I want to search for...
Permit #2024010897
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00300-0020 |
| CONDITIONED SPACE: 1801 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 18 sqft |
| OPENED PORCH (WITH ROOF) : 70 sqft |
| Total Square Footage: 2299 sqft |
| Block: 00300 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 202-494-2019 |
| Location Address: 3 PICKERING DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/12/2024 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB BFR FUND 1 LLC |
|
Address 3670 MAGUIRE BOULEVARD STE 220 ORLANDO , FL 32803 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/06/2024 | FINAL APPROVED | RSIMS |
| Note: 11/1/2024 - PREVIOUS INSPECTION NOTES 11/1/24 1. Pep Tank not hooked up 2. 2 outlets in garage, left side and for GDO, have no power 3. Several interior doors needs adjustments to close properly | |||
| ROW - FINAL APRON (AFTER POUR) | 11/06/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/6/24 INSPECTOR REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. PASSING AS NOTED. __________________________________________________________________________________________________________________________ 11/1/2024 - PREVIOUS INSPECTION NOTES 11/01/24 TPLACEK** ALL SEDIMENT AND OVER POUR NEEDS TO BE CLEANED OUT OF CULVERT | |||
| U -UTILITY RESIDENTIAL FINAL | 11/06/2024 | FINAL APPROVED | LFITZGERALD |
| Note: 11/1/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 11/1/2024 8:16:44 AM *** No sewer pump/floats in Pep Tank . advised sewer dept. . Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 10/28/2024 1:04:23 PM *** no irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 11/01/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 11/01/24 TPLACEK** ALL SEDIMENT AND OVER POUR NEEDS TO BE CLEANED OUT OF CULVERT | |||
| ROW - STORMWATER FINAL | 11/01/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 11/01/2024 | Disapproved - NO FEE | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 11/1/2024 8:16:44 AM *** No sewer pump/floats in Pep Tank . advised sewer dept. . Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 10/28/2024 1:04:23 PM *** no irrigation-no cross connection | |||
| BLD - BUILDING FINAL | 11/01/2024 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 11/1/24 1. Pep Tank not hooked up 2. 2 outlets in garage, left side and for GDO, have no power 3. Several interior doors needs adjustments to close properly | |||
| ELECTRIC 1ST ROUGH UNDERGROUND | 11/01/2024 | CANCELLED BY INSPECTOR | MCONTRYMAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/30/2024 | APPROVED | TPOLACEK |
| Note: Inspector Notes from Inspection 9270 10/16/24 TPOLACEK *** PLEASE MAKE SURE YOU HAVE 6" ACROSS ROAD AREA BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. New inspection due to canceled inspection 10/1/2024 - PREVIOUS INSPECTION NOTES 10/01/24 TPOLACEK*** RECIEVED TEXT FROM FRANK RRQUESTING TO CANCEL PRE POUR 9/26/2024 - PREVIOUS INSPECTION NOTES 9/26/24 THE RAINS FROM HELENE HAVE BEGUN. YOUR POUR AREA IS TO WET AND SOFT WITH WASHOUTS. PHOTO FOR REFERENCE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/30/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U-CROSS CONNECTION | 10/28/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/28/2024 1:04:23 PM *** no irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 10/16/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 10/16/24 TPOLACEK *** PLEASE MAKE SURE YOU HAVE 6" ACROSS ROAD AREA BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. New inspection due to canceled inspection 10/1/2024 - PREVIOUS INSPECTION NOTES 10/01/24 TPOLACEK*** RECIEVED TEXT FROM FRANK RRQUESTING TO CANCEL PRE POUR 9/26/2024 - PREVIOUS INSPECTION NOTES 9/26/24 THE RAINS FROM HELENE HAVE BEGUN. YOUR POUR AREA IS TO WET AND SOFT WITH WASHOUTS. PHOTO FOR REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/07/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 10/1/2024 - PREVIOUS INSPECTION NOTES 10/01/24 TPOLACEK*** RECIEVED TEXT FROM FRANK RRQUESTING TO CANCEL PRE POUR 9/26/2024 - PREVIOUS INSPECTION NOTES 9/26/24 THE RAINS FROM HELENE HAVE BEGUN. YOUR POUR AREA IS TO WET AND SOFT WITH WASHOUTS. PHOTO FOR REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/01/2024 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 10/01/24 TPOLACEK*** RECIEVED TEXT FROM FRANK RRQUESTING TO CANCEL PRE POUR 9/26/2024 - PREVIOUS INSPECTION NOTES 9/26/24 THE RAINS FROM HELENE HAVE BEGUN. YOUR POUR AREA IS TO WET AND SOFT WITH WASHOUTS. PHOTO FOR REFERENCE. | |||
| ELECTRIC - EARLY POWER | 09/30/2024 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/30/2024 2:01:21 PM *** Inspector Notes from Inspection 2200 8/1/24: FPL emailed at @ 12:00 > approved for TUG 9/30/24: FPL emailed to release power. Inspector Notes from Inspection 2200 8/1/24: FPL emailed at @ 12:00 > approved for TUG Inspector Notes from Inspection 2200 8/1/24: FPL emailed at @ 12:00 > approved for TUG | |||
| ROW- PRE-APRON (PRE-POUR) | 09/26/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 9/26/24 THE RAINS FROM HELENE HAVE BEGUN. YOUR POUR AREA IS TO WET AND SOFT WITH WASHOUTS. PHOTO FOR REFERENCE. | |||
| GRAVITY SEWER TEST | 09/06/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 09/06/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 08/28/2024 | APPROVED | CBOWERMASTER |
| Note: 8/26/2024 7:15:45 AM- PREVIOUS INSPECTION NOTES dumpster in the way | |||
| INSULATION | 08/28/2024 | APPROVED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 8/28/2024 4:34:44 PM *** prior notes resolved 8/27/2024 - PREVIOUS INSPECTION NOTES 8/27/24: Previous deficiency remains unresolved. 1). Missing fireblocking & firestop in garage on back and right side walls where ceiling level change occurs. FBC-R302.11 2). Insulating foam at top plate of dryer exhaust needs to be removed and replaced with fire rated foam. R302.11.1 Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 8/20/2024 3:52:46 PM *** Please pad the margins at the garage to house door to 1/4" shim space and install shims at each anchor. FBCR R609.1 | |||
| INSULATION | 08/27/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/27/2024 11:58:06 AM *** 8/27/24: Previous deficiency remains unresolved. 1). Missing fireblocking & firestop in garage on back and right side walls where ceiling level change occurs. FBC-R302.11 2). Insulating foam at top plate of dryer exhaust needs to be removed and replaced with fire rated foam. R302.11.1 Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 8/20/2024 3:52:46 PM *** Please pad the margins at the garage to house door to 1/4" shim space and install shims at each anchor. FBCR R609.1 | |||
| PEP TANK INSTALLATION REQUEST | 08/23/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: dumpster in the way | |||
| ALL ROUGH | 08/20/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/20/2024 3:52:46 PM *** Please pad the margins at the garage to house door to 1/4" shim space and install shims at each anchor. FBCR R609.1 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/19/2024 | APPROVED | MKRASKI |
| Note: 7/26/2024 - PREVIOUS INSPECTION NOTES 7/26/24: Walked with Superintendent. Revision still required for missing Truss T107A where 2nd Truss T107 is installed. Also, 2nd Truss T107 (Towards front of house) needs the correct truss engineering installed. (Currently 2pcs of 3/4PT - Must be the same species, dimensions & length of web). 7/25/2024 - PREVIOUS INSPECTION NOTES 7/25/24: No Change from Previous Inspection. * Also, please print out Engineer's repair letter for damaged Truss T20 and include with Plan documents. 7/22/2024 - PREVIOUS INSPECTION NOTES 7/22/24: 1). A revision will need to be submitted to & approved by the City for the truss layout that does not match the installed trusses. 2). Truss T02 web engineerring/bracing is installed on the wrong web. Marked on MiTek. 3). Truss T07 is missing web engineering/bracing as required on MiTek. 4). Truss T07A is missing. (a second Truss T07 is installed which does not match the configuration shown on MiTek). | |||
| LATH/BRICK/ WATER BARRIER | 08/05/2024 | APPROVED | RSIMS |
| ELECTRIC-TUG | 08/01/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 8/1/24: FPL emailed at @ 12:00 > approved for TUG | |||
| ROOF VALLEY & METAL | 07/29/2024 | APPROVED | LMILLER |
| Note: 7/23/2024 - PREVIOUS INSPECTION NOTES 7/23/24: 1). Drip edge/eave drip is incomplete at front of garage. 2). Please move the portable toilet out of the swale area and onto site area to allow water to flow freely through the swale. This will need to be complete before any further inspections will be approved. (This is also part of the Storm Water - Illicit Discharge Prevention Regulations so it will need to remain on site property out of swale). | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/26/2024 | Disapproved - NO FEE | RSIMS |
| Note: 7/26/24: Walked with Superintendent. Revision still required for missing Truss T107A where 2nd Truss T107 is installed. Also, 2nd Truss T107 (Towards front of house) needs the correct truss engineering installed. (Currently 2pcs of 3/4PT - Must be the same species, dimensions & length of web). 7/25/2024 - PREVIOUS INSPECTION NOTES 7/25/24: No Change from Previous Inspection. * Also, please print out Engineer's repair letter for damaged Truss T20 and include with Plan documents. 7/22/2024 - PREVIOUS INSPECTION NOTES 7/22/24: 1). A revision will need to be submitted to & approved by the City for the truss layout that does not match the installed trusses. 2). Truss T02 web engineerring/bracing is installed on the wrong web. Marked on MiTek. 3). Truss T07 is missing web engineering/bracing as required on MiTek. 4). Truss T07A is missing. (a second Truss T07 is installed which does not match the configuration shown on MiTek). | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/25/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 7/25/24: No Change from Previous Inspection. * Also, please print out Engineer's repair lettewr for damaged Truss T20 and include with Plan documents. 7/22/2024 - PREVIOUS INSPECTION NOTES 7/22/24: 1). A revision will need to be submitted to & approved by the City for the truss layout that does not match the installed trusses. 2). Truss T02 web engineerring/bracing is installed on the wrong web. Marked on MiTek. 3). Truss T07 is missing web engineering/bracing as required on MiTek. 4). Truss T07A is missing. (a second Truss T07 is installed which does not match the configuration shown on MiTek). | |||
| ROOF VALLEY & METAL | 07/23/2024 | Disapproved - NO FEE | RSIMS |
| Note: 7/23/24: 1). Drip edge/eave drip is incomplete at front of garage. 2). Please move the portable toilet out of the swale area and onto site area to allow water to flow freely through the swale. This will need to be complete before any further inspections will be approved. (This is also part of the Storm Water - Illicit Discharge Prevention Regulations so it will need to remain on site property out of swale). | |||
| WALL SHEATHING | 07/22/2024 | APPROVED | RSIMS |
| Note: 7/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 Repair and maintain silt fence 07-15-2024 Right side of wall sheathing not fastened completely. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/22/2024 | Disapproved - NO FEE | RSIMS |
| Note: 7/22/24: 1). A revision will need to be submitted to & approved by the City for the truss layout that does not match the installed trusses. 2). Truss T02 web engineerring/bracing is installed on the wrong web. Marked on MiTek. 3). Truss T07 is missing web engineering/bracing as required on MiTek. 4). Truss T07A is missing. (a second Truss T07 is installed which does not match the configuration shown on MiTek). | |||
| WALL SHEATHING | 07/15/2024 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2340 Repair and maintain silt fence 07-15-2024 Right side of wall sheathing not fastened completely. | |||
| ROOF SHEATHING | 07/15/2024 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2340 Repair and maintain silt fence | |||
| TIE BEAM / LINTEL | 07/02/2024 | APPROVED - AS NOTED | KSANDOE |
| Note: Repair and maintain silt fence | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/26/2024 | APPROVED | AMOBLEY |
| MONOLITHIC SLAB | 06/20/2024 | APPROVED | KSANDOE |
| Note: 6/18/2024 - PREVIOUS INSPECTION NOTES Vapor barrier must be properly secured in place. | |||
| MONOLITHIC SLAB | 06/18/2024 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Vapor barrier must be properly secured in place. | |||
| ELECTRIC 1ST ROUGH UNDERGROUND | 06/12/2024 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/12/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/11/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 05/06/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/22/2024 | 10/25/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/12/2024 | 08/16/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/12/2024 | 08/13/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/16/2024 | 07/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/26/2024 | 06/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete | |||
| ZON | COMPLETE | 06/26/2024 | 06/26/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 06/12/2024 | 06/12/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete | |||
| ZON | COMPLETE | 06/12/2024 | 06/12/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/05/2024 | 06/11/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Letter must be accompanied by a signed and sealed inspection and certification letter by the geotechnical engineer of record. Engineer’s letter to confirm the following: Site clearing / over excavation was completed and inspected by engineer prior to the placement of fill and engineer confirms clearing and over excavation work is acceptable. Engineer to confirm fill materials were suitable and within specifications. Engineer to confirm the required number and location of field density tests were completed. Engineer to include certification statement in accordance with Florida Administrative Code 61G15-18.011 (4) | |||
| BLD | HOLD | 05/29/2024 | 06/03/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Letter must be accompanied by a signed and sealed inspection and certification letter by the geotechnical engineer of record. Engineer’s letter to confirm the following: Site clearing / over excavation was completed and inspected by engineer prior to the placement of fill and engineer confirms clearing and over excavation work is acceptable. Engineer to confirm fill materials were suitable and within specifications. Engineer to confirm the required number and location of field density tests were completed. Engineer to include certification statement in accordance with Florida Administrative Code 61G15-18.011 (4) | |||
| ELEC | COMPLETE | 04/02/2024 | 04/05/2024 |
| Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/02/2024 | 04/05/2024 |
| Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/02/2024 | 04/05/2024 |
| Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 03/26/2024 | 04/01/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in kitchen need to be GFCI protected. NEC 2020 210.8 | |||
| ENGIN1 | COMPLETE | 03/26/2024 | 03/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/26/2024 | 03/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/26/2024 | 03/26/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/26/2024 | 04/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/14/2024 | 03/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 03/14/2024 | 03/18/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in kitchen need to be GFCI protected. NEC 2020 210.8 | |||
| MECH | COMPLETE | 03/14/2024 | 03/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/14/2024 | 03/15/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/01/2024 | 03/04/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/01/2024 | 03/04/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/23/2024 | 02/23/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/23/2024 | 02/29/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/23/2024 | 02/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/23/2024 | 02/28/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 02/23/2024 | 02/29/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Completion and Submittal of a Geotech Report and Identification of Subsurface Conditions Geotech reports are intended to identify subsurface conditions typically including classification of soils, soil compressibility or expansiveness, the elevation of the ground water table, evaluation of soil strength and adequacy of the soils and other whether other unsuitable subsurface conditions exist that must be mitigated in order for the soil to support the structure. The geotech engineer will determine the methods used to complete this process. 2. Foundation Engineer to provide presumptive load bearing value used for foundation design per R401.4.1 3. Geotechnical Report Not Accepted. Report submitted indicates root fibers and silt should be cleared to 24 inches. Provide amended geotechnical report to include the information below. | |||
| BLD | COMPLETE | 02/23/2024 | 02/26/2024 |
| Note: Released By: JPI | |||
| ENGIN1 | HOLD | 01/29/2024 | 01/29/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Benchmark elevation is off by 1' +/- | |||
| BADMIN | HOLD | 01/24/2024 | 01/30/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. If report determines unsuitable sub-surface conditions or unsuitable soil conditions, then engineer shall provide a soils mitigation plan in order to ensure soils are suitable to receive the building's foundation. Report to include fill and compaction specifications and engineering inspection requirements. At conclusion of any soils mitigation work, engineer will be required to certify work was performed according to plans. Be advised, if the geotechnical report reveals any unsuitable soils and / or subsurface conditions, the first inspection for this permit (1st Rough / Underground Plumbing) will be HELD until such time as a report by the geotechnical engineer is submitted to the Building Division documenting that the soil mitigation work has been completed according to the engineer's plans and is now suitable for construction. Report must also include a record of all required compaction testing. | |||
| BLD | COMPLETE | 01/24/2024 | 01/29/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 01/24/2024 | 01/26/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 01/24/2024 | 01/25/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in kitchen, laundry need to be GFCI protected. NEC 2020 210.8 2. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| ENGIN1 | COMPLETE | 01/24/2024 | 01/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 01/24/2024 | 01/29/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/24/2024 | 01/25/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/24/2024 | 01/29/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from 2023 code cycle | |||
| SW1 | COMPLETE | 01/24/2024 | 01/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/24/2024 | 01/24/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation: Right side window is missing banding | |||
| SWALE | COMPLETE | 01/24/2024 | 03/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 11/06/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/06/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/06/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/06/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/06/2024 |
| UTILITY PEP REINSPECTION | ¤40.00 | 11/06/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/06/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/12/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/12/2024 |
| SEWER CREDIT | (¤319.00) | 03/12/2024 |
| SEWER INSPECTION | ¤25.00 | 03/12/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 03/12/2024 |
| WATER CREDIT | (¤166.67) | 03/12/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 03/12/2024 |
| SITE PLAN 30 | ¤30.00 | 03/12/2024 |
| WATER- TURN ON | ¤25.00 | 03/12/2024 |
| ADJUSTMENT 50% | (¤599.22) | 03/12/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/12/2024 |
| INSPECTION - RESIDENTIAL | ¤910.25 | 03/12/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤258.18 | 03/12/2024 |
| CONNECTION FEES | ¤1,187.26 | 03/12/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 03/12/2024 |
| IMPACT FEE FIRE | ¤428.09 | 03/12/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/12/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/12/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 03/12/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/12/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 03/12/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/12/2024 |
| SURCHARGE FS 533.721 | ¤5.99 | 03/12/2024 |
| SURCHARGE - FS 468.631 | ¤8.99 | 03/12/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/12/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/12/2024 |
| SW ENG PRE APRON | ¤30.00 | 03/12/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,557.90 |