I want to search for...
Permit #2024010606
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00040-0220 |
| CONDITIONED SPACE: 1721 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| GARAGE: 455 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00040 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 631-929-5500 |
| Location Address: 48 FORDHAM LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/15/2024 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: YANNUCCI VINCENT |
|
Address PO BOX 638 SHOREHAM, NY 11786 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤205,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/25/2024 | FINAL APPROVED | HCAMACHO |
| Note: 9/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 9/17/2024 10:15:59 AM *** 1. Roof vent stack to short and needs boot right side. FBCR P3103.1.1 2. Please install power cord for food disposal. 3. No range or microwave installed, needs a way of warming food at final. 4. Please have 3" clearence at AHU and return Plenum M1305.1.1Furnaces and air handlers. 5. Need attic access cover.R402.4.1.1 | |||
| BLD - BUILDING FINAL | 09/17/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 9/17/2024 10:15:59 AM *** 1. Roof vent stack to short and needs boot right side. FBCR P3103.1.1 2. Please install power cord for food disposal. 3. No range or microwave installed, needs a way of warming food at final. 4. Please have 3" clearence at AHU and return Plenum M1305.1.1Furnaces and air handlers. 5. Need attic access cover.R402.4.1.1 | |||
| U -UTILITY RESIDENTIAL FINAL | 08/15/2024 | FINAL APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 08/07/2024 | APPROVED | RMARTIN |
| ROW - STORMWATER FINAL | 08/05/2024 | APPROVED | EMADISON |
| ROW - FINAL APRON (AFTER POUR) | 08/05/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/18/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/18/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 07/18/24 NEED TO REPAIR THE WASHOUT NEXT TO WATER METER BOX ON RIGHT SIDE CLEAN ERODED SEDIMENT OUT OF THE SWALE | |||
| SEWER TIE IN | 07/02/2024 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 06/28/2024 | APPROVED | GBERTOLA |
| Note: 06/28/24= AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVER DETAIL. ** 04/26/24 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ___________________________________________________________________________________________________________________ 4/25/2024 - PREVIOUS INSPECTION NOTES ** 04/25/24 BUILDER STILL REQUIRED TO REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO THE JOB SITE ** FOLLOW INSPECTION ON 04/26/24 ________________________________________________________________________________________________________________ 4/18/2024 - PREVIOUS INSPECTION NOTES 4/18/24 BUILDER NEEDS TO INSTALL A SILT FENCE AROUND THE ENTIRE PROERTY TO KEEP ANY RUNOFF FROM NEGATIVELY AFFECTING NEIGHBORING PROPERTIES. YOU WILL NEED TO REMOVE PORTA POTTY FROM THE ROW. YOU WILL NEED TO KEEP THE SWALE GRADED DAILY AND/OR INSTALL THE TEMP PIPE AND KEEP IT CLEAR OF DEBRIS. WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 4/25/24.. HOME NEXT DOOR IS HAVING ISSUES PLEASE ENSURE SILT AND RUNOFF IS NOT AFFECTING ADJACENT PROPERTIES MH | |||
| INSULATION | 06/17/2024 | APPROVED | JWALKER |
| Note: 6/14/2024 - PREVIOUS INSPECTION NOTES Front door jamb, missed insulation around the jamb. | |||
| INSULATION | 06/14/2024 | Disapproved - NO FEE | JWALKER |
| Note: Front door jamb, missed insulation around the jamb. | |||
| ALL ROUGH | 06/12/2024 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2460 1. Truss A04. Nail straps to truss at rear porch CMU wall. 2. Truss A16 missed engineering. Check for corrections at all rough. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/10/2024 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Truss A04. Nail straps to truss at rear porch CMU wall. 2. Truss A16 missed engineering. Check for corrections at all rough. | |||
| ROOF VALLEY & METAL | 06/06/2024 | APPROVED | JWALKER |
| WALL SHEATHING | 06/06/2024 | APPROVED | JWALKER |
| Note: Bump checked | |||
| LATH/BRICK/ WATER BARRIER | 06/06/2024 | APPROVED | JWALKER |
| ELECTRIC-TUG | 05/31/2024 | APPROVED | JWALKER |
| Note: 5/30/2024 - PREVIOUS INSPECTION NOTES Grounding electrode has not been installed. | |||
| U-CROSS CONNECTION | 05/31/2024 | APPROVED | DHANEY |
| ELECTRIC-TUG | 05/30/2024 | Disapproved - NO FEE | JWALKER |
| Note: Grounding electrode has not been installed. | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/08/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/06/2024 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 04/30/2024 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/26/2024 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 04/26/2024 | APPROVED | MGIBSON |
| Note: 4/19/2024 - PREVIOUS INSPECTION NOTES MUST SCHEDUAL INSPECTIONS FOR CORRECT ONES, GRAVITY SEWER IS NOT DONE YET | |||
| ROW - DRAINAGE | 04/26/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/26/24 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ___________________________________________________________________________________________________________________ 4/25/2024 - PREVIOUS INSPECTION NOTES ** 04/25/24 BUILDER STILL REQUIRED TO REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO THE JOB SITE ** FOLLOW INSPECTION ON 04/26/24 ________________________________________________________________________________________________________________ 4/18/2024 - PREVIOUS INSPECTION NOTES 4/18/24 BUILDER NEEDS TO INSTALL A SILT FENCE AROUND THE ENTIRE PROERTY TO KEEP ANY RUNOFF FROM NEGATIVELY AFFECTING NEIGHBORING PROPERTIES. YOU WILL NEED TO REMOVE PORTA POTTY FROM THE ROW. YOU WILL NEED TO KEEP THE SWALE GRADED DAILY AND/OR INSTALL THE TEMP PIPE AND KEEP IT CLEAR OF DEBRIS. WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 4/25/24.. HOME NEXT DOOR IS HAVING ISSUES PLEASE ENSURE SILT AND RUNOFF IS NOT AFFECTING ADJACENT PROPERTIES MH | |||
| ROW - DRAINAGE | 04/25/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/25/24 BUILDER STILL REQUIRED TO REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO THE JOB SITE ** FOLLOW INSPECTION ON 04/26/24 ________________________________________________________________________________________________________________ 4/18/2024 - PREVIOUS INSPECTION NOTES 4/18/24 BUILDER NEEDS TO INSTALL A SILT FENCE AROUND THE ENTIRE PROERTY TO KEEP ANY RUNOFF FROM NEGATIVELY AFFECTING NEIGHBORING PROPERTIES. YOU WILL NEED TO REMOVE PORTA POTTY FROM THE ROW. YOU WILL NEED TO KEEP THE SWALE GRADED DAILY AND/OR INSTALL THE TEMP PIPE AND KEEP IT CLEAR OF DEBRIS. WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 4/25/24.. HOME NEXT DOOR IS HAVING ISSUES PLEASE ENSURE SILT AND RUNOFF IS NOT AFFECTING ADJACENT PROPERTIES MH | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/25/2024 | APPROVED | JMUNSON |
| GRAVITY SEWER TEST | 04/19/2024 | Disapproved - NO FEE | MGIBSON |
| Note: MUST SCHEDUAL INSPECTIONS FOR CORRECT ONES, GRAVITY SEWER IS NOT DONE YET | |||
| ROW - DRAINAGE | 04/18/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 4/18/24 BUILDER NEEDS TO INSTALL A SILT FENCE AROUND THE ENTIRE PROERTY TO KEEP ANY RUNOFF FROM NEGATIVELY AFFECTING NEIGHBORING PROPERTIES. YOU WILL NEED TO REMOVE PORTA POTTY FROM THE ROW. YOU WILL NEED TO KEEP THE SWALE GRADED DAILY AND/OR INSTALL THE TEMP PIPE AND KEEP IT CLEAR OF DEBRIS. WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 4/25/24.. HOME NEXT DOOR IS HAVING ISSUES PLEASE ENSURE SILT AND RUNOFF IS NOT AFFECTING ADJACENT PROPERTIES MH | |||
| WATER METER INSTALLATION REQUEST | 04/17/2024 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 02/20/2024 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/05/2024 | 06/11/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/30/2024 | 06/04/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 05/29/2024 | 05/29/2024 |
| Note: Marked INFORMATION By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM No Sub infomation was provided. | |||
| MECH | HOLD | 05/24/2024 | 05/29/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM update mechanical subcontractors (Second Request) | |||
| BLD | COMPLETE | 05/24/2024 | 05/28/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/15/2024 | 05/20/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM update mechanical subcontractors | |||
| BLD | HOLD | 05/15/2024 | 05/21/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Truss packet needs to have approval stamp from engineer of record | |||
| ENGIN1 | HOLD | 05/08/2024 | 05/08/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Foundation survey not in system. | |||
| ZON | HOLD | 05/08/2024 | 05/08/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit Foundation Survey. That is not what was uploaded. | |||
| BADMIN | HOLD | 05/08/2024 | 05/08/2024 |
| Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Wrong document uploaded. | |||
| ZON | COMPLETE | 05/08/2024 | 05/08/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/08/2024 | 05/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/08/2024 | 05/08/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/22/2024 | 04/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/19/2024 | 04/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 02/16/2024 | 02/20/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 02/20/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| ELEC | COMPLETE | 02/16/2024 | 02/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/16/2024 | 02/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/16/2024 | 02/16/2024 |
| Note: Released By: JPI | |||
| BADMIN | COMPLETE | 02/16/2024 | 02/26/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/29/2024 | 03/11/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 01/29/2024 | 02/01/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. If report determines unsuitable sub-surface conditions or unsuitable soil conditions, then engineer shall provide a soils mitigation plan in order to ensure soils are suitable to receive the building's foundation. Report to include fill and compaction specifications and engineering inspection requirements. At conclusion of any soils mitigation work, engineer will be required to certify work was performed according to plans. Be advised, if the geotechnical report reveals any unsuitable soils and / or subsurface conditions, the first inspection for this permit (1st Rough / Underground Plumbing) will be HELD until such time as a report by the geotechnical engineer is submitted to the Building Division documenting that the soil mitigation work has been completed according to the engineer's plans and is now suitable for construction. Report must also include a record of all required compaction testing. 1. Or a deferred a letter | |||
| BLD | HOLD | 01/29/2024 | 01/30/2024 |
| Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. 2) Please provide the Deferred submittal request for Geotechnical Information. | |||
| CUSVC | COMPLETE | 01/29/2024 | 01/29/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 01/29/2024 | 01/29/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| ENGIN1 | COMPLETE | 01/29/2024 | 01/29/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 01/29/2024 | 01/30/2024 |
| LOCATE | COMPLETE | 01/29/2024 | 01/31/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/29/2024 | 01/30/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from 2023 code cycle | |||
| SW1 | COMPLETE | 01/29/2024 | 01/31/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/29/2024 | 01/29/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 01/17/2024 | 01/17/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Accepted these before realizing the plans are not to the current code. No reviews have started to allow you to upload a new set of plans to the FBC 8th Edition. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 09/25/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 09/25/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/25/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/25/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/25/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/25/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/25/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/15/2024 |
| WATER- TURN ON | ¤25.00 | 04/15/2024 |
| ADJUSTMENT 50% | (¤602.75) | 04/15/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/15/2024 |
| INSPECTION - RESIDENTIAL | ¤915.75 | 04/15/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤259.74 | 04/15/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/15/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/15/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/15/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/15/2024 |
| SEWER CREDIT | (¤850.00) | 04/15/2024 |
| SEWER INSPECTION | ¤25.00 | 04/15/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/15/2024 |
| WATER CREDIT | (¤60.00) | 04/15/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/15/2024 |
| WORK WITHOUT PERMIT | ¤602.74 | 04/15/2024 |
| SITE PLAN 30 | ¤30.00 | 04/15/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/15/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/15/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/15/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/15/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/15/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/15/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/15/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/15/2024 |
| SURCHARGE FS 533.721 | ¤12.05 | 04/15/2024 |
| SURCHARGE - FS 468.631 | ¤18.08 | 04/15/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/15/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,664.99 |