Permit #2023121135
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01050-0020 |
| CONDITIONED SPACE: 2258 sqft |
| GARAGE: 767 sqft |
| OPENED PORCH (WITH ROOF) : 64 sqft |
| OPENED PORCH (WITH ROOF) : 276 sqft |
| Total Square Footage: 3365 sqft |
| Block: 01050 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-931-4799 |
| Location Address: 7 EVANSTON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/01/2024 |
| NOC: RECORDED |
| Applicant name: JOHN DONALD GORDON |
| Owner: PRECISION CUSTOM BUILDERS OF NORTH FLORIDA LLC |
|
Address 7755 SOUTH US 1 BUNNELL, FL 32110 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤375,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PRECISION CUSTOM BUILDERS OF NORTH FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7755 S. US HWY 1 BUNNELL, FL 32110 |
CGC1528576 (Exp: 08/31/2026) | 386-931-4799 |
Sub Contractors
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
JACOB D CASTLE
| Status | Location Address | State License Number | Phone |
| CANCEL |
508 N MOORE ST BUNNELL, FL 32110 |
RF11067810 (Exp: 08/31/2027) | 386-864-5066 |
RICHARD GARY WILSON JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1504 OLD MOODY BLVD BUNNELL, FL 32110 |
UNIT 6 BUNNELL, FL 32110 |
CAC1817645 (Exp: 08/31/2026) | 386-586-6290 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/01/2025 | FINAL APPROVED | MCONTRYMAN |
| Note: 3/18/2025 - PREVIOUS INSPECTION NOTES 3/18/25 1. Whole home Surge Protection needs to be installed at at meter/main only NEC 230.67 (A) 2. ODU needs to be 3" above finished grade FBCR M1305.1.4.1 3. Left side master bath has leaking right side sink 4. Left side master bath sink drain stoppers not holding water 5. Back french door secondary locking mechanism does not go up all the way 6. Front french door secondary locking mechanism does not go up all the way 7. Energy calcs do not match units installed (Breakers do match units installed) FBC(A) 107.4 8. Missing Insulation Certificate FBC EC R303.1.1.2 | |||
| BLD - BUILDING FINAL | 03/18/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 3/18/25 1. Whole home Surge Protection needs to be installed at at meter/main only NEC 230.67 (A) 2. ODU needs to be 3" above finished grade FBCR M1305.1.4.1 3. Left side master bath has leaking right side sink 4. Left side master bath sink drain stoppers not holding water 5. Back french door secondary locking mechanism does not go up all the way 6. Front french door secondary locking mechanism does not go up all the way 7. Energy calcs do not match units installed (Breakers do match units installed) FBC(A) 107.4 8. Missing Insulation Certificate FBC EC R303.1.1.2 | |||
| U-CROSS CONNECTION | 12/16/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/16/2024 9:11:53 AM *** irrigation meter plus PVB-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 12/16/2024 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 12/13/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 12/13/24 SWALE CORRECTION MADE AT THE TIME OF THIS INSPECTION. SPOKE WITH DON CM AND TOLD HIM I WOULD PASS THIS INSPECTION AS NOTED THAT HE WOULD NEED TO CLEAN OUT THE BIT OF DIRT IN THE CULVERT ENDS ASAP. HE INDICATED IT WOULD BE DONE. APPROVING AS NOTED. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/13/2024 | APPROVED | FSLADISH |
| Note: 12/13/24 AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT NOT CLEAR, HOT PATCH COMPLETE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/05/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 12/5/24 CORRECT SURVEY UPLOADED. APPROVING AS NOTED. 9/25/2024 - PREVIOUS INSPECTION NOTES 9/25/24 YOUR SWALE ELEVATION NUMBERS ARE STILL INCONSISTENT. THE SWALE FLOWS FROM LEFT TO RIGHT. YOUR SWALE ELEVATION NUMBERS GO UP AND DOWN FROM LEFT SIDE (HIGH) 22.55 ALL THE WAY TO THE RIGHT (LOW) 25.56 SIDE PROPERTY LINE. YOU WILL NEED TO SHOW THE FFE AS WELL AS SWALE AND INVERT ELEVATIONS OF THE ADJOINING PROPERTY ON RIGHT. The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc. both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the property or in Reserved Parcels adjacent to the property 2 Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" 3 Roadside swale. Sec.300.01 C2 Sec.300.01 C2 "The tolerance on individual shots along the as-built flow line of the swale (depressions or high spots) is plus or minus 0.10 feet.Sec.300.01 C2" 8/16/2024 - PREVIOUS INSPECTION NOTES 8/16/24 YOUR SURVEY SHOWS YOUR FRONT SWALE ELEVATIONS INCONSISTENT AND FLOWING UPHILL, INCLUDING YOUR BACKPITCHED CULVERT PIPE IN RELATION TO THE SWALE PLAN DIAGRAM. Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/05/2024 | APPROVED | FSLADISH |
| Note: 12/5/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9463 12/5/24 CORRECT SURVEY UPLOADED. APPROVING AS NOTED. 9/25/2024 - PREVIOUS INSPECTION NOTES 9/25/24 YOUR SWALE ELEVATION NUMBERS ARE STILL INCONSISTENT. THE SWALE FLOWS FROM LEFT TO RIGHT. YOUR SWALE ELEVATION NUMBERS GO UP AND DOWN FROM LEFT SIDE (HIGH) 22.55 ALL THE WAY TO THE RIGHT (LOW) 25.56 SIDE PROPERTY LINE. YOU WILL NEED TO SHOW THE FFE AS WELL AS SWALE AND INVERT ELEVATIONS OF THE ADJOINING PROPERTY ON RIGHT. The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc. both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the property or in Reserved Parcels adjacent to the property 2 Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" 3 Roadside swale. Sec.300.01 C2 Sec.300.01 C2 "The tolerance on individual shots along the as-built flow line of the swale (depressions or high spots) is plus or minus 0.10 feet.Sec.300.01 C2" 8/16/2024 - PREVIOUS INSPECTION NOTES 8/16/24 YOUR SURVEY SHOWS YOUR FRONT SWALE ELEVATIONS INCONSISTENT AND FLOWING UPHILL, INCLUDING YOUR BACKPITCHED CULVERT PIPE IN RELATION TO THE SWALE PLAN DIAGRAM. Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/25/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 9/25/24 YOUR SWALE ELEVATION NUMBERS ARE STILL INCONSISTENT. THE SWALE FLOWS FROM LEFT TO RIGHT. YOUR SWALE ELEVATION NUMBERS GO UP AND DOWN FROM LEFT SIDE (HIGH) 22.55 ALL THE WAY TO THE RIGHT (LOW) 25.56 SIDE PROPERTY LINE. YOU WILL NEED TO SHOW THE FFE AS WELL AS SWALE AND INVERT ELEVATIONS OF THE ADJOINING PROPERTY ON RIGHT. The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc. both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the property or in Reserved Parcels adjacent to the property 2 Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" 3 Roadside swale. Sec.300.01 C2 Sec.300.01 C2 "The tolerance on individual shots along the as-built flow line of the swale (depressions or high spots) is plus or minus 0.10 feet.Sec.300.01 C2" 8/16/2024 - PREVIOUS INSPECTION NOTES 8/16/24 YOUR SURVEY SHOWS YOUR FRONT SWALE ELEVATIONS INCONSISTENT AND FLOWING UPHILL, INCLUDING YOUR BACKPITCHED CULVERT PIPE IN RELATION TO THE SWALE PLAN DIAGRAM. Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/16/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 8/16/24 YOUR SURVEY SHOWS YOUR FRONT SWALE ELEVATIONS INCONSISTENT AND FLOWING UPHILL, INCLUDING YOUR BACKPITCHED CULVERT PIPE IN RELATION TO THE SWALE PLAN DIAGRAM. Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. | |||
| GRAVITY SEWER TEST | 06/24/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 06/24/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 06/18/2024 | APPROVED | RSIMS |
| Note: 6/18/24: FPL emailed to release power. Inspector Notes from Inspection 2170 Emailed FPL @ 2pm | |||
| ROW- PRE-APRON (PRE-POUR) | 06/13/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. | |||
| PEP TANK INSTALLATION REQUEST | 05/29/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 05/28/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2320 5/20/24: Check notes from All Rough at Insulation Inspection. Inspector Notes from Inspection 2420 5-17-24 All of the following needed by insulation inspectcion Revision needed (see note 6 1. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. AND SHALL EXTEND NO LESS THAN 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES, (MUST BE MINIMUM OF 0.0575 inch., 1.463mm, 16 GAGE) 2. NAIL PLATES ELECTRIC 1 ¼ inches from the face of the member NEC 300.4 (Low voltage). 3. All metal boxes need to be ground FBC-R, E 3905.2 AND NEC.314.4 (low voltage) 4. DRYER DUCT NAIL PLATE M1502.5 FOR PROTECTION OF EXHAUST VENTS SHALL EXTEND 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES 5. Two forms of connections for bath exaust ducts DUCTS MUST BE SEALED: FBC, R-M1601.4.1 CONNECTIONS IN DUCTWORK SHALL BE SECURELY FASTENED AND SEALED 6. Need revision for windows (FL Product Approval numbers not matching) 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. | |||
| LATH/BRICK/ WATER BARRIER | 05/20/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 5/20/24: Check notes from All Rough at Insulation Inspection. Inspector Notes from Inspection 2420 5-17-24 All of the following needed by insulation inspectcion Revision needed (see note 6 1. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. AND SHALL EXTEND NO LESS THAN 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES, (MUST BE MINIMUM OF 0.0575 inch., 1.463mm, 16 GAGE) 2. NAIL PLATES ELECTRIC 1 ¼ inches from the face of the member NEC 300.4 (Low voltage). 3. All metal boxes need to be ground FBC-R, E 3905.2 AND NEC.314.4 (low voltage) 4. DRYER DUCT NAIL PLATE M1502.5 FOR PROTECTION OF EXHAUST VENTS SHALL EXTEND 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES 5. Two forms of connections for bath exaust ducts DUCTS MUST BE SEALED: FBC, R-M1601.4.1 CONNECTIONS IN DUCTWORK SHALL BE SECURELY FASTENED AND SEALED 6. Need revision for windows (FL Product Approval numbers not matching) 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. | |||
| ALL ROUGH | 05/17/2024 | APPROVED - AS NOTED | LMILLER |
| Note: 5-17-24 All of the following needed by insulation inspectcion Revision needed (see note 6 1. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. AND SHALL EXTEND NO LESS THAN 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES, (MUST BE MINIMUM OF 0.0575 inch., 1.463mm, 16 GAGE) 2. NAIL PLATES ELECTRIC 1 ¼ inches from the face of the member NEC 300.4 (Low voltage). 3. All metal boxes need to be ground FBC-R, E 3905.2 AND NEC.314.4 (low voltage) 4. DRYER DUCT NAIL PLATE M1502.5 FOR PROTECTION OF EXHAUST VENTS SHALL EXTEND 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES 5. Two forms of connections for bath exaust ducts DUCTS MUST BE SEALED: FBC, R-M1601.4.1 CONNECTIONS IN DUCTWORK SHALL BE SECURELY FASTENED AND SEALED 6. Need revision for windows (FL Product Approval numbers not matching) 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. | |||
| ROOF VALLEY & METAL | 05/06/2024 | APPROVED | RSIMS |
| Note: 5/3/2024 - PREVIOUS INSPECTION NOTES 5/3/24: 1). 5" x 5" flashing is not sealed as required. It will need to be sealed/taped directly to the sheathing/CMU wall as required by the manufacturer. Cannot be sealed to underlayment or tyvek. 4/17/2024 - PREVIOUS INSPECTION NOTES 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s. 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prio to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s. | |||
| ROOF VALLEY & METAL | 05/03/2024 | Disapproved - NO FEE | RSIMS |
| Note: 5/3/24: 1). 5" x 5" flashing is not sealed as required. It will need to be sealed/taped directly to the sheathing/CMU wall as required by the manufacturer. Cannot be sealed to underlayment or tyvek. 4/17/2024 - PREVIOUS INSPECTION NOTES 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s. 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prio to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s. | |||
| ROOF VALLEY & METAL | 04/17/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s. 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prio to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/16/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s. | |||
| WALL SHEATHING | 04/15/2024 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/15/2024 | Disapproved - NO FEE | RSIMS |
| Note: 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/01/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 03/28/2024 | APPROVED | RSIMS |
| MONOLITHIC SLAB | 03/11/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/06/2024 | APPROVED | MGIBSON |
| ELECTRIC TEMP POLE | 02/21/2024 | APPROVED | MKRASKI |
| ELECTRIC TEMP POLE | 02/21/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 2pm | |||
| WATER METER INSTALLATION REQUEST | 02/13/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/31/2025 | 03/31/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/19/2025 | 03/24/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| BADMIN | INFORMATION | 11/26/2024 | 11/26/2024 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please label pdf as final survey | |||
| BLD | COMPLETE | 05/17/2024 | 05/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/10/2024 | 05/16/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/10/2024 | 05/10/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/09/2024 | 05/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/03/2024 | 05/07/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Plan needs to be digitally signed and sealed. | |||
| ENGIN1 | COMPLETE | 04/01/2024 | 04/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/01/2024 | 04/01/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/29/2024 | 03/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/23/2024 | 02/29/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Field Density Test Reports by themselves not accepted. Tests must be accompanied by a signed and sealed inspection and certification letter by the geotechnical engineer of record. Engineer’s letter to confirm the following: Site clearing / over excavation was completed and inspected by engineer prior to the placement of fill and engineer confirms clearing and over excavation work is acceptable. Engineer to confirm fill materials were suitable and within specifications. Engineer to confirm the required number and location of field density tests were completed. Engineer to include certification statement in accordance with Florida Administrative Code 61G15-18.011 (4) | |||
| BLD | COMPLETE | 02/01/2024 | 02/06/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/26/2024 | 01/26/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/26/2024 | 01/26/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/26/2024 | 01/26/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/17/2024 | 02/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 01/16/2024 | 01/16/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey and site plan are not readable. Please reload them. | |||
| ELEC | HOLD | 01/16/2024 | 01/17/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 4. NEC 2017 210.52 | |||
| ZON | HOLD | 01/16/2024 | 01/16/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Site plan must show ac pad location Cannot have identical houses repeat within four lots of each other Site plan/survey copy is very blurry. Please submit a clear copy | |||
| SW1 | COMPLETE | 01/16/2024 | 01/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/16/2024 | 01/17/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Cannot have identical houses repeat within four lots of each other | |||
| ENGIN1 | COMPLETE | 01/16/2024 | 01/17/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/28/2023 | 12/28/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 12/28/2023 | 12/29/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 12/28/2023 | 12/29/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 4. NEC 2017 210.52 | |||
| ENGIN1 | HOLD | 12/28/2023 | 12/29/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey and site plan are not readable. Please reload them. | |||
| GAS | CANCEL | 12/28/2023 | 12/29/2023 |
| LOCATE | COMPLETE | 12/28/2023 | 01/02/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/28/2023 | 01/04/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 12/28/2023 | 01/04/2024 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Can not read this site plan to review, please send a more clear site plan | |||
| ZON | HOLD | 12/28/2023 | 12/29/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show ac pad location Cannot have identical houses repeat within four lots of each other Site plan/survey copy is very blurry. Please submit a clear copy | |||
| BADMIN | COMPLETE | 12/28/2023 | 12/29/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/31/2025 |
| CONNECTION FEES | ¤1,187.26 | 02/01/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 02/01/2024 |
| IMPACT FEE FIRE | ¤428.09 | 02/01/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/01/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/01/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 02/01/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/01/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 02/01/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/01/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/01/2024 |
| SURCHARGE FS 533.721 | ¤4.54 | 02/01/2024 |
| SURCHARGE - FS 468.631 | ¤6.82 | 02/01/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/01/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/01/2024 |
| SW ENG PRE APRON | ¤30.00 | 02/01/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/01/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/01/2024 |
| SEWER CREDIT | (¤850.00) | 02/01/2024 |
| SEWER INSPECTION | ¤25.00 | 02/01/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 02/01/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 02/01/2024 |
| SITE PLAN 30 | ¤30.00 | 02/01/2024 |
| WATER-METER | ¤514.49 | 02/01/2024 |
| WATER- TURN ON | ¤25.00 | 02/01/2024 |
| WATER- TURN ON | ¤25.00 | 02/01/2024 |
| ADJUSTMENT 50% | (¤802.19) | 02/01/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/01/2024 |
| INSPECTION - RESIDENTIAL | ¤1,226.50 | 02/01/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤347.88 | 02/01/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,807.42 |