site Not ready full inspection required | |||
| BLD - BUILDING FINAL | 01/09/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. ODU are required to be a min of 3'' off grade 2. Drain line for sink on lanis have not been installed properly 3. Attic access ladder needs to be installed properly 4. Down spouts and condensation line must be a min of 12'' of home ' 5. Counter top left of fridge B side requires an outlet 6. No E-cals on site Not ready full inspection required | |||
| ROW - FINAL INSPECTION | 12/30/2024 | APPROVED | FSLADISH |
| Note: 12/30/24 REQUIRED SWALE CORRECTION MADE AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ______________________________________________________________________________________________________________________ 12/16/2024 - PREVIOUS INSPECTION NOTES 12/16/24 PLEASE READ PREVIOUS INSPECTION NOTES. YOU NEED TO FIX THE RIGHT SIDE OF THE FRONT SWALE AT THE PROPERTY LINE. IT JUST DROPS OFF. NEED TO FILL IT IN AND MATCH SLOPE AND GRADE AT PROPERTY LINE BEFORE ROW FINAL PASSAGE. AS A ONE TIME COURTESY I WILL NOT FEE YOU TODAY AS I WAS ALREADY HERE FOR YOUR AFTER POUR INSPECTION. Inspector Notes from Inspection 9465 12/13/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. YOU WILL NEED TO FIX THE SLOPE ON THE RIGHT SIDE FRONT SWALE AT PROPERTY LINE. IT DROPS OFF. IT WILL NEED TO BE FILLED IN TO MATCH GRADE BEFORE ROW FINAL. APPROVING AS NOTED. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/16/2024 | FINAL APPROVED | BWRIGHT |
| U-CROSS CONNECTION | 12/16/2024 | APPROVED | BWRIGHT |
| ROW - FINAL INSPECTION | 12/16/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 12/16/24 PLEASE READ PREVIOUS INSPECTION NOTES. YOU NEED TO FIX THE RIGHT SIDE OF THE FRONT SWALE AT THE PROPERTY LINE. IT JUST DROPS OFF. NEED TO FILL IT IN AND MATCH SLOPE AND GRADE AT PROPERTY LINE BEFORE ROW FINAL PASSAGE. AS A ONE TIME COURTESY I WILL NOT FEE YOU TODAY AS I WAS ALREADY HERE FOR YOUR AFTER POUR INSPECTION. PHOTO ENCLOSED. Inspector Notes from Inspection 9465 12/13/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. YOU WILL NEED TO FIX THE SLOPE ON THE RIGHT SIDE FRONT SWALE AT PROPERTY LINE. IT DROPS OFF. IT WILL NEED TO BE FILLED IN TO MATCH GRADE BEFORE ROW FINAL. APPROVING AS NOTED. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/16/2024 | APPROVED | FSLADISH |
| Note: 12/16/24 PIPE ELEVATIONS GOOD. CULVERTS CLEAR. HOT PATCH COMPLETED AT THIS TIME. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 12/13/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. YOU WILL NEED TO FIX THE SLOPE ON THE RIGHT SIDE FRONT SWALE AT PROPERTY LINE. IT DROPS OFF. IT WILL NEED TO BE FILLED IN TO MATCH GRADE BEFORE ROW FINAL. APPROVING AS NOTED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/13/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/13/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 12/13/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. YOU WILL NEED TO FIX THE SLOPE ON THE RIGHT SIDE FRONT SWALE AT PROPERTY LINE. IT DROPS OFF. IT WILL NEED TO BE FILLED IN TO MATCH GRADE BEFORE ROW FINAL. APPROVING AS NOTED. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/06/2024 | APPROVED | FSLADISH |
| Note: 11/6/24 PIPE ELEVATIONS OK. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. Inspector Notes from Inspection 9470 3/1/24 SWALE IS OPEN, GRADED AND TEMPORARY PIPE INSTALLED AT THE TIME OF THIS DRAINAGE INSPECTION. WILL MONITOR FOR THIS SITE. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ PLEASE CHECK THE ROW IS OPEN BY GBERTOLA | |||
| ELECTRIC - EARLY POWER | 09/16/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9-16-24 1. Emailed FPL at 12:37. | |||
| GRAVITY SEWER TEST | 08/30/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 08/30/2024 | APPROVED | MGIBSON |
| INSULATION | 08/09/2024 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 7-30-24 1. Side A middle bedroom Smoke alarm to close to fresh air supply. 2. Roof pentrations need goose necks installed. 3. All bathroom exhaust fans need two forms of connections. | |||
| PEP TANK INSTALLATION REQUEST | 08/09/2024 | APPROVED | CBOWERMASTER |
| ALL ROUGH | 07/30/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 7-30-24 1. Side A middle bedroom Smoke alarm to close to fresh air supply. 2. Roof pentrations need goose necks installed. 3. All bathroom exhaust fans need two forms of connections. | |||
| LATH/BRICK/ WATER BARRIER | 06/17/2024 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 05/20/2024 | APPROVED | BTAYLOR |
| FIREWALL FINAL | 05/16/2024 | APPROVED | BTAYLOR |
| WALL SHEATHING | 05/13/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/13/2024 | APPROVED | BTAYLOR |
| FIREWALL FRAMING | 05/10/2024 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 05/10/2024 | APPROVED | BTAYLOR |
| TIE BEAM / LINTEL | 04/18/2024 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 04/01/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/19/2024 | APPROVED | BTAYLOR |
| Note: 3/18/2024 - PREVIOUS INSPECTION NOTES 3-18-24 1. B unit back drain pipe is not sleeved two sizes bigger through the footer. | |||
| MONOLITHIC SLAB | 03/18/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-18-24 1. B unit back drain pipe is not sleeved two sizes bigger through the footer. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/13/2024 | APPROVED | MGIBSON |
| ROW - DRAINAGE | 03/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/1/24 SWALE IS OPEN, GRADED AND TEMPORARY PIPE INSTALLED AT THE TIME OF THIS DRAINAGE INSPECTION. WILL MONITOR FOR THIS SITE. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ PLEASE CHECK THE ROW IS OPEN BY GBERTOLA | |||
| WATER METER INSTALLATION REQUEST | 02/09/2024 | APPROVED | BVITALE |
| Note: 2/8/2024 7:45:52 AM- PREVIOUS INSPECTION NOTES CLEARING | |||
| WATER METER INSTALLATION REQUEST | 02/07/2024 | Disapproved -FEE REQUIRED | BVITALE |
| Note: CLEARING |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/14/2025 | 01/17/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 12/08/2024 | 12/08/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Unable to process the final inspection survey due to the expired NOC. Please provide an updated NOC and resubmit the final survey for review/inspection. | |||
| ENGIN1 | COMPLETE | 03/28/2024 | 04/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/28/2024 | 03/28/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/30/2023 | 12/30/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/30/2023 | 12/31/2023 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 12/30/2023 | 01/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/20/2023 | 12/20/2023 |
| Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 12/20/2023 | 12/21/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/20/2023 | 12/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/20/2023 | 12/20/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/20/2023 | 12/22/2023 |
| LOCATE | COMPLETE | 12/20/2023 | 12/21/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/20/2023 | 12/29/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/20/2023 | 12/20/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/20/2023 | 12/20/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM You must have at least one shade tree on this lot. Crape Myrtle is not considered a shade tree Setbacks are missing on site plan/survey | |||
| BADMIN | COMPLETE | 12/20/2023 | 12/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/20/2023 | 02/07/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/28/2025 |
| REINSPECTION FEE | ¤40.00 | 12/16/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/16/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/02/2024 |
| SW ENG PRE APRON | ¤30.00 | 02/02/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/02/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/02/2024 |
| SEWER CREDIT | (¤5,684.34) | 02/02/2024 |
| SEWER INSPECTION | ¤25.00 | 02/02/2024 |
| SEWER CAPITAL FACILITY | ¤10,882.06 | 02/02/2024 |
| WATER CREDIT | (¤156.61) | 02/02/2024 |
| WATER CAPITAL FACILITY FEE | ¤7,989.02 | 02/02/2024 |
| SITE PLAN 30 | ¤30.00 | 02/02/2024 |
| SURCHARGE FS 533.721 | ¤6.16 | 02/02/2024 |
| SURCHARGE - FS 468.631 | ¤9.24 | 02/02/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/02/2024 |
| WATER- TURN ON | ¤50.00 | 02/02/2024 |
| ADJUSTMENT 50% | (¤1,091.65) | 02/02/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/02/2024 |
| INSPECTION - RESIDENTIAL | ¤1,677.50 | 02/02/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤475.80 | 02/02/2024 |
| CONNECTION FEES | ¤2,374.52 | 02/02/2024 |
| FC IMPACT FEE EMS | ¤124.00 | 02/02/2024 |
| IMPACT FEE FIRE | ¤856.18 | 02/02/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 02/02/2024 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 02/02/2024 |
| IMPACT FEE PARKS | ¤3,600.18 | 02/02/2024 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 02/02/2024 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 02/02/2024 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 02/02/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤36,373.56 |