I want to search for...

Permit #2023120895

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00100-0110
CONDITIONED SPACE: 1500 sqft
GARAGE: 396 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
Total Square Footage: 2008 sqft
Block: 00100
Subdivision: -
Job Phone: 202-494-2019
Location Address: 13 SEA TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/17/2024
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB FUND 2 LLC

Address

3670 MAGUIRE BOULEVARD STE 220

ORLANDO , FL 32803

Lot: 0110
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/03/2024 FINAL APPROVED BTAYLOR
Note: 6/28/2024 - PREVIOUS INSPECTION NOTES 6/27/2024 - PREVIOUS INSPECTION NOTES 6-28-24 1. Not ready.
BLD - BUILDING FINAL 06/28/2024 Disapproved - NO FEE BTAYLOR
Note: 6/27/2024 - PREVIOUS INSPECTION NOTES 6-28-24 1. Not ready.
BLD - BUILDING FINAL 06/27/2024 CANCELLED BY APPLICANT BTAYLOR
U -UTILITY RESIDENTIAL FINAL 06/25/2024 FINAL APPROVED BWRIGHT
ROW - FINAL APRON (AFTER POUR) 06/24/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW FIELD SURVEY /GRADING CERTIFICATION 06/24/2024 APPROVED PFLANAGAN
Note: CORRECTION MADE ------------------------------------------------------------------ 6/21/2024 - PREVIOUS INSPECTION NOTES THERE IS A LOW AREA BEHIND THE WATER METER WATER CAN NOT MAKE IT TO FRONT ROADSIDE SWALE. NEED TO FIX SO WATER WILL FLOW AND NOT SIT IN LOW AREA.
ROW - STORMWATER FINAL 06/24/2024 APPROVED - AS NOTED PFLANAGAN
Note: TALKED WITH BILL ON SITE AND HE STATES THAT HE WILL CLEAN ALL DIRT OUT OF CULVERT PIPE. PASSING AS NOTED
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/21/2024 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 06/21/2024 Disapproved - NO FEE PFLANAGAN
Note: THERE IS A LOW AREA BEHIND THE WATER METER WATER CAN NOT MAKE IT TO FRONT ROADSIDE SWALE. NEED TO FIX SO WATER WILL FLOW AND NOT SIT IN LOW AREA.
ELECTRIC - EARLY POWER 06/04/2024 APPROVED - AS NOTED BTAYLOR
Note: 6-4-24 1. Emailed FPL at 11:37.
U-CROSS CONNECTION 05/31/2024 APPROVED DHANEY
ELECTRIC - EARLY POWER 05/30/2024 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 05/24/2024 APPROVED - AS NOTED FSLADISH
Note: 5/24/24 PIPE ELEVEATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the
GRAVITY SEWER TEST 05/10/2024 APPROVED MGIBSON
SEWER TIE IN 05/10/2024 APPROVED MGIBSON
INSULATION 05/02/2024 APPROVED BTAYLOR
PEP TANK INSTALLATION REQUEST 04/29/2024 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 04/22/2024 APPROVED BTAYLOR
ALL ROUGH 04/18/2024 APPROVED BTAYLOR
ROOF VALLEY & METAL 04/02/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/01/2024 APPROVED BTAYLOR
Note: 3/26/2024 - PREVIOUS INSPECTION NOTES 3/26/24: Inspection stopped! 1). Permit box needs attention. Plans & MiTek disconnected and crumpled up. No Turss layout/detail in plans or in box. 2). Need to repair and maintain your silt fence.FBC 3307.1
WALL SHEATHING 03/26/2024 APPROVED RSIMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/26/2024 Disapproved - NO FEE RSIMS
Note: 3/26/24: Inspection stopped! 1). Permit box needs attention. Plans & MiTek disconnected and crumpled up. No Turss layout/detail in plans or in box. 2). Need to repair and maintain your silt fence.FBC 3307.1
ELECTRIC-TUG 03/25/2024 APPROVED RMARTIN
TIE BEAM / LINTEL 03/14/2024 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 03/13/2024 APPROVED TBAKER
MONOLITHIC SLAB 03/06/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 03/01/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/09/2024 APPROVED BVITALE

Review History

Department Status Date In Date Out
MECH COMPLETE 06/21/2024 06/24/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 06/17/2024 06/20/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy calcs needs to be Daytona Beach
ENGIN1 COMPLETE 03/13/2024 03/13/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/13/2024 03/13/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 HOLD 03/05/2024 03/06/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab.
ZON COMPLETE 03/05/2024 03/05/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 01/24/2024 01/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 01/10/2024 01/10/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/10/2024 01/10/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 01/10/2024 01/10/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 12/21/2023 12/21/2023
Note: Released By: JPI
CUSVC COMPLETE 12/21/2023 12/27/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 12/21/2023 12/22/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/21/2023 12/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 12/21/2023 12/22/2023
LOCATE COMPLETE 12/21/2023 12/22/2023
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 12/21/2023 01/02/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
SW1 COMPLETE 12/21/2023 12/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 12/21/2023 12/22/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM House layout on plans do not match layout on site and landscape plans
BADMIN COMPLETE 12/21/2023 12/22/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 12/21/2023 02/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 06/25/2024
CONNECTION FEES ¤1,187.26 01/17/2024
FC IMPACT FEE EMS ¤62.00 01/17/2024
IMPACT FEE FIRE ¤428.09 01/17/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/17/2024
FC IMPACT FEE LIBRARY ¤268.00 01/17/2024
IMPACT FEE PARKS ¤1,800.99 01/17/2024
IMPACT FEE SCHOOL ¤5,450.00 01/17/2024
IMPACT FEE TRANSPORTATION ¤1,812.00 01/17/2024
WATER -IRRIGATION INSPECTION ¤25.00 01/17/2024
SURCHARGE FS 533.721 ¤2.93 01/17/2024
SURCHARGE - FS 468.631 ¤4.39 01/17/2024
SW ENG - FOUNDATION SURVEY ¤20.00 01/17/2024
SW ENG INSPECTION 80 ¤80.00 01/17/2024
SW ENG PRE APRON ¤30.00 01/17/2024
SW ENG - REVIEW 20 ¤20.00 01/17/2024
SW ENG RES REVIEW 200 ¤200.00 01/17/2024
SEWER CREDIT (¤2,465.75) 01/17/2024
SEWER INSPECTION ¤25.00 01/17/2024
SEWER CAPITAL FACILITY ¤5,441.03 01/17/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 01/17/2024
SITE PLAN 30 ¤30.00 01/17/2024
WATER- TURN ON ¤25.00 01/17/2024
ADJUSTMENT 50% (¤512.73) 01/17/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/17/2024
INSPECTION - RESIDENTIAL ¤775.50 01/17/2024
PLAN REVIEW - RESIDENTIAL ¤219.96 01/17/2024
Fees Total Due: ¤0.00 Total Paid: ¤19,203.68