I want to search for...

Permit #2023120899

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00400-0160
CONDITIONED SPACE: 1500 sqft
GARAGE: 396 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
Total Square Footage: 2008 sqft
Block: 00400
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 202-494-2019
Location Address: 12 SERIEMA PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/01/2024
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB BFR FUND 1 LLC

Address

3670 MAGUIRE BOULEVARD

ORLANDO, FL 32803

Address

SUITE 220

ORLANDO, FL 32803

Lot: 0160
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/25/2024 FINAL APPROVED BTAYLOR
Note: 10/23/2024 - PREVIOUS INSPECTION NOTES 10-23-24 1. Heat strip not marked off. 2. No insulation cert on site.
BLD - BUILDING FINAL 10/23/2024 Disapproved - NO FEE BTAYLOR
Note: 10-23-24 1. Heat strip not marked off. 2. No insulation cert on site.
ROW - FINAL APRON (AFTER POUR) 10/23/2024 APPROVED FSLADISH
Note: 10/23/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 10/21/24 SUB WAS ON SITE FIXING RIGHT SIDE SWALE AT THE TIME OF THIS INSPECTION SO I AM APPROVING THIS INSPECTION AS NOTED THAT I WILL ALLOW YOU TO MOVE FORWARD AND WILL LOOK TO MAKE SURE OF CORRECTIONS BEFORE ROW FINAL PASSAGE. 10/17/2024 - PREVIOUS INSPECTION NOTES 10/17/24 UPON WALKING PROPERTY DETERMINED THAT LEFT SIDE REAR DOES'NT SEEM TO BE AN ISSUE. THE RIGHT SIDE PROPERTY LINE SHOULD BE A COMMON SWALE. YOUR PROPERTY IS HIGHER AT THE ADJOINING PROPERTY LINE EVEN PAST WHERE YOU HAVE BUILT A BERM. A COMMON SWALE IS ACHIEVABLE BASED ON THE ELEVATION NUMBERS PROVIDED IN YOUR SITE PLAN. THIS WILL NEED TO BE A COMMON SWALE ON THE RIGHT SIDE ABUTTING PROPERTIES. 8Rear yard will be drained Sec 300.01-C.7 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale. Flooding or draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 12 Common Swale required when possible Sec 300.03 C1c Sec 300.03 C1c When grading against a developable vacant lot a 'Common Swale' (meaning the drainage conveyance is on the property line) is required. Inspector Notes from Inspection 9463 10/17/24 ON YOUR NEW SURVEY YOU ARE SHOWING A SHORT BERM ON THE RIGHT REAR ADJOING PROPERTY LINE TO KEEP FROM IMPACTING THE ADJOINING LOT. YOUR SITE PLAN PROPOSED A COMMON SWALE AS THESE PROPERTIES ARE BOTH NEW BUILDS. ON YOUR SITE PLAN IN THE REAR LEFT PROPERTY LINE YOU PROPOSED A 27.40 AND A 27.30 THE LAST TWO ELEVATION SHOTS ON THE LEFT 5 FT OFFSET ARE 28.10 WHICH IS 7 AND 8 TENTHS HIGHER THAN PROPOSED. I AM GOING TO SEE IF THE SURVEY MATCHES THE FIELD AND DETERMINE WHAT VERIFIES. I AM APPROVING THIS AS NOTED THAT BASED ON FIELD FINDINGS CORRECTIONS MAY BE REQUIRED. ________________________________________________________________________________________________________________________ 10/14/2024 - PREVIOUS INSPECTION NOTES 10/14/24 ON THE RIGHT SIDE PROPERTY LINE TOWARDS THE REAR YOU ARE SHOWING 27.20 AT THE CORNER THEN GOING TO A 27.00 BACK UP TO A 27.20 WHICH IS UPHILL. AT THAT 27.20 SHOT YOU ARE SHOWING A COMMON SWALE, BUT THE DRAINAGE PATTERN SHOWS THE DRAINAGE FLOW GOING FROM 27.40 IN THE REAR QUADRANT FLOWING DOWN , AROUND TO THE 27.20 THEN DOWN TO 26.50 AT THE 10 FT OFFSET ON THE ADJOINING PROPERTY. THAT SHOWS DRAINAGE RUNNING STRAIGHT ONTO THE ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. 7Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 10/11/2024 - PREVIOUS INSPECTION NOTES City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOUR FFE HAS GONE UP THREE HUNDRETHS ON THIS NEW SURVEY. YOUR 27.50 ELEVATION SHOT ON THE LEFT SIDE MIDDLE OF THE STRUCTURE IS SHOWING 27.50 STILL NOT THE REQUIRED 4" BELOW FFE FOR BLOCK CONSTRUCTION. YOU ARE SHOWING A 27.95 10' OF THE REAR LEFT SIDE OF THE STRUCTURE INDICATING THAT DRAINAGE WILL HAVE NEGATIVE IMPACTS ON THE STRUCTURE WHERE YOUR ARE SHOWING AN ELEVATION OF 27.45 AT THE CORNER. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ 12 Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 9/24/2024 - PREVIOUS INSPECTION NOTES ALL SOD ELEVATIONS AGAINST THE HOUSE NEED TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures.
ROW - STORMWATER FINAL 10/23/2024 APPROVED - AS NOTED FSLADISH
Note: 10/23/24 SPOKE WITH BILL CM ONE SMALL AREA IN BACKPROPERTY LINE NEED A COUPLE PIECES OF SOD. BILL ASSURED ME IT WOULD BE TAKEN CARE OF ASAP. PASSING AS NOTED. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 10/21/24 SUB WAS ON SITE FIXING RIGHT SIDE SWALE AT THE TIME OF THIS INSPECTION SO I AM APPROVING THIS INSPECTION AS NOTED THAT I WILL ALLOW YOU TO MOVE FORWARD AND WILL LOOK TO MAKE SURE OF CORRECTIONS BEFORE ROW FINAL PASSAGE. 10/17/2024 - PREVIOUS INSPECTION NOTES 10/17/24 UPON WALKING PROPERTY DETERMINED THAT LEFT SIDE REAR DOES'NT SEEM TO BE AN ISSUE. THE RIGHT SIDE PROPERTY LINE SHOULD BE A COMMON SWALE. YOUR PROPERTY IS HIGHER AT THE ADJOINING PROPERTY LINE EVEN PAST WHERE YOU HAVE BUILT A BERM. A COMMON SWALE IS ACHIEVABLE BASED ON THE ELEVATION NUMBERS PROVIDED IN YOUR SITE PLAN. THIS WILL NEED TO BE A COMMON SWALE ON THE RIGHT SIDE ABUTTING PROPERTIES. 8Rear yard will be drained Sec 300.01-C.7 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale. Flooding or draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 12 Common Swale required when possible Sec 300.03 C1c Sec 300.03 C1c When grading against a developable vacant lot a 'Common Swale' (meaning the drainage conveyance is on the property line) is required. Inspector Notes from Inspection 9463 10/17/24 ON YOUR NEW SURVEY YOU ARE SHOWING A SHORT BERM ON THE RIGHT REAR ADJOING PROPERTY LINE TO KEEP FROM IMPACTING THE ADJOINING LOT. YOUR SITE PLAN PROPOSED A COMMON SWALE AS THESE PROPERTIES ARE BOTH NEW BUILDS. ON YOUR SITE PLAN IN THE REAR LEFT PROPERTY LINE YOU PROPOSED A 27.40 AND A 27.30 THE LAST TWO ELEVATION SHOTS ON THE LEFT 5 FT OFFSET ARE 28.10 WHICH IS 7 AND 8 TENTHS HIGHER THAN PROPOSED. I AM GOING TO SEE IF THE SURVEY MATCHES THE FIELD AND DETERMINE WHAT VERIFIES. I AM APPROVING THIS AS NOTED THAT BASED ON FIELD FINDINGS CORRECTIONS MAY BE REQUIRED. ________________________________________________________________________________________________________________________ 10/14/2024 - PREVIOUS INSPECTION NOTES 10/14/24 ON THE RIGHT SIDE PROPERTY LINE TOWARDS THE REAR YOU ARE SHOWING 27.20 AT THE CORNER THEN GOING TO A 27.00 BACK UP TO A 27.20 WHICH IS UPHILL. AT THAT 27.20 SHOT YOU ARE SHOWING A COMMON SWALE, BUT THE DRAINAGE PATTERN SHOWS THE DRAINAGE FLOW GOING FROM 27.40 IN THE REAR QUADRANT FLOWING DOWN , AROUND TO THE 27.20 THEN DOWN TO 26.50 AT THE 10 FT OFFSET ON THE ADJOINING PROPERTY. THAT SHOWS DRAINAGE RUNNING STRAIGHT ONTO THE ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. 7Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 10/11/2024 - PREVIOUS INSPECTION NOTES City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOUR FFE HAS GONE UP THREE HUNDRETHS ON THIS NEW SURVEY. YOUR 27.50 ELEVATION SHOT ON THE LEFT SIDE MIDDLE OF THE STRUCTURE IS SHOWING 27.50 STILL NOT THE REQUIRED 4" BELOW FFE FOR BLOCK CONSTRUCTION. YOU ARE SHOWING A 27.95 10' OF THE REAR LEFT SIDE OF THE STRUCTURE INDICATING THAT DRAINAGE WILL HAVE NEGATIVE IMPACTS ON THE STRUCTURE WHERE YOUR ARE SHOWING AN ELEVATION OF 27.45 AT THE CORNER. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ 12 Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 9/24/2024 - PREVIOUS INSPECTION NOTES ALL SOD ELEVATIONS AGAINST THE HOUSE NEED TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures.
U -UTILITY RESIDENTIAL FINAL 10/23/2024 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 No IRR. No CC
ROW FIELD SURVEY /GRADING CERTIFICATION 10/21/2024 APPROVED - AS NOTED FSLADISH
Note: 10/21/24 SUB WAS ON SITE FIXING RIGHT SIDE SWALE AT THE TIME OF THIS INSPECTION SO I AM APPROVING THIS INSPECTION AS NOTED THAT I WILL ALLOW YOU TO MOVE FORWARD AND WILL LOOK TO MAKE SURE OF CORRECTIONS BEFORE ROW FINAL PASSAGE. 10/17/2024 - PREVIOUS INSPECTION NOTES 10/17/24 UPON WALKING PROPERTY DETERMINED THAT LEFT SIDE REAR DOES'NT SEEM TO BE AN ISSUE. THE RIGHT SIDE PROPERTY LINE SHOULD BE A COMMON SWALE. YOUR PROPERTY IS HIGHER AT THE ADJOINING PROPERTY LINE EVEN PAST WHERE YOU HAVE BUILT A BERM. A COMMON SWALE IS ACHIEVABLE BASED ON THE ELEVATION NUMBERS PROVIDED IN YOUR SITE PLAN. THIS WILL NEED TO BE A COMMON SWALE ON THE RIGHT SIDE ABUTTING PROPERTIES. 8Rear yard will be drained Sec 300.01-C.7 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale. Flooding or draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 12 Common Swale required when possible Sec 300.03 C1c Sec 300.03 C1c When grading against a developable vacant lot a 'Common Swale' (meaning the drainage conveyance is on the property line) is required. Inspector Notes from Inspection 9463 10/17/24 ON YOUR NEW SURVEY YOU ARE SHOWING A SHORT BERM ON THE RIGHT REAR ADJOING PROPERTY LINE TO KEEP FROM IMPACTING THE ADJOINING LOT. YOUR SITE PLAN PROPOSED A COMMON SWALE AS THESE PROPERTIES ARE BOTH NEW BUILDS. ON YOUR SITE PLAN IN THE REAR LEFT PROPERTY LINE YOU PROPOSED A 27.40 AND A 27.30 THE LAST TWO ELEVATION SHOTS ON THE LEFT 5 FT OFFSET ARE 28.10 WHICH IS 7 AND 8 TENTHS HIGHER THAN PROPOSED. I AM GOING TO SEE IF THE SURVEY MATCHES THE FIELD AND DETERMINE WHAT VERIFIES. I AM APPROVING THIS AS NOTED THAT BASED ON FIELD FINDINGS CORRECTIONS MAY BE REQUIRED. ________________________________________________________________________________________________________________________ 10/14/2024 - PREVIOUS INSPECTION NOTES 10/14/24 ON THE RIGHT SIDE PROPERTY LINE TOWARDS THE REAR YOU ARE SHOWING 27.20 AT THE CORNER THEN GOING TO A 27.00 BACK UP TO A 27.20 WHICH IS UPHILL. AT THAT 27.20 SHOT YOU ARE SHOWING A COMMON SWALE, BUT THE DRAINAGE PATTERN SHOWS THE DRAINAGE FLOW GOING FROM 27.40 IN THE REAR QUADRANT FLOWING DOWN , AROUND TO THE 27.20 THEN DOWN TO 26.50 AT THE 10 FT OFFSET ON THE ADJOINING PROPERTY. THAT SHOWS DRAINAGE RUNNING STRAIGHT ONTO THE ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. 7Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 10/11/2024 - PREVIOUS INSPECTION NOTES City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOUR FFE HAS GONE UP THREE HUNDRETHS ON THIS NEW SURVEY. YOUR 27.50 ELEVATION SHOT ON THE LEFT SIDE MIDDLE OF THE STRUCTURE IS SHOWING 27.50 STILL NOT THE REQUIRED 4" BELOW FFE FOR BLOCK CONSTRUCTION. YOU ARE SHOWING A 27.95 10' OF THE REAR LEFT SIDE OF THE STRUCTURE INDICATING THAT DRAINAGE WILL HAVE NEGATIVE IMPACTS ON THE STRUCTURE WHERE YOUR ARE SHOWING AN ELEVATION OF 27.45 AT THE CORNER. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ 12 Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 9/24/2024 - PREVIOUS INSPECTION NOTES ALL SOD ELEVATIONS AGAINST THE HOUSE NEED TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/17/2024 APPROVED - AS NOTED FSLADISH
Note: 10/17/24 ON YOUR NEW SURVEY YOU ARE SHOWING A SHORT BERM ON THE RIGHT REAR ADJOING PROPERTY LINE TO KEEP FROM IMPACTING THE ADJOINING LOT. YOUR SITE PLAN PROPOSED A COMMON SWALE AS THESE PROPERTIES ARE BOTH NEW BUILDS. ON YOUR SITE PLAN IN THE REAR LEFT PROPERTY LINE YOU PROPOSED A 27.40 AND A 27.30 THE LAST TWO ELEVATION SHOTS ON THE LEFT 5 FT OFFSET ARE 28.10 WHICH IS 7 AND 8 TENTHS HIGHER THAN PROPOSED. I AM GOING TO SEE IF THE SURVEY MATCHES THE FIELD AND DETERMINE WHAT VERIFIES. I AM APPROVING THIS AS NOTED THAT BASED ON FIELD FINDINGS CORRECTIONS MAY BE REQUIRED. ________________________________________________________________________________________________________________________ 10/14/2024 - PREVIOUS INSPECTION NOTES 10/14/24 ON THE RIGHT SIDE PROPERTY LINE TOWARDS THE REAR YOU ARE SHOWING 27.20 AT THE CORNER THEN GOING TO A 27.00 BACK UP TO A 27.20 WHICH IS UPHILL. AT THAT 27.20 SHOT YOU ARE SHOWING A COMMON SWALE, BUT THE DRAINAGE PATTERN SHOWS THE DRAINAGE FLOW GOING FROM 27.40 IN THE REAR QUADRANT FLOWING DOWN , AROUND TO THE 27.20 THEN DOWN TO 26.50 AT THE 10 FT OFFSET ON THE ADJOINING PROPERTY. THAT SHOWS DRAINAGE RUNNING STRAIGHT ONTO THE ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. 7Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 10/11/2024 - PREVIOUS INSPECTION NOTES City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOUR FFE HAS GONE UP THREE HUNDRETHS ON THIS NEW SURVEY. YOUR 27.50 ELEVATION SHOT ON THE LEFT SIDE MIDDLE OF THE STRUCTURE IS SHOWING 27.50 STILL NOT THE REQUIRED 4" BELOW FFE FOR BLOCK CONSTRUCTION. YOU ARE SHOWING A 27.95 10' OF THE REAR LEFT SIDE OF THE STRUCTURE INDICATING THAT DRAINAGE WILL HAVE NEGATIVE IMPACTS ON THE STRUCTURE WHERE YOUR ARE SHOWING AN ELEVATION OF 27.45 AT THE CORNER. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ 12 Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 9/24/2024 - PREVIOUS INSPECTION NOTES ALL SOD ELEVATIONS AGAINST THE HOUSE NEED TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures.
ROW FIELD SURVEY /GRADING CERTIFICATION 10/17/2024 Disapproved - NO FEE FSLADISH
Note: 10/17/24 UPON WALKING PROPERTY DETERMINED THAT LEFT SIDE REAR DOES'NT SEEM TO BE AN ISSUE. THE RIGHT SIDE PROPERTY LINE SHOULD BE A COMMON SWALE. YOUR PROPERTY IS HIGHER AT THE ADJOINING PROPERTY LINE EVEN PAST WHERE YOU HAVE BUILT A BERM. A COMMON SWALE IS ACHIEVABLE BASED ON THE ELEVATION NUMBERS PROVIDED IN YOUR SITE PLAN. THIS WILL NEED TO BE A COMMON SWALE ON THE RIGHT SIDE ABUTTING PROPERTIES. 8Rear yard will be drained Sec 300.01-C.7 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale. Flooding or draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 12 Common Swale required when possible Sec 300.03 C1c Sec 300.03 C1c When grading against a developable vacant lot a 'Common Swale' (meaning the drainage conveyance is on the property line) is required. Inspector Notes from Inspection 9463 10/17/24 ON YOUR NEW SURVEY YOU ARE SHOWING A SHORT BERM ON THE RIGHT REAR ADJOING PROPERTY LINE TO KEEP FROM IMPACTING THE ADJOINING LOT. YOUR SITE PLAN PROPOSED A COMMON SWALE AS THESE PROPERTIES ARE BOTH NEW BUILDS. ON YOUR SITE PLAN IN THE REAR LEFT PROPERTY LINE YOU PROPOSED A 27.40 AND A 27.30 THE LAST TWO ELEVATION SHOTS ON THE LEFT 5 FT OFFSET ARE 28.10 WHICH IS 7 AND 8 TENTHS HIGHER THAN PROPOSED. I AM GOING TO SEE IF THE SURVEY MATCHES THE FIELD AND DETERMINE WHAT VERIFIES. I AM APPROVING THIS AS NOTED THAT BASED ON FIELD FINDINGS CORRECTIONS MAY BE REQUIRED. ________________________________________________________________________________________________________________________ 10/14/2024 - PREVIOUS INSPECTION NOTES 10/14/24 ON THE RIGHT SIDE PROPERTY LINE TOWARDS THE REAR YOU ARE SHOWING 27.20 AT THE CORNER THEN GOING TO A 27.00 BACK UP TO A 27.20 WHICH IS UPHILL. AT THAT 27.20 SHOT YOU ARE SHOWING A COMMON SWALE, BUT THE DRAINAGE PATTERN SHOWS THE DRAINAGE FLOW GOING FROM 27.40 IN THE REAR QUADRANT FLOWING DOWN , AROUND TO THE 27.20 THEN DOWN TO 26.50 AT THE 10 FT OFFSET ON THE ADJOINING PROPERTY. THAT SHOWS DRAINAGE RUNNING STRAIGHT ONTO THE ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. 7Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 10/11/2024 - PREVIOUS INSPECTION NOTES City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOUR FFE HAS GONE UP THREE HUNDRETHS ON THIS NEW SURVEY. YOUR 27.50 ELEVATION SHOT ON THE LEFT SIDE MIDDLE OF THE STRUCTURE IS SHOWING 27.50 STILL NOT THE REQUIRED 4" BELOW FFE FOR BLOCK CONSTRUCTION. YOU ARE SHOWING A 27.95 10' OF THE REAR LEFT SIDE OF THE STRUCTURE INDICATING THAT DRAINAGE WILL HAVE NEGATIVE IMPACTS ON THE STRUCTURE WHERE YOUR ARE SHOWING AN ELEVATION OF 27.45 AT THE CORNER. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ 12 Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 9/24/2024 - PREVIOUS INSPECTION NOTES ALL SOD ELEVATIONS AGAINST THE HOUSE NEED TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/14/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 10/14/24 ON THE RIGHT SIDE PROPERTY LINE TOWARDS THE REAR YOU ARE SHOWING 27.20 AT THE CORNER THEN GOING TO A 27.00 BACK UP TO A 27.20 WHICH IS UPHILL. AT THAT 27.20 SHOT YOU ARE SHOWING A COMMON SWALE, BUT THE DRAINAGE PATTERN SHOWS THE DRAINAGE FLOW GOING FROM 27.40 IN THE REAR QUADRANT FLOWING DOWN , AROUND TO THE 27.20 THEN DOWN TO 26.50 AT THE 10 FT OFFSET ON THE ADJOINING PROPERTY. THAT SHOWS DRAINAGE RUNNING STRAIGHT ONTO THE ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. 7Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 10/11/2024 - PREVIOUS INSPECTION NOTES City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOUR FFE HAS GONE UP THREE HUNDRETHS ON THIS NEW SURVEY. YOUR 27.50 ELEVATION SHOT ON THE LEFT SIDE MIDDLE OF THE STRUCTURE IS SHOWING 27.50 STILL NOT THE REQUIRED 4" BELOW FFE FOR BLOCK CONSTRUCTION. YOU ARE SHOWING A 27.95 10' OF THE REAR LEFT SIDE OF THE STRUCTURE INDICATING THAT DRAINAGE WILL HAVE NEGATIVE IMPACTS ON THE STRUCTURE WHERE YOUR ARE SHOWING AN ELEVATION OF 27.45 AT THE CORNER. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ 12 Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 9/24/2024 - PREVIOUS INSPECTION NOTES ALL SOD ELEVATIONS AGAINST THE HOUSE NEED TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/11/2024 Disapproved - NO FEE EMADISON
Note: City of Palm Coast Building Services CONTRACTORS NEWSFLASH Hurricane Milton- Stormwater Operations October 9, 2024 In anticipation of Hurricane Milton, the city has suspended normal Stormwater / Engineering Department (in addition to the Building Department) operations on Thursday and Friday. (original notice anticipated resuming on Friday). Normal operations are expected to resume on Monday, October 14th. Inspections scheduled for Thursday or Friday will not be performed and will be cancelled. Please rereschedule when you are ready. Now is the time to activate your hurricane preparedness plan and ensure that all jobsites are clear of debris that could become airborne projectiles. Construction sites should be secured, and swales and temporary culvert pipes are free flowing, are not obstructed in any way and checked for all appropriate erosion/sediment control measures as needed. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOUR FFE HAS GONE UP THREE HUNDRETHS ON THIS NEW SURVEY. YOUR 27.50 ELEVATION SHOT ON THE LEFT SIDE MIDDLE OF THE STRUCTURE IS SHOWING 27.50 STILL NOT THE REQUIRED 4" BELOW FFE FOR BLOCK CONSTRUCTION. YOU ARE SHOWING A 27.95 10' OF THE REAR LEFT SIDE OF THE STRUCTURE INDICATING THAT DRAINAGE WILL HAVE NEGATIVE IMPACTS ON THE STRUCTURE WHERE YOUR ARE SHOWING AN ELEVATION OF 27.45 AT THE CORNER. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ 12 Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 9/24/2024 - PREVIOUS INSPECTION NOTES ALL SOD ELEVATIONS AGAINST THE HOUSE NEED TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/07/2024 Disapproved - NO FEE FSLADISH
Note: 10/7/24 YOUR FFE HAS GONE UP THREE HUNDRETHS ON THIS NEW SURVEY. YOUR 27.50 ELEVATION SHOT ON THE LEFT SIDE MIDDLE OF THE STRUCTURE IS SHOWING 27.50 STILL NOT THE REQUIRED 4" BELOW FFE FOR BLOCK CONSTRUCTION. YOU ARE SHOWING A 27.95 10' OF THE REAR LEFT SIDE OF THE STRUCTURE INDICATING THAT DRAINAGE WILL HAVE NEGATIVE IMPACTS ON THE STRUCTURE WHERE YOUR ARE SHOWING AN ELEVATION OF 27.45 AT THE CORNER. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ 12 Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 9/24/2024 - PREVIOUS INSPECTION NOTES ALL SOD ELEVATIONS AGAINST THE HOUSE NEED TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures.
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/24/2024 Disapproved - NO FEE PFLANAGAN
Note: ALL SOD ELEVATIONS AGAINST THE HOUSE NEED TO BE 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures.
U-CROSS CONNECTION 08/23/2024 APPROVED - AS NOTED BWRIGHT
Note: No IRR. No CC
ROW- PRE-APRON (PRE-POUR) 08/22/2024 APPROVED - AS NOTED FSLADISH
Note: 8/22/24 PIPE ELEVATION OK. DRIVEWAY NOW HAS THE REQUIRED 4" OF CONCRETE COVERAGE IN THE ROW. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/21/2024 - PREVIOUS INSPECTION NOTES 8/21/24 YOU NEED TO HAVE A MINIMUM OF 4" OF CONCRETE DPTH IN THE ROW. COMPACTION IN POUR AREA NEEDS TO BE 95%. PHOTO FOR REFERENCE.
ROW- PRE-APRON (PRE-POUR) 08/21/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 8/21/24 YOU NEED TO HAVE A MINIMUM OF 4" OF CONCRETE DPTH IN THE ROW. COMPACTION IN POUR AREA NEEDS TO BE 95%. PHOTO FOR REFERENCE. YOUR CULVERT PIPE IS OUT OF TOLERANCE (BACKPITCHED). Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
ELECTRIC - EARLY POWER 07/25/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 6-12-24 1. Emailed FPL at 11:32. 7-25-24 1. Emailed FPL at 12:50.
LATH/BRICK/ WATER BARRIER 06/28/2024 APPROVED BTAYLOR
INSULATION 06/25/2024 APPROVED BTAYLOR
ALL ROUGH 06/21/2024 APPROVED BTAYLOR
ELECTRIC-TUG 06/12/2024 APPROVED - AS NOTED BTAYLOR
Note: 6-12-24 1. Emailed FPL at 11:32.
ROOF VALLEY & METAL 06/11/2024 APPROVED BTAYLOR
WALL SHEATHING 06/06/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/05/2024 APPROVED BTAYLOR
TIE BEAM / LINTEL 05/23/2024 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 05/17/2024 APPROVED TBAKER
MONOLITHIC SLAB 05/07/2024 APPROVED BTAYLOR
Note: 5/6/2024 - PREVIOUS INSPECTION NOTES 5-6-24 1. Areas have sand that has fallen back into the footer. Circled on plans.
MONOLITHIC SLAB 05/06/2024 Disapproved - NO FEE BTAYLOR
Note: 5-6-24 1. Areas have sand that has fallen back into the footer. Circled on plans.
SEWER TIE IN 05/02/2024 APPROVED - AS NOTED MGIBSON
Note: 5/1/2024 - PREVIOUS INSPECTION NOTES TAP NOT MADE YET. THIS WAS AVIRTUAL INSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 05/01/2024 APPROVED MGIBSON
GRAVITY SEWER TEST 05/01/2024 APPROVED MGIBSON
SEWER TIE IN 05/01/2024 Disapproved - NO FEE MGIBSON
Note: TAP NOT MADE YET
WATER METER INSTALLATION REQUEST 03/11/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 08/02/2024 08/07/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 07/29/2024 08/02/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide certification letter with test reports
ENGIN1 COMPLETE 05/17/2024 05/17/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/17/2024 05/17/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD HOLD 05/03/2024 05/07/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Letter must be accompanied by a signed and sealed inspection and certification letter by the geotechnical engineer of record. Engineer?s letter to confirm the following: Site clearing / over excavation was completed and inspected by engineer prior to the placement of fill and engineer confirms clearing and over excavation work is acceptable. Engineer to confirm fill materials were suitable and within specifications. Engineer to confirm the required number and location of field density tests were completed. Engineer to include certification statement in accordance with Florida Administrative Code 61G15-18.011 (4) Field dentisty Test Must be digiutally signed and sealed.
BADMIN INFORMATION 05/02/2024 05/02/2024
Note: Marked INFORMATION By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM Please correct file name.
ENGIN1 COMPLETE 04/15/2024 04/15/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 04/15/2024 04/15/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/15/2024 04/15/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/01/2024 03/04/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 01/16/2024 01/25/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/16/2024 01/16/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 12/28/2023 02/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 12/21/2023 12/21/2023
Note: Released By: JPI
CUSVC COMPLETE 12/21/2023 12/27/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 12/21/2023 12/22/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/21/2023 12/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 12/21/2023 12/22/2023
LOCATE COMPLETE 12/21/2023 12/22/2023
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 12/21/2023 01/02/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
SW1 HOLD 12/21/2023 12/28/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Lot drainage features and patterns must be clearly depicted and include flow arrows. COPC Technical Manual: Section V: Engineering, Section 300.01 (A)(1)(C)(5)
BADMIN COMPLETE 12/21/2023 12/22/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 12/21/2023 12/22/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Banding must be placed around all windows and doors facing right of way. Garage door missing banding

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 30 ¤30.00 10/23/2024
SW ENG - REVIEW 20 ¤20.00 02/01/2024
SW ENG RES REVIEW 200 ¤200.00 02/01/2024
SEWER CREDIT (¤850.00) 02/01/2024
SEWER INSPECTION ¤25.00 02/01/2024
SEWER CAPITAL FACILITY ¤5,441.03 02/01/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 02/01/2024
SITE PLAN 30 ¤30.00 02/01/2024
WATER- TURN ON ¤25.00 02/01/2024
ADJUSTMENT 50% (¤512.73) 02/01/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/01/2024
INSPECTION - RESIDENTIAL ¤775.50 02/01/2024
PLAN REVIEW - RESIDENTIAL ¤219.96 02/01/2024
CONNECTION FEES ¤1,187.26 02/01/2024
FC IMPACT FEE EMS ¤62.00 02/01/2024
IMPACT FEE FIRE ¤428.09 02/01/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/01/2024
FC IMPACT FEE LIBRARY ¤268.00 02/01/2024
IMPACT FEE PARKS ¤1,800.99 02/01/2024
IMPACT FEE SCHOOL ¤5,450.00 02/01/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 02/01/2024
WATER -IRRIGATION INSPECTION ¤25.00 02/01/2024
SURCHARGE FS 533.721 ¤2.93 02/01/2024
SURCHARGE - FS 468.631 ¤4.39 02/01/2024
SW ENG - FOUNDATION SURVEY ¤20.00 02/01/2024
SW ENG INSPECTION 80 ¤80.00 02/01/2024
SW ENG PRE APRON ¤30.00 02/01/2024
Fees Total Due: ¤0.00 Total Paid: ¤20,866.93