I want to search for...
Permit #2024011116
Permit Details
Status: COED
| Parcel Id: 07-11-31-7011-00110-0250 |
| CONDITIONED SPACE: 1721 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| GARAGE: 455 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00110 |
| Subdivision: 2193 - SECTION 11-BELLE TERRE |
| Job Phone: 631-929-5500 |
| Location Address: 90 BEAUFORD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/15/2024 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: YANNUCCI VINCENT |
|
Address PO BOX 638 SHOREHAM, NY 11786 |
| Lot: 0250 |
| Contracted Stated Job Value: ¤205,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/23/2024 | FINAL APPROVED | JSTEWART |
| Note: 8/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/22/2024 2:07:57 PM *** Plumbing vent stack left side of roof, Min 6" above roof. (to short) FBCR P3103.1.1 8/16/2024 - PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 08/22/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/22/2024 2:07:57 PM *** Plumbing vent stack left side of roof, Min 6" above roof. (to short) FBCR P3103.1.1 8/16/2024 - PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 08/16/2024 | CANCELLED BY APPLICANT | KSANDOE |
| U -UTILITY RESIDENTIAL FINAL | 08/15/2024 | FINAL APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 08/09/2024 | APPROVED - AS NOTED | KSANDOE |
| Note: Release Power 8/8/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/8/2024 3:47:59 PM *** Power is on in the building. Disconnect the load wires and reschedule inspection. Early power inspection must be approved prior to having power active in building. Post address FBCR 319.1 full inspection required. Inspector Notes from Inspection 2200 *** NOTES ADDED BY JSTEWART 5/31/2024 1:35:07 PM *** authorize release of email to FPL @ 1:35p 5/30/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 5/30/2024 2:02:44 PM *** No Grounding connection. per NEC 250.... | |||
| ELECTRIC - EARLY POWER | 08/08/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/8/2024 3:47:59 PM *** Power is on in the building. Disconnect the load wires and reschedule inspection. Early power inspection must be approved prior to having power active in building. Post address FBCR 319.1 full inspection required. Inspector Notes from Inspection 2200 *** NOTES ADDED BY JSTEWART 5/31/2024 1:35:07 PM *** authorize release of email to FPL @ 1:35p 5/30/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 5/30/2024 2:02:44 PM *** No Grounding connection. per NEC 250.... | |||
| ROW - FINAL APRON (AFTER POUR) | 08/06/2024 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 08/06/2024 | APPROVED | TPOLACEK |
| Note: 08/06/24 TPOLACEK*** PALLETS IN DRIVEWAY AT TIME OF INSPECTION NEED TO BE REMOVED. APPROVING AS NOTED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/05/2024 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/05/2024 | APPROVED | TPOLACEK |
| Note: 08/05/24 TPOLACEK*** WITH THE RAIN COMING DOWN THERE ARE SOME SMALL POOLING AREAS IN BACK YARD HOWEVER THE DRAINAGE APPEARS TO BE WORKING AS INDICATED ON FINAL SURVEY. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| SEWER TIE IN | 07/02/2024 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 06/20/2024 | APPROVED | GBERTOLA |
| Note: 6/20/24= AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVER DETAIL. 6/17/2024 - PREVIOUS INSPECTION NOTES 06/17/24 TPOLACEK*** CULVERT IS PITCHED IN THE WRONG DIRECTION, MITER BOARDS AT EDGE OF DRIVEWAY SHOULD BE 18" FROM BOARD TO SIDE OF CULVERT PIPE IN ACCORNACE TO THE RESIDENTIAL CULVERT DIAGRAM (SEE ATTACHMENT) | |||
| INSULATION | 06/18/2024 | APPROVED | FWILLIS |
| ROW- PRE-APRON (PRE-POUR) | 06/17/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 06/17/24 TPOLACEK*** CULVERT IS PITCHED IN THE WRONG DIRECTION, MITER BOARDS AT EDGE OF DRIVEWAY SHOULD BE 18" FROM BOARD TO SIDE OF CULVERT PIPE IN ACCORNACE TO THE RESIDENTIAL CULVERT DIAGRAM (SEE ATTACHMENT) | |||
| ALL ROUGH | 06/14/2024 | APPROVED | JSTEWART |
| WALL SHEATHING | 06/12/2024 | APPROVED | KSANDOE |
| Note: 6/11/2024 - PREVIOUS INSPECTION NOTES 6/11/24 - WALL SHEATHING IS COVERED. 6/7/2024 - PREVIOUS INSPECTION NOTES AREA FOR WALL SHEATHING IS COVERED WITH STUCCO. CANNOT INSPECT. | |||
| WALL SHEATHING | 06/11/2024 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: 6/11/24 - WALL SHEATHING IS COVERED. 6/7/2024 - PREVIOUS INSPECTION NOTES AREA FOR WALL SHEATHING IS COVERED WITH STUCCO. CANNOT INSPECT. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/10/2024 | APPROVED | FWILLIS |
| Note: 6/7/2024 - PREVIOUS INSPECTION NOTES CANNOT INSPECT. STUCCO BEING APPLIED AROUND HOUSE. SCAFFOLDS BLOCKING ENTRANCE AND STUCCO ON THE FLOOR IN AREAS, ESPECIAALY IN THE GARAGE. RESCHEDULE WHEN STUCCO IS COMPLETED, FLOOR CLEANED AND SAFETY HAZARDS REMOVED. | |||
| U-CROSS CONNECTION | 06/10/2024 | FINAL APPROVED | BWRIGHT |
| Note: 6/10/24 Meter and backflow was unassembled needs to be installed. | |||
| ROOF VALLEY & METAL | 06/07/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/07/2024 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: CANNOT INSPECT. STUCCO BEING APPLIED AROUND HOUSE. SCAFFOLDS BLOCKING ENTRANCE AND STUCCO ON THE FLOOR IN AREAS, ESPECIAALY IN THE GARAGE. RESCHEDULE WHEN STUCCO IS COMPLETED, FLOOR CLEANED AND SAFETY HAZARDS REMOVED. | |||
| WALL SHEATHING | 06/07/2024 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: AREA FOR WALL SHEATHING IS COVERED WITH STUCCO. CANNOT INSPECT. | |||
| ELECTRIC-TUG | 05/31/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 5/31/2024 1:35:07 PM *** authorize release of email to FPL @ 1:35p 5/30/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 5/30/2024 2:02:44 PM *** No Grounding connection. per NEC 250.... | |||
| U-CROSS CONNECTION | 05/31/2024 | CANCELLED BY APPLICANT | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 5/31/2024 9:42:45 AM *** Meter has not been installed yet . | |||
| LATH/BRICK/ WATER BARRIER | 05/30/2024 | APPROVED | MKRASKI |
| ELECTRIC-TUG | 05/30/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 5/30/2024 2:02:44 PM *** No Grounding connection. per NEC 250.... | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/08/2024 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 05/07/2024 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 04/30/2024 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/26/2024 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 04/26/2024 | APPROVED | MGIBSON |
| Note: 4/22/2024 - PREVIOUS INSPECTION NOTES WRONG INSPECTION SCHEDUALED, ALSO NEED GEO. REPORT FILED BEFORE SCHEDUALING FIRST ROUGH PLUMBING INSPECTION | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/25/2024 | APPROVED | JMUNSON |
| GRAVITY SEWER TEST | 04/22/2024 | Disapproved - NO FEE | MGIBSON |
| Note: WRONG INSPECTION SCHEDUALED, ALSO NEED GEO. REPORT FILED BEFORE SCHEDUALING FIRST ROUGH PLUMBING INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 04/19/2024 | APPROVED | CBOWERMASTER |
| Note: 4/18/2024 7:30:11 AM- PREVIOUS INSPECTION NOTES garbage | |||
| WATER METER INSTALLATION REQUEST | 04/17/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: garbage |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/31/2024 | 06/06/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/24/2024 | 05/31/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/15/2024 | 05/21/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Truss packet to have approval stamp from engineer of record | |||
| MECH | COMPLETE | 05/15/2024 | 05/20/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/08/2024 | 05/08/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/08/2024 | 05/08/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/23/2024 | 04/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/19/2024 | 04/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/16/2024 | 02/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/16/2024 | 02/16/2024 |
| Note: Released By: JPI | |||
| MECH | COMPLETE | 02/16/2024 | 02/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 01/29/2024 | 02/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/29/2024 | 01/30/2024 |
| Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 01/29/2024 | 01/30/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 01/29/2024 | 01/29/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| ENGIN1 | COMPLETE | 01/29/2024 | 01/29/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 01/29/2024 | 01/31/2024 |
| LOCATE | COMPLETE | 01/29/2024 | 02/01/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/29/2024 | 01/31/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs from 2023 code cycle | |||
| SW1 | COMPLETE | 01/29/2024 | 01/31/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/29/2024 | 01/29/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/29/2024 | 03/12/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 08/23/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/23/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/23/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/23/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/23/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/23/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 08/23/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 08/23/2024 |
| REINSPECTION FEE | ¤40.00 | 08/23/2024 |
| SURCHARGE FS 533.721 | ¤12.05 | 04/15/2024 |
| SURCHARGE - FS 468.631 | ¤18.08 | 04/15/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/15/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/15/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/15/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/15/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/15/2024 |
| SEWER CREDIT | (¤1,346.27) | 04/15/2024 |
| SEWER INSPECTION | ¤25.00 | 04/15/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/15/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/15/2024 |
| WORK WITHOUT PERMIT | ¤602.74 | 04/15/2024 |
| SITE PLAN 30 | ¤30.00 | 04/15/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/15/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/15/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/15/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/15/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/15/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/15/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/15/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/15/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/15/2024 |
| WATER- TURN ON | ¤25.00 | 04/15/2024 |
| ADJUSTMENT 50% | (¤602.75) | 04/15/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/15/2024 |
| INSPECTION - RESIDENTIAL | ¤915.75 | 04/15/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤259.74 | 04/15/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,368.72 |