Permit #2024020129
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00520-0140 |
| CONDITIONED SPACE: 2400 sqft |
| GARAGE: 566 sqft |
| OPENED PORCH (WITH ROOF) : 350 sqft |
| Total Square Footage: 3316 sqft |
| Block: 00520 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 386-283-2035 |
| Location Address: 11 PROSPECT LN |
| Type: DU - DUPLEX |
| Issue Date: 03/13/2024 |
| NOC: RECORDED |
| Applicant name: OLEG BELINSKIY |
| Owner: TARASOVA ANNA & ALEXANDER SHPERLING |
|
Address 578 DUNHILL DRIVE LAKE ZURICH, IL 60047 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
FLORIDAS BEST BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE PALM COAST, FL 32164 |
CBC1264760 (Exp: 08/31/2026) | 386-283-2035 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/17/2024 | FINAL APPROVED | RSIMS |
| Note: 12/13/2024 - PREVIOUS INSPECTION NOTES 12/13/24: 1). Draft stop wall is not fully sealed at the top on the B side. FBC [A]107.4 2). B-side Master bathroom sink has a partially clogged overflow drain. (allows sink to overflow the edge). FBC-P405.8 Both Units: 3). Outdoor unit needs to be 3" above finished grade. FBCR M1305.1.4.1 4). Outdoor Condensing unit - Titeseal raceway from disconnect needs to be anchored at 12" max from disconnect. NEC-334.30 5). Door locksets and handles along with door seals have been removed for painting in process. FBC [A]107.4 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] | |||
| U-CROSS CONNECTION | 12/13/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/13/2024 11:42:33 AM *** no irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 12/13/2024 | APPROVED | TPOLACEK |
| Note: 12/13/24 TPOLACEK*** PAVERS ARE SET. PIPE ELEVATION IS GOOD CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL INSPECTION | 12/13/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 12/13/2024 | FINAL APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/13/2024 12:00:52 PM *** contact city for new water metrr bix and get bth also,raised as discussed with ALX- BUILDER | |||
| BLD - BUILDING FINAL | 12/13/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/13/2024 1:56:17 PM *** 12/13/24: 1). Draft stop wall is not fully sealed at the top on the B side. FBC [A]107.4 2). B-side Master bathroom sink has a partially clogged overflow drain. (allows sink to overflow the edge). FBC-P405.8 Both Units: 3). Outdoor unit needs to be 3" above finished grade. FBCR M1305.1.4.1 4). Outdoor Condensing unit - Titeseal raceway from disconnect needs to be anchored at 12" max from disconnect. NEC-334.30 5). Door locksets and handles along with door seals have been removed for painting in process. FBC [A]107.4 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/12/2024 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/12/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/25/2024 | APPROVED | TPOLACEK |
| Note: 10/25/24 TPOLACEK** YOU ARE APPROVED TO LAY PAVERS. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/23/2024 - PREVIOUS INSPECTION NOTES 10/23/24 TPOLACEK*** SPOKE WITH MITCH ABOUT FORM BOARD ACROSS THE ROW TO CONTAIN THE POUR TO JUST THE APRON/ROW. APPROVING AS NOTED . AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/21/2024 - PREVIOUS INSPECTION NOTES 10/21/24 TPOLACEK*** BUILDER NEEDS TO SUBMIT THE PAVER DETAIL THEY HAVE CHOSEN. THERE IS NO DETAIL SHEET ATTACHED TO PERMIT. | |||
| ROW- PAVER RESTRAINTS | 10/23/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 10/23/2024 | PARTIALLY APPROVED | TPOLACEK |
| Note: 10/23/24 TPOLACEK*** SPOKE WITH MITCH ABOUT FORM BOARD ACROSS THE ROW TO CONTAIN THE POUR TO JUST THE APRON/ROW. APPROVING AS NOTED . AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/21/2024 - PREVIOUS INSPECTION NOTES 10/21/24 TPOLACEK*** BUILDER NEEDS TO SUBMIT THE PAVER DETAIL THEY HAVE CHOSEN. THERE IS NO DETAIL SHEET ATTACHED TO PERMIT. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/21/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 10/21/24 TPOLACEK*** BUILDER NEEDS TO SUBMIT THE PAVER DETAIL THEY HAVE CHOSEN. THERE IS NO DETAIL SHEET ATTACHED TO PERMIT. | |||
| ELECTRIC - EARLY POWER | 09/23/2024 | APPROVED | RSIMS |
| Note: 9/23/24: FPL emailed to release power. | |||
| FIREWALL FINAL | 09/06/2024 | APPROVED | RSIMS |
| Note: 9/4/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2443 9/4/24: Prfevious notes remain unresolved. *** NOTES ADDED BY RSIMS 9/3/2024 12:05:17 PM *** 9/3/24: Please complete prior to next inspection. 1). Please repair silt fence and have completed along the back of site. FBC 3307.1 2). Please clean up piles of trash/debris to make site safe for inspections. | |||
| FIREWALL FINAL | 09/04/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/4/2024 1:44:23 PM *** Inspector Notes from Inspection 2443 9/4/24: Prfevious notes remain unresolved. *** NOTES ADDED BY RSIMS 9/3/2024 12:05:17 PM *** 9/3/24: Please complete prior to next inspection. 1). Please repair silt fence and have completed along the back of site. FBC 3307.1 2). Please clean up piles of trash/debris to make site safe for inspections. | |||
| FIREWALL DRYWALL NAILING | 09/03/2024 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/3/2024 12:05:17 PM *** 9/3/24: Please complete prior to next inspection. 1). Please repair silt fence and have completed along the back of site. FBC 3307.1 2). Please clean up piles of trash/debris to make site safe for inspections. | |||
| FIREWALL FINAL | 08/29/2024 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/29/2024 12:33:07 PM *** 8/29/24: 1). Drywall at back lanai ceiling appears to be 1/2" moisture rated sheetrock and not the 5/8" X rated as required by the 1hr rating on the plans. (sheetrock is not labeled for firecode & did not see any scrap pieces on site or in dumpster for comparison). 7/24/24: Firewall framing inspection was for the draft stop above the ceiling only. A Partial Firewall final inspection will be required before ceiling drywall is applied. | |||
| GRAVITY SEWER TEST | 08/29/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 3307.1 protection of property. need silt fence in place before next inspection | |||
| SEWER TIE IN | 08/29/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 3307.1 protection of property. need silt fence in place before next inspection | |||
| FIREWALL DRYWALL NAILING | 08/26/2024 | APPROVED | KSANDOE |
| Note: 8/22/2024 - PREVIOUS INSPECTION NOTES 8/22/24: 1). Screw distance does not match fire code requirements (3" OC end and 7"OC in field). 7/31/2024 - PREVIOUS INSPECTION NOTES 7/31/24: This partial inspection is for the draft stop above the ceiling to view that it is sealed with joint compound, etc. properly. The Ceiling drywall will still need to be inspected for Nailing before finishing with joint compound. 7/24/24: Firewall framing inspection was for the draft stop above the ceiling only. A Partial Firewall final inspection will be required before ceiling drywall is applied. 7/2/2024 - PREVIOUS INSPECTION NOTES Revise detail to reflect change to draftstop in lieu of firewall. Trusses landed on CMU are inside the required space for 5/8 type X drywall as required by UL338. 6/28/2024 - PREVIOUS INSPECTION NOTES Must have building plans on site forr inspection. | |||
| FIREWALL DRYWALL NAILING | 08/22/2024 | Disapproved - NO FEE | RSIMS |
| Note: 8/22/24: 1). Screw distance does not match fire code requirements (3" OC end and 7"OC in field). 7/31/2024 - PREVIOUS INSPECTION NOTES 7/31/24: This partial inspection is for the draft stop above the ceiling to view that it is sealed with joint compound, etc. properly. The Ceiling drywall will still need to be inspected for Nailing before finishing with joint compound. 7/24/24: Firewall framing inspection was for the draft stop above the ceiling only. A Partial Firewall final inspection will be required before ceiling drywall is applied. 7/2/2024 - PREVIOUS INSPECTION NOTES Revise detail to reflect change to draftstop in lieu of firewall. Trusses landed on CMU are inside the required space for 5/8 type X drywall as required by UL338. 6/28/2024 - PREVIOUS INSPECTION NOTES Must have building plans on site forr inspection. | |||
| INSULATION | 08/13/2024 | APPROVED | RSIMS |
| Note: 8/9/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 8/9/2024 1:39:45 PM *** still missing fire stop at wires into top plates R302.11 8/7/2024 - PREVIOUS INSPECTION NOTES 8/7/24: * Unit B: (right side)(FBC-R302.11). 1). Missing firestop at garage electrical penetrations into CMU wall. 2). Missing firestop at top plate penetrations into attic space. Marked with FS below. | |||
| INSULATION | 08/09/2024 | Disapproved -FEE REQUIRED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 8/9/2024 1:39:45 PM *** still missing fire stop at wires into top plates R302.11 8/7/2024 - PREVIOUS INSPECTION NOTES 8/7/24: * Unit B: (right side)(FBC-R302.11). 1). Missing firestop at garage electrical penetrations into CMU wall. 2). Missing firestop at top plate penetrations into attic space. Marked with FS below. | |||
| INSULATION | 08/07/2024 | Disapproved - NO FEE | RSIMS |
| Note: 8/7/24: * Unit B: (right side)(FBC-R302.11). 1). Missing firestop at garage electrical penetrations into CMU wall. 2). Missing firestop at top plate penetrations into attic space. Marked with FS below. | |||
| FIREWALL DRYWALL NAILING | 07/31/2024 | PARTIALLY APPROVED | RSIMS |
| Note: 7/31/24: This partial inspection is for the draft stop above the ceiling to view that it is sealed with joint compound, etc. properly. The Ceiling drywall will still need to be inspected for Nailing before finishing with joint compound. 7/24/24: Firewall framing inspection was for the draft stop above the ceiling only. A Partial Firewall final inspection will be required before ceiling drywall is applied. 7/2/2024 - PREVIOUS INSPECTION NOTES Revise detail to reflect change to draftstop in lieu of firewall. Trusses landed on CMU are inside the required space for 5/8 type X drywall as required by UL338. 6/28/2024 - PREVIOUS INSPECTION NOTES Must have building plans on site forr inspection. | |||
| ALL ROUGH | 07/30/2024 | APPROVED | RSIMS |
| Note: 7/24/2024 - PREVIOUS INSPECTION NOTES 7/24/24: Both Units: 1). Lineset is not run through the sleeve & sealed as required. (Will not be visible on Building Final). 2). Bathroom exhausts require two points of connection. (1 seal & 1 mechanical). FBC-M1502.4.2 3). Kitchen exhaust:> FBC-M1601.4.1 - Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. Unit B (Right Side). 4). Master bedroom window is missing anchors on the right side jamb. | |||
| ALL ROUGH | 07/24/2024 | Disapproved - NO FEE | RSIMS |
| Note: 7/24/24: Both Units: 1). Lineset is not run through the sleeve & sealed as required. (Will not be visible on Building Final). 2). Bathroom exhausts require two points of connection. (1 seal & 1 mechanical). FBC-M1502.4.2 3). Kitchen exhaust:> FBC-M1601.4.1 - Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. Unit B (Right Side). 4). Master bedroom window is missing anchors on the right side jamb. | |||
| LATH/BRICK/ WATER BARRIER | 07/24/2024 | APPROVED | RSIMS |
| Note: 7/22/2024 - PREVIOUS INSPECTION NOTES 7/22/24: 1). Hole in CMU on the rear wall at the romex wire needs wire lath. 2). Overgrowth around entire site needs to be removed to make site safe for inspections. | |||
| FIREWALL FRAMING | 07/24/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 7/24/24: This inspection is for the draft stop above the ceiling only. A Firewall final partial inspection will be required before ceiling drywall is applied. 7/2/2024 - PREVIOUS INSPECTION NOTES Revise detail to reflect change to draftstop in lieu of firewall. Trusses landed on CMU are inside the required space for 5/8 type X drywall as required by UL338. 6/28/2024 - PREVIOUS INSPECTION NOTES Framing is covered by drywall. Unable to inspect. Framing members, truss ties, ridge poles and truss blocking cannot penetrate firewall. | |||
| ALL ROUGH | 07/23/2024 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 07/22/2024 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 07/22/2024 | Disapproved - NO FEE | RSIMS |
| Note: 7/22/24: 1). Hole in CMU on the rear wall at the romex wire needs wire lath. 2). Overgrowth around entire site needs to be removed to make site safe for inspections. | |||
| FIREWALL FRAMING | 07/02/2024 | Disapproved - NO FEE | KSANDOE |
| Note: Revise detail to reflect change to draftstop in lieu of firewall. Trusses landed on CMU are inside the required space for 5/8 type X drywall as required by UL338. 6/28/2024 - PREVIOUS INSPECTION NOTES Framing is covered by drywall. Unable to inspect. Framing members, truss ties, ridge poles and truss blocking cannot penetrate firewall. | |||
| FIREWALL DRYWALL NAILING | 06/28/2024 | Disapproved - NO FEE | KSANDOE |
| Note: Must have building plans on site forr inspection. | |||
| FIREWALL FRAMING | 06/28/2024 | Disapproved - NO FEE | KSANDOE |
| Note: Framing is covered by drywall. Unable to inspect. Framing members, truss ties, ridge poles and truss blocking cannot penetrate firewall. | |||
| ROOF VALLEY & METAL | 06/21/2024 | APPROVED | KSANDOE |
| WALL SHEATHING | 06/17/2024 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/17/2024 | APPROVED | AGAETANO |
| TIE BEAM / LINTEL | 05/21/2024 | APPROVED | KSANDOE |
| Note: 5/20/2024 - PREVIOUS INSPECTION NOTES 5/20/24: Met Superintendent upon arrival. Requested to cancel. | |||
| TIE BEAM / LINTEL | 05/20/2024 | CANCELLED BY APPLICANT | RSIMS |
| Note: 5/20/24: Met Superintendent upon arrival. Requested to cancel. | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/17/2024 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 05/09/2024 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/06/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 3307.1 protection of property. need silt fence in place before next inspection | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 05/03/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 03/20/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 10/21/2024 | 10/23/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| SW1 | COMPLETE | 09/05/2024 | 09/05/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ENGIN1 | COMPLETE | 09/05/2024 | 09/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/05/2024 | 09/05/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/04/2024 | 09/04/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/03/2024 | 09/03/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please provide driveway apron width at edge of pavement COPC Techinical Manual, Section 300.01 (A)(1)(C)(1) | |||
| ZON | HOLD | 09/03/2024 | 09/03/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utilization Agreement for Paver Driveway. | |||
| BLD | COMPLETE | 07/16/2024 | 07/23/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/17/2024 | 05/17/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/17/2024 | 05/17/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/07/2024 | 05/08/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/30/2024 | 05/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/03/2024 | 04/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/28/2024 | 04/02/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor | |||
| MECH | COMPLETE | 03/05/2024 | 03/05/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/03/2024 | 03/04/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 2023 Energy calcs need to be signed. 2022 Energy calcs were uploaded | |||
| ELEC | COMPLETE | 02/20/2024 | 02/26/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/20/2024 | 02/21/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/20/2024 | 02/23/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| BLD | COMPLETE | 02/20/2024 | 02/22/2024 |
| Note: Released By: JPI | |||
| BADMIN | COMPLETE | 02/20/2024 | 02/26/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/20/2024 | 02/21/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 02/05/2024 | 02/12/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) (YOU ARE MISSING (B) THE TRUSS LAYOUT AND (D) THE STAMP FROM THE ENGINEER OF RECORD. YOU CANNOT SUBMIT A LETTER. THE APPROVAL STAMP NEEDS TO BE ON THE FIRST PAGE OF THE TRUSS PACKET OR TRUSS LAYOUT.) | |||
| BLD | HOLD | 02/05/2024 | 02/09/2024 |
| Note: Held By: JPI 1. Provide appropriate revision numbers (i.e. R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. 107.2.4 2. Provide specific product numbers (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. 107.2.4 3. Provide correct Florida Product Approval (FPA) number for ALL products listed on Product Approval Specification Sheet; composite lumber number appears incorrect. 5. Florida Product Approval number for Roofing Underlayment does NOT match the one indicated on the Roofing Worksheet. 107.2.4 6. Provide roof ventilation calculations for required number and size of roof vents; identify size on plans and elevations. 107.2.4 7. Provide/indicate what elevation lines represent on ALL elevations; dimensions have been provided, however nothing indicates what they are dimensioning to. 107.3.5 8. Identify U.L. number for “upper tenant firewall detail” drawing on Sht. 2. Chapter 7 9. Provide U.L. Listing from ULC Online Directories for UL338; similar to U905 provided on Sht. 3. Chapter 7 10. Detail 4 on Sht. 3 identifies as a firewall detail but no U.L. Listing is provided. Chapter 7 11. Under “General” on Sht. 4 states, “all connectors shown in these drawings can be substituted with other suitable connectors”; substitutions shall have Florida Product Approval numbers. 107.2.4 12. “Common Wire To Gun Nail Conversion” table on Sht. 8 is difficult to read; numbers have been placed over numbers. 107.3.5 | |||
| CUSVC | COMPLETE | 02/05/2024 | 02/07/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 02/05/2024 | 02/05/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in kitchen, laundry and garage need to be GFCI protected. NEC 2020 210.8 | |||
| ENGIN1 | COMPLETE | 02/05/2024 | 02/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/05/2024 | 02/06/2024 |
| MECH | HOLD | 02/05/2024 | 02/06/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs from the 2023 code cycle | |||
| SW1 | COMPLETE | 02/05/2024 | 02/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/05/2024 | 02/05/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan:Map panel number incorrect should be 0138E. Driveway in 16' per side 16 ft min: 2.Garages must have a driveway extending for a minimum of 20 feet in front of each garage door. The driveway shall be at least the width of the garage door(s), with a minimum width of ten feet, to allow for safe access. For the 20 feet of the driveway that is closest to the garage, driveways for one and two-car garages shall have a minimum width of 16 feet, and driveways for three-car or larger garages shall have a minimum width of 24 feet. | |||
| SWALE | COMPLETE | 02/05/2024 | 03/21/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/13/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/10/2024 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 09/03/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/28/2024 |
| WATER- TURN ON | ¤50.00 | 03/13/2024 |
| ADJUSTMENT 50% | (¤821.61) | 03/13/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/13/2024 |
| INSPECTION - RESIDENTIAL | ¤1,256.75 | 03/13/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤356.46 | 03/13/2024 |
| IMPACT FEE TRANSPORTATION | ¤2,890.00 | 03/13/2024 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 03/13/2024 |
| SURCHARGE FS 533.721 | ¤8.22 | 03/13/2024 |
| SURCHARGE - FS 468.631 | ¤12.32 | 03/13/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/13/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/13/2024 |
| SW ENG PRE APRON | ¤30.00 | 03/13/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/13/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/13/2024 |
| SEWER INSPECTION | ¤25.00 | 03/13/2024 |
| SEWER CAPITAL FACILITY | ¤10,882.06 | 03/13/2024 |
| WATER CAPITAL FACILITY FEE | ¤7,989.02 | 03/13/2024 |
| SITE PLAN 30 | ¤30.00 | 03/13/2024 |
| CONNECTION FEES | ¤2,374.52 | 03/13/2024 |
| FC IMPACT FEE EMS | ¤124.00 | 03/13/2024 |
| IMPACT FEE FIRE | ¤856.18 | 03/13/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 03/13/2024 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 03/13/2024 |
| IMPACT FEE PARKS | ¤3,600.18 | 03/13/2024 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 03/13/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤42,099.10 |