I want to search for...
Permit #2023120933
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00010-0360 |
| GARAGE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 170 sqft |
| Total Square Footage: 2942 sqft |
| Block: 00010 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 831-383-2883 |
| Location Address: 64 FERNDALE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/16/2024 |
| NOC: RECORDED |
| Applicant name: EDWARD LEE DAUBERT JR |
| Owner: FLORIDA SUN PARTNERS II |
|
Address 6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
| Lot: 0360 |
| Contracted Stated Job Value: ¤277,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
CBC1266303 (Exp: 08/31/2026) | 831-383-2883 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CFC1430061 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 11/26/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE --------------------------------------------------------------------- 11/20/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT FROM CULVERT PIPE 2) NEED TO PICK UP ALL TRASH IN THE BACK ALSO THE SILT FENCE STAKE NEEDS TO BE REMOVED IN THE BACK 3)NEED TO SOD ALL DESTURBED GROUND IN THE ADJACENT LOT TO THE LEFT WITH SOD IN THE ROADSIDE SWALE. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/20/2024 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 11/20/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO REMOVE ALL DIRT FROM CULVERT PIPE 2) NEED TO PICK UP ALL TRASH IN THE BACK ALSO THE SILT FENCE STAKE NEEDS TO BE REMOVED IN THE BACK 3)NEED TO SOD ALL DESTURBED GROUND IN THE ADJACENT LOT TO THE LEFT WITH SOD IN THE ROADSIDE SWALE. | |||
| BLD - BUILDING FINAL | 11/20/2024 | FINAL APPROVED | HCAMACHO |
| Note: Please paint CPVC where it attaches to relief valve. | |||
| U-CROSS CONNECTION | 11/20/2024 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 11/19/2024 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/19/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE -------------------------------------------------------- 11/6/2024 - PREVIOUS INSPECTION NOTES 1) AREA ON THE LEFT SIDE OF HOUSE NEEDS TO BE LOWER BY .30 SO WATER WILL NOT IMPACT THE ADJACENT LOT. AREA IS PAINTED IN PINK PAINT 2) SOD ALONG EDGE OF PAVEMENT NEEDS TO BE LOWERED PLEASE SEE DRAWING IN TECHINAL MANUAL #300.D FOR HOW TO GRADE ALONG EDGE OF PAVEMENT. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/06/2024 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/06/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) AREA ON THE LEFT SIDE OF HOUSE NEEDS TO BE LOWER BY .30 SO WATER WILL NOT IMPACT THE ADJACENT LOT. AREA IS PAINTED IN PINK PAINT 2) SOD ALONG EDGE OF PAVEMENT NEEDS TO BE LOWERED PLEASE SEE DRAWING IN TECHINAL MANUAL #300.D FOR HOW TO GRADE ALONG EDGE OF PAVEMENT. | |||
| ELECTRIC - EARLY POWER | 10/08/2024 | APPROVED | PKNAPIK |
| Note: Inspector Notes from Inspection 2200 *** NOTES ADDED BY JSTEWART 7/31/2024 11:06:44 AM *** Authorize release of email to FPL. 3307.1 Protection required.. . Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| FLOOR / WALL PENETRATION | 10/08/2024 | APPROVED | PKNAPIK |
| FLOOR / WALL PENETRATION | 10/04/2024 | APPROVED | HCAMACHO |
| Note: Micro over the Range exhaust is installed, and sealed. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/23/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/23/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| INSULATION | 08/26/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 8/20/2024 10:33:43 AM *** 1. Please install mechanical faster at all bath exhaust duct at fan asembley. FBCR M1601.4.1 2. Please install (3) screws as required at the hood exhaust duct joint. FBCR M1601.4.1 will check at insulation | |||
| ALL ROUGH | 08/20/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/20/2024 10:33:43 AM *** 1. Please install mechanical faster at all bath exhaust duct at fan asembley. FBCR M1601.4.1 2. Please install (3) screws as required at the hood exhaust duct joint. FBCR M1601.4.1 will check at insulation | |||
| LATH/BRICK/ WATER BARRIER | 08/16/2024 | APPROVED | LMILLER |
| ROOF VALLEY & METAL | 08/09/2024 | APPROVED | JSTEWART |
| WALL SHEATHING | 08/07/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/07/2024 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 07/31/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 7/31/2024 11:06:44 AM *** Authorize release of email to FPL. 3307.1 Protection required.. . Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| TIE BEAM / LINTEL | 07/26/2024 | APPROVED | LMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 07/24/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/17/2024 | APPROVED | JSTEWART |
| Note: 7/16/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 7/16/2024 2:05:54 PM *** Do to weather, Please clean out washouts and cave ins. for min 3" clearence from earth. FBC R404.1.3.3.7.4 | |||
| MONOLITHIC SLAB | 07/16/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 7/16/2024 2:05:54 PM *** Do to weather, Please clean out washouts and cave ins. for min 3" clearence from earth. FBC R404.1.3.3.7.4 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/11/2024 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 07/11/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 07/11/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED TO OFFSET OR PUT C/O ON CONTRACTOR LOT SPRAY PAINTED IN ORANGE TO THE LOCATION MARKED | |||
| WATER METER INSTALLATION REQUEST | 05/30/2024 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 01/03/2024 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/20/2024 | 08/20/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/25/2024 | 07/31/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/24/2024 | 07/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/24/2024 | 07/24/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/18/2024 | 07/23/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Heatload needs to be Daytona Beach (Second Request) | |||
| ZON | COMPLETE | 07/18/2024 | 07/18/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/09/2024 | 07/12/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Heatload needs to be Daytona Beach | |||
| BLD | COMPLETE | 06/10/2024 | 06/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Highlight numbers that changed or only submit numbers that are changing. | |||
| BLD | HOLD | 06/04/2024 | 06/10/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Highlight numbers that changed or only submit numbers that are changing. | |||
| ENGIN1 | COMPLETE | 05/29/2024 | 05/29/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/29/2024 | 05/29/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/29/2024 | 05/29/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/09/2024 | 04/10/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/09/2024 | 04/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/09/2024 | 04/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/28/2023 | 02/12/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/22/2023 | 12/24/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/22/2023 | 12/27/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 12/22/2023 | 12/27/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/22/2023 | 12/28/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/22/2023 | 12/27/2023 |
| LOCATE | COMPLETE | 12/22/2023 | 12/28/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/22/2023 | 01/04/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/22/2023 | 12/28/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/22/2023 | 12/22/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM This lot has two flood map numbers both should be listed on site plan/survey | |||
| BADMIN | COMPLETE | 12/22/2023 | 12/27/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 12/22/2023 | 01/03/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 01/03/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/25/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/20/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/16/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/16/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/16/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/16/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/16/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/16/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/16/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/16/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/16/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/16/2024 |
| SURCHARGE FS 533.721 | ¤5.04 | 04/16/2024 |
| SURCHARGE - FS 468.631 | ¤7.56 | 04/16/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/16/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/16/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/16/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/16/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/16/2024 |
| SEWER INSPECTION | ¤25.00 | 04/16/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/16/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/16/2024 |
| SITE PLAN 30 | ¤30.00 | 04/16/2024 |
| WATER-METER | ¤514.49 | 04/16/2024 |
| WATER- TURN ON | ¤25.00 | 04/16/2024 |
| WATER- TURN ON | ¤25.00 | 04/16/2024 |
| ADJUSTMENT 50% | (¤503.91) | 04/16/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/16/2024 |
| INSPECTION - RESIDENTIAL | ¤761.75 | 04/16/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤216.06 | 04/16/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,300.37 |