Permit #2023121135

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01050-0020
CONDITIONED SPACE: 2258 sqft
GARAGE: 767 sqft
OPENED PORCH (WITH ROOF) : 64 sqft
OPENED PORCH (WITH ROOF) : 276 sqft
Total Square Footage: 3365 sqft
Block: 01050
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-931-4799
Location Address: 7 EVANSTON LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/01/2024
NOC: RECORDED
Applicant name: JOHN DONALD GORDON
Owner: PRECISION CUSTOM BUILDERS OF NORTH FLORIDA LLC

Address

7755 SOUTH US 1

BUNNELL, FL 32110

Lot: 0020
Contracted Stated Job Value: ¤375,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PRECISION CUSTOM BUILDERS OF NORTH FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

7755 S. US HWY 1

BUNNELL, FL 32110

CGC1528576 (Exp: 08/31/2026) 386-931-4799

Sub Contractors

DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
JACOB D CASTLE
Status Location Address State License Number Phone
CANCEL

508 N MOORE ST

BUNNELL, FL 32110

RF11067810 (Exp: 08/31/2027) 386-864-5066
RICHARD GARY WILSON JR
Status Location Address Mailing Address State License Number Phone
ACTIVE

1504 OLD MOODY BLVD

BUNNELL, FL 32110

UNIT 6

BUNNELL, FL 32110

CAC1817645 (Exp: 08/31/2026) 386-586-6290

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/01/2025 FINAL APPROVED MCONTRYMAN
Note: 3/18/2025 - PREVIOUS INSPECTION NOTES 3/18/25 1. Whole home Surge Protection needs to be installed at at meter/main only NEC 230.67 (A) 2. ODU needs to be 3" above finished grade FBCR M1305.1.4.1 3. Left side master bath has leaking right side sink 4. Left side master bath sink drain stoppers not holding water 5. Back french door secondary locking mechanism does not go up all the way 6. Front french door secondary locking mechanism does not go up all the way 7. Energy calcs do not match units installed (Breakers do match units installed) FBC(A) 107.4 8. Missing Insulation Certificate FBC EC R303.1.1.2
BLD - BUILDING FINAL 03/18/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 3/18/25 1. Whole home Surge Protection needs to be installed at at meter/main only NEC 230.67 (A) 2. ODU needs to be 3" above finished grade FBCR M1305.1.4.1 3. Left side master bath has leaking right side sink 4. Left side master bath sink drain stoppers not holding water 5. Back french door secondary locking mechanism does not go up all the way 6. Front french door secondary locking mechanism does not go up all the way 7. Energy calcs do not match units installed (Breakers do match units installed) FBC(A) 107.4 8. Missing Insulation Certificate FBC EC R303.1.1.2
U-CROSS CONNECTION 12/16/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/16/2024 9:11:53 AM *** irrigation meter plus PVB-no cross connection
U -UTILITY RESIDENTIAL FINAL 12/16/2024 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 12/13/2024 APPROVED - AS NOTED FSLADISH
Note: 12/13/24 SWALE CORRECTION MADE AT THE TIME OF THIS INSPECTION. SPOKE WITH DON CM AND TOLD HIM I WOULD PASS THIS INSPECTION AS NOTED THAT HE WOULD NEED TO CLEAN OUT THE BIT OF DIRT IN THE CULVERT ENDS ASAP. HE INDICATED IT WOULD BE DONE. APPROVING AS NOTED. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL APRON (AFTER POUR) 12/13/2024 APPROVED FSLADISH
Note: 12/13/24 AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT NOT CLEAR, HOT PATCH COMPLETE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/05/2024 APPROVED - AS NOTED FSLADISH
Note: 12/5/24 CORRECT SURVEY UPLOADED. APPROVING AS NOTED. 9/25/2024 - PREVIOUS INSPECTION NOTES 9/25/24 YOUR SWALE ELEVATION NUMBERS ARE STILL INCONSISTENT. THE SWALE FLOWS FROM LEFT TO RIGHT. YOUR SWALE ELEVATION NUMBERS GO UP AND DOWN FROM LEFT SIDE (HIGH) 22.55 ALL THE WAY TO THE RIGHT (LOW) 25.56 SIDE PROPERTY LINE. YOU WILL NEED TO SHOW THE FFE AS WELL AS SWALE AND INVERT ELEVATIONS OF THE ADJOINING PROPERTY ON RIGHT. The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc. both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the property or in Reserved Parcels adjacent to the property 2 Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" 3 Roadside swale. Sec.300.01 C2 Sec.300.01 C2 "The tolerance on individual shots along the as-built flow line of the swale (depressions or high spots) is plus or minus 0.10 feet.Sec.300.01 C2" 8/16/2024 - PREVIOUS INSPECTION NOTES 8/16/24 YOUR SURVEY SHOWS YOUR FRONT SWALE ELEVATIONS INCONSISTENT AND FLOWING UPHILL, INCLUDING YOUR BACKPITCHED CULVERT PIPE IN RELATION TO THE SWALE PLAN DIAGRAM. Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/05/2024 APPROVED FSLADISH
Note: 12/5/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9463 12/5/24 CORRECT SURVEY UPLOADED. APPROVING AS NOTED. 9/25/2024 - PREVIOUS INSPECTION NOTES 9/25/24 YOUR SWALE ELEVATION NUMBERS ARE STILL INCONSISTENT. THE SWALE FLOWS FROM LEFT TO RIGHT. YOUR SWALE ELEVATION NUMBERS GO UP AND DOWN FROM LEFT SIDE (HIGH) 22.55 ALL THE WAY TO THE RIGHT (LOW) 25.56 SIDE PROPERTY LINE. YOU WILL NEED TO SHOW THE FFE AS WELL AS SWALE AND INVERT ELEVATIONS OF THE ADJOINING PROPERTY ON RIGHT. The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc. both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the property or in Reserved Parcels adjacent to the property 2 Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" 3 Roadside swale. Sec.300.01 C2 Sec.300.01 C2 "The tolerance on individual shots along the as-built flow line of the swale (depressions or high spots) is plus or minus 0.10 feet.Sec.300.01 C2" 8/16/2024 - PREVIOUS INSPECTION NOTES 8/16/24 YOUR SURVEY SHOWS YOUR FRONT SWALE ELEVATIONS INCONSISTENT AND FLOWING UPHILL, INCLUDING YOUR BACKPITCHED CULVERT PIPE IN RELATION TO THE SWALE PLAN DIAGRAM. Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/25/2024 Disapproved - NO FEE FSLADISH
Note: 9/25/24 YOUR SWALE ELEVATION NUMBERS ARE STILL INCONSISTENT. THE SWALE FLOWS FROM LEFT TO RIGHT. YOUR SWALE ELEVATION NUMBERS GO UP AND DOWN FROM LEFT SIDE (HIGH) 22.55 ALL THE WAY TO THE RIGHT (LOW) 25.56 SIDE PROPERTY LINE. YOU WILL NEED TO SHOW THE FFE AS WELL AS SWALE AND INVERT ELEVATIONS OF THE ADJOINING PROPERTY ON RIGHT. The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc. both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the property or in Reserved Parcels adjacent to the property 2 Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" 3 Roadside swale. Sec.300.01 C2 Sec.300.01 C2 "The tolerance on individual shots along the as-built flow line of the swale (depressions or high spots) is plus or minus 0.10 feet.Sec.300.01 C2" 8/16/2024 - PREVIOUS INSPECTION NOTES 8/16/24 YOUR SURVEY SHOWS YOUR FRONT SWALE ELEVATIONS INCONSISTENT AND FLOWING UPHILL, INCLUDING YOUR BACKPITCHED CULVERT PIPE IN RELATION TO THE SWALE PLAN DIAGRAM. Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/16/2024 Disapproved - NO FEE FSLADISH
Note: 8/16/24 YOUR SURVEY SHOWS YOUR FRONT SWALE ELEVATIONS INCONSISTENT AND FLOWING UPHILL, INCLUDING YOUR BACKPITCHED CULVERT PIPE IN RELATION TO THE SWALE PLAN DIAGRAM. Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
GRAVITY SEWER TEST 06/24/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 06/24/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 06/18/2024 APPROVED RSIMS
Note: 6/18/24: FPL emailed to release power. Inspector Notes from Inspection 2170 Emailed FPL @ 2pm
ROW- PRE-APRON (PRE-POUR) 06/13/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
PEP TANK INSTALLATION REQUEST 05/29/2024 APPROVED CBOWERMASTER
INSULATION 05/28/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2320 5/20/24: Check notes from All Rough at Insulation Inspection. Inspector Notes from Inspection 2420 5-17-24 All of the following needed by insulation inspectcion Revision needed (see note 6 1. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. AND SHALL EXTEND NO LESS THAN 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES, (MUST BE MINIMUM OF 0.0575 inch., 1.463mm, 16 GAGE) 2. NAIL PLATES ELECTRIC 1 ¼ inches from the face of the member NEC 300.4 (Low voltage). 3. All metal boxes need to be ground FBC-R, E 3905.2 AND NEC.314.4 (low voltage) 4. DRYER DUCT NAIL PLATE M1502.5 FOR PROTECTION OF EXHAUST VENTS SHALL EXTEND 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES 5. Two forms of connections for bath exaust ducts DUCTS MUST BE SEALED: FBC, R-M1601.4.1 CONNECTIONS IN DUCTWORK SHALL BE SECURELY FASTENED AND SEALED 6. Need revision for windows (FL Product Approval numbers not matching) 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose.
LATH/BRICK/ WATER BARRIER 05/20/2024 APPROVED - AS NOTED RSIMS
Note: 5/20/24: Check notes from All Rough at Insulation Inspection. Inspector Notes from Inspection 2420 5-17-24 All of the following needed by insulation inspectcion Revision needed (see note 6 1. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. AND SHALL EXTEND NO LESS THAN 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES, (MUST BE MINIMUM OF 0.0575 inch., 1.463mm, 16 GAGE) 2. NAIL PLATES ELECTRIC 1 ¼ inches from the face of the member NEC 300.4 (Low voltage). 3. All metal boxes need to be ground FBC-R, E 3905.2 AND NEC.314.4 (low voltage) 4. DRYER DUCT NAIL PLATE M1502.5 FOR PROTECTION OF EXHAUST VENTS SHALL EXTEND 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES 5. Two forms of connections for bath exaust ducts DUCTS MUST BE SEALED: FBC, R-M1601.4.1 CONNECTIONS IN DUCTWORK SHALL BE SECURELY FASTENED AND SEALED 6. Need revision for windows (FL Product Approval numbers not matching) 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose.
ALL ROUGH 05/17/2024 APPROVED - AS NOTED LMILLER
Note: 5-17-24 All of the following needed by insulation inspectcion Revision needed (see note 6 1. NAIL PLATES FOR PLUMBING P2603.2.1 PROTECTION AGAINST PHYSICAL DAMAGE. AND SHALL EXTEND NO LESS THAN 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES, (MUST BE MINIMUM OF 0.0575 inch., 1.463mm, 16 GAGE) 2. NAIL PLATES ELECTRIC 1 ¼ inches from the face of the member NEC 300.4 (Low voltage). 3. All metal boxes need to be ground FBC-R, E 3905.2 AND NEC.314.4 (low voltage) 4. DRYER DUCT NAIL PLATE M1502.5 FOR PROTECTION OF EXHAUST VENTS SHALL EXTEND 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES 5. Two forms of connections for bath exaust ducts DUCTS MUST BE SEALED: FBC, R-M1601.4.1 CONNECTIONS IN DUCTWORK SHALL BE SECURELY FASTENED AND SEALED 6. Need revision for windows (FL Product Approval numbers not matching) 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose.
ROOF VALLEY & METAL 05/06/2024 APPROVED RSIMS
Note: 5/3/2024 - PREVIOUS INSPECTION NOTES 5/3/24: 1). 5" x 5" flashing is not sealed as required. It will need to be sealed/taped directly to the sheathing/CMU wall as required by the manufacturer. Cannot be sealed to underlayment or tyvek. 4/17/2024 - PREVIOUS INSPECTION NOTES 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s. 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prio to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s.
ROOF VALLEY & METAL 05/03/2024 Disapproved - NO FEE RSIMS
Note: 5/3/24: 1). 5" x 5" flashing is not sealed as required. It will need to be sealed/taped directly to the sheathing/CMU wall as required by the manufacturer. Cannot be sealed to underlayment or tyvek. 4/17/2024 - PREVIOUS INSPECTION NOTES 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s. 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prio to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s.
ROOF VALLEY & METAL 04/17/2024 Disapproved -FEE REQUIRED RSIMS
Note: 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prior to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s. 4/17/24: As previously noted. You need to correct the PT to CMU wall condition at a minimum. The revision is also still required and MUST be complete prio to All Rough Inspection. Inspector Notes from Inspection 2460 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/16/2024 APPROVED - AS NOTED RSIMS
Note: 4/16/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. Previous Item 2: Plan page P-3 shows the garage wall as a load bearing wall. The only detail for a wood bearing wall shown on Plan page P-6 requires sheathing attached. Contractor will be submitting a revision to have that requirement removed by the Engineer. Also, the PT to CMU anchoring requires 32" OC in the middle and the nuts need to be tightened as some are loose. 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s.
WALL SHEATHING 04/15/2024 APPROVED RSIMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/15/2024 Disapproved - NO FEE RSIMS
Note: 4/15/24: 1). Need piles of trash & debris cleaned up and placed in dumpster to make site safe for inspection. 2). Load bearing wall is incomplete. No sheathing installed as required on plan detail. 3). Over valley framing to the left of entry door is missing straps at the top 2" x 4"s.
FOUND SURVEY APPROVED (OFFICE) 04/01/2024 APPROVED TBAKER
TIE BEAM / LINTEL 03/28/2024 APPROVED RSIMS
MONOLITHIC SLAB 03/11/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 03/06/2024 APPROVED MGIBSON
ELECTRIC TEMP POLE 02/21/2024 APPROVED MKRASKI
ELECTRIC TEMP POLE 02/21/2024 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 2pm
WATER METER INSTALLATION REQUEST 02/13/2024 APPROVED BVITALE

Review History

Department Status Date In Date Out
MECH COMPLETE 03/31/2025 03/31/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 03/19/2025 03/24/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
BADMIN INFORMATION 11/26/2024 11/26/2024
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please label pdf as final survey
BLD COMPLETE 05/17/2024 05/22/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 05/10/2024 05/16/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 05/10/2024 05/10/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 05/09/2024 05/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 05/03/2024 05/07/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Plan needs to be digitally signed and sealed.
ENGIN1 COMPLETE 04/01/2024 04/01/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/01/2024 04/01/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 02/29/2024 03/05/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 02/23/2024 02/29/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Field Density Test Reports by themselves not accepted. Tests must be accompanied by a signed and sealed inspection and certification letter by the geotechnical engineer of record. Engineer’s letter to confirm the following: Site clearing / over excavation was completed and inspected by engineer prior to the placement of fill and engineer confirms clearing and over excavation work is acceptable. Engineer to confirm fill materials were suitable and within specifications. Engineer to confirm the required number and location of field density tests were completed. Engineer to include certification statement in accordance with Florida Administrative Code 61G15-18.011 (4)
BLD COMPLETE 02/01/2024 02/06/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 01/26/2024 01/26/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ELEC COMPLETE 01/26/2024 01/26/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 01/26/2024 01/26/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 01/17/2024 02/26/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 HOLD 01/16/2024 01/16/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey and site plan are not readable. Please reload them.
ELEC HOLD 01/16/2024 01/17/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 4. NEC 2017 210.52
ZON HOLD 01/16/2024 01/16/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Site plan must show ac pad location Cannot have identical houses repeat within four lots of each other Site plan/survey copy is very blurry. Please submit a clear copy
SW1 COMPLETE 01/16/2024 01/26/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 01/16/2024 01/17/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Cannot have identical houses repeat within four lots of each other
ENGIN1 COMPLETE 01/16/2024 01/17/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 12/28/2023 12/28/2023
Note: Released By: JPI
CUSVC COMPLETE 12/28/2023 12/29/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 12/28/2023 12/29/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 4. NEC 2017 210.52
ENGIN1 HOLD 12/28/2023 12/29/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey and site plan are not readable. Please reload them.
GAS CANCEL 12/28/2023 12/29/2023
LOCATE COMPLETE 12/28/2023 01/02/2024
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 12/28/2023 01/04/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
SW1 HOLD 12/28/2023 01/04/2024
Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Can not read this site plan to review, please send a more clear site plan
ZON HOLD 12/28/2023 12/29/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show ac pad location Cannot have identical houses repeat within four lots of each other Site plan/survey copy is very blurry. Please submit a clear copy
BADMIN COMPLETE 12/28/2023 12/29/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 03/31/2025
REINSPECTION RESIDENTIAL ¤40.00 03/31/2025
REINSPECTION RESIDENTIAL ¤40.00 03/31/2025
CONNECTION FEES ¤1,187.26 02/01/2024
FC IMPACT FEE EMS ¤62.00 02/01/2024
IMPACT FEE FIRE ¤428.09 02/01/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/01/2024
FC IMPACT FEE LIBRARY ¤268.00 02/01/2024
IMPACT FEE PARKS ¤1,800.99 02/01/2024
IMPACT FEE SCHOOL ¤5,450.00 02/01/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 02/01/2024
WATER -IRRIGATION INSPECTION ¤25.00 02/01/2024
WATER -IRRIGATION INSPECTION ¤25.00 02/01/2024
SURCHARGE FS 533.721 ¤4.54 02/01/2024
SURCHARGE - FS 468.631 ¤6.82 02/01/2024
SW ENG - FOUNDATION SURVEY ¤20.00 02/01/2024
SW ENG INSPECTION 80 ¤80.00 02/01/2024
SW ENG PRE APRON ¤30.00 02/01/2024
SW ENG - REVIEW 20 ¤20.00 02/01/2024
SW ENG RES REVIEW 200 ¤200.00 02/01/2024
SEWER CREDIT (¤850.00) 02/01/2024
SEWER INSPECTION ¤25.00 02/01/2024
SEWER CAPITAL FACILITY ¤5,441.03 02/01/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 02/01/2024
SITE PLAN 30 ¤30.00 02/01/2024
WATER-METER ¤514.49 02/01/2024
WATER- TURN ON ¤25.00 02/01/2024
WATER- TURN ON ¤25.00 02/01/2024
ADJUSTMENT 50% (¤802.19) 02/01/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/01/2024
INSPECTION - RESIDENTIAL ¤1,226.50 02/01/2024
PLAN REVIEW - RESIDENTIAL ¤347.88 02/01/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,807.42