Permit #2023120896
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00400-0050 |
| CONDITIONED SPACE: 1650 sqft |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2158 sqft |
| Block: 00400 |
| Subdivision: - |
| Job Phone: 202-494-2019 |
| Location Address: 174 UNDERWOOD TRL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/17/2024 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB BFR FUND 1 LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 07/31/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/31/24 PIPE ELEVATION GOOD. CUTS MADE. CULVERT CLEAN. HOT PATCH/ROAD REPAIR COMPLETED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ 7/30/2024 - PREVIOUS INSPECTION NOTES 7/30/24 THERE ARE STILL PILES OF DIRT, DEBRIS, CONCRETE CHUNKS AND ASSORTED FLOTSAM IN THE DRIVEWAY/SWALE AREA AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9465 7/29/24 UPON WALKING PROPERTY IT APPEARS THAT YOU HAVE REPOURED THE DRIVEWAY APRON. CHECKED ELEVATIONS, THEY ARE WITHIN COPC CULVERT ELEVATION SWALE PLAN DIAGRAM TOLERANCES AT THE TIME OF THIS INSPECTION. YOU WILL NEED TO MAKE A SAWCUT OVER THE CENTER OF THE CULVERT BEFORE ROW FINAL. WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED. APPROVING THIS FIELD SURVEY AS NOTED. Inspector Notes from Inspection 9463 7/29/24 CULVERT ELEVATIONS CORRECTED ON THIS SURVEY WILL CONFIRM DURING FIELD SURVEY. PASSING AS NOTED THAT CULVERT ELEVATIONS ARE NOW WITHIN COPC TOLERANCES. _________________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________________ 7/26/2024 - PREVIOUS INSPECTION NOTES 7/26/24 YOUR CULVERT PIPE ELEVATIONS 22.74-22.66 ARE STILL OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM ELEVATION OF 22.50. . Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place. IF YOU WOULD LIKE YOU CAN MEET ME ON SITE NEXT WEEK TO RESHOOT THEM AND GO FROM THER. CONTACT ME IF THAT IS THE CASE AND WE CAN FIGURE OUT A TIME AND DATE. Inspector Notes from Inspection 9270 7/19/24 PIPE ELEVATION IS GOOD AT THIS TIME. READY TO REPOUR YOUR APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW - STORMWATER FINAL | 07/31/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/31/24 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 7/30/2024 - PREVIOUS INSPECTION NOTES 7/30/24 YOU WILL NEED TO COMPACT, SLOPE AND SOD TO MATCH GRADE AT DRIVEWAY APRON/FRONT SWALE AREA AFTER CLEANING AREA UP. THERE ARE STILL PILES OF DIRT, DEBRIS, CONCRETE CHUNKS AND ASSORTED FLOTSAM IN THE DRIVEWAY/SWALE AREA AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 7/29/24 UPON WALKING PROPERTY IT APPEARS THAT YOU HAVE REPOURED THE DRIVEWAY APRON. CHECKED ELEVATIONS, THEY ARE WITHIN COPC CULVERT ELEVATION SWALE PLAN DIAGRAM TOLERANCES AT THE TIME OF THIS INSPECTION. YOU WILL NEED TO MAKE A SAWCUT OVER THE CENTER OF THE CULVERT BEFORE ROW FINAL. WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED. APPROVING THIS FIELD SURVEY AS NOTED. Inspector Notes from Inspection 9463 7/29/24 CULVERT ELEVATIONS CORRECTED ON THIS SURVEY WILL CONFIRM DURING FIELD SURVEY. PASSING AS NOTED THAT CULVERT ELEVATIONS ARE NOW WITHIN COPC TOLERANCES. _________________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________________ 7/26/2024 - PREVIOUS INSPECTION NOTES 7/26/24 YOUR CULVERT PIPE ELEVATIONS 22.74-22.66 ARE STILL OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM ELEVATION OF 22.50. . Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place. IF YOU WOULD LIKE YOU CAN MEET ME ON SITE NEXT WEEK TO RESHOOT THEM AND GO FROM THER. CONTACT ME IF THAT IS THE CASE AND WE CAN FIGURE OUT A TIME AND DATE. Inspector Notes from Inspection 9270 7/19/24 PIPE ELEVATION IS GOOD AT THIS TIME. READY TO REPOUR YOUR APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/30/2024 | FINAL APPROVED | BWRIGHT |
| ROW - STORMWATER FINAL | 07/30/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 7/30/24 YOU WILL NEED TO COMPACT, SLOPE AND SOD TO MATCH GRADE AT DRIVEWAY APRON/FRONT SWALE AREA AFTER CLEANING AREA UP. THERE ARE STILL PILES OF DIRT, DEBRIS, CONCRETE CHUNKS AND ASSORTED FLOTSAM IN THE DRIVEWAY/SWALE AREA AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 7/29/24 UPON WALKING PROPERTY IT APPEARS THAT YOU HAVE REPOURED THE DRIVEWAY APRON. CHECKED ELEVATIONS, THEY ARE WITHIN COPC CULVERT ELEVATION SWALE PLAN DIAGRAM TOLERANCES AT THE TIME OF THIS INSPECTION. YOU WILL NEED TO MAKE A SAWCUT OVER THE CENTER OF THE CULVERT BEFORE ROW FINAL. WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED. APPROVING THIS FIELD SURVEY AS NOTED. Inspector Notes from Inspection 9463 7/29/24 CULVERT ELEVATIONS CORRECTED ON THIS SURVEY WILL CONFIRM DURING FIELD SURVEY. PASSING AS NOTED THAT CULVERT ELEVATIONS ARE NOW WITHIN COPC TOLERANCES. _________________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________________ 7/26/2024 - PREVIOUS INSPECTION NOTES 7/26/24 YOUR CULVERT PIPE ELEVATIONS 22.74-22.66 ARE STILL OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM ELEVATION OF 22.50. . Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place. IF YOU WOULD LIKE YOU CAN MEET ME ON SITE NEXT WEEK TO RESHOOT THEM AND GO FROM THER. CONTACT ME IF THAT IS THE CASE AND WE CAN FIGURE OUT A TIME AND DATE. Inspector Notes from Inspection 9270 7/19/24 PIPE ELEVATION IS GOOD AT THIS TIME. READY TO REPOUR YOUR APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW - FINAL APRON (AFTER POUR) | 07/30/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 7/30/24 THERE ARE STILL PILES OF DIRT, DEBRIS, CONCRETE CHUNKS AND ASSORTED FLOTSAM IN THE DRIVEWAY/SWALE AREA AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9465 7/29/24 UPON WALKING PROPERTY IT APPEARS THAT YOU HAVE REPOURED THE DRIVEWAY APRON. CHECKED ELEVATIONS, THEY ARE WITHIN COPC CULVERT ELEVATION SWALE PLAN DIAGRAM TOLERANCES AT THE TIME OF THIS INSPECTION. YOU WILL NEED TO MAKE A SAWCUT OVER THE CENTER OF THE CULVERT BEFORE ROW FINAL. WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED. APPROVING THIS FIELD SURVEY AS NOTED. Inspector Notes from Inspection 9463 7/29/24 CULVERT ELEVATIONS CORRECTED ON THIS SURVEY WILL CONFIRM DURING FIELD SURVEY. PASSING AS NOTED THAT CULVERT ELEVATIONS ARE NOW WITHIN COPC TOLERANCES. _________________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________________ 7/26/2024 - PREVIOUS INSPECTION NOTES 7/26/24 YOUR CULVERT PIPE ELEVATIONS 22.74-22.66 ARE STILL OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM ELEVATION OF 22.50. . Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place. IF YOU WOULD LIKE YOU CAN MEET ME ON SITE NEXT WEEK TO RESHOOT THEM AND GO FROM THER. CONTACT ME IF THAT IS THE CASE AND WE CAN FIGURE OUT A TIME AND DATE. Inspector Notes from Inspection 9270 7/19/24 PIPE ELEVATION IS GOOD AT THIS TIME. READY TO REPOUR YOUR APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| BLD - BUILDING FINAL | 07/30/2024 | FINAL APPROVED | BTAYLOR |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/29/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/29/24 CULVERT ELEVATIONS CORRECTED ON THIS SURVEY WILL CONFIRM DURING FIELD SURVEY. PASSING AS NOTED THAT CULVERT ELEVATIONS ARE NOW WITHIN COPC TOLERANCES. _________________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________________ 7/26/2024 - PREVIOUS INSPECTION NOTES 7/26/24 YOUR CULVERT PIPE ELEVATIONS 22.74-22.66 ARE STILL OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM ELEVATION OF 22.50. . Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place. IF YOU WOULD LIKE YOU CAN MEET ME ON SITE NEXT WEEK TO RESHOOT THEM AND GO FROM THER. CONTACT ME IF THAT IS THE CASE AND WE CAN FIGURE OUT A TIME AND DATE. Inspector Notes from Inspection 9270 7/19/24 PIPE ELEVATION IS GOOD AT THIS TIME. READY TO REPOUR YOUR APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/29/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/29/24 UPON WALKING PROPERTY IT APPEARS THAT YOU HAVE REPOURED THE DRIVEWAY APRON. CHECKED ELEVATIONS, THEY ARE WITHIN COPC CULVERT ELEVATION SWALE PLAN DIAGRAM TOLERANCES AT THE TIME OF THIS INSPECTION. YOU WILL NEED TO MAKE A SAWCUT OVER THE CENTER OF THE CULVERT BEFORE ROW FINAL. WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED. APPROVING THIS FIELD SURVEY AS NOTED. Inspector Notes from Inspection 9463 7/29/24 CULVERT ELEVATIONS CORRECTED ON THIS SURVEY WILL CONFIRM DURING FIELD SURVEY. PASSING AS NOTED THAT CULVERT ELEVATIONS ARE NOW WITHIN COPC TOLERANCES. _________________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________________ 7/26/2024 - PREVIOUS INSPECTION NOTES 7/26/24 YOUR CULVERT PIPE ELEVATIONS 22.74-22.66 ARE STILL OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM ELEVATION OF 22.50. . Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place. IF YOU WOULD LIKE YOU CAN MEET ME ON SITE NEXT WEEK TO RESHOOT THEM AND GO FROM THER. CONTACT ME IF THAT IS THE CASE AND WE CAN FIGURE OUT A TIME AND DATE. Inspector Notes from Inspection 9270 7/19/24 PIPE ELEVATION IS GOOD AT THIS TIME. READY TO REPOUR YOUR APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/26/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 7/26/24 YOUR CULVERT PIPE ELEVATIONS 22.74-22.66 ARE STILL OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM ELEVATION OF 22.50. . Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place. IF YOU WOULD LIKE YOU CAN MEET ME ON SITE NEXT WEEK TO RESHOOT THEM AND GO FROM THER. CONTACT ME IF THAT IS THE CASE AND WE CAN FIGURE OUT A TIME AND DATE. Inspector Notes from Inspection 9270 7/19/24 PIPE ELEVATION IS GOOD AT THIS TIME. READY TO REPOUR YOUR APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U-CROSS CONNECTION | 07/19/2024 | APPROVED | BWRIGHT |
| ROW- PRE-APRON (PRE-POUR) | 07/19/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/19/24 PIPE ELEVATION IS GOOD AT THIS TIME. READY TO REPOUR YOUR APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/10/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 7/10/24 YOUR CULVERT PIPE INVERT ELEVATIONS (22.70 & 22.75) ARE OUT OF TOLERANCE TO THE SWALE PLAN ELEVATION OF 22.50. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. ON THE LEFT SIDE UPSHIRE PATH ROADSIDE SWALE YOU ARE SHOWING A SPOT (22.90) 2 TENTHS HIGHER THAN THE UPSTREAM ELEVATIONS FROM IT (22.70) WHICH IS ALSO SHOWING FLAT AT (22.70) FOR 60'. Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" Roadside swale. Sec.300.01 C2 Sec.300.01 C2 "The tolerance on individual shots along the as-built flow line of the swale (depressions or high spots) is plus or minus 0.10 feet.Sec.300.01 C2" | |||
| ROW- PRE-APRON (PRE-POUR) | 06/21/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. ------------------------------------------------------------------------------ 6/18/2024 - PREVIOUS INSPECTION NOTES THE MITER END FOOTERS NEED TO BE A MINIMUM OF 6"X6". PLEASE SEE DRAWING IN TECH. MANUAL #300.E FOR DIAGRAM OF FOOTERS | |||
| ROW- PRE-APRON (PRE-POUR) | 06/18/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE MITER END FOOTERS NEED TO BE A MINIMUM OF 6"X6". PLEASE SEE DRAWING IN TECH. MANUAL #300.E FOR DIAGRAM OF FOOTERS | |||
| ELECTRIC - EARLY POWER | 05/30/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 4-23-24 1. Emailed FPL at 12:58. 5-30-24 1. Emailed FPL at 1:57. | |||
| LATH/BRICK/ WATER BARRIER | 05/06/2024 | APPROVED | BTAYLOR |
| INSULATION | 05/06/2024 | APPROVED | BTAYLOR |
| ALL ROUGH | 05/01/2024 | APPROVED | BTAYLOR |
| ALL ROUGH | 04/30/2024 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 04/29/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/29/2024 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 04/29/2024 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 04/26/2024 | APPROVED | TBAKER |
| ELECTRIC-TUG | 04/23/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4-23-24 1. Emailed FPL at 12:58. | |||
| GRAVITY SEWER TEST | 04/18/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 04/18/2024 | APPROVED | MGIBSON |
| TIE BEAM / LINTEL | 04/01/2024 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 03/15/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-15-24 1. No bug cert. in box. | |||
| MONOLITHIC SLAB | 03/15/2024 | APPROVED | BTAYLOR |
| Note: 3/15/2024 - PREVIOUS INSPECTION NOTES 3-15-24 1. No bug cert. in box. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/08/2024 | APPROVED | BTAYLOR |
| WATER METER INSTALLATION REQUEST | 02/27/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 07/09/2024 | 07/09/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM This is not a final. | |||
| ENGIN1 | COMPLETE | 04/25/2024 | 04/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/25/2024 | 04/25/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 03/11/2024 | 03/11/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 03/11/2024 | 03/11/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/07/2024 | 02/09/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/21/2023 | 12/21/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/21/2023 | 12/27/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 12/21/2023 | 12/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/21/2023 | 12/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/21/2023 | 12/29/2023 |
| LOCATE | COMPLETE | 12/21/2023 | 12/22/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/21/2023 | 01/02/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/21/2023 | 12/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/21/2023 | 12/22/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 12/21/2023 | 12/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/21/2023 | 02/08/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/30/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/30/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/18/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/17/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/17/2024 |
| SEWER CREDIT | (¤850.00) | 01/17/2024 |
| SEWER INSPECTION | ¤25.00 | 01/17/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 01/17/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 01/17/2024 |
| SITE PLAN 30 | ¤30.00 | 01/17/2024 |
| WATER- TURN ON | ¤25.00 | 01/17/2024 |
| ADJUSTMENT 50% | (¤555.09) | 01/17/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/17/2024 |
| INSPECTION - RESIDENTIAL | ¤841.50 | 01/17/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤238.68 | 01/17/2024 |
| CONNECTION FEES | ¤1,187.26 | 01/17/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 01/17/2024 |
| IMPACT FEE FIRE | ¤428.09 | 01/17/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/17/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/17/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 01/17/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/17/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 01/17/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/17/2024 |
| SURCHARGE FS 533.721 | ¤3.16 | 01/17/2024 |
| SURCHARGE - FS 468.631 | ¤4.75 | 01/17/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/17/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/17/2024 |
| SW ENG PRE APRON | ¤30.00 | 01/17/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,899.88 |