I want to search for...

Permit #2023120929

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-00800-0010
CONDITIONED SPACE: 2306 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 170 sqft
Total Square Footage: 2942 sqft
Block: 00800
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 831-383-2883
Location Address: 22 BUD HOLLOW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/20/2024
NOC: RECORDED
Applicant name: EDWARD LEE DAUBERT JR
Owner: FLORIDA SUN PARTNERS II LLC

Address

6751 FORUM DRIVE SUITE 210

ORLANDO, FL 32821

Lot: 0010
Contracted Stated Job Value: ¤277,000.00
Job Description: Single Family Residence
Type: CN

Contractor

BRITE BUILDING GROUP LLC
Status Location Address State License Number Phone
ACTIVE

6751 FORUM DRIVE SUITE 210

ORLANDO, FL 32821

CBC1266303 (Exp: 08/31/2026) 831-383-2883

Sub Contractors

JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CFC1430061 (Exp: 08/31/2026) 407-404-4000
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
ANTHONY OKEITH FENNELL
Status Location Address State License Number Phone
ACTIVE

217 N. WESTMONTE DR, SUITE 1007

ALTAMONTE SPRINGS, FL 32714

EC13011194 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/21/2024 FINAL APPROVED AGAETANO
Note: 08-21-2024. Spoke to DCBO Alphanette Waters and she stated the garage attic did not need to be sealed . There is a passageway fro the attic wall to the living space. 08-22-2024. Spoke to DCBO Alphanette Waters this morning and she retracted and stated the information was incorrect. She will contact the builder and they are required to seal that area or install a sealed attic door.
U-CROSS CONNECTION 08/21/2024 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 08/21/2024 APPROVED EMADISON
Note:
ROW - STORMWATER FINAL 08/21/2024 APPROVED EMADISON
Note:
U -UTILITY RESIDENTIAL FINAL 08/21/2024 FINAL APPROVED DHANEY
ELECTRIC - EARLY POWER 08/05/2024 APPROVED JSTEWART
Note: 8/1/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/1/2024 11:50:45 AM *** 3 exterior outlets need to be safed off (face plates). NEC 110.27 Inspector Notes from Inspection 2200 Breaker in panel is required to be labeled by final Emailed FPL @ 9:15am
FLOOR / WALL PENETRATION 08/05/2024 APPROVED FWILLIS
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/02/2024 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 08/02/2024 APPROVED - AS NOTED PFLANAGAN
Note: THERE IS A FEW WASH OUTS AT PEP TANK AND CLEAN OUT. BEFORE ROW FINAL ALL PINE STRAW AND SEED ALONG THE LEFT SIDE NEEDS TO BE SOD.
ELECTRIC - EARLY POWER 08/01/2024 Disapproved -FEE REQUIRED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 8/1/2024 11:50:45 AM *** 3 exterior outlets need to be safed off (face plates). NEC 110.27 Inspector Notes from Inspection 2200 Breaker in panel is required to be labeled by final Emailed FPL @ 9:15am
GRAVITY SEWER TEST 07/09/2024 APPROVED MGIBSON
SEWER TIE IN 07/09/2024 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 07/02/2024 APPROVED - AS NOTED EMADISON
Note: ** 07/02/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
PEP TANK INSTALLATION REQUEST 06/14/2024 APPROVED CBOWERMASTER
INSULATION 06/11/2024 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 6/5/2024 10:40:45 AM *** Please submit a revision to the building dept for Product approval sheet for windows/doors installed. (dont match). WILL CHECK AT INSULATION.
ALL ROUGH 06/05/2024 APPROVED - AS NOTED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 6/5/2024 10:40:45 AM *** Please submit a revision to the building dept for Product approval sheet for windows/doors installed. (dont match). WILL CHECK AT INSULATION.
LATH/BRICK/ WATER BARRIER 06/05/2024 APPROVED FWILLIS
ROOF VALLEY & METAL 06/03/2024 APPROVED FWILLIS
Note: 5/24/2024 - PREVIOUS INSPECTION NOTES 1. Valley metal not installed per A4.0 2. No vapor barrier on wall at roof/wall flashing See A4.0 notes
ROOF VALLEY & METAL 05/24/2024 Disapproved -FEE REQUIRED AWATERS
Note: 1. Valley metal not installed per A4.0 2. No vapor barrier on wall at roof/wall flashing See A4.0 notes
WALL SHEATHING 05/22/2024 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/22/2024 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 05/20/2024 APPROVED AMOBLEY
ELECTRIC-TUG 05/17/2024 APPROVED - AS NOTED MKRASKI
Note: Breaker in panel is required to be labeled by final Emailed FPL @ 9:15am
ELECTRIC-TUG 05/16/2024 Disapproved - NO FEE MKRASKI
Note: 1. Conduit under meter main is required to be sch 80 PVC 2. Breaker in panel is required to be labeled
TIE BEAM / LINTEL 05/13/2024 APPROVED FWILLIS
MONOLITHIC SLAB 05/06/2024 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 04/29/2024 APPROVED MGIBSON
Note: 4/26/2024 - PREVIOUS INSPECTION NOTES WAS TEXTED BY DAN TO CANCEL
PLUMBING 1ST ROUGH UNDERGROUND 04/26/2024 CANCELLED BY APPLICANT MGIBSON
Note: WAS TEXTED BY DAN TO CANCEL
ROW - DRAINAGE 04/22/2024 APPROVED - AS NOTED EMADISON
Note: ** 04/23/24 CORRECTIONS HAVE BEEN MADE IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE EROSION CONTROL AND DRAINAGE OF THE PROJECT SITE SO THERE IS NO NEGATIVE IMPACT UPON ANY ADJACENT PROPERTY AS WELL AS THE STORMWATER SYSTEM _________________________________________________________________________________________________________________ 4/16/2024 - PREVIOUS INSPECTION NOTES NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE EROSION CONTROL INSPECTION (119), SECTION 300.04 LOT GRADING PERMIT REQUIREMENTS FOR VACANT LOTS. INSPECTOR BE BACK 4/22/24
ROW - DRAINAGE 04/16/2024 Disapproved - NO FEE GBERTOLA
Note: NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE EROSION CONTROL INSPECTION (119), SECTION 300.04 LOT GRADING PERMIT REQUIREMENTS FOR VACANT LOTS. INSPECTOR BE BACK 4/22/24
WATER METER INSTALLATION REQUEST 04/05/2024 APPROVED BVITALE

Review History

Department Status Date In Date Out
ZON COMPLETE 07/10/2024 07/10/2024
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
BLD COMPLETE 06/11/2024 06/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Highlight the changed numbers or only submit changed numbers.
BLD HOLD 06/06/2024 06/11/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Highlight the changed numbers or only submit changed numbers.
ENGIN1 COMPLETE 05/17/2024 05/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/17/2024 05/20/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 04/15/2024 04/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 04/11/2024 04/12/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 03/22/2024 03/25/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R403.7 FBC Energy Conservation 2023 8Th Edition (SECOND REQUEST) FACES NW
MECH HOLD 02/21/2024 02/22/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R403.7 FBC Energy Conservation 2023 8Th Edition
SWALE COMPLETE 02/07/2024 02/13/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/06/2024 02/07/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 02/06/2024 02/13/2024
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON COMPLETE 02/06/2024 02/06/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM changes for stw and swale no zoning changes
BLD COMPLETE 12/22/2023 12/23/2023
Note: Released By: JPI
CUSVC COMPLETE 12/22/2023 12/27/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 12/22/2023 12/27/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 12/22/2023 12/28/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey
GAS CANCEL 12/22/2023 12/27/2023
LOCATE COMPLETE 12/22/2023 12/28/2023
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 12/22/2023 01/04/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
SW1 HOLD 12/22/2023 01/03/2024
Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM 1- Please include both inverts of the adjacent property (Lot 2). Currently, only one side is visible (BTM 27.63'). 2- A few proposed elevations on the back are missing (existing 28.9 in the center and 29.1 on the side adjacent to the ditch). 3- Please include the flow lines along the side of the property adjacent to the ditch. 4- A north arrow would be appreciated.
ZON COMPLETE 12/22/2023 12/22/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN COMPLETE 12/22/2023 12/27/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤65.00 08/21/2024
PLAN REVIEW - REVISION ¤32.50 08/21/2024
REINSPECTION RESIDENTIAL ¤40.00 08/21/2024
REINSPECTION RESIDENTIAL ¤40.00 08/21/2024
CONTRACTOR CHANGE ¤20.00 08/21/2024
SW ENG - INSPECTION 20 ¤20.00 08/21/2024
SW ENG - INSPECTION 20 ¤20.00 08/21/2024
SW ENG INSPECTION 80 ¤80.00 02/20/2024
SW ENG PRE APRON ¤30.00 02/20/2024
SW ENG - REVIEW 20 ¤20.00 02/20/2024
SW ENG RES REVIEW 200 ¤200.00 02/20/2024
SEWER CREDIT (¤850.00) 02/20/2024
SEWER INSPECTION ¤25.00 02/20/2024
SEWER CAPITAL FACILITY ¤5,441.03 02/20/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 02/20/2024
SITE PLAN 30 ¤30.00 02/20/2024
FC IMPACT FEE EMS ¤62.00 02/20/2024
IMPACT FEE FIRE ¤428.09 02/20/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/20/2024
FC IMPACT FEE LIBRARY ¤268.00 02/20/2024
IMPACT FEE PARKS ¤1,800.99 02/20/2024
IMPACT FEE SCHOOL ¤5,450.00 02/20/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 02/20/2024
WATER -IRRIGATION INSPECTION ¤25.00 02/20/2024
WATER -IRRIGATION INSPECTION ¤25.00 02/20/2024
SURCHARGE FS 533.721 ¤7.62 02/20/2024
SURCHARGE - FS 468.631 ¤11.42 02/20/2024
SW ENG - FOUNDATION SURVEY ¤20.00 02/20/2024
CONNECTION FEES ¤1,187.26 02/20/2024
WATER-METER ¤514.49 02/20/2024
WATER- TURN ON ¤25.00 02/20/2024
WATER- TURN ON ¤25.00 02/20/2024
ADJUSTMENT 50% (¤761.60) 02/20/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/20/2024
INSPECTION - RESIDENTIAL ¤1,163.25 02/20/2024
PLAN REVIEW - RESIDENTIAL ¤329.94 02/20/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,899.50