Permit #2024011153
Permit Details
Status: FINAL
| Parcel Id: 21-10-30-0000-02020-0010 |
| Block: 02020 |
| Subdivision: - |
| Job Phone: 386-257-3570 |
| Location Address: 11100 US 1 HWY N |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 04/09/2024 |
| NOC: Unknown |
| Applicant name: CHARLES ANDREW COLEMAN |
| Owner: HORIZON REAL ESTATE FUND L P |
|
Address SUITE 210-A WILMINGTON, DE 19801 |
|
Address 300 DELAWARE AVENUE WILMINGTON, DE 19801 |
| Lot: 0010 |
| Job Description: SITE WORK: STORAGE FACILITY |
| Type: CN |
Contractor
COLEMAN GOODEMOTE CONSTRUCTION COMPANY INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
619 N. BEACH ST. DAYTONA BEACH, FL 32114 |
CGC057396 (Exp: 08/31/2026) | 386-257-3570 | 386-253-6692 |
Inspection History
| Type | Request Date | Result | Inspector |
| PERFORMANCE BOND ACCEPTANCE | 11/13/2025 | APPROVED | DRAMIREZ |
| Note: Landscape Bond | |||
| MAINT BOND ACCEPTANCE (OFFICE) | 11/13/2025 | APPROVED | DRAMIREZ |
| CLOSE OUT DOCUMENTS | 11/13/2025 | APPROVED | DRAMIREZ |
| LDSC- LANDSCAPE FINAL | 11/07/2025 | APPROVED | RPICATAGI |
| Note: 1. Clean up chunks of sod and soil where podocarpus plantings were installed to screen backflow preventer 2. Cut/mow overgrown lawn areas and treat with WEED and FEED to reduce weed species 3. Seed or sod 10 - feet wide buffer area at south property line (entire length) to stabilize the loose soil. | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 10/23/2025 | APPROVED | DRAMIREZ |
| Note: 10/14/2025 4:58:25 PM- PREVIOUS INSPECTION NOTES IRRIGATION AS-BUILTS MAY CHANGE BASED UPON MISSING PERIMETER BUFFER AT SOUTH PROPERTY LINE THAT ISSUE MUST BE RESOLOVED PRIOR TO APPROVAL OF ASBUILT Bond Submitted. 10/22/2025 | |||
| LDSC- LANDSCAPE FINAL | 10/23/2025 | APPROVED | DRAMIREZ |
| Note: Performance bond Submitted and Approved. | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 10/22/2025 | APPROVED | DRAMIREZ |
| LDSC-PRE-PLANTING TREE QUALITY | 10/14/2025 | APPROVED | RPICATAGI |
| IRRIGATION AFFIDAVIT | 10/14/2025 | Disapproved - NO FEE | RPICATAGI |
| Note: AFFIDAVIT IS NOT ATTACHED PROVIDE IRRIGATION AFFIDAVIT SIGNED AND SEALED BY FLORIDA RLZ | |||
| LDSC-IRRIGATION FINAL | 10/14/2025 | APPROVED | RPICATAGI |
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 10/14/2025 | Disapproved - NO FEE | RPICATAGI |
| Note: IRRIGATION AS-BUILTS MAY CHANGE BASED UPON MISSING PERIMETER BUFFER AT SOUTH PROPERTY LINE THAT ISSUE MUST BE RESOLOVED PRIOR TO APPROVAL OF ASBUILT | |||
| UC-SUBSTANTIAL WALK-THRU | 10/10/2025 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 all approved by Don-no notes again-all verbal s]approved to contractor with np notes | |||
| UC- PRELIMINARY AS-BUILTS | 10/10/2025 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 all approved by Don-no notes again-all verbal s]approved to contractor with np notes | |||
| UC-FINAL SITE INSPECTION | 10/10/2025 | APPROVED | LFITZGERALD |
| U - UTILITY COMMERCIAL FINAL | 10/10/2025 | FINAL APPROVED | BWRIGHT |
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 10/10/2025 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 all approved by Don-no notes again-all verbal s]approved to contractor with np notes | |||
| UC-DRAINAGE STRUCT PLACMNT | 10/09/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: all approved by Don-no notes | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 10/09/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9113 all approved by Don-no notes again-all verbal s]approved to contractor with np notes | |||
| PLAN - PRE-CON 386-986-3750 | 10/09/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: DON approved-no notes | |||
| BLD - SEWER TIE IN | 09/24/2025 | APPROVED | MGIBSON |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 09/24/2025 | APPROVED | FWILLIS |
| Note: 7/14/2025 - PREVIOUS INSPECTION NOTES NOT READY FOR ADA INSPECTION. NOT COMPLETE. | |||
| BLD- ADA PARKING | 09/24/2025 | FINAL APPROVED | FWILLIS |
| BLD- ADA SIGNAGECONTROL | 09/24/2025 | APPROVED | FWILLIS |
| BLD- ADA VEHICULAR WAY | 09/24/2025 | APPROVED | FWILLIS |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 09/24/2025 | APPROVED | RMARTIN |
| Note: 11/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 11/20/2024 10:13:05 AM *** pending front section near road | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 09/24/2025 | APPROVED | RMARTIN |
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 09/24/2025 | APPROVED | RMARTIN |
| U-SEWER FORCE MAIN INSTALL/TESTING | 09/24/2025 | APPROVED | BWRIGHT |
| Note: 8/19/2025 - PREVIOUS INSPECTION NOTES 8/19/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 8/19/2024 1:25:31 PM *** Main dug up . Tapping saddle installed . 7/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 7/22/2024 10:39:05 AM *** Boring under US 1 for 2" main In progress | |||
| U-WATER SERVICE INSTALLATION | 09/24/2025 | APPROVED | BWRIGHT |
| Note: 8/19/2025 - PREVIOUS INSPECTION NOTES 8/19/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 8/19/2024 1:28:47 PM *** Water Main dug up , saddle installed and water main wet Tap completed . 8/19 7/23/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/23/2024 4:15:46 PM *** use this for services to buildings-verifications/used WM install... for all mainline install and testing 7/22/2024 - PREVIOUS INSPECTION NOTES In progress | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 09/24/2025 | APPROVED | BWRIGHT |
| UC-ASPHALT PRE PLACEMENT | 09/24/2025 | APPROVED | BWRIGHT |
| UC-DRAINAGE STRUCT PLACMNT | 09/24/2025 | APPROVED | BWRIGHT |
| U-REUSE MAIN INSTALL/TESTING | 09/24/2025 | APPROVED | BWRIGHT |
| Note: 8/19/2025 - PREVIOUS INSPECTION NOTES 8/19/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 8/19/2024 1:24:10 PM *** Main dug up , tapping saddle installed .8/19 7/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 7/22/2024 10:37:03 AM *** Boring under US 1 For 2" main In progress | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 09/24/2025 | APPROVED | BWRIGHT |
| Note: 7/2/2025 9:09:24 AM- PREVIOUS INSPECTION NOTES 7/1/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. | |||
| UROW-RETENT/DETENT STABILI | 09/24/2025 | APPROVED | BWRIGHT |
| UROW- CURBING & GUTTER | 09/24/2025 | APPROVED | BWRIGHT |
| Note: 7/16/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 7/16/2025 11:53:23 AM *** N. Curbing form boards are in , waiting on concrete . New inspection due to canceled inspection 6/30/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/30/2025 1:47:42 PM *** Still in progress for north side - waiting on concrete crew . 6/24/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/24/2025 2:22:01 PM *** South side completed . OK . | |||
| UROW - FINAL DRAINAGE | 09/24/2025 | FINAL APPROVED | BWRIGHT |
| U-ROW FINAL | 09/24/2025 | FINAL APPROVED | BWRIGHT |
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 09/24/2025 | APPROVED | BWRIGHT |
| U-PUMP STATION PRE-INSTALLATION | 08/19/2025 | APPROVED | BWRIGHT |
| U-PUMP STATION START-UP | 08/19/2025 | CANCELLED BY APPLICANT | WEB |
| U-PUMP STATION START-UP | 08/19/2025 | APPROVED | BWRIGHT |
| U-WATER SERVICE INSTALLATION | 08/19/2025 | PARTIALLY APPROVED | BWRIGHT |
| Note: 8/19/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 8/19/2024 1:28:47 PM *** Water Main dug up , saddle installed and water main wet Tap completed . 8/19 7/23/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/23/2024 4:15:46 PM *** use this for services to buildings-verifications/used WM install... for all mainline install and testing 7/22/2024 - PREVIOUS INSPECTION NOTES In progress | |||
| U-REUSE MAIN INSTALL/TESTING | 08/19/2025 | PARTIALLY APPROVED | BWRIGHT |
| Note: 8/19/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 8/19/2024 1:24:10 PM *** Main dug up , tapping saddle installed .8/19 7/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 7/22/2024 10:37:03 AM *** Boring under US 1 For 2" main In progress | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 08/19/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: 7/23/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/23/2024 4:13:54 PM *** 12in bore under US 1 In progress | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 08/19/2025 | PARTIALLY APPROVED | BWRIGHT |
| Note: 8/19/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 8/19/2024 1:25:31 PM *** Main dug up . Tapping saddle installed . 7/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 7/22/2024 10:39:05 AM *** Boring under US 1 for 2" main In progress | |||
| UROW- CURBING & GUTTER | 07/16/2025 | PARTIALLY APPROVED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 7/16/2025 11:53:23 AM *** N. Curbing form boards are in , waiting on concrete . New inspection due to canceled inspection 6/30/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/30/2025 1:47:42 PM *** Still in progress for north side - waiting on concrete crew . 6/24/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/24/2025 2:22:01 PM *** South side completed . OK . | |||
| UROW- CURBING & GUTTER | 07/14/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 6/30/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/30/2025 1:47:42 PM *** Still in progress for north side - waiting on concrete crew . 6/24/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/24/2025 2:22:01 PM *** South side completed . OK . | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 07/14/2025 | Disapproved - NO FEE | FWILLIS |
| Note: NOT READY FOR ADA INSPECTION. NOT COMPLETE. | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 07/01/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 7/1/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. | |||
| UROW- CURBING & GUTTER | 06/30/2025 | PARTIALLY APPROVED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 6/30/2025 1:47:42 PM *** Still in progress for north side - waiting on concrete crew . 6/24/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/24/2025 2:22:01 PM *** South side completed . OK . | |||
| UROW- CURBING & GUTTER | 06/24/2025 | PARTIALLY APPROVED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 6/24/2025 2:22:01 PM *** South side completed . OK . | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 06/10/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 06/03/2025 | CANCELLED BY INSPECTOR | JMYERS |
| Note: 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 ALL EROSION CONTROL AND INLET PROTECTION MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 4/2/2025 - PREVIOUS INSPECTION NOTES 4/2/25 ALL EROSION CONTROL AND INLET PROTECTION MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 3/11/2025 - PREVIOUS INSPECTION NOTES 3/11/25 REPAIRS IN PROGRESS 3/7/2025 - PREVIOUS INSPECTION NOTES 3/7/25 INLET PROTECTION SHALL BE CLEANED BY TUESDAY 3/11/25 3/4/2025 - PREVIOUS INSPECTION NOTES 3/4/25 SILT FENCE STILL IN PLACE AND IN GOOD CONDITION. SILT SCREENS ON INLETS NEED TO BE CLEANED AND RE-INSTALLED. FOLLOW UP INSPECTION ON FRIDAY 3/7/25 2/7/2025 1:41:47 PM- PREVIOUS INSPECTION NOTES 2/7/25 SILT FENCE HAS BEEN RE-INSTALLED AND POND SODDED. INLET PROTECTION STILL NEEDS TO BE CLEANED AND RE-NSTALLED FOLLOW UP INSPECTION NEXT MONTH 2/4/2025 4:50:18 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE SHALL BE RE-INSTALLED ALONG ENTIRE PERIMETER OF SITE. INLET PROTECTION SHALL BE CLEANED AND RE-INSTALLED. PIPE DEBRIS SHALL BE REMOVED FROM SITE. FOLLOW UP INSPECTION ON FRIDAY 2/7/25 | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 05/06/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 5/6/25 ALL EROSION CONTROL AND INLET PROTECTION MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 4/2/2025 - PREVIOUS INSPECTION NOTES 4/2/25 ALL EROSION CONTROL AND INLET PROTECTION MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 3/11/2025 - PREVIOUS INSPECTION NOTES 3/11/25 REPAIRS IN PROGRESS 3/7/2025 - PREVIOUS INSPECTION NOTES 3/7/25 INLET PROTECTION SHALL BE CLEANED BY TUESDAY 3/11/25 3/4/2025 - PREVIOUS INSPECTION NOTES 3/4/25 SILT FENCE STILL IN PLACE AND IN GOOD CONDITION. SILT SCREENS ON INLETS NEED TO BE CLEANED AND RE-INSTALLED. FOLLOW UP INSPECTION ON FRIDAY 3/7/25 2/7/2025 1:41:47 PM- PREVIOUS INSPECTION NOTES 2/7/25 SILT FENCE HAS BEEN RE-INSTALLED AND POND SODDED. INLET PROTECTION STILL NEEDS TO BE CLEANED AND RE-NSTALLED FOLLOW UP INSPECTION NEXT MONTH 2/4/2025 4:50:18 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE SHALL BE RE-INSTALLED ALONG ENTIRE PERIMETER OF SITE. INLET PROTECTION SHALL BE CLEANED AND RE-INSTALLED. PIPE DEBRIS SHALL BE REMOVED FROM SITE. FOLLOW UP INSPECTION ON FRIDAY 2/7/25 | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 04/29/2025 | APPROVED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 4/29/2025 9:30:49 AM *** drainage miter constuction , OK . | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 04/01/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 4/2/25 ALL EROSION CONTROL AND INLET PROTECTION MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 3/11/2025 - PREVIOUS INSPECTION NOTES 3/11/25 REPAIRS IN PROGRESS 3/7/2025 - PREVIOUS INSPECTION NOTES 3/7/25 INLET PROTECTION SHALL BE CLEANED BY TUESDAY 3/11/25 3/4/2025 - PREVIOUS INSPECTION NOTES 3/4/25 SILT FENCE STILL IN PLACE AND IN GOOD CONDITION. SILT SCREENS ON INLETS NEED TO BE CLEANED AND RE-INSTALLED. FOLLOW UP INSPECTION ON FRIDAY 3/7/25 2/7/2025 1:41:47 PM- PREVIOUS INSPECTION NOTES 2/7/25 SILT FENCE HAS BEEN RE-INSTALLED AND POND SODDED. INLET PROTECTION STILL NEEDS TO BE CLEANED AND RE-NSTALLED FOLLOW UP INSPECTION NEXT MONTH 2/4/2025 4:50:18 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE SHALL BE RE-INSTALLED ALONG ENTIRE PERIMETER OF SITE. INLET PROTECTION SHALL BE CLEANED AND RE-INSTALLED. PIPE DEBRIS SHALL BE REMOVED FROM SITE. FOLLOW UP INSPECTION ON FRIDAY 2/7/25 | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 03/11/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 3/11/25 REPAIRS IN PROGRESS 3/7/2025 - PREVIOUS INSPECTION NOTES 3/7/25 INLET PROTECTION SHALL BE CLEANED BY TUESDAY 3/11/25 3/4/2025 - PREVIOUS INSPECTION NOTES 3/4/25 SILT FENCE STILL IN PLACE AND IN GOOD CONDITION. SILT SCREENS ON INLETS NEED TO BE CLEANED AND RE-INSTALLED. FOLLOW UP INSPECTION ON FRIDAY 3/7/25 2/7/2025 1:41:47 PM- PREVIOUS INSPECTION NOTES 2/7/25 SILT FENCE HAS BEEN RE-INSTALLED AND POND SODDED. INLET PROTECTION STILL NEEDS TO BE CLEANED AND RE-NSTALLED FOLLOW UP INSPECTION NEXT MONTH 2/4/2025 4:50:18 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE SHALL BE RE-INSTALLED ALONG ENTIRE PERIMETER OF SITE. INLET PROTECTION SHALL BE CLEANED AND RE-INSTALLED. PIPE DEBRIS SHALL BE REMOVED FROM SITE. FOLLOW UP INSPECTION ON FRIDAY 2/7/25 | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 03/07/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 3/7/25 INLET PROTECTION SHALL BE CLEANED BY TUESDAY 3/11/25 3/4/2025 - PREVIOUS INSPECTION NOTES 3/4/25 SILT FENCE STILL IN PLACE AND IN GOOD CONDITION. SILT SCREENS ON INLETS NEED TO BE CLEANED AND RE-INSTALLED. FOLLOW UP INSPECTION ON FRIDAY 3/7/25 2/7/2025 1:41:47 PM- PREVIOUS INSPECTION NOTES 2/7/25 SILT FENCE HAS BEEN RE-INSTALLED AND POND SODDED. INLET PROTECTION STILL NEEDS TO BE CLEANED AND RE-NSTALLED FOLLOW UP INSPECTION NEXT MONTH 2/4/2025 4:50:18 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE SHALL BE RE-INSTALLED ALONG ENTIRE PERIMETER OF SITE. INLET PROTECTION SHALL BE CLEANED AND RE-INSTALLED. PIPE DEBRIS SHALL BE REMOVED FROM SITE. FOLLOW UP INSPECTION ON FRIDAY 2/7/25 | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 03/04/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 3/4/25 SILT FENCE STILL IN PLACE AND IN GOOD CONDITION. SILT SCREENS ON INLETS NEED TO BE CLEANED AND RE-INSTALLED. FOLLOW UP INSPECTION ON FRIDAY 3/7/25 2/7/2025 1:41:47 PM- PREVIOUS INSPECTION NOTES 2/7/25 SILT FENCE HAS BEEN RE-INSTALLED AND POND SODDED. INLET PROTECTION STILL NEEDS TO BE CLEANED AND RE-NSTALLED FOLLOW UP INSPECTION NEXT MONTH 2/4/2025 4:50:18 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE SHALL BE RE-INSTALLED ALONG ENTIRE PERIMETER OF SITE. INLET PROTECTION SHALL BE CLEANED AND RE-INSTALLED. PIPE DEBRIS SHALL BE REMOVED FROM SITE. FOLLOW UP INSPECTION ON FRIDAY 2/7/25 | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 02/07/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 2/7/25 SILT FENCE HAS BEEN RE-INSTALLED AND POND SODDED. INLET PROTECTION STILL NEEDS TO BE CLEANED AND RE-NSTALLED FOLLOW UP INSPECTION NEXT MONTH 2/4/2025 4:50:18 PM- PREVIOUS INSPECTION NOTES 2/4/25 SILT FENCE SHALL BE RE-INSTALLED ALONG ENTIRE PERIMETER OF SITE. INLET PROTECTION SHALL BE CLEANED AND RE-INSTALLED. PIPE DEBRIS SHALL BE REMOVED FROM SITE. FOLLOW UP INSPECTION ON FRIDAY 2/7/25 | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 02/04/2025 | Disapproved - NO FEE | JMYERS |
| Note: 2/4/25 SILT FENCE SHALL BE RE-INSTALLED ALONG ENTIRE PERIMETER OF SITE. INLET PROTECTION SHALL BE CLEANED AND RE-INSTALLED. PIPE DEBRIS SHALL BE REMOVED FROM SITE. FOLLOW UP INSPECTION ON FRIDAY 2/7/25 | |||
| UC-CONSTRUCTION ENTRANCE | 12/10/2024 | APPROVED | DHANEY |
| Note: 6/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/6/2024 12:12:07 PM *** met with Bll-57/iinch stone being used-usually 1.5-3inch stone perferred-made aware to keep attention to any of this stone getting on US1 where fast travelling vehicles can really displace/ fire rocks around | |||
| U-GRAVITY SEWER INSTALL/TESTING | 11/22/2024 | CANCELLED BY APPLICANT | WEB |
| U-GRAVITY SEWER INSTALL/TESTING | 11/22/2024 | APPROVED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 11/22/2024 9:55:41 AM *** Inlet and outlet of mini lift station is good . | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 11/20/2024 | CANCELLED BY APPLICANT | WEB |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 11/20/2024 | PARTIALLY APPROVED | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 11/20/2024 10:13:05 AM *** pending front section near road | |||
| CONSTRUCTION ENTRANCE | 09/10/2024 | APPROVED | DHANEY |
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 09/10/2024 | APPROVED | DHANEY |
| Note: 6/6/2024 - PREVIOUS INSPECTION NOTES | |||
| U-REUSE MAIN INSTALL/TESTING | 08/19/2024 | PARTIALLY APPROVED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 8/19/2024 1:24:10 PM *** Main dug up , tapping saddle installed .8/19 7/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 7/22/2024 10:37:03 AM *** Boring under US 1 For 2" main | |||
| U-WATER SERVICE INSTALLATION | 08/19/2024 | PARTIALLY APPROVED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 8/19/2024 1:28:47 PM *** Water Main dug up , saddle installed and water main wet Tap completed . 8/19 7/23/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/23/2024 4:15:46 PM *** use this for services to buildings-verifications/used WM install... for all mainline install and testing 7/22/2024 - PREVIOUS INSPECTION NOTES | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 08/19/2024 | PARTIALLY APPROVED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 8/19/2024 1:25:31 PM *** Main dug up . Tapping saddle installed . 7/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 7/22/2024 10:39:05 AM *** Boring under US 1 for 2" main | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 07/23/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/23/2024 4:13:54 PM *** 12in bore under US 1 | |||
| U-WATER SERVICE INSTALLATION | 07/23/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/23/2024 4:15:46 PM *** use this for services to buildings-verifications/used WM install... for all mainline install and testing 7/22/2024 - PREVIOUS INSPECTION NOTES | |||
| U-WATER SERVICE INSTALLATION | 07/22/2024 | CANCELLED BY APPLICANT | DHANEY |
| U-REUSE MAIN INSTALL/TESTING | 07/22/2024 | PARTIALLY APPROVED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 7/22/2024 10:37:03 AM *** Boring under US 1 For 2" main | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 07/22/2024 | PARTIALLY APPROVED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 7/22/2024 10:39:05 AM *** Boring under US 1 for 2" main | |||
| UC-CONSTRUCTION ENTRANCE | 06/06/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/6/2024 12:12:07 PM *** met with Bll-57/iinch stone being used-usually 1.5-3inch stone perferred-made aware to keep attention to any of this stone getting on US1 where fast travelling vehicles can really displace/ fire rocks around | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 06/06/2024 | PARTIALLY APPROVED | LFITZGERALD |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/30/2024 | 02/02/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/30/2024 | 01/30/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 01/30/2024 | 01/30/2024 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 01/30/2024 | 02/01/2024 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 01/30/2024 | 02/01/2024 |
| Note: Released By: GREG DEGLER - - GDEGLER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤222.50) | 04/09/2024 |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 04/09/2024 |
| SITE INSPECTION | ¤1,000.00 | 04/09/2024 |
| SITE PLAN 30 | ¤30.00 | 04/09/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤932.50 |