Permit #2024020165

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00370-0270
CONDITIONED SPACE: 2582 sqft
GARAGE: 407 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
OPENED PORCH (WITH ROOF) : 68 sqft
Total Square Footage: 3110 sqft
Block: 00370
Subdivision: 2123 - SECTION 57-ULYSSES TREES
Job Phone: 904-531-5923
Location Address: 82 UPSHIRE PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/07/2024
NOC: RECORDED
Applicant name: TAVARIS JEROME DAVIS
Owner: BRIGHTLAND HOMES OF FLORIDA LLC

Address

15725 N DALLAS PARKWAY SUITE 300

ADDISON, TX 75001

Lot: 0270
Contracted Stated Job Value: ¤250,000.00
Job Description: Single Family Construction
Type: CN

Contractor

BRIGHTLAND HOMES OF FLORIDA, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

3505 EAST FRONTAGE RD

ADDISON, TX 75001

STE 145

TAMPA, FL 33607

CBC1267320 (Exp: 08/31/2026) 904-531-5923

Sub Contractors

LARRY LAVON TURNAGE
Status Location Address State License Number Phone
CANCEL

531 CODISCO WAY

SANFORD, FL 32771

CMC1249777 (Exp: 08/31/2024) 407-333-2665
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
OLIN MARSHALL CANNON
Status Location Address State License Number Phone
INACTIVE

1794 ROGERO RD #2

JACKSONVILLE, FL 32211

CFC1426140 (Exp: 08/31/2026) 904-343-4344
JAMES E LINTON
Status Location Address State License Number Phone
ACTIVE

200 COLLEGE DR

ORANGE PARK, FL 32065

EC0001152 (Exp: 08/31/2026) 904-272-0272

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/12/2025 FINAL APPROVED BTAYLOR
Note: 2/11/2025 - PREVIOUS INSPECTION NOTES 2-11-25 1. Toilet down stairs does not flush. 2. Air handler lines need to be sealed where they enter ceiling. 2/5/2025 - PREVIOUS INSPECTION NOTES Repair to the swale areas across the street & next to the job site damaged by Contractor vehicle traffic will be required prior to Building Final approval.
BLD - BUILDING FINAL 02/11/2025 Disapproved - NO FEE BTAYLOR
Note: 2-11-25 1. Toilet down stairs does not flush. 2. Air handler lines need to be sealed where they enter ceiling. 2/5/2025 - PREVIOUS INSPECTION NOTES Repair to the swale areas across the street & next to the job site damaged by Contractor vehicle traffic will be required prior to Building Final approval.
ROW - FINAL APRON (AFTER POUR) 02/11/2025 APPROVED FSLADISH
Note: 2/11/25 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ___________________________________________________________________________________________________________________________ 2/5/2025 - PREVIOUS INSPECTION NOTES 2/5/25 CM ASKED TO PLEASE CANCEL INSPECTION.
ROW - STORMWATER FINAL 02/11/2025 APPROVED FSLADISH
Note: 2/11/25 THERE ARE A FEW PIECES OF TRASH YOU STILL NEED TO PICK UP. AS A COURTESY I AM GOING TO APPROVE THIS ROW FINAL. PLEASE MAKE SURE ALL TRASH IS PICKED UP. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 02/05/2025 FINAL APPROVED BWRIGHT
ROW - FINAL APRON (AFTER POUR) 02/05/2025 CANCELLED BY APPLICANT FSLADISH
Note: 2/5/25 CM ASKED TO PLEASE CANCEL INSPECTION.
BLD - BUILDING FINAL 02/05/2025 CANCELLED BY APPLICANT BTAYLOR
Note: Repair to the swale areas across the street & next to the job site damaged by Contractor vehicle traffic will be required prior to Building Final approval.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/04/2025 APPROVED FSLADISH
Note: 2/4/25 CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. ______________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES 11/27/24 YOU NEED TO HAVE ONE TENTH OF FALL DOWN THE PROPERTY LINES ON BOTH SIDES. LEFT SIDE IS INCONSISTENT. RIGHT SIDE SHOWS A HIGH POINT IN AREA OF THE REAR OF THE STRUCTURE AT PROPERTY LINE OF 23.95. Elevations every 20 ft off the property lines Sec 300.01D2 Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. Inspector Notes from Inspection 9270 10/17/24 MET WITH BRANDON THE GRADER SUB AND REMEASURED THE LEFT SIDE CULVERT PIPE END FROM EDGE OF ROAD. DUE TO IT BEING IN THE CURVE AND ASPHALT GONE FROM THE EDGE, AFTER DIGGING DOWN AND FINDING THE LIME ROCK BASE MEASURED THE CULVERT PIPE TO BE ROUGHLY 4" OFF FROM THE REQUIRED 8' FROM EDGE OF ROAD. DUE TO THE FACT THAT IT IS IN THE CURVE, I AM GOING TO ALLOW THIS VARIATION DUE TO THE FACT THAT I SPOKE WITH BRANDON AND HE WILL BE ABLE TO SLIGHTLY MOVE THE SWALE INCREMENTALLY AND MATCH IT BACK TO 8' FROM EDGEOF PAVEMENT BEFORE THE LEFT SIDE ADJOINING PROPERTY LINE. SPOKE TO NICK CM AND ADVISED HIM OF MY DECISION. PIPE IS GOOD (21.85 FLAT) AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. APPROVING AS NOTED. 10/16/2024 - PREVIOUS INSPECTION NOTES 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 YOUR CULVERT PIPE IS OUT OF TOLERANCE OF OUR SWALE PLAN DIAGRAM DISTANCE REQUIREMENT OF 8 FOOT FROM THE EDGE OF PAVEMENT TO THE MIDDLE BOTTOM OF THE CULVERT PIPE END. PLEASE SEE PHOTO FOR REFERENCE. PLEASE RESET CULVERT PIPE AT REQUIRED DISTANCE FROM THE EDGE OF THE ROAD.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/04/2025 APPROVED FSLADISH
Note: 2/4/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. INSPECTORS NOTE. YOU WILL BE REQUIRED TO SOD BARE AREA IN FRONT RIGHT SWALE AND ALONG PROPERTY LINE TO INCLUDE AT THE REAR RIGHT BARE AREA. WHERE IT HAS BEEN DISTURBED.
U-CROSS CONNECTION 12/17/2024 APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/27/2024 Disapproved - NO FEE FSLADISH
Note: 11/27/24 YOU NEED TO HAVE ONE TENTH OF FALL DOWN THE PROPERTY LINES ON BOTH SIDES. LEFT SIDE IS INCONSISTENT. RIGHT SIDE SHOWS A HIGH POINT IN AREA OF THE REAR OF THE STRUCTURE AT PROPERTY LINE OF 23.95. Elevations every 20 ft off the property lines Sec 300.01D2 Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. Inspector Notes from Inspection 9270 10/17/24 MET WITH BRANDON THE GRADER SUB AND REMEASURED THE LEFT SIDE CULVERT PIPE END FROM EDGE OF ROAD. DUE TO IT BEING IN THE CURVE AND ASPHALT GONE FROM THE EDGE, AFTER DIGGING DOWN AND FINDING THE LIME ROCK BASE MEASURED THE CULVERT PIPE TO BE ROUGHLY 4" OFF FROM THE REQUIRED 8' FROM EDGE OF ROAD. DUE TO THE FACT THAT IT IS IN THE CURVE, I AM GOING TO ALLOW THIS VARIATION DUE TO THE FACT THAT I SPOKE WITH BRANDON AND HE WILL BE ABLE TO SLIGHTLY MOVE THE SWALE INCREMENTALLY AND MATCH IT BACK TO 8' FROM EDGEOF PAVEMENT BEFORE THE LEFT SIDE ADJOINING PROPERTY LINE. SPOKE TO NICK CM AND ADVISED HIM OF MY DECISION. PIPE IS GOOD (21.85 FLAT) AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. APPROVING AS NOTED. 10/16/2024 - PREVIOUS INSPECTION NOTES 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 YOUR CULVERT PIPE IS OUT OF TOLERANCE OF OUR SWALE PLAN DIAGRAM DISTANCE REQUIREMENT OF 8 FOOT FROM THE EDGE OF PAVEMENT TO THE MIDDLE BOTTOM OF THE CULVERT PIPE END. PLEASE SEE PHOTO FOR REFERENCE. PLEASE RESET CULVERT PIPE AT REQUIRED DISTANCE FROM THE EDGE OF THE ROAD.
ROW- PRE-APRON (PRE-POUR) 10/17/2024 APPROVED - AS NOTED FSLADISH
Note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a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. APPROVING AS NOTED. 10/16/2024 - PREVIOUS INSPECTION NOTES 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 YOUR CULVERT PIPE IS OUT OF TOLERANCE OF OUR SWALE PLAN DIAGRAM DISTANCE REQUIREMENT OF 8 FOOT FROM THE EDGE OF PAVEMENT TO THE MIDDLE BOTTOM OF THE CULVERT PIPE END. PLEASE SEE PHOTO FOR REFERENCE. PLEASE RESET CULVERT PIPE AT REQUIRED DISTANCE FROM THE EDGE OF THE ROAD.
ROW- PRE-APRON (PRE-POUR) 10/16/2024 CANCELLED BY APPLICANT FSLADISH
Note: 10/16/24 RECEIVED TEXT FROM NICK TO PLEASE CANCEL INSPECTION. __________________________________________________________________________________________________________________________ 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 YOUR CULVERT PIPE IS OUT OF TOLERANCE OF OUR SWALE PLAN DIAGRAM DISTANCE REQUIREMENT OF 8 FOOT FROM THE EDGE OF PAVEMENT TO THE MIDDLE BOTTOM OF THE CULVERT PIPE END. PLEASE SEE PHOTO FOR REFERENCE. PLEASE RESET CULVERT PIPE AT REQUIRED DISTANCE FROM THE EDGE OF THE ROAD.
ROW- PRE-APRON (PRE-POUR) 10/15/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 10/15/24 YOUR CULVERT PIPE IS OUT OF TOLERANCE OF OUR SWALE PLAN DIAGRAM DISTANCE REQUIREMENT OF 8 FOOT FROM THE EDGE OF PAVEMENT TO THE MIDDLE BOTTOM OF THE CULVERT PIPE END. PLEASE SEE PHOTO FOR REFERENCE. PLEASE RESET CULVERT PIPE AT REQUIRED DISTANCE FROM THE EDGE OF THE ROAD. Pipe not 8 ft/5 ft from road edge or missing 22 degree Elbow Swale Plan #2 Swale Plan #2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul de sacs may require a 22.5° elbow.
ELECTRIC - EARLY POWER 09/05/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 8/12/2024 - PREVIOUS INSPECTION NOTES 8-12-24 1. No sleeve for SER cable. 8-30-24 1. Emailed FPL at 2:42. 9-5-24 1. Emailed FPL at 3:24.
ELECTRIC-TUG 08/30/2024 APPROVED - AS NOTED BTAYLOR
Note: 8/12/2024 - PREVIOUS INSPECTION NOTES 8-12-24 1. No sleeve for SER cable. 8-30-24 1. Emailed FPL at 2:42.
ELECTRIC-TUG 08/12/2024 Disapproved - NO FEE BTAYLOR
Note: 8-12-24 1. No sleeve for SER cable.
GRAVITY SEWER TEST 08/12/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 08/12/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 07/23/2024 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 06/27/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 5-29-24 1. Dumpster needs to be removed off of silt fence. 2. Silt fence needs to be repaired before next inspection. 6-24-24 1. Missing second story front window. 2. Holes in top of electrical panel need to have steel plugs installed. 6-27-24 1. Silt fence needs to be repaired on the right side of the house.
INSULATION 06/27/2024 APPROVED BTAYLOR
Note: 6/26/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 5-29-24 1. Dumpster needs to be removed off of silt fence. 2. Silt fence needs to be repaired before next inspection. 6-24-24 1. Missing second story front window. 2. Holes in top of electrical panel need to have steel plugs installed. 6-26-24 1. Holes in top of electrical panel need to have steel plugs installed. 2. Line set for air handler upstairs is not foamed. 3. Vent stack next to master shower not foamed at top or bottom.
INSULATION 06/26/2024 Disapproved - NO FEE BTAYLOR
Note: Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 5-29-24 1. Dumpster needs to be removed off of silt fence. 2. Silt fence needs to be repaired before next inspection. 6-24-24 1. Missing second story front window. 2. Holes in top of electrical panel need to have steel plugs installed. 6-26-24 1. Holes in top of electrical panel need to have steel plugs installed. 2. Line set for air handler upstairs is not foamed. 3. Vent stack next to master shower not foamed at top or bottom.
ALL ROUGH 06/24/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2467 5-29-24 1. Dumpster needs to be removed off of silt fence. 2. Silt fence needs to be repaired before next inspection. 6-24-24 1. Missing second story front window. 2. Holes in top of electrical panel need to have steel plugs installed.
ROOF VALLEY & METAL 05/29/2024 APPROVED - AS NOTED BTAYLOR
Note: 5-29-24 1. Dumpster needs to be removed off of silt fence. 2. Silt fence needs to be repaired before next inspection.
WALL SHEATHING 05/21/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/21/2024 APPROVED - AS NOTED BTAYLOR
Note: 5-21-24 1. Garage header nail pattern is not correct. 2. Eyebrow has not been built.
FOUND SURVEY APPROVED (OFFICE) 05/20/2024 APPROVED TBAKER
MONOLITHIC SLAB 04/09/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 04/03/2024 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/02/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 03/22/2024 APPROVED BVITALE

Review History

Department Status Date In Date Out
MECH COMPLETE 06/05/2024 06/10/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/20/2024 05/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
CUSVC COMPLETE 04/22/2024 04/23/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 HOLD 04/22/2024 04/23/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM COPC standards require that new slab elevation be within .83' of any adjacent slab. Please contact Ms. Jordan Meyers for more information - 386-986-4789
ZON COMPLETE 04/22/2024 04/22/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 04/01/2024 04/02/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 02/29/2024 03/05/2024
Note: Released By: JPI
ELEC COMPLETE 02/29/2024 03/04/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 02/29/2024 02/29/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 02/23/2024 02/23/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC HOLD 02/23/2024 02/29/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 2. Need correct outlet spacing in bed 3. NEC 2020 210.52
BLD HOLD 02/23/2024 02/25/2024
Note: Held By: JPI ½ hour not approved 1. Provide specific product numbers including current revisions (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet. 2. Provide roof underlayment and shingle revision number on Florida Product Approval Specification Sheet that corresponds with the Roofing Worksheet; underlayment Florida Product Approval. The number on Roofing Worksheet does not include revision number. 107.2.4. Repeating comment. 3. Provide Florida Product Approval number for shutters. 107.2.4. Repeating comment.
BADMIN COMPLETE 02/23/2024 02/29/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/23/2024 02/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 02/23/2024 02/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SWALE COMPLETE 02/06/2024 03/25/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN HOLD 02/05/2024 02/12/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) (YOU ARE MISSING (D) THE STAMP FROM THE ENGINEER OF RECORD. YOU CANNOT SUBMIT A LETTER. THE APPROVAL STAMP NEEDS TO BE ON THE FIRST PAGE OF THE TRUSS PACKET OR TRUSS LAYOUT.)
BLD HOLD 02/05/2024 02/09/2024
Note: Held By: JPI 1. City of Palm Coast Color and Material Sheet (form) appears OMITTED from submission. FBC 105 2. Provide specific product numbers including current revisions (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. 3. Provide roof underlayment and shingle revision number on Florida Product Approval Specification Sheet that corresponds with the Roofing Worksheet; underlayment Florida Product Approval number on Roofing Worksheet does not include revision number. 107.2.4 4. Provide Florida Product Approval number for shutters. 107.2.4 5. Architectural drawings do NOT have a signed seal by the Architect of Record/Engineer of Record. 6. Reference to 2023 Florida Residential Code, Section R302.3. 7. Provide elevation (height) for Second Floor on ALL Elevations. 107.3.5 8. Provide pitch/slopes of ALL roofs on the Elevations.. R802
CUSVC COMPLETE 02/05/2024 02/08/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 02/05/2024 02/06/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry and garage need to be GFCI protected. NEC 2020 210.8 2. Need correct outlet spacing in bed 3. NEC 2020 210.52 3. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 4. Electrical load calcs are done by a different contractor thhats listed on your permit.
ENGIN1 COMPLETE 02/05/2024 02/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 02/05/2024 02/06/2024
LOCATE COMPLETE 02/05/2024 02/06/2024
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 02/05/2024 02/06/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/05/2024 02/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 02/05/2024 02/06/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Landscape plan not for this address Site plan/survey missing lot square footage Site plan/survey states 1 story, plans are for a 2 story Block number incorrect within lot boundaries on site plan/survey

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 02/04/2025
SW ENG REINSPECTION 30 ¤30.00 02/04/2025
PLAN REVIEW - REVISION ¤32.50 02/04/2025
CONNECTION FEES ¤1,187.26 03/07/2024
SW ENG - REVIEW 20 ¤20.00 03/07/2024
SW ENG RES REVIEW 200 ¤200.00 03/07/2024
SEWER INSPECTION ¤25.00 03/07/2024
SEWER CAPITAL FACILITY ¤5,441.03 03/07/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 03/07/2024
SITE PLAN 30 ¤30.00 03/07/2024
WATER- TURN ON ¤25.00 03/07/2024
ADJUSTMENT 50% (¤830.43) 03/07/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/07/2024
INSPECTION - RESIDENTIAL ¤1,270.50 03/07/2024
PLAN REVIEW - RESIDENTIAL ¤360.36 03/07/2024
CONTRACTOR CHANGE ¤20.00 03/07/2024
CONTRACTOR CHANGE ¤20.00 03/07/2024
FC IMPACT FEE EMS ¤62.00 03/07/2024
IMPACT FEE FIRE ¤428.09 03/07/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/07/2024
FC IMPACT FEE LIBRARY ¤268.00 03/07/2024
IMPACT FEE PARKS ¤1,800.99 03/07/2024
IMPACT FEE SCHOOL ¤5,450.00 03/07/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 03/07/2024
WATER -IRRIGATION INSPECTION ¤25.00 03/07/2024
SURCHARGE FS 533.721 ¤8.30 03/07/2024
SURCHARGE - FS 468.631 ¤12.46 03/07/2024
SW ENG - FOUNDATION SURVEY ¤20.00 03/07/2024
SW ENG INSPECTION 80 ¤80.00 03/07/2024
SW ENG PRE APRON ¤30.00 03/07/2024
Fees Total Due: ¤0.00 Total Paid: ¤22,140.57