Permit #2024020107
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00560-0060 |
| CONDITIONED SPACE: 2080 sqft |
| GARAGE: 402 sqft |
| OPENED PORCH (WITH ROOF) : 47 sqft |
| OPENED PORCH (WITH ROOF) : 88 sqft |
| Total Square Footage: 2617 sqft |
| Block: 00560 |
| Subdivision: - |
| Job Phone: 904-531-5923 |
| Location Address: 96 UNIVERSAL TRL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/11/2024 |
| NOC: RECORDED |
| Applicant name: TAVARIS JEROME DAVIS |
| Owner: BRIGHTLAND HOMES OF FLORIDA LLC |
|
Address 15725 N DALLAS PARKWAY SUITE 300 ADDISON, TX 75001 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BRIGHTLAND HOMES OF FLORIDA, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3505 EAST FRONTAGE RD ADDISON, TX 75001 |
STE 145 TAMPA, FL 33607 |
CBC1267320 (Exp: 08/31/2026) | 904-531-5923 |
Sub Contractors
LARRY LAVON TURNAGE
| Status | Location Address | State License Number | Phone |
| CANCEL |
531 CODISCO WAY SANFORD, FL 32771 |
CMC1249777 (Exp: 08/31/2024) | 407-333-2665 |
OLIN MARSHALL CANNON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1794 ROGERO RD #2 JACKSONVILLE, FL 32211 |
CFC1426140 (Exp: 08/31/2026) | 904-343-4344 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JAMES E LINTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
200 COLLEGE DR ORANGE PARK, FL 32065 |
EC0001152 (Exp: 08/31/2026) | 904-272-0272 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/21/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 1-21-25 1. Refrigerator not GFCI protected NEC 210.8 1/10/2025 - PREVIOUS INSPECTION NOTES 1-10-25 1. House locked. 12/30/2024 - PREVIOUS INSPECTION NOTES 12/30/24 Make all repairs before calling in for re-inspection 12/17/24 1. Refrigerator not GFCI protected NEC 210.8 2. Front bedroom has loose outlets NEC 406.4 3. Loose outlet in garage NEC 406.4 4. Both sides of grage door, on bottom, frame is fulled away 5. No required light in attic access 6. Please repair front right side shingles/caps. Large gap | |||
| BLD - BUILDING FINAL | 01/21/2025 | FINAL APPROVED | BTAYLOR |
| Note: 1/21/2025 - PREVIOUS INSPECTION NOTES 1-21-25 1. Refrigerator not GFCI protected NEC 210.8 1/10/2025 - PREVIOUS INSPECTION NOTES 1-10-25 1. House locked. 12/30/2024 - PREVIOUS INSPECTION NOTES 12/30/24 Make all repairs before calling in for re-inspection 12/17/24 1. Refrigerator not GFCI protected NEC 210.8 2. Front bedroom has loose outlets NEC 406.4 3. Loose outlet in garage NEC 406.4 4. Both sides of grage door, on bottom, frame is fulled away 5. No required light in attic access 6. Please repair front right side shingles/caps. Large gap | |||
| BLD - BUILDING FINAL | 01/10/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 1-10-25 1. House locked. 12/30/2024 - PREVIOUS INSPECTION NOTES 12/30/24 Make all repairs before calling in for re-inspection 12/17/24 1. Refrigerator not GFCI protected NEC 210.8 2. Front bedroom has loose outlets NEC 406.4 3. Loose outlet in garage NEC 406.4 4. Both sides of grage door, on bottom, frame is fulled away 5. No required light in attic access 6. Please repair front right side shingles/caps. Large gap | |||
| BLD - BUILDING FINAL | 12/30/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 12/30/24 Make all repairs before calling in for re-inspection 12/17/24 1. Refrigerator not GFCI protected NEC 210.8 2. Front bedroom has loose outlets NEC 406.4 3. Loose outlet in garage NEC 406.4 4. Both sides of grage door, on bottom, frame is fulled away 5. No required light in attic access 6. Please repair front right side shingles/caps. Large gap | |||
| BLD - BUILDING FINAL | 12/23/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 12/17/2024 - PREVIOUS INSPECTION NOTES 12/17/24 1. Refrigerator not GFCI protected NEC 210.8 2. Front bedroom has loose outlets NEC 406.4 3. Loose outlet in garage NEC 406.4 4. Both sides of grage door, on bottom, frame is fulled away 5. No required light in attic access 6. Please repair front right side shingles/caps. Large gap | |||
| BLD - BUILDING FINAL | 12/17/2024 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 12/17/24 1. Refrigerator not GFCI protected NEC 210.8 2. Front bedroom has loose outlets NEC 406.4 3. Loose outlet in garage NEC 406.4 4. Both sides of grage door, on bottom, frame is fulled away 5. No required light in attic access 6. Please repair front right side shingles/caps. Large gap | |||
| U -UTILITY RESIDENTIAL FINAL | 12/12/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 No IRR. No CC | |||
| ROW - STORMWATER FINAL | 12/09/2024 | APPROVED | FSLADISH |
| Note: 12/9/24 CORRECTIONS REQUIRED MADE AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ 12/3/2024 - PREVIOUS INSPECTION NOTES 12/3/24 YOU WILL NEED TO SOD BARE AREA ON LEFT OF DRIVEWAY. CULVERT NEEDS TO BE CLEANED OUT. AS PREVIOUSLY STATED YOU NEED TO PUT A FEW PIECES OF SOD IN THE REAR RIGHT CORNER WHERE YOU HAVE A STRAIGHT DROP OFF. A 2:1 SLOPE IS REQUIRED.I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY, AS I WAS HERE FOR YOUR AFTER POUR INSPECTION ALREADY. PLESE MAKE ALL REQUIRED CORRECTIONS BEFORE RESUBMITTING FOR ROW FINAL. Inspector Notes from Inspection 9465 10/16/24 UPON WALKING THE PROPERTY DETERMINED THAT YOU WILL NEED TO SOD/SLOPE AREA TOWARD THE REAR AREA ON THE RIGHT SIDE WHERE IT JUST DROPS OFF TO CONTROL WASHOUTS AND EROSION BEFORE ROW FINAL. CORRECTIONS ARE NEEDED BEFORE ROW FINAL APPROVING AS NOTED THAT THIS AND ANYTHING ELSE THAT MAY CHANGE FROM NOW TO THE NEXT INSPECTION WILL NEED CORRECTION. Inspector Notes from Inspection 9463 10/16/24 THERE ARE A COUPLE OF FLAT ELEVATION SHOTS IN THE REAR ON BOTH PROPERTY LINES. I WILL SEE IF THIS IS TRUE IN THE FIELD SURVEY. APPROVING AS NOTED. Inspector Notes from Inspection 9270 8/8/24 Pipe elevation is ok (3.13 flat). Ready to pour at the time of this inspection. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW - STORMWATER FINAL | 12/03/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 12/3/24 YOU WILL NEED TO SOD BARE AREA ON LEFT OF DRIVEWAY. CULVERT NEEDS TO BE CLEANED OUT. AS PREVIOUSLY STATED YOU NEED TO PUT A FEW PIECES OF SOD IN THE REAR RIGHT CORNER WHERE YOU HAVE A STRAIGHT DROP OFF. A 2:1 SLOPE IS REQUIRED.I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY, AS I WAS HERE FOR YOUR AFTER POUR INSPECTION ALREADY. PLESE MAKE ALL REQUIRED CORRECTIONS BEFORE RESUBMITTING FOR ROW FINAL. Inspector Notes from Inspection 9465 10/16/24 UPON WALKING THE PROPERTY DETERMINED THAT YOU WILL NEED TO SOD/SLOPE AREA TOWARD THE REAR AREA ON THE RIGHT SIDE WHERE IT JUST DROPS OFF TO CONTROL WASHOUTS AND EROSION BEFORE ROW FINAL. CORRECTIONS ARE NEEDED BEFORE ROW FINAL APPROVING AS NOTED THAT THIS AND ANYTHING ELSE THAT MAY CHANGE FROM NOW TO THE NEXT INSPECTION WILL NEED CORRECTION. Inspector Notes from Inspection 9463 10/16/24 THERE ARE A COUPLE OF FLAT ELEVATION SHOTS IN THE REAR ON BOTH PROPERTY LINES. I WILL SEE IF THIS IS TRUE IN THE FIELD SURVEY. APPROVING AS NOTED. Inspector Notes from Inspection 9270 8/8/24 Pipe elevation is ok (3.13 flat). Ready to pour at the time of this inspection. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/03/2024 | APPROVED | FSLADISH |
| Note: 12/3/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT IS NOT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 10/16/24 UPON WALKING THE PROPERTY DETERMINED THAT YOU WILL NEED TO SOD/SLOPE AREA TOWARD THE REAR AREA ON THE RIGHT SIDE WHERE IT JUST DROPS OFF TO CONTROL WASHOUTS AND EROSION BEFORE ROW FINAL. CORRECTIONS ARE NEEDED BEFORE ROW FINAL APPROVING AS NOTED THAT THIS AND ANYTHING ELSE THAT MAY CHANGE FROM NOW TO THE NEXT INSPECTION WILL NEED CORRECTION. Inspector Notes from Inspection 9463 10/16/24 THERE ARE A COUPLE OF FLAT ELEVATION SHOTS IN THE REAR ON BOTH PROPERTY LINES. I WILL SEE IF THIS IS TRUE IN THE FIELD SURVEY. APPROVING AS NOTED. Inspector Notes from Inspection 9270 8/8/24 Pipe elevation is ok (3.13 flat). Ready to pour at the time of this inspection. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ELECTRIC - EARLY POWER | 10/22/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 10/17/2024 - PREVIOUS INSPECTION NOTES 9/10/2024 - PREVIOUS INSPECTION NOTES 9-10-24 1. Outside outlet on right side not safed off. 10-17-24 1. Outside outlet on right side not safed off. 10-22-24 1. Emailed FPL at 10:44. | |||
| ELECTRIC - EARLY POWER | 10/17/2024 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 9/10/2024 - PREVIOUS INSPECTION NOTES 9-10-24 1. Outside outlet on right side not safed off. 10-17-24 1. Outside outlet on right side not safed off. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/16/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/16/24 THERE ARE A COUPLE OF FLAT ELEVATION SHOTS IN THE REAR ON BOTH PROPERTY LINES. I WILL SEE IF THIS IS TRUE IN THE FIELD SURVEY. APPROVING AS NOTED. Inspector Notes from Inspection 9270 8/8/24 Pipe elevation is ok (3.13 flat). Ready to pour at the time of this inspection. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/16/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/16/24 UPON WALKING THE PROPERTY DETERMINED THAT YOU WILL NEED TO SOD/SLOPE AREA TOWARD THE REAR AREA ON THE RIGHT SIDE WHERE IT JUST DROPS OFF TO CONTROL WASHOUTS AND EROSION BEFORE ROW FINAL. CORRECTIONS ARE NEEDED BEFORE ROW FINAL APPROVING AS NOTED THAT THIS AND ANYTHING ELSE THAT MAY CHANGE FROM NOW TO THE NEXT INSPECTION WILL NEED CORRECTION. Inspector Notes from Inspection 9463 10/16/24 THERE ARE A COUPLE OF FLAT ELEVATION SHOTS IN THE REAR ON BOTH PROPERTY LINES. I WILL SEE IF THIS IS TRUE IN THE FIELD SURVEY. APPROVING AS NOTED. Inspector Notes from Inspection 9270 8/8/24 Pipe elevation is ok (3.13 flat). Ready to pour at the time of this inspection. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U-CROSS CONNECTION | 09/10/2024 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR. No CC | |||
| ELECTRIC - EARLY POWER | 09/10/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 9-10-24 1. Outside outlet on right side not safed off. | |||
| ELECTRIC-TUG | 09/03/2024 | APPROVED | RMARTIN |
| Note: 8/12/2024 - PREVIOUS INSPECTION NOTES 8-12-24 1. SER sleeve not glued. | |||
| ELECTRIC-TUG | 08/12/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 8-12-24 1. SER sleeve not glued. | |||
| GRAVITY SEWER TEST | 08/12/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 08/12/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 08/09/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/8/24 Pipe elevation is ok (3.13 flat). Ready to pour at the time of this inspection. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes, but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| LATH/BRICK/ WATER BARRIER | 07/23/2024 | APPROVED | BTAYLOR |
| INSULATION | 06/24/2024 | APPROVED | BTAYLOR |
| Note: 6/20/2024 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/13/2024 - PREVIOUS INSPECTION NOTES 6/13/24: 1). Firestop/firefoam missing at top plate penetrations in the following areas: (Marked with FS on the wall/studs below): Bedroom 2 / Master Bedroom / Great Room / Guest bathroom plumbing stack / Garage above breaker box at top plate connection of stud wall & panel box framing. Inspector Notes from Inspection 2320 6-5-24 1. Silt fence needs to be repaired on the left side. 6-20-24 1. Insulation is good but master bath exhaust fans have no duct to the outside. | |||
| INSULATION | 06/20/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 6/13/2024 - PREVIOUS INSPECTION NOTES 6/13/24: 1). Firestop/firefoam missing at top plate penetrations in the following areas: (Marked with FS on the wall/studs below): Bedroom 2 / Master Bedroom / Great Room / Guest bathroom plumbing stack / Garage above breaker box at top plate connection of stud wall & panel box framing. Inspector Notes from Inspection 2320 6-5-24 1. Silt fence needs to be repaired on the left side. | |||
| INSULATION | 06/20/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: New inspection due to canceled inspection 6/13/2024 - PREVIOUS INSPECTION NOTES 6/13/24: 1). Firestop/firefoam missing at top plate penetrations in the following areas: (Marked with FS on the wall/studs below): Bedroom 2 / Master Bedroom / Great Room / Guest bathroom plumbing stack / Garage above breaker box at top plate connection of stud wall & panel box framing. Inspector Notes from Inspection 2320 6-5-24 1. Silt fence needs to be repaired on the left side. 6-20-24 1. Insulation is good but master bath exhaust fans have no duct to the outside. | |||
| INSULATION | 06/13/2024 | Disapproved - NO FEE | RSIMS |
| Note: 6/13/24: 1). Firestop/firefoam missing at top plate penetrations in the following areas: (Marked with FS on the wall/studs below): Bedroom 2 / Master Bedroom / Great Room / Guest bathroom plumbing stack / Garage above breaker box at top plate connection of stud wall & panel box framing. Inspector Notes from Inspection 2320 6-5-24 1. Silt fence needs to be repaired on the left side. | |||
| LATH/BRICK/ WATER BARRIER | 06/05/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 6-5-24 1. Silt fence needs to be repaired on the left side. | |||
| ALL ROUGH | 06/04/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 6-4-24 1. Need to put nail plates at electrical panel. Check at insulation. | |||
| ROOF VALLEY & METAL | 05/14/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/08/2024 | APPROVED | BTAYLOR |
| Note: 5/3/2024 - PREVIOUS INSPECTION NOTES 5-3-24 1. No structural page in plans. 2. No strapping has been started. | |||
| WALL SHEATHING | 05/03/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/03/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-3-24 1. No structural page in plans. 2. No strapping has been started. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/25/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/16/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/10/2024 | APPROVED | RSIMS |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/09/2024 | CANCELLED BY APPLICANT | WEB |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/08/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 03/26/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/25/2024 | 04/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/25/2024 | 04/25/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/05/2024 | 04/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/06/2024 | 03/21/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/05/2024 | 03/05/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/05/2024 | 03/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: JPI | |||
| BADMIN | COMPLETE | 03/05/2024 | 03/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 02/05/2024 | 02/12/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) (YOU ARE MISSING (B) THE TRUSS LAYOUT AND (D) THE STAMP FROM THE ENGINEER OF RECORD. YOU CANNOT SUBMIT A LETTER. THE APPROVAL STAMP NEEDS TO BE ON THE FIRST PAGE OF THE TRUSS PACKET OR TRUSS LAYOUT.) | |||
| BLD | HOLD | 02/05/2024 | 02/09/2024 |
| Note: Held By: JPI 1. City of Palm Coast Color and Material Sheet (form) appears OMITTED from submission. FBC 105 2. Provide specific product numbers including current revisions (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. 3. Provide roof underlayment and shingle revision number on Florida Product Approval Specification Sheet that corresponds with the Roofing Worksheet; underlayment Florida Product Approval number on Roofing Worksheet does not include revision number. 107.2.4 4. Provide Florida Product Approval number for shutters. 107.2.4 5. Architectural drawings do NOT have a signed seal by the Architect of Record/Engineer of Record. 6. Reference to 2023 Florida Residential Code, Section R302.3. 7. Provide elevation (height) for Second Floor on ALL Elevations. 107.3.5 8. Provide pitch/slopes of ALL roofs on the Elevations.. R802 | |||
| CUSVC | COMPLETE | 02/05/2024 | 02/05/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 02/05/2024 | 02/05/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry and garage need to be GFCI protected. NEC 2020 210.8 2. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 3. Electrical load calcs are done by a different electrical contractor then listed on your permit. | |||
| ENGIN1 | HOLD | 02/05/2024 | 02/05/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey | |||
| GAS | CANCEL | 02/05/2024 | 02/06/2024 |
| LOCATE | COMPLETE | 02/05/2024 | 02/05/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/05/2024 | 02/06/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/05/2024 | 02/05/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Provide benchmark on site plan Provide fin floor elev of adjacent structures Identify size and material of proposed culvert. | |||
| ZON | HOLD | 02/05/2024 | 02/05/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide the width and material of the walkway on site plan/survey Please provide the width of driveway on site plan/survey AC pad location must be shown on site plan/survey Landscape plan not for this address AC must be screened with 7 gallon shrubs All required trees must be located within the lots boundaries not in swale area |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 02/04/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/04/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 06/03/2024 |
| CONNECTION FEES | ¤1,187.26 | 03/11/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/11/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/11/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/11/2024 |
| WATER- TURN ON | ¤25.00 | 03/11/2024 |
| ADJUSTMENT 50% | (¤685.70) | 03/11/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/11/2024 |
| INSPECTION - RESIDENTIAL | ¤1,045.00 | 03/11/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤296.40 | 03/11/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 03/11/2024 |
| IMPACT FEE FIRE | ¤428.09 | 03/11/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/11/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/11/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 03/11/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/11/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 03/11/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/11/2024 |
| SURCHARGE FS 533.721 | ¤6.86 | 03/11/2024 |
| SURCHARGE - FS 468.631 | ¤10.29 | 03/11/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/11/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/11/2024 |
| SW ENG PRE APRON | ¤30.00 | 03/11/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/11/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/11/2024 |
| SEWER CREDIT | (¤3,512.73) | 03/11/2024 |
| SEWER INSPECTION | ¤25.00 | 03/11/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 03/11/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 03/11/2024 |
| SITE PLAN 30 | ¤30.00 | 03/11/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,497.00 |