Permit #2024020162
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00120-0260 |
| CONDITIONED SPACE: 1851 sqft |
| GARAGE: 411 sqft |
| OPENED PORCH (WITH ROOF) : 39 sqft |
| OPENED PORCH (WITH ROOF) : 74 sqft |
| Total Square Footage: 2375 sqft |
| Block: 00120 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 904-531-5923 |
| Location Address: 85 FORSYTHE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/12/2024 |
| NOC: RECORDED |
| Applicant name: TAVARIS JEROME DAVIS |
| Owner: BRIGHTLAND HOMES OF FLORIDA LLC |
|
Address 1572 N DALLAS PARKWAY SUITE 300 ADDISON , TX 75001 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Construction |
| Type: CN |
Contractor
BRIGHTLAND HOMES OF FLORIDA, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3505 EAST FRONTAGE RD ADDISON, TX 75001 |
STE 145 TAMPA, FL 33607 |
CBC1267320 (Exp: 08/31/2026) | 904-531-5923 |
Sub Contractors
LARRY LAVON TURNAGE
| Status | Location Address | State License Number | Phone |
| CANCEL |
531 CODISCO WAY SANFORD, FL 32771 |
CMC1249777 (Exp: 08/31/2024) | 407-333-2665 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
OLIN MARSHALL CANNON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1794 ROGERO RD #2 JACKSONVILLE, FL 32211 |
CFC1426140 (Exp: 08/31/2026) | 904-343-4344 |
JAMES E LINTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
200 COLLEGE DR ORANGE PARK, FL 32065 |
EC0001152 (Exp: 08/31/2026) | 904-272-0272 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/31/2025 | FINAL APPROVED | HCAMACHO |
| Note: 1/30/2025 - PREVIOUS INSPECTION NOTES 1/28/2025 - PREVIOUS INSPECTION NOTES 1. There's material on the roof that's not supposed to be there at front Entrance. 2. Outlet in Hall between bedrooms next to hall bath needs to be GFCI, within 6' of sink. NEC 210.8 3. Power coming from ceiling in A/C closet needs to be sealed.R402.4.1.1 4. Please post Termite Certificate on Breaker Panel.FBC [A] 105.11 | |||
| BLD - BUILDING FINAL | 01/30/2025 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/30/2025 8:38:06 AM *** 1/30/25: Cancelled by Applicant via text at @ 08:24. 1/28/2025 - PREVIOUS INSPECTION NOTES 1. There's material on the roof that's not supposed to be there at front Entrance. 2. Outlet in Hall between bedrooms next to hall bath needs to be GFCI, within 6' of sink. NEC 210.8 3. Power coming from ceiling in A/C closet needs to be sealed.R402.4.1.1 4. Please post Termite Certificate on Breaker Panel.FBC [A] 105.11 | |||
| BLD - BUILDING FINAL | 01/28/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. There's material on the roof that's not supposed to be there at front Entrance. 2. Outlet in Hall between bedrooms next to hall bath needs to be GFCI, within 6' of sink. NEC 210.8 3. Power coming from ceiling in A/C closet needs to be sealed.R402.4.1.1 4. Please post Termite Certificate on Breaker Panel.FBC [A] 105.11 | |||
| U -UTILITY RESIDENTIAL FINAL | 01/21/2025 | FINAL APPROVED | LFITZGERALD |
| Note: 1/15/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 1/15/2025 11:30:04 AM *** locatevsewervclean iut at tap | |||
| U -UTILITY RESIDENTIAL FINAL | 01/15/2025 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/15/2025 11:30:04 AM *** locatevsewervclean iut at tap | |||
| BLD - BUILDING FINAL | 01/15/2025 | CANCELLED BY APPLICANT | HCAMACHO |
| Note: Cancelled by applicant | |||
| U-CROSS CONNECTION | 01/15/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/15/2025 11:29:39 AM *** no irrigation-no cross connectin | |||
| ROW - FINAL APRON (AFTER POUR) | 01/14/2025 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/14/2025 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/14/2025 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 01/14/2025 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/27/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: 10/21/2024 - PREVIOUS INSPECTION NOTES **10/21/24 Sec 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ ** Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) (NOTE YOUR LEFT REAR WILL ALL FLOW ONTO THE ADJACENT PROPERTY ) ** LEFT SIDE NEED THE 10' OFFSET SHOTS ALL THE WAY TO THE REAR PROPERTY LINE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/21/2024 | Disapproved - NO FEE | EMADISON |
| Note: **10/21/24 Sec 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ ** Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) (NOTE YOUR LEFT REAR WILL ALL FLOW ONTO THE ADJACENT PROPERTY ) ** LEFT SIDE NEED THE 10' OFFSET SHOTS ALL THE WAY TO THE REAR PROPERTY LINE | |||
| ROW- PRE-APRON (PRE-POUR) | 09/13/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/13/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES ** 09/10/24 RISERFOR SWERE CLEAN OUT IS STILL SET LOWER THAN YOUR FORMS ** NEED TO RE-DIG FOOTERS AT CUVERT ENDS ** NEED TO BACK FILL AROUND FORM BOARDS TO CONTAIN CONCRETE WITHIN POUR AREA ** NEED TO REMOVE FORM BOARD FROM EDGE OF ROADWAY AND PUT FACEBOARD ACROSS EDGE OF ROAD _________________________________________________________________________________________________________________ 9/5/2024 - PREVIOUS INSPECTION NOTES ** 09/05/24 SEWER CLEAN OUT NEEDS A RISER AS IT IS CURRENTLY BELOW FORM BOARDS IN POUR AREA | |||
| ROW- PRE-APRON (PRE-POUR) | 09/10/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/10/24 RISERFOR SWERE CLEAN OUT IS STILL SET LOWER THAN YOUR FORMS ** NEED TO RE-DIG FOOTERS AT CUVERT ENDS ** NEED TO BACK FILL AROUND FORM BOARDS TO CONTAIN CONCRETE WITHIN POUR AREA ** NEED TO REMOVE FORM BOARD FROM EDGE OF ROADWAY AND PUT FACEBOARD ACROSS EDGE OF ROAD _________________________________________________________________________________________________________________ 9/5/2024 - PREVIOUS INSPECTION NOTES ** 09/05/24 SEWER CLEAN OUT NEEDS A RISER AS IT IS CURRENTLY BELOW FORM BOARDS IN POUR AREA | |||
| ROW- PRE-APRON (PRE-POUR) | 09/05/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/05/24 SEWER CLEAN OUT NEEDS A RISER AS IT IS CURRENTLY BELOW FORM BOARDS IN POUR AREA | |||
| ELECTRIC - EARLY POWER | 08/20/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/20/2024 9:51:12 AM *** Authorize release of email to FPL. Please remove portalet from swale area, before next inspection. FBC 3303.5 SWALE CLEAR Sec. 24-162 (c) of the Land Development Code ........Constructi.on and protection of swales—Roadside | |||
| GRAVITY SEWER TEST | 08/12/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 08/12/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 07/08/2024 | APPROVED | JWALKER |
| ALL ROUGH | 07/01/2024 | APPROVED | JSTEWART |
| Note: 6/28/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 6/28/2024 9:19:10 AM *** the following still needs cerrection 1. Please install mechanical fasteners at exhaust duct connection at fan assembly (was sealed as previously noted)FBC M1601.4.1 Joints, seams and connections 2. Please seal broken seal at exhaust duct roof penetration Master bath. 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 6/26/2024 9:59:15 AM *** Previous note no rectified....2. UFB wiring has not been installed at the kitchen island. (conduit under slab needs to be relocated into wall line, currently is in the middle of refridgerator floor space) In addition....1. Please install mechanical fasteners at exhaust duct connection at fan assembly (was sealed as previously noted)FBC M1601.4.1 Joints, seams and connections 2. Please seal broken seal at exhaust duct roof penetration Master bath. 6/12/2024 - PREVIOUS INSPECTION NOTES 6/12/24 1. Multiple nail plates needed through out the building at the eletrical wiring. 2. UFB wiring has not been installed at the kitchen island. 3. Rear slider has not been installed. 4. Phase out the 2 wire in the electrical sub panel. 5. Seal all flex duct where they connect to the distribution boxes. 6/10/2024 - PREVIOUS INSPECTION NOTES No electrical wiring installed. HVAC just getting started. Inspeciton stopped, Job site is not ready. Please walk your job site prior to scheduling for inspections. | |||
| ALL ROUGH | 06/28/2024 | Disapproved -FEE REQUIRED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 6/28/2024 9:19:10 AM *** the following still needs cerrection 1. Please install mechanical fasteners at exhaust duct connection at fan assembly (was sealed as previously noted)FBC M1601.4.1 Joints, seams and connections 2. Please seal broken seal at exhaust duct roof penetration Master bath. 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 6/26/2024 9:59:15 AM *** Previous note no rectified....2. UFB wiring has not been installed at the kitchen island. (conduit under slab needs to be relocated into wall line, currently is in the middle of refridgerator floor space) In addition....1. Please install mechanical fasteners at exhaust duct connection at fan assembly (was sealed as previously noted)FBC M1601.4.1 Joints, seams and connections 2. Please seal broken seal at exhaust duct roof penetration Master bath. 6/12/2024 - PREVIOUS INSPECTION NOTES 6/12/24 1. Multiple nail plates needed through out the building at the eletrical wiring. 2. UFB wiring has not been installed at the kitchen island. 3. Rear slider has not been installed. 4. Phase out the 2 wire in the electrical sub panel. 5. Seal all flex duct where they connect to the distribution boxes. 6/10/2024 - PREVIOUS INSPECTION NOTES No electrical wiring installed. HVAC just getting started. Inspeciton stopped, Job site is not ready. Please walk your job site prior to scheduling for inspections. | |||
| LATH/BRICK/ WATER BARRIER | 06/28/2024 | APPROVED | LMILLER |
| Note: 6/13/2024 - PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 06/26/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 6/26/2024 9:59:15 AM *** Previous note no rectified....2. UFB wiring has not been installed at the kitchen island. (conduit under slab needs to be relocated into wall line, currently is in the middle of refridgerator floor space) In addition....1. Please install mechanical fasteners at exhaust duct connection at fan assembly (was sealed as previously noted)FBC M1601.4.1 Joints, seams and connections 2. Please seal broken seal at exhaust duct roof penetration Master bath. 6/12/2024 - PREVIOUS INSPECTION NOTES 6/12/24 1. Multiple nail plates needed through out the building at the eletrical wiring. 2. UFB wiring has not been installed at the kitchen island. 3. Rear slider has not been installed. 4. Phase out the 2 wire in the electrical sub panel. 5. Seal all flex duct where they connect to the distribution boxes. 6/10/2024 - PREVIOUS INSPECTION NOTES No electrical wiring installed. HVAC just getting started. Inspeciton stopped, Job site is not ready. Please walk your job site prior to scheduling for inspections. | |||
| LATH/BRICK/ WATER BARRIER | 06/13/2024 | CANCELLED BY APPLICANT | JWALKER |
| ALL ROUGH | 06/12/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 6/12/24 1. Multiple nail plates needed through out the building at the eletrical wiring. 2. UFB wiring has not been installed at the kitchen island. 3. Rear slider has not been installed. 4. Phase out the 2 wire in the electrical sub panel. 5. Seal all flex duct where they connect to the distribution boxes. 6/10/2024 - PREVIOUS INSPECTION NOTES No electrical wiring installed. HVAC just getting started. Inspeciton stopped, Job site is not ready. Please walk your job site prior to scheduling for inspections. | |||
| ALL ROUGH | 06/10/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: No electrical wiring installed. HVAC just getting started. Inspeciton stopped, Job site is not ready. Please walk your job site prior to scheduling for inspections. | |||
| ROOF VALLEY & METAL | 06/06/2024 | APPROVED | JWALKER |
| WALL SHEATHING | 05/30/2024 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/30/2024 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 05/29/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/13/2024 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/08/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 05/07/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 03/28/2024 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 02/08/2024 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/05/2024 | 06/10/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/29/2024 | 05/29/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/29/2024 | 05/29/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/03/2024 | 05/07/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/05/2024 | 03/05/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/05/2024 | 03/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: JPI | |||
| BADMIN | COMPLETE | 03/05/2024 | 03/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/05/2024 | 03/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/05/2024 | 03/12/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/06/2024 | 03/22/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 02/06/2024 | 02/08/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 02/08/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| BADMIN | HOLD | 02/05/2024 | 02/12/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) (YOU ARE MISSING (D) THE STAMP FROM THE ENGINEER OF RECORD. YOU CANNOT SUBMIT A LETTER. THE APPROVAL STAMP NEEDS TO BE ON THE FIRST PAGE OF THE TRUSS PACKET OR TRUSS LAYOUT.) | |||
| BLD | HOLD | 02/05/2024 | 02/09/2024 |
| Note: Held By: JPI 1. City of Palm Coast Color and Material Sheet (form) appears OMITTED from submission. FBC 105 2. Provide specific product numbers including current revisions (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. 3. Provide roof underlayment and shingle revision number on Florida Product Approval Specification Sheet that corresponds with the Roofing Worksheet; underlayment Florida Product Approval number on Roofing Worksheet does not include revision number. 107.2.4 4. Provide Florida Product Approval number for shutters. 107.2.4 5. Architectural drawings do NOT have a signed seal by the Architect of Record/Engineer of Record. 6. Reference to 2023 Florida Residential Code, Section R302.3. 7. Provide elevation (height) for Second Floor on ALL Elevations. 107.3.5 8. Provide pitch/slopes of ALL roofs on the Elevations.. R802 | |||
| CUSVC | COMPLETE | 02/05/2024 | 02/08/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 02/05/2024 | 02/08/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry and garage need to be GFCI protected. NEC 2020 210.8 2. DW outlet can not be located behind the DW. NEC 2020 422.16 3. Electric load calcs are done by a different contractor thats listed on your permit. 4. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| ENGIN1 | COMPLETE | 02/05/2024 | 02/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/05/2024 | 02/06/2024 |
| LOCATE | COMPLETE | 02/05/2024 | 02/06/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/05/2024 | 02/06/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on heatload needs to be Daytona Beach 2. Square footage on the Energy calcs does not match the house plans | |||
| SW1 | COMPLETE | 02/05/2024 | 02/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/05/2024 | 02/06/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Survey/ site plan:missing square footage of lot, missing Map Panel number should be 0129E. Missing walkway, materials and width also. Landscape plan: provide the correct plan as the plan provided is for a different home. Please make sure the trees are within the property lines for credit. AC needs a minimum of 7 gallons Elevation is missing the roof pitch. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/04/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/04/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/04/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/04/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 02/04/2025 |
| REINSPECTION FEE | ¤40.00 | 02/04/2025 |
| SURCHARGE FS 533.721 | ¤6.17 | 03/12/2024 |
| SURCHARGE - FS 468.631 | ¤9.25 | 03/12/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/12/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/12/2024 |
| SW ENG PRE APRON | ¤30.00 | 03/12/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/12/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/12/2024 |
| SEWER CREDIT | (¤850.00) | 03/12/2024 |
| SEWER INSPECTION | ¤25.00 | 03/12/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 03/12/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 03/12/2024 |
| SITE PLAN 30 | ¤30.00 | 03/12/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 03/12/2024 |
| IMPACT FEE FIRE | ¤428.09 | 03/12/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/12/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/12/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 03/12/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/12/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 03/12/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/12/2024 |
| CONNECTION FEES | ¤1,187.26 | 03/12/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/12/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/12/2024 |
| WATER- TURN ON | ¤25.00 | 03/12/2024 |
| ADJUSTMENT 50% | (¤616.87) | 03/12/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/12/2024 |
| INSPECTION - RESIDENTIAL | ¤937.75 | 03/12/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤265.98 | 03/12/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,201.66 |