I want to search for...
Permit #2024020166
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00720-0130 |
| CONDITIONED SPACE: 2400 sqft |
| GARAGE: 566 sqft |
| OPENED PORCH (WITH ROOF) : 350 sqft |
| Total Square Footage: 3316 sqft |
| Block: 00720 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: 386-283-2035 |
| Location Address: 9 SLATINGTON PL |
| Type: DU - DUPLEX |
| Issue Date: 03/13/2024 |
| NOC: RECORDED |
| Applicant name: OLEG BELINSKIY |
| Owner: FLORIDA'S BEST BUILDERS INC |
|
Address 101 PALM HARBOR PKWY UNIT 145 PALM COAST, FL 32137 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
FLORIDAS BEST BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE PALM COAST, FL 32164 |
CBC1264760 (Exp: 08/31/2026) | 386-283-2035 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 02/03/2025 | APPROVED | FSLADISH |
| Note: 2/3/25 CORRECTION MADE. PAVERS GLUED DOWN. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 1/27/2025 - PREVIOUS INSPECTION NOTES 1/27/25 UPON WALKING DRIVEWAY AS PREVIOUSLY NOTED ON THE LEFT SIDE OF DRIVEWAY APRON AT EDGE OF PAVEMENT THER ARE LOOSE PAVERS. THESE WILL NEED TO BE REGLUED AND SET. YOU ARE ALSO REQUIRED TO SEED AND STRAW BARE AREA ON THE REAR PROPERTY LINE/VACANT BEFORE ROW FINAL WILL PASS. | |||
| U-CROSS CONNECTION | 01/28/2025 | APPROVED | BWRIGHT |
| BLD - BUILDING FINAL | 01/27/2025 | FINAL APPROVED | BTAYLOR |
| ROW - FINAL APRON (AFTER POUR) | 01/27/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/27/25 UPON WALKING DRIVEWAY AS PREVIOUSLY NOTED ON THE LEFT SIDE OF DRIVEWAY APRON AT EDGE OF PAVEMENT THER ARE LOOSE PAVERS. THESE WILL NEED TO BE REGLUED AND SET BEFORE ROW FINAL WILL PASS. NO OTHER CHIPPED CRACKED OR BROKEN PAVERS OBSERVED AT THE TIME OF THIS INSPECTION. APPROVING THIS AS NOTED THAT CORRECTIONS ARE REQUIRED BEFORE ROW FINAL PASSAGE. INSPECTORS NOTE. LEFT SIDE DRIVEWAY APRON PAVERS, A FEW ARE LOOSE AT EDGE OF ROAD AS OF TODAY 1/22 | |||
| U -UTILITY RESIDENTIAL FINAL | 01/27/2025 | FINAL APPROVED | BWRIGHT |
| ROW - FINAL INSPECTION | 01/27/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 1/27/25 UPON WALKING DRIVEWAY AS PREVIOUSLY NOTED ON THE LEFT SIDE OF DRIVEWAY APRON AT EDGE OF PAVEMENT THER ARE LOOSE PAVERS. THESE WILL NEED TO BE REGLUED AND SET. YOU ARE ALSO REQUIRED TO SEED AND STRAW BARE AREA ON THE REAR PROPERTY LINE/VACANT BEFORE ROW FINAL WILL PASS. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/22/2025 | APPROVED | FSLADISH |
| Note: 1/22/25 TREES MOVED. ELEVATIONS NOW SHOW POSITIVE REAR TO FRONT SWALE FLOW. DRAINAGE WILL WORK AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED __________________________________________________________________________________________________________________________ 12/12/2024 - PREVIOUS INSPECTION NOTES 12/12/24 AS PREVIOUSLY INDICATED AND CONFIRMED IN THE FIELD, THERE ARE INDEED HIGH AREAS THAT NEED TO BE LOWERED TO ALLOW DRAINGE TO FLOW FROM REAR TO FRONT SWALE. YOU WILL ALSO NEED TO RELOCATE THE TWO TREES IN THE REAR BACK OUT OF THE DRAINAGE CONVETANCE. THEY WILL NOT ALLOW POSITIVE DRAINAGE. BOTH AREAS OF CORRECTION ARE OUTLINED IN WHITE PAINT. Inspector Notes from Inspection 9463 12/12/24 YOU HAVE TWO HIGH SPOTS BY THE REAR CORNERS SHOWING ON YOUR FINAL SURVEY. ON THE LEFT YOU ARE SHOWING 26.30 TO A 26.60 BACK TO 26.40. ON THE RIGHT YOU ARE SHOWING 26.40 TO A 26.70 TO A 26.20. I WILL SEE IF THIS IS THE CASE ON THE FIELD SURVEY. APPROVING THIS INSPECTION AS NOTED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/22/2025 | APPROVED | FSLADISH |
| Note: 1/22/25 ELEVATION CORRECTIONS MADE AS OF THIS FINAL SURVEY. _______________________________________________________________________________________________________________________ 1/10/2025 - PREVIOUS INSPECTION NOTES 1/10/25 YOUR ELEVATIONS COMING AROUND THE LEFT SIDE FROM THE REAR AT 26.25 UP TO 26.35 TO A 26.10 AT STRUCTURE CORNER AT START OF INSIDE DRAINAGE CONVEYANCE THEN UPHILL TO A 26.35 TO A 26.30 TO A 26.10 WHICH IS FLAT FROM THE SHOT 60FT BACK. THIS WILL NOT ALLOW DRAINAGE TO HAVE POSITIVE FLOW. Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet Sec.300.01 C2 The tolerance on individual shots along the as-built flow line of the swale (depressions orhigh spots) is plus or minus 0.10 feet.Sec.300.01 C2 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet. 12/26/2024 - PREVIOUS INSPECTION NOTES 12/26/24=THE CULVERT PIPE IS OUT OF TOLERANCE ON BOTH ENDS. PLEASE REFER TO THE DETAILED SWALE PLAN FOR REFERENCE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/10/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 1/10/25 YOUR ELEVATIONS COMING AROUND THE LEFT SIDE FROM THE REAR AT 26.25 UP TO 26.35 TO A 26.10 AT STRUCTURE CORNER AT START OF INSIDE DRAINAGE CONVEYANCE THEN UPHILL TO A 26.35 TO A 26.30 TO A 26.10 WHICH IS FLAT FROM THE SHOT 60FT BACK. THIS WILL NOT ALLOW DRAINAGE TO HAVE POSITIVE FLOW. Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet Sec.300.01 C2 The tolerance on individual shots along the as-built flow line of the swale (depressions orhigh spots) is plus or minus 0.10 feet.Sec.300.01 C2 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet. 12/26/2024 - PREVIOUS INSPECTION NOTES 12/26/24=THE CULVERT PIPE IS OUT OF TOLERANCE ON BOTH ENDS. PLEASE REFER TO THE DETAILED SWALE PLAN FOR REFERENCE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/26/2024 | Disapproved - NO FEE | GBERTOLA |
| Note: 12/26/24=THE CULVERT PIPE IS OUT OF TOLERANCE ON BOTH ENDS. PLEASE REFER TO THE DETAILED SWALE PLAN FOR REFERENCE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/12/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 12/12/24 AS PREVIOUSLY INDICATED AND CONFIRMED IN THE FIELD, THERE ARE INDEED HIGH AREAS THAT NEED TO BE LOWERED TO ALLOW DRAINGE TO FLOW FROM REAR TO FRONT SWALE. YOU WILL ALSO NEED TO RELOCATE THE TWO TREES IN THE REAR BACK OUT OF THE DRAINAGE CONVETANCE. THEY WILL NOT ALLOW POSITIVE DRAINAGE. BOTH AREAS OF CORRECTION ARE OUTLINED IN WHITE PAINT. Inspector Notes from Inspection 9463 12/12/24 YOU HAVE TWO HIGH SPOTS BY THE REAR CORNERS SHOWING ON YOUR FINAL SURVEY. ON THE LEFT YOU ARE SHOWING 26.30 TO A 26.60 BACK TO 26.40. ON THE RIGHT YOU ARE SHOWING 26.40 TO A 26.70 TO A 26.20. I WILL SEE IF THIS IS THE CASE ON THE FIELD SURVEY. APPROVING THIS INSPECTION AS NOTED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/12/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 12/12/24 YOU HAVE TWO HIGH SPOTS BY THE REAR CORNERS SHOWING ON YOUR FINAL SURVEY. ON THE LEFT YOU ARE SHOWING 26.30 TO A 26.60 BACK TO 26.40. ON THE RIGHT YOU ARE SHOWING 26.40 TO A 26.70 TO A 26.20. I WILL SEE IF THIS IS THE CASE ON THE FIELD SURVEY. APPROVING THIS INSPECTION AS NOTED. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/08/2024 | APPROVED | FSLADISH |
| Note: 11/8/24 YOU ARE APPROVED TO LAY PAVERS AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9271 11/4/24 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PAVER RESTRAINTS | 11/04/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/4/24 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 11/04/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 11/4/24 PIPE ELEVATION GOOD. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ELECTRIC - EARLY POWER | 09/19/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9/18/2024 - PREVIOUS INSPECTION NOTES 9-18-24 1. House locked. 9-19-24 1. Emailed FPL at 1:10. | |||
| ELECTRIC - EARLY POWER | 09/18/2024 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 9-18-24 1. House locked. | |||
| GRAVITY SEWER TEST | 09/03/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 3307.1 PROTECTION OF PROPERTY, NEED SILT FENCE IN PLACE BEFORE SLAB INSPECTION | |||
| SEWER TIE IN | 09/03/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 3307.1 PROTECTION OF PROPERTY, NEED SILT FENCE IN PLACE BEFORE SLAB INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 08/20/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 08/07/2024 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 08/07/2024 | APPROVED | BTAYLOR |
| Note: 7/31/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 7-30-24 1. Need two forms of connection for bathroom exhaust fans. 2. Side Aelectrical panel needs to be dropped down to 6'. 3. Island outlets on ends need to be moved down. 4. Roof penatrations need their covers and goose necks. 7-31-24 1. Nothing from above has been resolved. | |||
| LATH/BRICK/ WATER BARRIER | 07/31/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 7-30-24 1. Need two forms of connection for bathroom exhaust fans. 2. Side Aelectrical panel needs to be dropped down to 6'. 3. Island outlets on ends need to be moved down. 4. Roof penatrations need their covers and goose necks. 7-31-24 1. Nothing from above has been resolved. | |||
| ALL ROUGH | 07/30/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 7-30-24 1. Need two forms of connection for bathroom exhaust fans. 2. Side Aelectrical panel needs to be dropped down to 6'. 3. Island outlets on ends need to be moved down. 4. Roof penatrations need their covers and goose necks. | |||
| FIREWALL FINAL | 07/16/2024 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 07/10/2024 | APPROVED | RSIMS |
| FIREWALL FRAMING | 07/01/2024 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 06/26/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/24/2024 | APPROVED | BTAYLOR |
| Note: 6/21/2024 - PREVIOUS INSPECTION NOTES 6/20/2024 - PREVIOUS INSPECTION NOTES 6-20-24 1. Overframing needs to be strapped at both ends of rafters. 2. Missing engineering on truss T17. Circled in plans. 6-21-24 1. Overframing needs to be strapped at both ends of rafters. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/21/2024 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 6/20/2024 - PREVIOUS INSPECTION NOTES 6-20-24 1. Overframing needs to be strapped at both ends of rafters. 2. Missing engineering on truss T17. Circled in plans. 6-21-24 1. Overframing needs to be strapped at both ends of rafters. | |||
| WALL SHEATHING | 06/20/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/20/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 6-20-24 1. Overframing needs to be strapped at both ends of rafters. 2. Missing engineering on truss T17. Circled in plans. | |||
| TIE BEAM / LINTEL | 05/24/2024 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 05/22/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/14/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/09/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 3307.1 PROTECTION OF PROPERTY, NEED SILT FENCE IN PLACE BEFORE SLAB INSPECTION | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 05/02/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 03/22/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/05/2024 | 09/05/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ENGIN1 | COMPLETE | 09/05/2024 | 09/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/05/2024 | 09/05/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/04/2024 | 09/04/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/03/2024 | 09/03/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please provide driveway apron width at edge of pavement COPC Techinical Manual, Section 300.01 (A)(1)(C)(1) | |||
| ZON | HOLD | 09/03/2024 | 09/03/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utilization Agreement for Paver Driveway. | |||
| ENGIN1 | COMPLETE | 05/21/2024 | 05/22/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/21/2024 | 05/21/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/07/2024 | 05/08/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/29/2024 | 05/02/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/24/2024 | 04/29/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Letter needs to include the density test reports. | |||
| BLD | COMPLETE | 04/03/2024 | 04/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/28/2024 | 04/02/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor | |||
| MECH | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/03/2024 | 03/04/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide energy calcs from current code cycle (Third Request) | |||
| MECH | HOLD | 02/20/2024 | 02/26/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs from 2023 code cycle ( Second Request) | |||
| ZON | COMPLETE | 02/20/2024 | 02/20/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/20/2024 | 02/26/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/20/2024 | 02/22/2024 |
| Note: Released By: JPI | |||
| BADMIN | COMPLETE | 02/20/2024 | 02/26/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/06/2024 | 03/22/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 02/05/2024 | 02/12/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) (YOU ARE MISSING (B) THE TRUSS LAYOUT AND (D) THE STAMP FROM THE ENGINEER OF RECORD. YOU CANNOT SUBMIT A LETTER. THE APPROVAL STAMP NEEDS TO BE ON THE FIRST PAGE OF THE TRUSS PACKET OR TRUSS LAYOUT.) | |||
| BLD | HOLD | 02/05/2024 | 02/09/2024 |
| Note: Held By: JPI 1. Provide appropriate revision numbers (i.e. R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. 107.2.4 2. Provide specific product numbers (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. 107.2.4 3. Provide correct Florida Product Approval (FPA) number for ALL products listed on Product Approval Specification Sheet; composite lumber number appears incorrect. 5. Florida Product Approval number for Roofing Underlayment does NOT match the one indicated on the Roofing Worksheet. 107.2.4 6. Provide roof ventilation calculations for required number and size of roof vents; identify size on plans and elevations. 107.2.4 7. Provide/indicate what elevation lines represent on ALL elevations; dimensions have been provided, however nothing indicates what they are dimensioning to. 107.3.5 8. Identify U.L. number for “upper tenant firewall detail” drawing on Sht. 2. Chapter 7 9. Provide U.L. Listing from ULC Online Directories for UL338; similar to U905 provided on Sht. 3. Chapter 7 10. Detail 4 on Sht. 3 identifies as a firewall detail but no U.L. Listing is provided. Chapter 7 11. Under “General” on Sht. 4 states, “all connectors shown in these drawings can be substituted with other suitable connectors”; substitutions shall have Florida Product Approval numbers. 107.2.4 12. “Common Wire To Gun Nail Conversion” table on Sht. 8 is difficult to read; numbers have been placed over numbers. 107.3.5 | |||
| CUSVC | COMPLETE | 02/05/2024 | 02/08/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 02/05/2024 | 02/08/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry and garage need to be GFCI protected. NEC 2020 210.8 | |||
| ENGIN1 | COMPLETE | 02/05/2024 | 02/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/05/2024 | 02/06/2024 |
| LOCATE | COMPLETE | 02/05/2024 | 02/06/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/05/2024 | 02/06/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs from 2023 code cycle | |||
| SW1 | COMPLETE | 02/05/2024 | 02/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/05/2024 | 02/06/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM This lot has two flood panel numbers both must be listed on survey/site plan Must have a minimum 16ft driveway for each one car garage. Total should be a minimum 32ft in width |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/05/2024 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 09/03/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/21/2024 |
| WATER- TURN ON | ¤50.00 | 03/13/2024 |
| ADJUSTMENT 50% | (¤821.61) | 03/13/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/13/2024 |
| INSPECTION - RESIDENTIAL | ¤1,256.75 | 03/13/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤356.46 | 03/13/2024 |
| IMPACT FEE TRANSPORTATION | ¤2,890.00 | 03/13/2024 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 03/13/2024 |
| SURCHARGE FS 533.721 | ¤8.22 | 03/13/2024 |
| SURCHARGE - FS 468.631 | ¤12.32 | 03/13/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/13/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/13/2024 |
| SW ENG PRE APRON | ¤30.00 | 03/13/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/13/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/13/2024 |
| SEWER INSPECTION | ¤25.00 | 03/13/2024 |
| SEWER CAPITAL FACILITY | ¤10,882.06 | 03/13/2024 |
| WATER CAPITAL FACILITY FEE | ¤7,989.02 | 03/13/2024 |
| SITE PLAN 30 | ¤30.00 | 03/13/2024 |
| CONNECTION FEES | ¤2,374.52 | 03/13/2024 |
| FC IMPACT FEE EMS | ¤124.00 | 03/13/2024 |
| IMPACT FEE FIRE | ¤856.18 | 03/13/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 03/13/2024 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 03/13/2024 |
| IMPACT FEE PARKS | ¤3,600.18 | 03/13/2024 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 03/13/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤42,059.10 |