Permit #2023120893
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00700-0040 |
| CONDITIONED SPACE: 1500 sqft |
| GARAGE: 396 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 119 sqft |
| Total Square Footage: 2015 sqft |
| Block: 00700 |
| Subdivision: - |
| Job Phone: 202-494-2019 |
| Location Address: 36 SLEEPY HOLLOW TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/07/2024 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB FUND 2 LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/02/2024 | FINAL APPROVED | BTAYLOR |
| ROW - FINAL APRON (AFTER POUR) | 07/02/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW - STORMWATER FINAL | 07/02/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE ----------------------------------------------------------- MEET WITH BILL ON SITE SHOWED HIM WHAT NEEDS DONE PASSING AS NOTED THAT WE WILL LOOK AT THIS ON THE ROW FINAL. -------------------------------------------------------------- 6/25/2024 - PREVIOUS INSPECTION NOTES THE SOD AT THE PROPERTY LINE IS STILL HIGHER THAN THE ADJACENT LOT TO THE RIGHT. THE SOD NEEDS TO BE AT THE SAME ELEVATION OR LITTLE LOWER TO ALLOW THE WATER TO FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY STATES. -------------------------------------------------------------------------------------- 6/24/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE THE HIGH SPOT AT THE PROPERTY LINE SO THE WATER FROM THE ADJACENT LOT TO THE RIGHT WILL FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY SHOWS. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/02/2024 | FINAL APPROVED | LFITZGERALD |
| ELEVATION CERTIFICATE-FINAL APPROVAL | 06/28/2024 | APPROVED | JMYERS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/26/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: MEET WITH BILL ON SITE SHOWED HIM WHAT NEEDS DONE PASSING AS NOTED THAT WE WILL LOOK AT THIS ON THE ROW FINAL. -------------------------------------------------------------- 6/25/2024 - PREVIOUS INSPECTION NOTES THE SOD AT THE PROPERTY LINE IS STILL HIGHER THAN THE ADJACENT LOT TO THE RIGHT. THE SOD NEEDS TO BE AT THE SAME ELEVATION OR LITTLE LOWER TO ALLOW THE WATER TO FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY STATES. -------------------------------------------------------------------------------------- 6/24/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE THE HIGH SPOT AT THE PROPERTY LINE SO THE WATER FROM THE ADJACENT LOT TO THE RIGHT WILL FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY SHOWS. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/25/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE SOD AT THE PROPERTY LINE IS STILL HIGHER THAN THE ADJACENT LOT TO THE RIGHT. THE SOD NEEDS TO BE AT THE SAME ELEVATION OR LITTLE LOWER TO ALLOW THE WATER TO FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY STATES. -------------------------------------------------------------------------------------- 6/24/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE THE HIGH SPOT AT THE PROPERTY LINE SO THE WATER FROM THE ADJACENT LOT TO THE RIGHT WILL FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY SHOWS. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/24/2024 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/24/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO REMOVE THE HIGH SPOT AT THE PROPERTY LINE SO THE WATER FROM THE ADJACENT LOT TO THE RIGHT WILL FLOW TO YOUR DRAINAGE PATTERN LIKE THE FINAL SURVEY SHOWS. | |||
| U-CROSS CONNECTION | 05/31/2024 | APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 05/30/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PLEASE PUT AGAINST FORM BOARDS SO CONCRETE DOESN'T WASH OUT UNDER FORMS. TALKED TO BILL ABOUT THIS. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. | |||
| ELECTRIC - EARLY POWER | 05/28/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 3/25/24: FPL emailed at @ 13:08 - Approved for TUG outlet. Please label TUG outlet before early power. 5-28-24 1. Emailed FPL at 11:23. | |||
| GRAVITY SEWER TEST | 05/13/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 05/13/2024 | APPROVED | MGIBSON |
| INSULATION | 05/01/2024 | APPROVED | BTAYLOR |
| PEP TANK INSTALLATION REQUEST | 05/01/2024 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 04/23/2024 | APPROVED | BTAYLOR |
| ALL ROUGH | 04/16/2024 | APPROVED | BTAYLOR |
| Note: 4/15/2024 - PREVIOUS INSPECTION NOTES 4-15-24 1. Need to have energy cals on site so duct laytout can be checked. | |||
| ALL ROUGH | 04/15/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 4-15-24 1. Need to have energy cals on site so duct laytout can be checked. | |||
| ROOF VALLEY & METAL | 04/02/2024 | APPROVED | BTAYLOR |
| WALL SHEATHING | 03/28/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/28/2024 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 03/25/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 3/25/24: FPL emailed at @ 13:08 - Approved for TUG outlet. Please label TUG outlet before early power. | |||
| ELEV CERT-FOUNDATION APPROVAL | 03/21/2024 | APPROVED | JMYERS |
| FOUND SURVEY APPROVED (OFFICE) | 03/19/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 03/14/2024 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 03/07/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/29/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/15/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 06/27/2024 | 06/28/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLFM | HOLD | 06/25/2024 | 06/27/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM C2d should be rounded up as the FFE of the garage is listed at 24.45'. C2h, staff cannot locate this elevation on the final survey please either remove and leave N/A or revise the elevation. | |||
| ENGIN1 | COMPLETE | 03/19/2024 | 03/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 03/19/2024 | 03/21/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| ZON | COMPLETE | 03/19/2024 | 03/19/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 03/01/2024 | 03/01/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 03/01/2024 | 03/01/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/07/2024 | 02/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/17/2024 | 01/17/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/05/2024 | 01/08/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment: Elevation plan: Roof pitch is incorrect | |||
| PLFM | COMPLETE | 01/05/2024 | 01/10/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been accepted. Please provide Foundation and Final prior to receiving CO. | |||
| BADMIN | INFORMATION | 01/05/2024 | 01/05/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM A fema certificate was uploaded under landscape plan. choose the elevation certificate document type and name your file 'elevation certificate'. | |||
| BLD | COMPLETE | 12/21/2023 | 12/21/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/21/2023 | 12/28/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 12/21/2023 | 12/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/21/2023 | 12/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/21/2023 | 12/22/2023 |
| LOCATE | COMPLETE | 12/21/2023 | 12/22/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/21/2023 | 01/02/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/21/2023 | 12/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/21/2023 | 12/21/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Land scape plan: missing the green shrubs on the legend and the gallons. Elevation plan: missing roof pitch | |||
| SWALE | COMPLETE | 12/21/2023 | 02/08/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 12/21/2023 | 12/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 12/21/2023 | 12/22/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM B9 needs to be 25.5'. C2 d, e, f, and g are all missing the measurement box checked. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 06/25/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 02/07/2024 |
| IMPACT FEE FIRE | ¤428.09 | 02/07/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/07/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/07/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 02/07/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/07/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 02/07/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/07/2024 |
| SURCHARGE FS 533.721 | ¤2.94 | 02/07/2024 |
| SURCHARGE - FS 468.631 | ¤4.41 | 02/07/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/07/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/07/2024 |
| SW ENG PRE APRON | ¤30.00 | 02/07/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/07/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/07/2024 |
| SEWER INSPECTION | ¤25.00 | 02/07/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 02/07/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 02/07/2024 |
| SITE PLAN 30 | ¤30.00 | 02/07/2024 |
| WATER- TURN ON | ¤25.00 | 02/07/2024 |
| ADJUSTMENT 50% | (¤514.50) | 02/07/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/07/2024 |
| INSPECTION - RESIDENTIAL | ¤778.25 | 02/07/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤220.74 | 02/07/2024 |
| CONNECTION FEES | ¤1,187.26 | 02/07/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,658.72 |