Permit #2023120893

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00700-0040
CONDITIONED SPACE: 1500 sqft
GARAGE: 396 sqft
ENCLOSE EXISTING PORCH TO LIVING : 119 sqft
Total Square Footage: 2015 sqft
Block: 00700
Subdivision: -
Job Phone: 202-494-2019
Location Address: 36 SLEEPY HOLLOW TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/07/2024
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB FUND 2 LLC

Address

3670 MAGUIRE BOULEVARD

ORLANDO, FL 32803

Lot: 0040
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/02/2024 FINAL APPROVED BTAYLOR
ROW - FINAL APRON (AFTER POUR) 07/02/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW - STORMWATER FINAL 07/02/2024 APPROVED PFLANAGAN
Note: CORRECTIONS MADE ----------------------------------------------------------- MEET WITH BILL ON SITE SHOWED HIM WHAT NEEDS DONE PASSING AS NOTED THAT WE WILL LOOK AT THIS ON THE ROW FINAL. -------------------------------------------------------------- 6/25/2024 - PREVIOUS INSPECTION NOTES THE SOD AT THE PROPERTY LINE IS STILL HIGHER THAN THE ADJACENT LOT TO THE RIGHT. THE SOD NEEDS TO BE AT THE SAME ELEVATION OR LITTLE LOWER TO ALLOW THE WATER TO FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY STATES. -------------------------------------------------------------------------------------- 6/24/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE THE HIGH SPOT AT THE PROPERTY LINE SO THE WATER FROM THE ADJACENT LOT TO THE RIGHT WILL FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY SHOWS.
U -UTILITY RESIDENTIAL FINAL 07/02/2024 FINAL APPROVED LFITZGERALD
ELEVATION CERTIFICATE-FINAL APPROVAL 06/28/2024 APPROVED JMYERS
ROW FIELD SURVEY /GRADING CERTIFICATION 06/26/2024 APPROVED - AS NOTED PFLANAGAN
Note: MEET WITH BILL ON SITE SHOWED HIM WHAT NEEDS DONE PASSING AS NOTED THAT WE WILL LOOK AT THIS ON THE ROW FINAL. -------------------------------------------------------------- 6/25/2024 - PREVIOUS INSPECTION NOTES THE SOD AT THE PROPERTY LINE IS STILL HIGHER THAN THE ADJACENT LOT TO THE RIGHT. THE SOD NEEDS TO BE AT THE SAME ELEVATION OR LITTLE LOWER TO ALLOW THE WATER TO FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY STATES. -------------------------------------------------------------------------------------- 6/24/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE THE HIGH SPOT AT THE PROPERTY LINE SO THE WATER FROM THE ADJACENT LOT TO THE RIGHT WILL FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY SHOWS.
ROW FIELD SURVEY /GRADING CERTIFICATION 06/25/2024 Disapproved - NO FEE PFLANAGAN
Note: THE SOD AT THE PROPERTY LINE IS STILL HIGHER THAN THE ADJACENT LOT TO THE RIGHT. THE SOD NEEDS TO BE AT THE SAME ELEVATION OR LITTLE LOWER TO ALLOW THE WATER TO FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY STATES. -------------------------------------------------------------------------------------- 6/24/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE THE HIGH SPOT AT THE PROPERTY LINE SO THE WATER FROM THE ADJACENT LOT TO THE RIGHT WILL FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY SHOWS.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/24/2024 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 06/24/2024 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO REMOVE THE HIGH SPOT AT THE PROPERTY LINE SO THE WATER FROM THE ADJACENT LOT TO THE RIGHT WILL FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY SHOWS.
U-CROSS CONNECTION 05/31/2024 APPROVED DHANEY
ROW- PRE-APRON (PRE-POUR) 05/30/2024 APPROVED - AS NOTED PFLANAGAN
Note: PLEASE PUT AGAINST FORM BOARDS SO CONCRETE DOESN'T WASH OUT UNDER FORMS. TALKED TO BILL ABOUT THIS. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS.
ELECTRIC - EARLY POWER 05/28/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 3/25/24: FPL emailed at @ 13:08 - Approved for TUG outlet. Please label TUG outlet before early power. 5-28-24 1. Emailed FPL at 11:23.
GRAVITY SEWER TEST 05/13/2024 APPROVED MGIBSON
SEWER TIE IN 05/13/2024 APPROVED MGIBSON
INSULATION 05/01/2024 APPROVED BTAYLOR
PEP TANK INSTALLATION REQUEST 05/01/2024 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 04/23/2024 APPROVED BTAYLOR
ALL ROUGH 04/16/2024 APPROVED BTAYLOR
Note: 4/15/2024 - PREVIOUS INSPECTION NOTES 4-15-24 1. Need to have energy cals on site so duct laytout can be checked.
ALL ROUGH 04/15/2024 Disapproved - NO FEE BTAYLOR
Note: 4-15-24 1. Need to have energy cals on site so duct laytout can be checked.
ROOF VALLEY & METAL 04/02/2024 APPROVED BTAYLOR
WALL SHEATHING 03/28/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/28/2024 APPROVED BTAYLOR
ELECTRIC-TUG 03/25/2024 APPROVED - AS NOTED RSIMS
Note: 3/25/24: FPL emailed at @ 13:08 - Approved for TUG outlet. Please label TUG outlet before early power.
ELEV CERT-FOUNDATION APPROVAL 03/21/2024 APPROVED JMYERS
FOUND SURVEY APPROVED (OFFICE) 03/19/2024 APPROVED TBAKER
TIE BEAM / LINTEL 03/14/2024 APPROVED BTAYLOR
MONOLITHIC SLAB 03/07/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 02/29/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/15/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
PLFM COMPLETE 06/27/2024 06/28/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM HOLD 06/25/2024 06/27/2024
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM C2d should be rounded up as the FFE of the garage is listed at 24.45'. C2h, staff cannot locate this elevation on the final survey please either remove and leave N/A or revise the elevation.
ENGIN1 COMPLETE 03/19/2024 03/19/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM COMPLETE 03/19/2024 03/21/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO.
ZON COMPLETE 03/19/2024 03/19/2024
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
ENGIN1 HOLD 03/01/2024 03/01/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab.
ZON COMPLETE 03/01/2024 03/01/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 02/07/2024 02/13/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 01/17/2024 01/17/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON HOLD 01/05/2024 01/08/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment: Elevation plan: Roof pitch is incorrect
PLFM COMPLETE 01/05/2024 01/10/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been accepted. Please provide Foundation and Final prior to receiving CO.
BADMIN INFORMATION 01/05/2024 01/05/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM A fema certificate was uploaded under landscape plan. choose the elevation certificate document type and name your file 'elevation certificate'.
BLD COMPLETE 12/21/2023 12/21/2023
Note: Released By: JPI
CUSVC COMPLETE 12/21/2023 12/28/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 12/21/2023 12/22/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/21/2023 12/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 12/21/2023 12/22/2023
LOCATE COMPLETE 12/21/2023 12/22/2023
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 12/21/2023 01/02/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
SW1 COMPLETE 12/21/2023 12/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 12/21/2023 12/21/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Land scape plan: missing the green shrubs on the legend and the gallons. Elevation plan: missing roof pitch
SWALE COMPLETE 12/21/2023 02/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 12/21/2023 12/22/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLFM HOLD 12/21/2023 12/22/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM B9 needs to be 25.5'. C2 d, e, f, and g are all missing the measurement box checked.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 06/25/2024
FC IMPACT FEE EMS ¤62.00 02/07/2024
IMPACT FEE FIRE ¤428.09 02/07/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/07/2024
FC IMPACT FEE LIBRARY ¤268.00 02/07/2024
IMPACT FEE PARKS ¤1,800.99 02/07/2024
IMPACT FEE SCHOOL ¤5,450.00 02/07/2024
IMPACT FEE TRANSPORTATION ¤1,812.00 02/07/2024
WATER -IRRIGATION INSPECTION ¤25.00 02/07/2024
SURCHARGE FS 533.721 ¤2.94 02/07/2024
SURCHARGE - FS 468.631 ¤4.41 02/07/2024
SW ENG - FOUNDATION SURVEY ¤20.00 02/07/2024
SW ENG INSPECTION 80 ¤80.00 02/07/2024
SW ENG PRE APRON ¤30.00 02/07/2024
SW ENG - REVIEW 20 ¤20.00 02/07/2024
SW ENG RES REVIEW 200 ¤200.00 02/07/2024
SEWER INSPECTION ¤25.00 02/07/2024
SEWER CAPITAL FACILITY ¤5,441.03 02/07/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 02/07/2024
SITE PLAN 30 ¤30.00 02/07/2024
WATER- TURN ON ¤25.00 02/07/2024
ADJUSTMENT 50% (¤514.50) 02/07/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/07/2024
INSPECTION - RESIDENTIAL ¤778.25 02/07/2024
PLAN REVIEW - RESIDENTIAL ¤220.74 02/07/2024
CONNECTION FEES ¤1,187.26 02/07/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,658.72