I want to search for...
Permit #2024011040
Permit Details
Status: COED
| Parcel Id: 29-10-31-5540-00000-1230 |
| CONDITIONED SPACE: 3294 sqft |
| GARAGE: 880 sqft |
| SCREEN PORCH (SOLID ROOF) : 759 sqft |
| SCREEN PORCH (SOLID ROOF) : 71 sqft |
| Total Square Footage: 5004 sqft |
| Block: 00000 |
| Subdivision: 1005 - SANCTUARY SUBDIVISION |
| Job Phone: (386)445-9393 |
| Location Address: 21 SABAL BEND |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/19/2024 |
| NOC: RECORDED |
| Applicant name: ANTONIO JR AMARAL |
| Owner: ROYAL SABAL BEND 2021, LLC |
|
Address 13 UTILITY DR PALM COAST, FL 32137 |
|
Address STE B PALM COAST, FL 32137 |
| Lot: 1230 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Sub Contractors
ANTONIO AMARAL JR
| Status | Location Address | State License Number |
| ACTIVE |
1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2026) |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/11/2025 | FINAL APPROVED | HCAMACHO |
| Note: | |||
| BLD - BUILDING FINAL | 04/10/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Missing locking breakers on Wall oven and Cooktop. 2. Wire coming out of the wall in the back right side for future pool needs to be in a box secured to the wall. | |||
| BLD - BUILDING FINAL | 04/09/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Missing locking breakers on Wall oven and Cooktop. 2. Wire coming out of the wall in the back right side for future pool needs to be in a water proof box secured to the wall. 3. Missing attic access cover in the master closet. 4. Hole in the soffit on back side of garage. | |||
| U-CROSS CONNECTION | 12/26/2024 | APPROVED | BWRIGHT |
| ROW - FINAL APRON (AFTER POUR) | 12/26/2024 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 12/26/2024 | APPROVED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 12/26/2024 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/20/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/20/2024 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/18/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 12/18/24 BUILDER PLEASE RESUBMIT AS YOUR FINAL SURVEY IS TOO BLURRY WE NEED TO HAVE A CLEAN CLEAR LEGIBLE SURVEY | |||
| ELECTRIC - EARLY POWER | 09/19/2024 | APPROVED | RMARTIN |
| ROW- PRE-APRON (PRE-POUR) | 08/13/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/13/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ New inspection due to canceled inspection 7/24/2024 - PREVIOUS INSPECTION NOTES ** 07/24/24 READY TO POUR APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED AND ALL CONSTRUCTION EQUIPMENT AND MATERIAL ARE REMOVED FROM THE DRIVEWAY ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS | |||
| GRAVITY SEWER TEST | 08/07/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 08/07/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC-TUG | 07/30/2024 | APPROVED | RMARTIN |
| ROW- PRE-APRON (PRE-POUR) | 07/30/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 7/24/2024 - PREVIOUS INSPECTION NOTES ** 07/24/24 READY TO POUR APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED AND ALL CONSTRUCTION EQUIPMENT AND MATERIAL ARE REMOVED FROM THE DRIVEWAY ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS | |||
| INSULATION | 07/29/2024 | APPROVED | JSTEWART |
| LATH/BRICK/ WATER BARRIER | 07/25/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 7/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 7/22/2024 3:52:59 PM *** 1. Improper nail plates for range vent top plate (needs to cover the plate and extend 2 inches below per M1502.5 2. Need nail plates for plumbing supply (shown to Tony Sr. on site) per P2603.2.1 3. Need all approved documents on site for all-rough (needed product approval selection sheet, door and window installation docs, and energy calcs with duct layout along with the plan sheets) Per FBC 107.3 4. Still need to make corrections for the doors and windows sited below. 6/21/2024 - PREVIOUS INSPECTION NOTES 6/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 6/20/2024 10:27:53 AM *** notes attached below for the inspection called in for 6-20-24 indicagte this is for window and door nailing only. (The approved documents need to be on site for the inspection, there are no door and window installation instructions on site and the Approved florida product approval selection sheet is not on site). 6-21-24 1. Font door is not installed. Rear doors are being installed at time of inspection.Need to check at all rough. 2. Windows and slider are approved. 7-23-24 1. Front door is not installed. Need to check at insulation. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/24/2024 | PARTIALLY APPROVED | EMADISON |
| Note: ** 07/24/24 READY TO POUR APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED AND ALL CONSTRUCTION EQUIPMENT AND MATERIAL ARE REMOVED FROM THE DRIVEWAY ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS Inspector Notes from Inspection 9271 ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS | |||
| ALL ROUGH | 07/23/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 7/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 7/22/2024 3:52:59 PM *** 1. Improper nail plates for range vent top plate (needs to cover the plate and extend 2 inches below per M1502.5 2. Need nail plates for plumbing supply (shown to Tony Sr. on site) per P2603.2.1 3. Need all approved documents on site for all-rough (needed product approval selection sheet, door and window installation docs, and energy calcs with duct layout along with the plan sheets) Per FBC 107.3 4. Still need to make corrections for the doors and windows sited below. 6/21/2024 - PREVIOUS INSPECTION NOTES 6/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 6/20/2024 10:27:53 AM *** notes attached below for the inspection called in for 6-20-24 indicagte this is for window and door nailing only. (The approved documents need to be on site for the inspection, there are no door and window installation instructions on site and the Approved florida product approval selection sheet is not on site). 6-21-24 1. Font door is not installed. Rear doors are being installed at time of inspection.Need to check at all rough. 2. Windows and slider are approved. 7-23-24 1. Front door is not installed. Need to check at insulation. | |||
| ALL ROUGH | 07/22/2024 | Disapproved - NO FEE | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 7/22/2024 3:52:59 PM *** 1. Improper nail plates for range vent top plate (needs to cover the plate and extend 2 inches below per M1502.5 2. Need nail plates for plumbing supply (shown to Tony Sr. on site) per P2603.2.1 3. Need all approved documents on site for all-rough (needed product approval selection sheet, door and window installation docs, and energy calcs with duct layout along with the plan sheets) Per FBC 107.3 4. Still need to make corrections for the doors and windows sited below. 6/21/2024 - PREVIOUS INSPECTION NOTES 6/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 6/20/2024 10:27:53 AM *** notes attached below for the inspection called in for 6-20-24 indicagte this is for window and door nailing only. (The approved documents need to be on site for the inspection, there are no door and window installation instructions on site and the Approved florida product approval selection sheet is not on site). 6-21-24 1. Font door is not installed. Rear doors are being installed at time of inspection.Need to check at all rough. 2. Windows and slider are approved. | |||
| ELECTRIC-TUG | 07/18/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- PAVER RESTRAINTS | 07/10/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 07/10/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS | |||
| ROW- PAVER RESTRAINTS | 07/09/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 07/09/24 PAVER RESTRAINTS ARE COLLASPING BACK IN ON THEMSELVES NEED TO RE-ESTABLISH RESTRAINTS (FOOTERS) NEED TO BE A MINIMU OF 4 INCHES WIDE X 8 INCHES DEEP YOURS ARE TOO SHALLOW OVERALL YOUR OUTSIDE FORM BOARDS ARE HIGHER THAN THE INSIDE **SITE PLAN CALLS FOR A CONCRETE DRIVEWAY SITE PLAN NEEDS TO BE UPDATED PRIOR TO THE FINAL SURVEY BEING SUBMITTED ** SEE ATTACHED PHOTOS | |||
| ALL ROUGH | 06/21/2024 | PARTIALLY APPROVED | BTAYLOR |
| Note: 6/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 6/20/2024 10:27:53 AM *** notes attached below for the inspection called in for 6-20-24 indicagte this is for window and door nailing only. (The approved documents need to be on site for the inspection, there are no door and window installation instructions on site and the Approved florida product approval selection sheet is not on site). 6-21-24 1. Font door is not installed. Rear doors are being installed at time of inspection.Need to check at all rough. 2. Windows and slider are approved. | |||
| ALL ROUGH | 06/20/2024 | Disapproved - NO FEE | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 6/20/2024 10:27:53 AM *** notes attached below for the inspection called in for 6-20-24 indicagte this is for window and door nailing only. (The approved documents need to be on site for the inspection, there are no door and window installation instructions on site and the Approved florida product approval selection sheet is not on site). | |||
| ROOF VALLEY & METAL | 06/12/2024 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/04/2024 | APPROVED | JWALKER |
| Note: 6/3/2024 - PREVIOUS INSPECTION NOTES Roof sheating bumped checked. Passed inspection. Down cells Pass inspection. Inspection stopped! Unable to read the truss manufacture's truss layout plan. Please provide a readable plan. | |||
| WALL SHEATHING | 06/04/2024 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/03/2024 | Disapproved - NO FEE | JWALKER |
| Note: Roof sheating bumped checked. Passed inspection. Down cells Pass inspection. Inspection stopped! Unable to read the truss manufacture's truss layout plan. Please provide a readable plan. | |||
| TIE BEAM / LINTEL | 05/14/2024 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 05/13/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/01/2024 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/29/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/22/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 04/12/2024 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 01/31/2024 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/23/2024 | 09/25/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/18/2024 | 09/20/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| ELEC | COMPLETE | 07/23/2024 | 07/29/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/23/2024 | 07/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/23/2024 | 07/25/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/23/2024 | 07/23/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/13/2024 | 05/13/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/13/2024 | 05/13/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/18/2024 | 04/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/16/2024 | 04/16/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/15/2024 | 04/16/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/15/2024 | 04/17/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/15/2024 | 04/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/15/2024 | 03/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/12/2024 | 03/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 03/12/2024 | 03/15/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 2. Need smoke alarms outside of bedroom 2 FRC 2023 314,315 6. . Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67, 230.85 9. Submit Electrical load calculations. | |||
| BLD | COMPLETE | 03/12/2024 | 03/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/12/2024 | 03/13/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/12/2024 | 03/18/2024 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/12/2024 | 03/13/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 02/27/2024 | 03/01/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical code year needs to be updated on the Electrical page. 2. Need smoke alarms outside of all bedrooms. FRC 2023 314,315 3. Need correct outlet spacing in bed 2. NEC 2020 210.52 4. Need correct outlet spacing in Dinning room exterior walls. NEC 2020 210.52 5. Outlet in storage room needs to be GFCI protected. NEC 2020 210.8 6. . Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67, 230.85 9. Submit Electrical load calculations. | |||
| MECH | HOLD | 02/27/2024 | 02/29/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation in vented attic. Energy calcs say R20 spray foam with unvented attic. Revise to match (Second Request) | |||
| BADMIN | COMPLETE | 01/26/2024 | 02/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/26/2024 | 01/29/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 01/26/2024 | 01/29/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 01/26/2024 | 01/29/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical code year needs to be updated on the Electrical page. 2. Need smoke alarms outside of all bedrooms. FRC 2023 314,315 3. Need correct outlet spacing in bed 2. NEC 2020 210.52 4. Need correct outlet spacing in Dinning room exterior walls. NEC 2020 210.52 5. Outlet in storage room needs to be GFCI protected. NEC 2020 210.8 6. . Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67, 230.85 7. Submit manufacture specs of the generator an a Riser diagram for the generator showing all wire sizes and breaker sizes. 8. Need to show location of emergency disconnect switch. Switch on the back of the generator is no longer in code compliance with NEC 2020 445.18 9. Submit Electrical load calculations. | |||
| ENGIN1 | COMPLETE | 01/26/2024 | 01/29/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 01/26/2024 | 01/30/2024 |
| LOCATE | COMPLETE | 01/26/2024 | 01/31/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/26/2024 | 01/30/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation in vented attic. Energy calcs say R20 spray foam with unvented attic. Revise to match | |||
| SW1 | COMPLETE | 01/26/2024 | 02/02/2024 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/26/2024 | 01/29/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 01/26/2024 | 01/31/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 01/31/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/11/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/11/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/19/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/19/2024 |
| SEWER INSPECTION | ¤25.00 | 03/19/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 03/19/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 03/19/2024 |
| SITE PLAN 30 | ¤30.00 | 03/19/2024 |
| SITE PLAN 30 | ¤30.00 | 03/19/2024 |
| CONNECTION FEES | ¤25.00 | 03/19/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 03/19/2024 |
| IMPACT FEE FIRE | ¤428.09 | 03/19/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/19/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/19/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 03/19/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/19/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 03/19/2024 |
| SURCHARGE FS 533.721 | ¤11.73 | 03/19/2024 |
| SURCHARGE - FS 468.631 | ¤17.59 | 03/19/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/19/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/19/2024 |
| SW ENG PRE APRON | ¤30.00 | 03/19/2024 |
| WATER-METER | ¤514.49 | 03/19/2024 |
| ADJUSTMENT 50% | (¤1,172.84) | 03/19/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/19/2024 |
| INSPECTION - RESIDENTIAL | ¤1,804.00 | 03/19/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤511.68 | 03/19/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,295.77 |