Permit #2024010833
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-01530-0080 |
| CONDITIONED SPACE: 1876 sqft |
| GARAGE: 414 sqft |
| OPENED PORCH (WITH ROOF) : 68 sqft |
| Total Square Footage: 2358 sqft |
| Block: 01530 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 904-268-7730 |
| Location Address: 3 BIRCH HAVEN PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/27/2024 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: FOCUS HOMES LLC |
|
Address 5220 SHAD ROAD JACKSONVILLE, FL 32257 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤210,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FOCUS HOMES LLC OF FLORIDA
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
5220 SHAD RD JACKSONVILLE, FL 32257 |
# 202 JACKSONVILLE, FL 32257 |
CRC1332443 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
DANIEL GREGORY PUGLISI
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
EC13011195 (Exp: 08/31/2024) | 407-302-7800 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
GARY CARMACK
| Status | State License Number |
| CANCEL | CAC043900 (Exp: 08/31/2010) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/19/2024 | FINAL APPROVED | JSTEWART |
| Note: 7/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 7/18/2024 9:24:40 AM *** 1. Please remove screen at dryer exhaust. FBC M1502.3 2. Please seal wall Penetration at power. (ground conduit) FBC R402.4 3. Please install surge protection per NEC ARTICLE 230.67 4. Please install GFCI Breaker for dryer Receptacle Per NEC ARTICLE 210.8 | |||
| BLD - BUILDING FINAL | 07/18/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 7/18/2024 9:24:40 AM *** 1. Please remove screen at dryer exhaust. FBC M1502.3 2. Please seal wall Penetration at power. (ground conduit) FBC R402.4 3. Please install surge protection per NEC ARTICLE 230.67 4. Please install GFCI Breaker for dryer Receptacle Per NEC ARTICLE 210.8 | |||
| U -UTILITY RESIDENTIAL FINAL | 07/17/2024 | FINAL APPROVED | BWRIGHT |
| ROW - FINAL APRON (AFTER POUR) | 07/16/2024 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/16/2024 | APPROVED | TPOLACEK |
| Note: Inspector Notes from Inspection 9270 ** 06/18/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/16/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 07/16/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U-CROSS CONNECTION | 07/03/2024 | APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 06/24/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 06/18/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 06/18/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 06/10/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 6/10/2024 11:54:13 AM *** NOTE: Please install surge protection per NEC ARTICLE 230.67 Please install GFCI breaker for locations of Range, Dryer, etc per NEC ARTICLE 210.8 Before Building Final inspection. Inspector Notes from Inspection 2200 4/18/24- Authorize release of email to FPL @ 9:18a | |||
| SEWER TIE IN | 06/04/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 05/10/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 05/06/2024 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 05/02/2024 | APPROVED | FWILLIS |
| Note: 5/1/2024 - PREVIOUS INSPECTION NOTES ON SITE AT 1:17PM, 2 FPL TRUCKS WITH BOOMS EXTENDED WORKING ON WIRES. COULD NOT GET DOWN TO HOUSE. WALKING WAS CUT OFF TOO. RESCHEDULE FOR TOMORROW, THANKS. | |||
| ALL ROUGH | 05/01/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 5/1/24- 1. Please install nail plates at the following water supply for exterior nailing protection. Laundry, refridgerator, and master toilet room.P2603.2.1… PROTECTION AGAINST PHYSICAL DAMAGE 2. Please install approved nail plate at the tp of laundry vent stack. P2603.2.1… PROTECTION AGAINST PHYSICAL DAMAGE… AND SHALL EXTEND NO LESS THAN 2 inches ABOVE SOLE PLATES AND BELOW TOP PLATES 3. Please install nail plates at island wall. WILL CHECK AT INSULATION | |||
| LATH/BRICK/ WATER BARRIER | 05/01/2024 | CANCELLED BY APPLICANT | FWILLIS |
| Note: ON SITE AT 1:17PM, 2 FPL TRUCKS WITH BOOMS EXTENDED WORKING ON WIRES. COULD NOT GET DOWN TO HOUSE. WALKING WAS CUT OFF TOO. RESCHEDULE FOR TOMORROW, THANKS. | |||
| ROOF VALLEY & METAL | 04/23/2024 | APPROVED | JSTEWART |
| ELECTRIC-TUG | 04/18/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 4/18/24- Authorize release of email to FPL @ 9:18a | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/17/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING | 04/16/2024 | APPROVED | FWILLIS |
| WALL SHEATHING | 04/16/2024 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 04/02/2024 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 04/01/2024 | APPROVED | TBAKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/28/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED TO CHANGE PLUMBING SUB-CONTRACTOR | |||
| GRAVITY SEWER TEST | 03/28/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/26/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 03/07/2024 | APPROVED | CBOWERMASTER |
| Note: 3/6/2024 7:27:30 AM- PREVIOUS INSPECTION NOTES STILL CLEARING | |||
| WATER METER INSTALLATION REQUEST | 03/05/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: STILL CLEARING |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/09/2024 | 05/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/06/2024 | 05/08/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition | |||
| ENGIN1 | COMPLETE | 03/28/2024 | 04/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/28/2024 | 03/28/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/25/2024 | 03/26/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/20/2024 | 03/25/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Letter must be accompanied by a signed and sealed inspection and certification letter by the geotechnical engineer of record. Engineer’s letter to confirm the following: Engineer to include certification statement in accordance with Florida Administrative Code 61G15-18.011 (4) | |||
| ELEC | COMPLETE | 02/22/2024 | 02/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/22/2024 | 02/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/22/2024 | 02/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/22/2024 | 02/23/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/13/2024 | 02/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/13/2024 | 02/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/13/2024 | 02/21/2024 |
| Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM 1- Drainage from the structure is to be a 6 inch minimum slope for the first 10’ (from 24.50 points on the back of the structure to 24.20 point). Please revise your FFE and structure elevations or drainage design. 2- When adjacent to an improved lot, you must match the elevations. On the property line (adjacent to Lot 9 Block 153), there are some points that appear to be proposed elevations, please revise or clarify. | |||
| BADMIN | COMPLETE | 02/13/2024 | 02/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/13/2024 | 02/13/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/13/2024 | 02/13/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 02/13/2024 | 02/15/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical load calculation are done by a electrician that is not listed on your permit. | |||
| BADMIN | HOLD | 01/23/2024 | 01/30/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. If report determines unsuitable sub-surface conditions or unsuitable soil conditions, then engineer shall provide a soils mitigation plan in order to ensure soils are suitable to receive the building's foundation. Report to include fill and compaction specifications and engineering inspection requirements. At conclusion of any soils mitigation work, engineer will be required to certify work was performed according to plans. Be advised, if the geotechnical report reveals any unsuitable soils and / or subsurface conditions, the first inspection for this permit (1st Rough / Underground Plumbing) will be HELD until such time as a report by the geotechnical engineer is submitted to the Building Division documenting that the soil mitigation work has been completed according to the engineer's plans and is now suitable for construction. Report must also include a record of all required compaction testing. | |||
| BLD | HOLD | 01/23/2024 | 01/25/2024 |
| Note: Held By: JPI 1) The Geotechnical Report appears to be missing from the file directory. FBC 1603 | |||
| CUSVC | COMPLETE | 01/23/2024 | 01/26/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 01/23/2024 | 01/23/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical load calculation are doen by a electrican that is not listed on your permit. 2. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67, 230.85 | |||
| ENGIN1 | COMPLETE | 01/23/2024 | 01/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 01/23/2024 | 01/26/2024 |
| LOCATE | COMPLETE | 01/23/2024 | 01/25/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/23/2024 | 01/26/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R403.7 FBC Energy Conservation 2023 8Th Edition | |||
| SW1 | HOLD | 01/23/2024 | 01/30/2024 |
| Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM 1- Finished floor elevations should not exceed 10 inches higher than the lowest adjacent property finished floor elevation (Lot 9 block 153 = 24.87). Please revise your proposed finished floor elevation and grading accordingly. 2- Please include the inverts of adjacent improved property driveway culvert (Lot 9 Block 153) | |||
| ZON | COMPLETE | 01/23/2024 | 01/24/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/23/2024 | 03/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 07/19/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/19/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 07/19/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 07/19/2024 |
| REINSPECTION FEE | ¤40.00 | 07/19/2024 |
| SURCHARGE FS 533.721 | ¤6.19 | 02/27/2024 |
| SURCHARGE - FS 468.631 | ¤9.28 | 02/27/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/27/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/27/2024 |
| SW ENG PRE APRON | ¤30.00 | 02/27/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/27/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/27/2024 |
| SEWER CREDIT | (¤850.00) | 02/27/2024 |
| SEWER INSPECTION | ¤25.00 | 02/27/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 02/27/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 02/27/2024 |
| SITE PLAN 30 | ¤30.00 | 02/27/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 02/27/2024 |
| IMPACT FEE FIRE | ¤428.09 | 02/27/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/27/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/27/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 02/27/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/27/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 02/27/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/27/2024 |
| CONNECTION FEES | ¤1,187.26 | 02/27/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 02/27/2024 |
| WATER- TURN ON | ¤25.00 | 02/27/2024 |
| ADJUSTMENT 50% | (¤618.63) | 02/27/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/27/2024 |
| INSPECTION - RESIDENTIAL | ¤940.50 | 02/27/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤266.76 | 02/27/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,123.48 |