I want to search for...

Permit #2024010126

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7035-01230-0110
Block: 01230
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 904-501-2751
Location Address: 225 BIRD OF PARADISE DR
Type: DR - DRIVEWAY
Issue Date: 01/11/2024
NOC: Unknown
Applicant name: JARED THOMAS SAVIO
Owner: KENNETH D AND MARCIA ANN ARNETT

Address

225 BIRD OF PARADISE DR

PALM COAST, FL 32137

Lot: 0110
Contracted Stated Job Value: ¤2,300.00
Job Description: CIRCULAR CONCRETE DRIVEWAY ADDITION
Type: CN

Contractor

J & R CONSTRUCTION OF NEFL INC
Status Location Address Phone
ACTIVE

14 LINCOLN LANE

PALM COAST, FL 32137

904-501-2751

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 03/19/2024 APPROVED - AS NOTED FSLADISH
Note: 3/19/24 CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9272 3/4/24 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED. APPROVING THIS AFTER POUR AS NOTED. ***INSPECTORS NOTE***BEFORE ROW FINAL INSPECTION WILL PASS YOU WILL NEED TO FILL IN WITH DIRT, COMPACT AND RESET SOD TO BE FLUSH WITH THE DRIVEWAY, TOP OF CULVERT, APRON AND ALL SIDE AREAS THAT ARE BARE AROUND THE PERIMETER OF THE POURED AREA. THIS IS REQUIRED TO PREVENT WASHOUTS, BLOW OUTS AND EROSION UNDERMINING THE POUR. ON THE LEFT SIDE BETWEEN THE MITERED END AND DRIVEWAY APRON YOU ALREADY HAVE A WASHOUT UNDER THE NEW POUR. THIS WILL NEED TO BE FILLED IN AND COMPACTED.*** PHOTOS FOR REFERENCE. Inspector Notes from Inspection ** 02/08/24 READY TO POUR CONCRETE ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. Inspector Notes from Inspection 9270 ** 02/08/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh.
U -UTILITY RESIDENTIAL FINAL 03/19/2024 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 03/04/2024 APPROVED - AS NOTED FSLADISH
Note: 3/4/24 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED. APPROVING THIS AFTER POUR AS NOTED. ***INSPECTORS NOTE***BEFORE ROW FINAL INSPECTION WILL PASS YOU WILL NEED TO FILL IN WITH DIRT, COMPACT AND RESET SOD TO BE FLUSH WITH THE DRIVEWAY, TOP OF CULVERT, APRON AND ALL SIDE AREAS THAT ARE BARE AROUND THE PERIMETER OF THE POURED AREA. THIS IS REQUIRED TO PREVENT WASHOUTS, BLOW OUTS AND EROSION UNDERMINING THE POUR. ON THE LEFT SIDE BETWEEN THE MITERED END AND DRIVEWAY APRON YOU ALREADY HAVE A WASHOUT UNDER THE NEW POUR. THIS WILL NEED TO BE FILLED IN AND COMPACTED.*** PHOTOS FOR REFERENCE. Inspector Notes from Inspection ** 02/08/24 READY TO POUR CONCRETE ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. Inspector Notes from Inspection 9270 ** 02/08/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh.
ROW- PRE-APRON (PRE-POUR) 02/09/2024 APPROVED - AS NOTED EMADISON
Note: ** 02/08/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh.

Review History

Department Status Date In Date Out
ZON COMPLETE 01/10/2024 01/10/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/10/2024 01/10/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 01/10/2024 01/11/2024
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
BADMIN INFORMATION 01/09/2024 01/09/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
ENGIN1 COMPLETE 01/04/2024 01/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 01/04/2024 01/09/2024
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON HOLD 01/04/2024 01/04/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan :dotted line indicates the 5' easment you are proposing the arc of the driveway is in the easement. Please show you will not be in the easement. Please fix description to Circular driveway.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 50% (¤15.00) 01/11/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/11/2024
SW ENG INSPECTION 40 ¤40.00 01/11/2024
SW ENG PRE APRON ¤30.00 01/11/2024
SW ENG RES REVIEW 200 ¤200.00 01/11/2024
SITE PLAN 15 ¤15.00 01/11/2024
Fees Total Due: ¤0.00 Total Paid: ¤300.00