I want to search for...

Permit #2023121026

Permit Details

Status: COED

Parcel Id: 23-11-30-6060-00000-00K0
Total Square Footage: 1027 sqft
Subdivision: 2333 - WHITEVIEW MULTI-FAMILY
Job Phone: 904-268-5515
Location Address: 680 PERIGON DR
Type: CAS - COMMERCIAL ACCESSORY STRUCTURE
Issue Date: 02/10/2025
NOC: RECORDED
Applicant name: MICHAEL M PADGETT
Owner: MARBELLA APARTMENTS LLC

Address

3060 PEACHTREE ROAD NW SUITE 970

ATLANTA, GA 30305

Contracted Stated Job Value: ¤72,988.00
Job Description: Trash enclosure
Type: CN

Contractor

SUMMIT CONTRACTING GROUP INC
Status Location Address State License Number Phone
ACTIVE

7595 BAYMEADOWS WAY SUITE 100

JACKSONVILLE, FL 32204

CGC1513073 (Exp: 08/31/2026) 904-268-5515

Sub Contractors

ANTHONY DEFEE
Status Location Address State License Number Phone
ACTIVE

44449 WOODRIDGE DRIVE

CALLAHAN, FL 32011

EC13007835 (Exp: 08/31/2026) 904-518-3542

Inspection History

Type Request Date Result Inspector
BLD - ADA COMPLIANT 02/11/2026 Approval - Private Provider PPROVIDER
ACCESSORY FINAL 02/11/2026 Approval - Private Provider PPROVIDER
FIRE FINAL 02/11/2026 APPROVED RMARTIN
LATH/BRICK/WATER BARRIER 10/08/2025 Approval - Private Provider PPROVIDER
DOWN CELL 10/07/2025 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 09/08/2025 Approval - Private Provider PPROVIDER
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 05/02/2025 Approval - Private Provider PPROVIDER
TIE BEAM 04/17/2025 Approval - Private Provider PPROVIDER
LINTEL 04/11/2025 Approval - Private Provider PPROVIDER
FOUNDATION SURVEY - OFFICE USE ONLY 04/08/2025 APPROVED DLEAP

Review History

Department Status Date In Date Out
ELEC COMPLETE 09/04/2025 09/04/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 05/06/2025 05/06/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
ARCHR COMPLETE 05/02/2025 05/16/2025
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD COMPLETE 05/02/2025 05/15/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
DSD COMPLETE 05/02/2025 05/06/2025
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
FI1 COMPLETE 05/02/2025 05/12/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 04/07/2025 04/08/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
FI1 COMPLETE 04/30/2024 05/13/2024
Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
DSD COMPLETE 04/30/2024 05/23/2024
Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM
BLD COMPLETE 04/30/2024 05/15/2024
Note: Released By: JIM WALKER - (386)529-4112 - JWALKER@PALMCOASTGOV.COM
ELEC COMPLETE 04/08/2024 04/08/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
DSD HOLD 03/22/2024 04/02/2024
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM The following must happen before issuance of this permit: Executed Utility Agreement. Issuance of a Water Receipt DEP Permits Infrastructure Site Permit must be issued.
FI1 HOLD 03/22/2024 04/08/2024
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code, 2020 FBC, and or 2020 Existing Building Code Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets and add page locations for each response. 1. Repeat comment. (“06 Approved Civil Plans” was not uploaded as stated in the response letter).Please upload the approved site plan from the AR application #2434 for review. 2. Repeat comment. (E600 was not updated or uploaded). On note C (1) under electrical specifications (sheet CE600) please include the code year (2017) for the NEC 3. Repeat comment. (E600 was not updated or uploaded). On note C (2) under electrical specifications (sheet CE600) please change the code for safety to life to the FFPC 7 edition (2020) (This code encompasses both NFPA1, and NFPA 101) (This is the prevailing code for Life safety). 4. Repeat comment. (E600 was not updated or uploaded). On note C (3) under electrical specifications (sheet CE600) please include the code year (2016) for the alarm system. 5. Repeat comment. (E600 was not updated or uploaded). On note L. under chapter 61G15 requirements section, please change FPC to FFPC Additional comments are likely after resubmittal.
BLD HOLD 03/22/2024 04/05/2024
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM COMMENTS PER THE 2020 FLORIDA BUILDING CODE-BUILDING AND FLORIDA BUILDING CODE-ACCESSIBILITY 1. PARTIAL REPEAT COMMENT. INCORRECT DIMENSION OF LANDING IN THE DIRECTION OF TRAVEL PROVIDED, STAIR RISER HEIGHTS NOT SHOWN, HANDRAIL TYPE NOT SHOWN, MOUNTING DETAILS NOT PROVIDED, GUARD DESIGN LOADS NOT PROVIDED, GUARD OPENING LIMITATIONS NOT PROVIDED. Provide stair and guard details to include width of stairs, dimensions of required landings at top and bottom of stairs, stair riser and run (run is not correct), handrail type, height, mounting details, clearances, handrail extensions and returns, guard design loads, guard height, guard opening limitations. 2. PARTIAL REPEAT COMMENT. HANDRAIL TYPE NOW SHOWN, MOUNTING HIGHT OF HANDRAIL ON BLOCK WALL NOT SHOWN, MOUNTING DETAILS NOT PROVIDED, HANDRAIL EXTENSION AND RETURN DIMENSIONS NOT SHOWN, RAMP EDGE PROTECTION NOT IDENTIFIED, INCORRECT DIMENSION IN THE DIRECTION OF TRAVEL AT THE BOTTOM OF THE RAMP PROVIDED. Provide accessible ramp details including overall rise of ramp, ramp handrails, handrail type, height, mounting details, clearances, handrail extensions and returns, ramp edge protection, dimensions of landings at top and bottom of ramp. 3. REPEAT COMMENT: Provide design loads for guards, guard in-fill components, handrails. Provide material specifications, fastening and connection details. 4. OK.. 5. OK. 6. OK. 7. NEW COMMENT. PROVIDE COMPLIANT DIGITAL SIGNATURE AND SEAL ON ALL RESUBMITTED PLAN SHEETS PER FLORIDA ADMINISTRATIVE CODE 61G1-16.005. 8. NEW COMMENT. CLOUD ALL REVISIONS. 9. NEW COMMENT. ADD NEW PLAN SHEET CA040 TO A00 – DRAWING INDEX.
FI1 HOLD 01/11/2024 01/11/2024
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code, 2020 FBC, and or 2020 Existing Building Code Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets and add page locations for each response. 1. Please upload the approved site plan from the AR application #2434 for review. 2. On note C (1) under electrical specifications (sheet CE600) please include the code year (2017) for the NEC 3. On note C (2) under electrical specifications (sheet CE600) please change the code for safety to life to the FFPC 7 edition (2020) (This code encompasses both NFPA1, and NFPA 101) (This is the prevailing code for Life safety). 4. On note C (3) under electrical specifications (sheet CE600) please include the code year (2016) for the alarm system. 5. On note L. under chapter 61G15 requirements section, please change FPC to FFPC Additional comments are likely after resubmittal.
ARCHR COMPLETE 12/27/2023 01/11/2024
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD HOLD 12/27/2023 02/06/2024
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM COMMENTS PER THE 2020 FLORIDA BUILDING CODE-BUILDING AND FLORIDA BUILDING CODE-ACCESSIBILITY 1. Provide stair and guard details to include width of stairs, dimensions of required landings at top and bottom of stairs, stair riser and run (run is not correct), handrail type, height, mounting details, clearances, handrail extensions and returns, guard design loads, guard height, guard opening limitations. 2. Provide accessible ramp details including overall rise of ramp, ramp handrails, handrail type, height, mounting details, clearances, handrail extensions and returns, ramp edge protection, dimensions of landings at top and bottom of ramp. 3. Provide design loads for guards, guard in-fill components, handrails. Provide material specifications, fastening and connection details. 4. Explain circle in front of door? Is it intended to denote accessible maneuvering space? If so, its not used correctly. Refer to door approach clearances based on forward or latch side parallel approach based off width of landing in front of door. 5. Show direction of approach clearances at door and clearances beyond latch side of door. 6. Indicate type of door handle requiring no pinching, grasping or turning of the wrist. Indicate mounting height within reuired reach range based on direction of approach.
DSD HOLD 12/27/2023 12/27/2023
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Executed Utility Agreement. Provide Water Receipt DEP Approval letter Site Permit must be issued.
ENGIN1 CANCEL 12/27/2023 12/28/2023
FI1 HOLD 12/27/2023 01/11/2024
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
UD1 COMPLETE 12/27/2023 01/08/2024
Note: Released By: GREG DEGLER - - GDEGLER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 50% (¤97.73) 02/10/2025
ADMINISTRATIVE - COMMERCIAL PP ¤450.00 02/10/2025
ADMINISTRATIVE - COMMERCIAL ¤75.00 02/10/2025
INSPECTION - FIRE COMMERCIAL ¤18.25 02/10/2025
PLAN REVIEW - COMMERCIAL ¤102.20 02/10/2025
SURCHARGE FS 533.721 ¤5.48 02/10/2025
SURCHARGE - FS 468.631 ¤8.22 02/10/2025
SITE PLAN 30 ¤30.00 02/10/2025
Fees Total Due: ¤0.00 Total Paid: ¤591.42