I want to search for...
Permit #2024011236
Permit Details
Status: COED
| Parcel Id: 05-12-31-2755-00000-0150 |
| CONDITIONED SPACE: 1806 sqft |
| GARAGE: 458 sqft |
| OPENED PORCH (WITH ROOF) : 248 sqft |
| Total Square Footage: 2512 sqft |
| Block: 00000 |
| Subdivision: 2313 - THE GABLES SUBDIVISION |
| Job Phone: (386)756-0439 |
| Location Address: 229 HAWTHORN AVENUE |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/14/2024 |
| NOC: RECORDED |
| Applicant name: JAMES MICHAEL MATHER |
| Owner: PAYTAS HOMES INC |
|
Address PO BOX 290490 PORT ORANGE, FL 32127 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PAYTAS HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 290490 PORT ORANGE, FL 32127 |
CBC1261873 (Exp: 08/31/2026) | (386)756-0439 |
Sub Contractors
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/13/2024 | Approval - Private Provider | PPROVIDER |
| ROW - STORMWATER FINAL | 08/13/2024 | APPROVED | TPOLACEK |
| Note: 08/13/24 TPOLACEK *** CORRECTIONS MADE . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 8/6/2024 - PREVIOUS INSPECTION NOTES NEED TO HAVE A ROW OF SOD AT THE AC UNIT AND THE RIGHT FRONT CORNER OF THE LOT STANDING WATER BY THE WATER METER | |||
| U -UTILITY RESIDENTIAL FINAL | 08/06/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 8/6/2024 10:19:31 AM *** as discussed change out broken sewerC/O coupling | |||
| ROW - FINAL APRON (AFTER POUR) | 08/06/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW - STORMWATER FINAL | 08/06/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO HAVE A ROW OF SOD AT THE AC UNIT AND THE RIGHT FRONT CORNER OF THE LOT STANDING WATER BY THE WATER METER | |||
| U-CROSS CONNECTION | 08/06/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 8/6/2024 10:18:36 AM *** reclaim irr-no cross connectin=NOTE-CLEAN OUT RECLAIM PIT OF EXCSS SOILS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/31/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/31/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/31/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED. THAT BEING SAID THERE IS A LOW ARE IN THE FRONT RIGHT SIDE BY WATER METER THAT IS HOLDING WATER AT THE TIME OF THIS INSPECTION. PHOTO ENCLOSED. THIS AREA WILL NEED TO HAVE POSITIVE DRAINAGE FLOW BEFORE ROW FINAL PASSAGE. APPROVING THIS FIELD SURVEY AS NOTED. | |||
| ELECTRIC - EARLY POWER | 07/16/2024 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 07/03/2024 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS ------------------------------------------------------------------------ 6/21/2024 - PREVIOUS INSPECTION NOTES READY TO POUR APRON, SIDEWALK AND PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR ALL PAVER BASE MUST BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/27/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 6/21/2024 - PREVIOUS INSPECTION NOTES READY TO POUR APRON, SIDEWALK AND PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR ALL PAVER BASE MUST BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. | |||
| ROW- PAVER RESTRAINTS | 06/21/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/21/2024 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR APRON, SIDEWALK AND PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR ALL PAVER BASE MUST BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. | |||
| INSULATION | 05/03/2024 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 05/02/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 04/30/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 04/10/2024 | Approval - Private Provider | PPROVIDER |
| SEWER TIE IN | 03/27/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 3/15/2024 - PREVIOUS INSPECTION NOTES. THIS WAS A VIRTUAL INSPECTION | |||
| WALL SHEATHING | 03/27/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/27/2024 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 03/15/2024 | Approval - Private Provider | PPROVIDER |
| SEWER TIE IN | 03/15/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| ELECTRIC-TUG | 03/14/2024 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 03/06/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 03/06/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/28/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/23/2024 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 02/21/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/06/2024 | 03/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/06/2024 | 03/06/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/07/2024 | 02/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 01/31/2024 | 02/06/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1.Need shop drawing approval stamp on truss packet or truss layout. By engineer of record for the house. | |||
| CUSVC | COMPLETE | 01/31/2024 | 02/05/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/31/2024 | 01/31/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/31/2024 | 02/01/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/31/2024 | 02/06/2024 |
| Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/31/2024 | 01/31/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM when submitting ROW please scan them into the permit before bringing in the Originals. They should approved before bringing in originals. | |||
| URB | COMPLETE | 01/31/2024 | 02/02/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/15/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/14/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/14/2024 |
| SEWER INSPECTION | ¤25.00 | 02/14/2024 |
| SITE PLAN 30 | ¤30.00 | 02/14/2024 |
| WATER-METER | ¤514.49 | 02/14/2024 |
| WATER-METER | ¤427.42 | 02/14/2024 |
| ADJUSTMENT 50% | (¤15.00) | 02/14/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/14/2024 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 02/14/2024 |
| CONNECTION FEES | ¤25.00 | 02/14/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 02/14/2024 |
| IMPACT FEE FIRE | ¤428.09 | 02/14/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/14/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/14/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 02/14/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/14/2024 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 02/14/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 02/14/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/14/2024 |
| SURCHARGE FS 533.721 | ¤2.40 | 02/14/2024 |
| SURCHARGE - FS 468.631 | ¤3.60 | 02/14/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/14/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/14/2024 |
| SW ENG PRE APRON | ¤30.00 | 02/14/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,337.99 |