Permit #2023121092
Permit Details
Status: COED
| Parcel Id: 07-11-31-7065-00350-0060 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 170 sqft |
| Total Square Footage: 2942 sqft |
| Block: 00350 |
| Subdivision: - |
| Job Phone: 831-383-2883 |
| Location Address: 48 KATHLEEN TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/16/2024 |
| NOC: RECORDED |
| Applicant name: EDWARD LEE DAUBERT JR |
| Owner: FLORIDA SUN PARTNERS II LLC |
|
Address PO BOX 770279 ORLANDO , FL 32877 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤277,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
CBC1266303 (Exp: 08/31/2026) | 831-383-2883 |
Sub Contractors
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CFC1430061 (Exp: 08/31/2026) | 407-404-4000 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/26/2024 | FINAL APPROVED | MKRASKI |
| U -UTILITY RESIDENTIAL FINAL | 09/26/2024 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 IRR with potable water. PVB in place. No CC. | |||
| ROW - STORMWATER FINAL | 09/25/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 9/25/24 WE HAVE HAD A LOT OF RAIN LATELY, SOD IN SWALE IS SATURATED AND BROWN BUT SURVEY SHOWS POSITIVE DRAINAGE. I WILL DEFER TO THE SIGNED AND SEALED LEGAL SURVEY DOCUMENT AS A INDICATION THAT SWALE HAS FLOW. AT THE TIME OF THIS THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 09/25/2024 | APPROVED | FSLADISH |
| Note: 9/25/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U-CROSS CONNECTION | 09/23/2024 | APPROVED - AS NOTED | BWRIGHT |
| Note: IRR with potable water. PVB in place. No CC. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/23/2024 | Disapproved - NO FEE | BWRIGHT |
| Note: No Power to the PeP tank. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/19/2024 | APPROVED | FSLADISH |
| Note: 9/18/2024 - PREVIOUS INSPECTION NOTES 9/18/24 You must submit a new final survey now that you have submitted a revised site plan. Your revised site plan was approved on 9/16/24 Your latest final survey was submitted on 9/13/24. Inspector Notes from Inspection 9270 8/19/24 PIPE ELEVATION IS GOOD. SPOKE WITH DAN CM AND LET HIM KNOW WE WOULD NEED A REVISED SITE PLAN SHOWING THE NEW DRIVEWAY CONFIGURATION. LAYOUT WILL WORK AND CONFORMS TO COPC DRIVEWAY STANDARDS AT THE TIME OF THIS INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/19/2024 | APPROVED | FSLADISH |
| Note: 9/19/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED. THERE ARE A FEW WASHOUTS BY THE CULVERT PIPE WHICH IS FULL OF DIRT/SILT. THE CULVERT PIPE WILL NEED TO BE FULLY CLEANED OUT AND WASHOUTS FIXED BEFORE FOW FINAL. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/18/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 9/18/24 You must submit a new final survey now that you have submitted a revised site plan. Your revised site plan was approved on 9/16/24 Your latest final survey was submitted on 9/13/24. Inspector Notes from Inspection 9270 8/19/24 PIPE ELEVATION IS GOOD. SPOKE WITH DAN CM AND LET HIM KNOW WE WOULD NEED A REVISED SITE PLAN SHOWING THE NEW DRIVEWAY CONFIGURATION. LAYOUT WILL WORK AND CONFORMS TO COPC DRIVEWAY STANDARDS AT THE TIME OF THIS INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ELECTRIC - EARLY POWER | 09/11/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 Release Power 9-11-24 1. Emailed FPL at 12:37. | |||
| FLOOR / WALL PENETRATION | 09/11/2024 | APPROVED | BTAYLOR |
| ROW- PRE-APRON (PRE-POUR) | 08/19/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/19/24 PIPE ELEVATION IS GOOD. SPOKE WITH DAN CM AND LET HIM KNOW WE WOULD NEED A REVISED SITE PLAN SHOWING THE NEW DRIVEWAY CONFIGURATION. LAYOUT WILL WORK AND CONFORMS TO COPC DRIVEWAY STANDARDS AT THE TIME OF THIS INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| GRAVITY SEWER TEST | 08/15/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 08/15/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 08/01/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 07/26/2024 | APPROVED | KSANDOE |
| Note: 7/25/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 7-15-24 1. No windows installed. Windows are on back order. 7-25-24 1. Windows are not insulated. | |||
| LATH/BRICK/ WATER BARRIER | 07/26/2024 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 7-15-24 1. No windows installed. Windows are on back order. | |||
| INSULATION | 07/25/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 7-15-24 1. No windows installed. Windows are on back order. 7-25-24 1. Windows are not insulated. | |||
| ALL ROUGH | 07/15/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 7-15-24 1. No windows installed. Windows are on back order. | |||
| ROOF VALLEY & METAL | 07/11/2024 | APPROVED | BTAYLOR |
| Note: 7/9/2024 - PREVIOUS INSPECTION NOTES 7/9/24: 1). Piles of trash & debris at front of property need to be cleaned up and placed in dumpster. 2). 5" x 5" flashing needs to be sealed to CMU along top leg as required. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/09/2024 | APPROVED | RSIMS |
| Note: 7/2/2024 - PREVIOUS INSPECTION NOTES 7/2/24: 1). 3Ply truss T01T is not connected as required on MiTek. Marked on MiTek. 2). 2ply Trusses T24 & T25 are not connected as required on MiTek. Marked on MiTek. 3). Overvalley framing straps: some are too short and all are not connected at bottom as required. | |||
| ROOF VALLEY & METAL | 07/09/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 7/9/24: 1). Piles of trash & debris at front of property need to be cleaned up and placed in dumpster. 2). 5" x 5" flashing needs to be sealed to CMU along top leg as required. | |||
| WALL SHEATHING | 07/02/2024 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/02/2024 | Disapproved - NO FEE | RSIMS |
| Note: 7/2/24: 1). 3Ply truss T01T is not connected as required on MiTek. Marked on MiTek. 2). 2ply Trusses T24 & T25 are not connected as required on MiTek. Marked on MiTek. 3). Overvalley framing straps: some are too short and all are not connected at bottom as required. | |||
| ELECTRIC-TUG | 06/27/2024 | APPROVED - AS NOTED | KSANDOE |
| Note: Release Power | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/27/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 06/21/2024 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 06/12/2024 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/07/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 05/30/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 09/17/2024 | 09/17/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/17/2024 | 09/17/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 09/17/2024 | 09/17/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/10/2024 | 07/10/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/10/2024 | 07/10/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/27/2024 | 06/27/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/27/2024 | 06/27/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/03/2024 | 05/07/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/19/2024 | 04/23/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition | |||
| ENGIN1 | COMPLETE | 04/08/2024 | 04/08/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/08/2024 | 04/08/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/08/2024 | 04/08/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/08/2024 | 05/08/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/27/2023 | 12/28/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/27/2023 | 12/28/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 12/27/2023 | 12/28/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 12/27/2023 | 12/28/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey | |||
| GAS | CANCEL | 12/27/2023 | 12/28/2023 |
| LOCATE | COMPLETE | 12/27/2023 | 12/31/2023 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/27/2023 | 01/04/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 12/27/2023 | 01/04/2024 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Please show and I D site Bench Mark, Drainage from structure to be minimum 6" slope for the first 10' (i e rear of house) | |||
| ZON | COMPLETE | 12/27/2023 | 12/28/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 12/27/2023 | 12/28/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 09/26/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/26/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/26/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/16/2024 |
| WATER-METER | ¤514.49 | 04/16/2024 |
| WATER- TURN ON | ¤25.00 | 04/16/2024 |
| WATER- TURN ON | ¤25.00 | 04/16/2024 |
| ADJUSTMENT 50% | (¤761.60) | 04/16/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/16/2024 |
| INSPECTION - RESIDENTIAL | ¤1,163.25 | 04/16/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤329.94 | 04/16/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/16/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/16/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/16/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/16/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/16/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/16/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/16/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/16/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/16/2024 |
| SURCHARGE FS 533.721 | ¤7.62 | 04/16/2024 |
| SURCHARGE - FS 468.631 | ¤11.42 | 04/16/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/16/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/16/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/16/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/16/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/16/2024 |
| SEWER INSPECTION | ¤25.00 | 04/16/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/16/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/16/2024 |
| SITE PLAN 30 | ¤30.00 | 04/16/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,604.50 |