Permit #2024011018
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00240-0050 |
| CONDITIONED SPACE: 2163 sqft |
| GARAGE: 622 sqft |
| OPENED PORCH (WITH ROOF) : 73 sqft |
| OPENED PORCH (WITH ROOF) : 337 sqft |
| Total Square Footage: 3195 sqft |
| Block: 00240 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 386-931-5935 |
| Location Address: 4 PINE CEDAR DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/22/2024 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: CAPEZZA PAUL & CARMEN H&W |
|
Address 91 HIDDEN LAKE DRIVE NORTH BRUNSWICK, NJ 08902 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤450,000.00 |
| Job Description: SINGLE FAMILY RESIDENTIAL |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CCC1334569 (Exp: 08/31/2026) | 386-931-5935 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
DILLON CARRERAS
| Status | Location Address | State License Number |
| ACTIVE |
3504 LUNDY ROAD PALATKA, FL 32177 |
EC13010133 (Exp: 08/31/2026) |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 12/04/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/4/2024 11:22:31 AM *** potable irrigation with PVB-no cross cnnection Inspector Notes from Inspection 9500 *** NOTES ADDED BY LFITZGERALD 11/25/2024 9:41:02 AM *** please use flush mount clean out caps-not the square nut type 11/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/22/2024 10:06:42 AM *** lower sewer clean out | |||
| BLD - BUILDING FINAL | 11/26/2024 | Approval - Private Provider | PPROVIDER |
| Note: 11/25/2024 4:08:27 PM- PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 11/25/2024 | Disapproved- Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 11/25/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/25/2024 9:41:02 AM *** please use flush mount clean out caps-not the square nut type 11/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/22/2024 10:06:42 AM *** lower sewer clean out | |||
| ROW - FINAL APRON (AFTER POUR) | 11/22/2024 | APPROVED | FSLADISH |
| Note: 11/22/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 11/20/24 UPON WALKING PROPERTY DETERMINED THAT YOUR SURVEY IS DIFFERENT THAN YOUR SITE PLAN, BUT IN THIS CASE DUE TO SITE SPECIFIC CONDITIONS I BELIEVE THE DRAINAGE WILL WORK AND MOVING THE DRAINAGE FROM REAR FORWARD IS THE BETTER CHOICE THAN REARWARD FLOW. APPROVING AS NOTED THAT WHILE IT NOT THE SAME AS SITE PLAN THAT IN THIS SPECIFIC CASE DRAINAGE WILL WORK AS INDICATED ON YOUR FINAL SURVEY. | |||
| ROW - STORMWATER FINAL | 11/22/2024 | APPROVED | FSLADISH |
| Note: 11/22/24 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 11/20/24 UPON WALKING PROPERTY DETERMINED THAT YOUR SURVEY IS DIFFERENT THAN YOUR SITE PLAN, BUT IN THIS CASE DUE TO SITE SPECIFIC CONDITIONS I BELIEVE THE DRAINAGE WILL WORK AND MOVING THE DRAINAGE FROM REAR FORWARD IS THE BETTER CHOICE THAN REARWARD FLOW. APPROVING AS NOTED THAT WHILE IT NOT THE SAME AS SITE PLAN THAT IN THIS SPECIFIC CASE DRAINAGE WILL WORK AS INDICATED ON YOUR FINAL SURVEY. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/22/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/22/2024 10:06:42 AM *** lower sewer clean out | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/20/2024 | APPROVED | FSLADISH |
| Note: 11/20/24 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/20/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/20/24 UPON WALKING PROPERTY DETERMINED THAT YOUR SURVEY IS DIFFERENT THAN YOUR SITE PLAN, BUT IN THIS CASE DUE TO SITE SPECIFIC CONDITIONS I BELIEVE THE DRAINAGE WILL WORK AND MOVING THE DRAINAGE FROM REAR FORWARD IS THE BETTER CHOICE THAN REARWARD FLOW. APPROVING AS NOTED THAT WHILE IT NOT THE SAME AS SITE PLAN THAT IN THIS SPECIFIC CASE DRAINAGE WILL WORK AS INDICATED ON YOUR FINAL SURVEY. | |||
| ELECTRIC - EARLY POWER | 11/07/2024 | Approval - Private Provider | PPROVIDER |
| Note: 11/5/2024 3:51:33 PM- PREVIOUS INSPECTION NOTES | |||
| ELECTRIC - EARLY POWER | 11/05/2024 | Disapproved- Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 09/10/2024 | APPROVED | TPOLACEK |
| Note: 09/10/24 TPOLACEK*** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/9/2024 - PREVIOUS INSPECTION NOTES 9/9/24 MITERED END WASHED IN. DIRT IN CULVERT PIPE. THERE ARE WASHOUTS IN THE POUR AREA AT THE TIME OF THIS INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/09/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 9/9/24 MITERED END WASHED IN. DIRT IN CULVERT PIPE. THERE ARE WASHOUTS IN THE POUR AREA AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. | |||
| GRAVITY SEWER TEST | 08/23/2024 | Approval - Private Provider | PPROVIDER |
| Note: 8/22/2024 8:41:33 PM- PREVIOUS INSPECTION NOTES | |||
| SEWER TIE IN | 08/23/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 07/26/2024 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 07/25/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 07/17/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 07/12/2024 | Approval - Private Provider | PPROVIDER |
| Note: 7/11/2024 3:11:58 PM- PREVIOUS INSPECTION NOTES NEED TO MOVE PORTABLE TOILET OUT OF NEIGHBORING SWALE AREA AND ONTO SITE. | |||
| ALL ROUGH | 07/11/2024 | Disapproved- Private Provider | PPROVIDER |
| Note: NEED TO MOVE PORTABLE TOILET OUT OF NEIGHBORING SWALE AREA AND ONTO SITE. | |||
| GRAVITY SEWER TEST | 07/11/2024 | CANCELLED BY APPLICANT | PPROVIDER |
| ROOF VALLEY & METAL | 06/20/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/14/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 06/14/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/13/2024 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 04/15/2024 | APPROVED | TBAKER |
| ELECTRIC-TUG | 04/11/2024 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 04/05/2024 | Approval - Private Provider | PPROVIDER |
| TIE DOWN | 04/05/2024 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 03/20/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/15/2024 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/14/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 03/01/2024 | APPROVED | CBOWERMASTER |
| Note: 2/29/2024 8:18:51 AM- PREVIOUS INSPECTION NOTES logs on left side of property | |||
| WATER METER INSTALLATION REQUEST | 02/28/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: logs on left side of property |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/15/2024 | 04/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/15/2024 | 04/15/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/08/2024 | 03/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/08/2024 | 03/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 03/05/2024 | 03/05/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please upload this under the geo tech report doc type | |||
| BLD | HOLD | 03/05/2024 | 03/08/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Field Density Test Reports by themselves not accepted. Tests must be accompanied by a signed and sealed inspection and certification letter by the geotechnical engineer of record. Engineer’s letter to confirm the following: Site clearing / over excavation was completed and inspected by engineer prior to the placement of fill and engineer confirms clearing and over excavation work is acceptable. Engineer to confirm fill materials were suitable and within specifications. Engineer to confirm the required number and location of field density tests were completed. Engineer to include certification statement in accordance with Florida Administrative Code 61G15-18.011 (4) | |||
| BADMIN | COMPLETE | 02/13/2024 | 02/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 02/07/2024 | 02/07/2024 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Private Provider missing liablity insurance. | |||
| BLD | COMPLETE | 02/01/2024 | 02/07/2024 |
| Note: Released By: JPI | |||
| ELEC | COMPLETE | 02/01/2024 | 02/02/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 02/01/2024 | 02/02/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. If report determines unsuitable sub-surface conditions or unsuitable soil conditions, then engineer shall provide a soils mitigation plan in order to ensure soils are suitable to receive the building's foundation. Report to include fill and compaction specifications and engineering inspection requirements. At conclusion of any soils mitigation work, engineer will be required to certify work was performed according to plans. Be advised, if the geotechnical report reveals any unsuitable soils and / or subsurface conditions, the first inspection for this permit (1st Rough / Underground Plumbing) will be HELD until such time as a report by the geotechnical engineer is submitted to the Building Division documenting that the soil mitigation work has been completed according to the engineer's plans and is now suitable for construction. Report must also include a record of all required compaction testing. | |||
| BADMIN | INFORMATION | 02/01/2024 | 02/01/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Private Provider missing liability insurance. | |||
| SWALE | COMPLETE | 01/26/2024 | 03/07/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 01/25/2024 | 01/30/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. If report determines unsuitable sub-surface conditions or unsuitable soil conditions, then engineer shall provide a soils mitigation plan in order to ensure soils are suitable to receive the building's foundation. Report to include fill and compaction specifications and engineering inspection requirements. At conclusion of any soils mitigation work, engineer will be required to certify work was performed according to plans. Be advised, if the geotechnical report reveals any unsuitable soils and / or subsurface conditions, the first inspection for this permit (1st Rough / Underground Plumbing) will be HELD until such time as a report by the geotechnical engineer is submitted to the Building Division documenting that the soil mitigation work has been completed according to the engineer's plans and is now suitable for construction. Report must also include a record of all required compaction testing. | |||
| BLD | HOLD | 01/25/2024 | 01/25/2024 |
| Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 01/25/2024 | 01/29/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 01/25/2024 | 01/26/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in kitchen, laundry need to be GFCI protected. NEC 2020 210.8 2. DW outlet can not be located behind the DW. NEC 2020 422.16 3. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67, 230.85 | |||
| ENGIN1 | COMPLETE | 01/25/2024 | 01/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 01/25/2024 | 01/30/2024 |
| LOCATE | COMPLETE | 01/25/2024 | 01/29/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/25/2024 | 01/30/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/25/2024 | 01/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/25/2024 | 01/26/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/03/2024 |
| REINSPECTION FEE | ¤40.00 | 12/03/2024 |
| REINSPECTION FEE | ¤40.00 | 12/03/2024 |
| SURCHARGE FS 533.721 | ¤4.16 | 02/22/2024 |
| SURCHARGE - FS 468.631 | ¤6.23 | 02/22/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/22/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/22/2024 |
| SW ENG PRE APRON | ¤30.00 | 02/22/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/22/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/22/2024 |
| SEWER CREDIT | (¤1,147.00) | 02/22/2024 |
| SEWER INSPECTION | ¤25.00 | 02/22/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 02/22/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 02/22/2024 |
| SITE PLAN 30 | ¤30.00 | 02/22/2024 |
| WATER-METER | ¤514.49 | 02/22/2024 |
| WATER- TURN ON | ¤25.00 | 02/22/2024 |
| WATER- TURN ON | ¤25.00 | 02/22/2024 |
| ADJUSTMENT 50% | (¤190.50) | 02/22/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/22/2024 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 02/22/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤351.00 | 02/22/2024 |
| CONNECTION FEES | ¤1,187.26 | 02/22/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 02/22/2024 |
| IMPACT FEE FIRE | ¤428.09 | 02/22/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/22/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/22/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 02/22/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/22/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 02/22/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/22/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/22/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,120.26 |