Permit #2024011040

Permit Details

Status: COED

Parcel Id: 29-10-31-5540-00000-1230
CONDITIONED SPACE: 3294 sqft
GARAGE: 880 sqft
SCREEN PORCH (SOLID ROOF) : 759 sqft
SCREEN PORCH (SOLID ROOF) : 71 sqft
Total Square Footage: 5004 sqft
Block: 00000
Subdivision: 1005 - SANCTUARY SUBDIVISION
Job Phone: (386)445-9393
Location Address: 21 SABAL BEND
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/19/2024
NOC: RECORDED
Applicant name: ANTONIO JR AMARAL
Owner: ROYAL SABAL BEND 2021, LLC

Address

13 UTILITY DR

PALM COAST, FL 32137

Address

STE B

PALM COAST, FL 32137

Lot: 1230
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AMARAL HOMES & POOLS, LLC
Status Location Address State License Number Phone
ACTIVE

13 Utility Drive

PALM COAST, FL 32137

CBC058062 (Exp: 08/31/2026) (386)445-9393

Sub Contractors

ANTONIO AMARAL JR
Status Location Address State License Number
ACTIVE

1370 PALM HARBOR PKWY

PALM COAST, FL 32137

CCC058004 (Exp: 08/31/2026)
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/11/2025 FINAL APPROVED HCAMACHO
Note:
BLD - BUILDING FINAL 04/10/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Missing locking breakers on Wall oven and Cooktop. 2. Wire coming out of the wall in the back right side for future pool needs to be in a box secured to the wall.
BLD - BUILDING FINAL 04/09/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Missing locking breakers on Wall oven and Cooktop. 2. Wire coming out of the wall in the back right side for future pool needs to be in a water proof box secured to the wall. 3. Missing attic access cover in the master closet. 4. Hole in the soffit on back side of garage.
U-CROSS CONNECTION 12/26/2024 APPROVED BWRIGHT
ROW - FINAL APRON (AFTER POUR) 12/26/2024 APPROVED PFLANAGAN
ROW - STORMWATER FINAL 12/26/2024 APPROVED PFLANAGAN
U -UTILITY RESIDENTIAL FINAL 12/26/2024 FINAL APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/20/2024 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 12/20/2024 APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/18/2024 Disapproved - NO FEE EMADISON
Note: ** 12/18/24 BUILDER PLEASE RESUBMIT AS YOUR FINAL SURVEY IS TOO BLURRY WE NEED TO HAVE A CLEAN CLEAR LEGIBLE SURVEY
ELECTRIC - EARLY POWER 09/19/2024 APPROVED RMARTIN
ROW- PRE-APRON (PRE-POUR) 08/13/2024 APPROVED - AS NOTED EMADISON
Note: ** 08/13/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ New inspection due to canceled inspection 7/24/2024 - PREVIOUS INSPECTION NOTES ** 07/24/24 READY TO POUR APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED AND ALL CONSTRUCTION EQUIPMENT AND MATERIAL ARE REMOVED FROM THE DRIVEWAY ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS
GRAVITY SEWER TEST 08/07/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 08/07/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ELECTRIC-TUG 07/30/2024 APPROVED RMARTIN
ROW- PRE-APRON (PRE-POUR) 07/30/2024 CANCELLED BY APPLICANT WEB
Note: 7/24/2024 - PREVIOUS INSPECTION NOTES ** 07/24/24 READY TO POUR APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED AND ALL CONSTRUCTION EQUIPMENT AND MATERIAL ARE REMOVED FROM THE DRIVEWAY ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS
INSULATION 07/29/2024 APPROVED JSTEWART
LATH/BRICK/ WATER BARRIER 07/25/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 7/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 7/22/2024 3:52:59 PM *** 1. Improper nail plates for range vent top plate (needs to cover the plate and extend 2 inches below per M1502.5 2. Need nail plates for plumbing supply (shown to Tony Sr. on site) per P2603.2.1 3. Need all approved documents on site for all-rough (needed product approval selection sheet, door and window installation docs, and energy calcs with duct layout along with the plan sheets) Per FBC 107.3 4. Still need to make corrections for the doors and windows sited below. 6/21/2024 - PREVIOUS INSPECTION NOTES 6/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 6/20/2024 10:27:53 AM *** notes attached below for the inspection called in for 6-20-24 indicagte this is for window and door nailing only. (The approved documents need to be on site for the inspection, there are no door and window installation instructions on site and the Approved florida product approval selection sheet is not on site). 6-21-24 1. Font door is not installed. Rear doors are being installed at time of inspection.Need to check at all rough. 2. Windows and slider are approved. 7-23-24 1. Front door is not installed. Need to check at insulation.
ROW- PRE-APRON (PRE-POUR) 07/24/2024 PARTIALLY APPROVED EMADISON
Note: ** 07/24/24 READY TO POUR APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED AND ALL CONSTRUCTION EQUIPMENT AND MATERIAL ARE REMOVED FROM THE DRIVEWAY ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS
ALL ROUGH 07/23/2024 APPROVED - AS NOTED BTAYLOR
Note: 7/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 7/22/2024 3:52:59 PM *** 1. Improper nail plates for range vent top plate (needs to cover the plate and extend 2 inches below per M1502.5 2. Need nail plates for plumbing supply (shown to Tony Sr. on site) per P2603.2.1 3. Need all approved documents on site for all-rough (needed product approval selection sheet, door and window installation docs, and energy calcs with duct layout along with the plan sheets) Per FBC 107.3 4. Still need to make corrections for the doors and windows sited below. 6/21/2024 - PREVIOUS INSPECTION NOTES 6/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 6/20/2024 10:27:53 AM *** notes attached below for the inspection called in for 6-20-24 indicagte this is for window and door nailing only. (The approved documents need to be on site for the inspection, there are no door and window installation instructions on site and the Approved florida product approval selection sheet is not on site). 6-21-24 1. Font door is not installed. Rear doors are being installed at time of inspection.Need to check at all rough. 2. Windows and slider are approved. 7-23-24 1. Front door is not installed. Need to check at insulation.
ALL ROUGH 07/22/2024 Disapproved - NO FEE LMILLER
Note: *** NOTES ADDED BY LMILLER 7/22/2024 3:52:59 PM *** 1. Improper nail plates for range vent top plate (needs to cover the plate and extend 2 inches below per M1502.5 2. Need nail plates for plumbing supply (shown to Tony Sr. on site) per P2603.2.1 3. Need all approved documents on site for all-rough (needed product approval selection sheet, door and window installation docs, and energy calcs with duct layout along with the plan sheets) Per FBC 107.3 4. Still need to make corrections for the doors and windows sited below. 6/21/2024 - PREVIOUS INSPECTION NOTES 6/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 6/20/2024 10:27:53 AM *** notes attached below for the inspection called in for 6-20-24 indicagte this is for window and door nailing only. (The approved documents need to be on site for the inspection, there are no door and window installation instructions on site and the Approved florida product approval selection sheet is not on site). 6-21-24 1. Font door is not installed. Rear doors are being installed at time of inspection.Need to check at all rough. 2. Windows and slider are approved.
ELECTRIC-TUG 07/18/2024 CANCELLED BY APPLICANT WEB
ROW- PAVER RESTRAINTS 07/10/2024 APPROVED - AS NOTED EMADISON
Note: ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS
ROW- PAVER RESTRAINTS 07/09/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS
ALL ROUGH 06/21/2024 PARTIALLY APPROVED BTAYLOR
Note: 6/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 6/20/2024 10:27:53 AM *** notes attached below for the inspection called in for 6-20-24 indicagte this is for window and door nailing only. (The approved documents need to be on site for the inspection, there are no door and window installation instructions on site and the Approved florida product approval selection sheet is not on site). 6-21-24 1. Font door is not installed. Rear doors are being installed at time of inspection.Need to check at all rough. 2. Windows and slider are approved.
ALL ROUGH 06/20/2024 Disapproved - NO FEE LMILLER
Note: *** NOTES ADDED BY LMILLER 6/20/2024 10:27:53 AM *** notes attached below for the inspection called in for 6-20-24 indicagte this is for window and door nailing only. (The approved documents need to be on site for the inspection, there are no door and window installation instructions on site and the Approved florida product approval selection sheet is not on site).
ROOF VALLEY & METAL 06/12/2024 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/04/2024 APPROVED JWALKER
Note: 6/3/2024 - PREVIOUS INSPECTION NOTES Roof sheating bumped checked. Passed inspection. Down cells Pass inspection. Inspection stopped! Unable to read the truss manufacture's truss layout plan. Please provide a readable plan.
WALL SHEATHING 06/04/2024 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/03/2024 Disapproved - NO FEE JWALKER
Note: Roof sheating bumped checked. Passed inspection. Down cells Pass inspection. Inspection stopped! Unable to read the truss manufacture's truss layout plan. Please provide a readable plan.
TIE BEAM / LINTEL 05/14/2024 APPROVED JWALKER
FOUND SURVEY APPROVED (OFFICE) 05/13/2024 APPROVED TBAKER
MONOLITHIC SLAB 05/01/2024 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 04/29/2024 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/22/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 04/12/2024 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 01/31/2024 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
MECH COMPLETE 09/23/2024 09/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 09/18/2024 09/20/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
ELEC COMPLETE 07/23/2024 07/29/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/23/2024 07/24/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/23/2024 07/25/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 07/23/2024 07/23/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/13/2024 05/13/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/13/2024 05/13/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 04/18/2024 04/22/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 04/16/2024 04/16/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 04/15/2024 04/16/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 04/15/2024 04/17/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/15/2024 04/16/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ELEC COMPLETE 03/15/2024 03/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 03/12/2024 03/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC HOLD 03/12/2024 03/15/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 2. Need smoke alarms outside of bedroom 2 FRC 2023 314,315 6. . Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67, 230.85 9. Submit Electrical load calculations.
BLD COMPLETE 03/12/2024 03/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/12/2024 03/13/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 03/12/2024 03/18/2024
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON COMPLETE 03/12/2024 03/13/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC HOLD 02/27/2024 03/01/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical code year needs to be updated on the Electrical page. 2. Need smoke alarms outside of all bedrooms. FRC 2023 314,315 3. Need correct outlet spacing in bed 2. NEC 2020 210.52 4. Need correct outlet spacing in Dinning room exterior walls. NEC 2020 210.52 5. Outlet in storage room needs to be GFCI protected. NEC 2020 210.8 6. . Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67, 230.85 9. Submit Electrical load calculations.
MECH HOLD 02/27/2024 02/29/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation in vented attic. Energy calcs say R20 spray foam with unvented attic. Revise to match (Second Request)
BADMIN COMPLETE 01/26/2024 02/01/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 01/26/2024 01/29/2024
Note: Released By: JPI
CUSVC COMPLETE 01/26/2024 01/29/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 01/26/2024 01/29/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical code year needs to be updated on the Electrical page. 2. Need smoke alarms outside of all bedrooms. FRC 2023 314,315 3. Need correct outlet spacing in bed 2. NEC 2020 210.52 4. Need correct outlet spacing in Dinning room exterior walls. NEC 2020 210.52 5. Outlet in storage room needs to be GFCI protected. NEC 2020 210.8 6. . Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67, 230.85 7. Submit manufacture specs of the generator an a Riser diagram for the generator showing all wire sizes and breaker sizes. 8. Need to show location of emergency disconnect switch. Switch on the back of the generator is no longer in code compliance with NEC 2020 445.18 9. Submit Electrical load calculations.
ENGIN1 COMPLETE 01/26/2024 01/29/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 01/26/2024 01/30/2024
LOCATE COMPLETE 01/26/2024 01/31/2024
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH HOLD 01/26/2024 01/30/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation in vented attic. Energy calcs say R20 spray foam with unvented attic. Revise to match
SW1 COMPLETE 01/26/2024 02/02/2024
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON COMPLETE 01/26/2024 01/29/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
PLENV COMPLETE 01/26/2024 01/31/2024
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 01/31/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 04/11/2025
SW ENG REINSPECTION 20 ¤20.00 04/11/2025
SW ENG - REVIEW 20 ¤20.00 03/19/2024
SW ENG RES REVIEW 200 ¤200.00 03/19/2024
SEWER INSPECTION ¤25.00 03/19/2024
SEWER CAPITAL FACILITY ¤5,441.03 03/19/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 03/19/2024
SITE PLAN 30 ¤30.00 03/19/2024
SITE PLAN 30 ¤30.00 03/19/2024
CONNECTION FEES ¤25.00 03/19/2024
FC IMPACT FEE EMS ¤62.00 03/19/2024
IMPACT FEE FIRE ¤428.09 03/19/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/19/2024
FC IMPACT FEE LIBRARY ¤268.00 03/19/2024
IMPACT FEE PARKS ¤1,800.99 03/19/2024
IMPACT FEE SCHOOL ¤5,450.00 03/19/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 03/19/2024
SURCHARGE FS 533.721 ¤11.73 03/19/2024
SURCHARGE - FS 468.631 ¤17.59 03/19/2024
SW ENG - FOUNDATION SURVEY ¤20.00 03/19/2024
SW ENG INSPECTION 80 ¤80.00 03/19/2024
SW ENG PRE APRON ¤30.00 03/19/2024
WATER-METER ¤514.49 03/19/2024
ADJUSTMENT 50% (¤1,172.84) 03/19/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/19/2024
INSPECTION - RESIDENTIAL ¤1,804.00 03/19/2024
PLAN REVIEW - RESIDENTIAL ¤511.68 03/19/2024
Fees Total Due: ¤0.00 Total Paid: ¤23,295.77