I want to search for...
Permit #2024020216
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00440-0430 |
| CONDITIONED SPACE: 1970 sqft |
| GARAGE: 401 sqft |
| OPENED PORCH (WITH ROOF) : 18 sqft |
| OPENED PORCH (WITH ROOF) : 81 sqft |
| Total Square Footage: 2470 sqft |
| Block: 00440 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 904-531-5923 |
| Location Address: 40 PRAIRIE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/05/2024 |
| NOC: RECORDED |
| Applicant name: TAVARIS JEROME DAVIS |
| Owner: STANISLAW BAK & BAK JOLANTA |
|
Address STONEY CREEK ONTARIO, CANADA L8J 3T5, 0 |
|
Address 25 FOXTROT DR ONTARIO, CANADA L8J 3T5, 0 |
| Lot: 0430 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Construction |
| Type: CN |
Contractor
BRIGHTLAND HOMES OF FLORIDA, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3505 EAST FRONTAGE RD ADDISON, TX 75001 |
STE 145 TAMPA, FL 33607 |
CBC1267320 (Exp: 08/31/2026) | 904-531-5923 |
Sub Contractors
LARRY LAVON TURNAGE
| Status | Location Address | State License Number | Phone |
| CANCEL |
531 CODISCO WAY SANFORD, FL 32771 |
CMC1249777 (Exp: 08/31/2024) | 407-333-2665 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JAMES E LINTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
200 COLLEGE DR ORANGE PARK, FL 32065 |
EC0001152 (Exp: 08/31/2026) | 904-272-0272 |
OLIN MARSHALL CANNON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1794 ROGERO RD #2 JACKSONVILLE, FL 32211 |
CFC1426140 (Exp: 08/31/2026) | 904-343-4344 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/27/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Fix previos item 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] New inspection due to canceled inspection 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection. | |||
| BLD - BUILDING FINAL | 02/27/2025 | APPROVED | CVANSTRAHLEN |
| Note: New inspection due to canceled inspection 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection. | |||
| BLD - BUILDING FINAL | 02/21/2025 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/21/2025 8:23:39 AM *** 2/21/25: Cancelled by Applicant via text at @ 08:08. 2/19/2025 - PREVIOUS INSPECTION NOTES 2/19/25: *** Previously listed items 3, 6 and 9 remain unresolved. 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. New inspection due to canceled inspection 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection. | |||
| BLD - BUILDING FINAL | 02/19/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/19/2025 1:03:30 PM *** 2/19/25: *** Previously listed items 3, 6 and 9 remain unresolved. 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. New inspection due to canceled inspection 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection. | |||
| BLD - BUILDING FINAL | 02/18/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection. | |||
| BLD - BUILDING FINAL | 02/12/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/12/2025 4:22:17 PM *** 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection. | |||
| BLD - BUILDING FINAL | 02/05/2025 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection. | |||
| BLD - BUILDING FINAL | 12/23/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/23/2024 | APPROVED | TPOLACEK |
| Note: 12/23/24 TPOLACEK*** Inspector Notes from Inspection 9471 11/19/24 TPOLACEK*** BEFORE AFTER POUR WILL BE APPROVED BUILDER NEEDS TO CLEAN SEDIMENT FROM CULVERT PIPE. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/23/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/20/2024 5:08:08 PM *** water is locked by utility dept.-please contact to them and square away any outstanding issus Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 9/4/2024 11:27:08 AM *** no irr-no cross connection | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/19/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 11/6/2024 - PREVIOUS INSPECTION NOTES 11/6/24 UPON WALKING PROPERTY YOU HAVE ESTABLISHED A INSIDE SWALE ON THE LEFT SIDE, BUT YOUR RIGHT SIDE IS NOT A COMMON SWALE, YOUR PROPERTY LINE IS HIGHER AND SLOPED AT THE TIME OF THIS INSPECTION. SITE PLAN AND SURVEY SHOW A COMMON SWALE. Inspector Notes from Inspection 9463 11/6/24 NEW SURVEY NOW CONFORMS TO COPC 3 TENTH STANDARD FROM TOE TO HEEL REQUIREMENT ON LEFT SIDE PROPERTY LINE. WIII SEE IF IT IS REFLECTED IN THE FIELD ON THE FIELD SURVEY. APPROVING THIS SURVEY AS NOTED. _______________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES 1021/24 TPOLACEK*** FINAL SURVEY INDICATES LEFT SIDE DRAINAGE WILL NEG IMOACT ADJOINING PROPERTY ON THE LEFT SIDE. YOU MUST CREAT AN INSIDE "W" SWALE ALONG LEFT SIDE PROPERTY. A COMMON SWALE WILL NOT WORK G PROPERTY DOES NOT HAVE POSITIVE FLOW FROM REAR TO FRONT. THE SURVEY INDICATES A .10 INSIDE SWALE THE MINIMUM COPC REQUIREMENT IS .30 FROM TOP TO TOE. MUST HAVE POSITIVE FLOW FROM REAR TO FRONT. YOU MAY NOT BACKFILL AGAINST EXISTING FENCE AS WELL. PLEASE PULL SOD AND DIRT AWAY FROM FENCE EXPOSING THE BOTTOM OF FENCE. 2 No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 9/13/2024 - PREVIOUS INSPECTION NOTES 09/13/24 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE WILL NEG IMPACT ALL ADJOINING PROPERTIES. REAR YARD DRAINAGE MUST FLOW TO FRONT SWALE. DRAINAGE SWALE ALOMG SIDES MUST BE .30 LOWER THAN 10' OFF SHOT IN ADJOINING LOTS. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 7 Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Inspector Notes from Inspection 9270 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW - STORMWATER FINAL | 11/19/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 11/19/24 TPOLACEK*** BEFORE AFTER POUR WILL BE APPROVED BUILDER NEEDS TO CLEAN SEDIMENT FROM CULVERT PIPE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/06/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/6/24 NEW SURVEY NOW CONFORMS TO COPC 3 TENTH STANDARD FROM TOE TO HEEL REQUIREMENT ON LEFT SIDE PROPERTY LINE. WIII SEE IF IT IS REFLECTED IN THE FIELD ON THE FIELD SURVEY. APPROVING THIS SURVEY AS NOTED. _______________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES 1021/24 TPOLACEK*** FINAL SURVEY INDICATES LEFT SIDE DRAINAGE WILL NEG IMOACT ADJOINING PROPERTY ON THE LEFT SIDE. YOU MUST CREAT AN INSIDE "W" SWALE ALONG LEFT SIDE PROPERTY. A COMMON SWALE WILL NOT WORK G PROPERTY DOES NOT HAVE POSITIVE FLOW FROM REAR TO FRONT. THE SURVEY INDICATES A .10 INSIDE SWALE THE MINIMUM COPC REQUIREMENT IS .30 FROM TOP TO TOE. MUST HAVE POSITIVE FLOW FROM REAR TO FRONT. YOU MAY NOT BACKFILL AGAINST EXISTING FENCE AS WELL. PLEASE PULL SOD AND DIRT AWAY FROM FENCE EXPOSING THE BOTTOM OF FENCE. 2 No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 9/13/2024 - PREVIOUS INSPECTION NOTES 09/13/24 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE WILL NEG IMPACT ALL ADJOINING PROPERTIES. REAR YARD DRAINAGE MUST FLOW TO FRONT SWALE. DRAINAGE SWALE ALOMG SIDES MUST BE .30 LOWER THAN 10' OFF SHOT IN ADJOINING LOTS. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 7 Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Inspector Notes from Inspection 9270 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/06/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 11/6/24 UPON WALKING PROPERTY YOU HAVE ESTABLISHED A INSIDE SWALE ON THE LEFT SIDE, BUT YOUR RIGHT SIDE IS NOT A COMMON SWALE, YOUR PROPERTY LINE IS HIGHER AND SLOPED AT THE TIME OF THIS INSPECTION. SITE PLAN AND SURVEY SHOW A COMMON SWALE. Inspector Notes from Inspection 9463 11/6/24 NEW SURVEY NOW CONFORMS TO COPC 3 TENTH STANDARD FROM TOE TO HEEL REQUIREMENT ON LEFT SIDE PROPERTY LINE. WIII SEE IF IT IS REFLECTED IN THE FIELD ON THE FIELD SURVEY. APPROVING THIS SURVEY AS NOTED. _______________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES 1021/24 TPOLACEK*** FINAL SURVEY INDICATES LEFT SIDE DRAINAGE WILL NEG IMOACT ADJOINING PROPERTY ON THE LEFT SIDE. YOU MUST CREAT AN INSIDE "W" SWALE ALONG LEFT SIDE PROPERTY. A COMMON SWALE WILL NOT WORK G PROPERTY DOES NOT HAVE POSITIVE FLOW FROM REAR TO FRONT. THE SURVEY INDICATES A .10 INSIDE SWALE THE MINIMUM COPC REQUIREMENT IS .30 FROM TOP TO TOE. MUST HAVE POSITIVE FLOW FROM REAR TO FRONT. YOU MAY NOT BACKFILL AGAINST EXISTING FENCE AS WELL. PLEASE PULL SOD AND DIRT AWAY FROM FENCE EXPOSING THE BOTTOM OF FENCE. 2 No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 9/13/2024 - PREVIOUS INSPECTION NOTES 09/13/24 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE WILL NEG IMPACT ALL ADJOINING PROPERTIES. REAR YARD DRAINAGE MUST FLOW TO FRONT SWALE. DRAINAGE SWALE ALOMG SIDES MUST BE .30 LOWER THAN 10' OFF SHOT IN ADJOINING LOTS. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 7 Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Inspector Notes from Inspection 9270 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/21/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 1021/24 TPOLACEK*** FINAL SURVEY INDICATES LEFT SIDE DRAINAGE WILL NEG IMOACT ADJOINING PROPERTY ON THE LEFT SIDE. YOU MUST CREAT AN INSIDE "W" SWALE ALONG LEFT SIDE PROPERTY. A COMMON SWALE WILL NOT WORK G PROPERTY DOES NOT HAVE POSITIVE FLOW FROM REAR TO FRONT. THE SURVEY INDICATES A .10 INSIDE SWALE THE MINIMUM COPC REQUIREMENT IS .30 FROM TOP TO TOE. MUST HAVE POSITIVE FLOW FROM REAR TO FRONT. YOU MAY NOT BACKFILL AGAINST EXISTING FENCE AS WELL. PLEASE PULL SOD AND DIRT AWAY FROM FENCE EXPOSING THE BOTTOM OF FENCE. 2 No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 9/13/2024 - PREVIOUS INSPECTION NOTES 09/13/24 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE WILL NEG IMPACT ALL ADJOINING PROPERTIES. REAR YARD DRAINAGE MUST FLOW TO FRONT SWALE. DRAINAGE SWALE ALOMG SIDES MUST BE .30 LOWER THAN 10' OFF SHOT IN ADJOINING LOTS. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 7 Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Inspector Notes from Inspection 9270 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ELECTRIC - EARLY POWER | 09/23/2024 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/23/2024 11:37:14 AM *** 9/23/24: FPL emailed to release power. 9/13/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 9/13/2024 12:50:04 PM 9/13/24: Cancelled by Applicant via text at @ 08:42. 9/4/2024 - PREVIOUS INSPECTION NOTES 9/4/24: 1). Water heater feed is not safed off properly. Requires a temp box & blank cover to prevent accidental dislodging of wire nuts. 2). Attic access door is blocked from below by cabinets. Please move cabinets and leave drywall panel out for inspection. | |||
| ELECTRIC - EARLY POWER | 09/13/2024 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/13/2024 12:50:04 PM 9/13/24: Cancelled by Applicant via text at @ 08:42. 9/4/2024 - PREVIOUS INSPECTION NOTES 9/4/24: 1). Water heater feed is not safed off properly. Requires a temp box & blank cover to prevent accidental dislodging of wire nuts. 2). Attic access door is blocked from below by cabinets. Please move cabinets and leave drywall panel out for inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/13/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 09/13/24 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE WILL NEG IMPACT ALL ADJOINING PROPERTIES. REAR YARD DRAINAGE MUST FLOW TO FRONT SWALE. DRAINAGE SWALE ALOMG SIDES MUST BE .30 LOWER THAN 10' OFF SHOT IN ADJOINING LOTS. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 7 Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Inspector Notes from Inspection 9270 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U-CROSS CONNECTION | 09/04/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/4/2024 11:27:08 AM *** no irr-no cross connection | |||
| ELECTRIC - EARLY POWER | 09/04/2024 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/4/2024 1:25:56 PM *** 9/4/24: 1). Water heater feed is not safed off properly. Requires a temp box & blank cover to prevent accidental dislodging of wire nuts. 2). Attic access door is blocked from below by cabinets. Please move cabinets and leave drywallm panel out for inspection. | |||
| ROW- PROJECT STATUS | 08/22/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 08/26/24 TPOLACEK*** BUILDER HAS GRADED PROPERTY ACCORDING TO SITE PLAN WITH A COMMON SWALE ON BOTH SIDES. ALTHOUGH THERE IS NO SOD DOWN AND FINAL SURVEY HAS NOT YET BEEN CONDUCTED THE GRADING LOOKS TO BE AS PROPOSED. I RANG BELL AND KNOCKED BUT THERE WAS NO ANSWER. I LEFT MY CARD IN THE DOORBELL. BUILDER WILL NEED TO LOWER THE LEFT SIDE BACK OF SWALE TO ALLOW THEIR PROPOERTY TO DRAIN INTO THEIR SWALE AND NOT CROSS OVER THE PROPERTY LINE. NIEGHBOR AT 42 SAYS THEY HAVE POURED THE DRIVEWAY BUT HAVE BROUGHT IN THREE MORE TRUCK LOADS OF DIRT THE YARD IS GOING TO BE TOO HIGH AND WILL FLOOD HIS PROPERTY. PLS CHECK ELEVATIONS AND MAKE CONTACT WITH RESIDENT. MH | |||
| ROW- PRE-APRON (PRE-POUR) | 08/02/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| LATH/BRICK/ WATER BARRIER | 07/23/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection. | |||
| SEWER TIE IN | 07/11/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 7/8/2024 - PREVIOUS INSPECTION NOTES GRAVITY SEWER AND SEWER TIE NEED TO BE SCHEDUALED TOGETHER, BOTH ARE COVERD. THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 07/11/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 07/08/2024 | Disapproved - NO FEE | MGIBSON |
| Note: GRAVITY SEWER AND SEWER TIE NEED TO BE SCHEDUALED TOGETHER, BOTH ARE COVERD | |||
| LATH/BRICK/ WATER BARRIER | 06/25/2024 | APPROVED | KSANDOE |
| Note: 6/24/2024 - PREVIOUS INSPECTION NOTES 6/20/2024 - PREVIOUS INSPECTION NOTES Nail off tyvek per spec. 6/17/2024 - PREVIOUS INSPECTION NOTES Tyvek not nailed correctly. Check all areas 6/12/2024 - PREVIOUS INSPECTION NOTES Tyvek needs to be fastened per design instruction attached below Fasteners should be spaced no closer than 6” and no further than 18” on vertical and horizontal stud lines. Note: Do not fasten within 9” of rough opening head. Inspector Notes from Inspection 2420 Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed. | |||
| INSULATION | 06/25/2024 | APPROVED | KSANDOE |
| Note: 6/24/2024 - PREVIOUS INSPECTION NOTES Missing fireblocking over sub panel in garage 6/20/2024 - PREVIOUS INSPECTION NOTES Previous note has not been addressed. Missing fireblocking over sub panel in garage. 6/17/2024 - PREVIOUS INSPECTION NOTES Dryer vent top plate penetration must be sealed with fire rated foam or caulking meeting ASTM requirements | |||
| INSULATION | 06/24/2024 | Disapproved - NO FEE | KSANDOE |
| Note: Missing fireblocking over sub panel in garage 6/20/2024 - PREVIOUS INSPECTION NOTES Previous note has not been addressed. Missing fireblocking over sub panel in garage. 6/17/2024 - PREVIOUS INSPECTION NOTES Dryer vent top plate penetration must be sealed with fire rated foam or caulking meeting ASTM requirements | |||
| LATH/BRICK/ WATER BARRIER | 06/24/2024 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 6/20/2024 - PREVIOUS INSPECTION NOTES Nail off tyvek per spec. 6/17/2024 - PREVIOUS INSPECTION NOTES Tyvek not nailed correctly. Check all areas 6/12/2024 - PREVIOUS INSPECTION NOTES Tyvek needs to be fastened per design instruction attached below Fasteners should be spaced no closer than 6” and no further than 18” on vertical and horizontal stud lines. Note: Do not fasten within 9” of rough opening head. Inspector Notes from Inspection 2420 Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed. | |||
| LATH/BRICK/ WATER BARRIER | 06/20/2024 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Nail off tyvek per spec. 6/17/2024 - PREVIOUS INSPECTION NOTES Tyvek not nailed correctly. Check all areas 6/12/2024 - PREVIOUS INSPECTION NOTES Tyvek needs to be fastened per design instruction attached below Fasteners should be spaced no closer than 6” and no further than 18” on vertical and horizontal stud lines. Note: Do not fasten within 9” of rough opening head. Inspector Notes from Inspection 2420 Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed. | |||
| INSULATION | 06/20/2024 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Previous note has not been addressed. Missing fireblocking over sub panel in garage. 6/17/2024 - PREVIOUS INSPECTION NOTES Dryer vent top plate penetration must be sealed with fire rated foam or caulking meeting ASTM requirements | |||
| INSULATION | 06/17/2024 | Disapproved - NO FEE | KSANDOE |
| Note: Dryer vent top plate penetration must be sealed with fire rated foam or caulking meeting ASTM requirements | |||
| LATH/BRICK/ WATER BARRIER | 06/17/2024 | Disapproved - NO FEE | KSANDOE |
| Note: Tyvek not nailed correctly. Check all areas 6/12/2024 - PREVIOUS INSPECTION NOTES Tyvek needs to be fastened per design instruction attached below Fasteners should be spaced no closer than 6” and no further than 18” on vertical and horizontal stud lines. Note: Do not fasten within 9” of rough opening head. Inspector Notes from Inspection 2420 Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed. | |||
| LATH/BRICK/ WATER BARRIER | 06/12/2024 | Disapproved - NO FEE | KSANDOE |
| Note: Tyvek needs to be fastened per design instruction attached below Fasteners should be spaced no closer than 6” and no further than 18” on vertical and horizontal stud lines. Note: Do not fasten within 9” of rough opening head. Inspector Notes from Inspection 2420 Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed. | |||
| ROW- PROJECT STATUS | 06/11/2024 | APPROVED | PFLANAGAN |
| Note: WENT OUT TO VERIFY FFE OF THE NEW HOME AND SHOT .01 FROM THE FOUNDATION SURVEY THAT WAS PROVIDED BY SWA. THIS ELEVATION IS .78 HIGHER THAN THE ADJACENT HOUSE TO THE LEFTS ELEVATION THAT MEANS IT MEETS THE CITY STANDARDS OF NO HIGHER THAN 10". I RANG THE DOOR BELL AND KNOCKED ON THE DOOR TO TALK TO THE RESIDENT AT 42 PRAIRIE LANE AND NO ANSWER. I DID LOOK AT THE SITE PLAN FOR DRAINAGE AND THE CALLS FOR A COMMON SWALE THAT WILL FLOW TO THE ROADSIDE SWALE. NO ACTION AT THIS TIME NEEDED. ---------------------------------------------------------------------------------------------------- PLS INSPECT/VERIFY HEIGHT OF NEW HOME. NEIGHBOR AT 42 IS CONCERNED WITH ELEVATIONS. MH | |||
| ALL ROUGH | 06/10/2024 | APPROVED - AS NOTED | KSANDOE |
| Note: Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed. | |||
| ROOF VALLEY & METAL | 05/29/2024 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY KSANDOE 5/21/2024 1:35:04 PM *** Addressed minor issues with framer. Truss A01 to be cleaned so a gang plate inspection can be done on next inspection. Upload all engineered repairs for review | |||
| WALL SHEATHING | 05/21/2024 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/21/2024 | APPROVED - AS NOTED | KSANDOE |
| Note: *** NOTES ADDED BY KSANDOE 5/21/2024 1:35:04 PM *** Addressed minor issues with framer. Truss A01 to be cleaned so a gang plate inspection can be done on next inspection. Upload all engineered repairs for review | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/09/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/25/2024 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/23/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/22/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 03/28/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 09/10/2024 | 09/10/2024 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM INCORRECT ADDRESS | |||
| MECH | COMPLETE | 06/10/2024 | 06/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Duct layout signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| MECH | HOLD | 06/05/2024 | 06/10/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Duct layout signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| BLD | COMPLETE | 05/29/2024 | 06/04/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/09/2024 | 05/09/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/09/2024 | 05/09/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/17/2024 | 04/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/29/2024 | 03/04/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/23/2024 | 02/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/23/2024 | 02/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/23/2024 | 02/23/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/23/2024 | 02/29/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/23/2024 | 02/28/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/23/2024 | 02/29/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 2. Provide specific product numbers including current revisions (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. (Second Request) | |||
| BADMIN | COMPLETE | 02/23/2024 | 02/29/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/23/2024 | 03/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 02/06/2024 | 02/13/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) (YOU ARE MISSING (D) THE SHOP DRAWING APPROVAL STAMP ON THE TRUSS PACKET OR TRUSS LAYOUT. LETTER IS NOT ACCEPTED) | |||
| BLD | HOLD | 02/06/2024 | 02/13/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. City of Palm Coast Color and Material Sheet (form) appears OMITTED from submission. FBC 105 2. Provide specific product numbers including current revisions (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. 3. Provide roof underlayment and shingle revision number on Florida Product Approval Specification Sheet that corresponds with the Roofing Worksheet; underlayment Florida Product Approval number on Roofing Worksheet does not include revision number. 107.2.4 4. Provide Florida Product Approval number for shutters. 107.2.4 5. Architectural drawings do NOT have a signed seal by the Architect of Record/Engineer of Record. 6. Reference to 2023 Florida Residential Code, Section R302.3. 7. Provide elevation (height) for Second Floor on ALL Elevations. 107.3.5 8. Provide pitch/slopes of ALL roofs on the Elevations.. R802 | |||
| CUSVC | COMPLETE | 02/06/2024 | 02/08/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 02/06/2024 | 02/09/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry and garage need to be GFCI protected. NEC 2020 210.8 2. DW outlet can not be located behind the DW. NEC 2020 422.16 3. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| ENGIN1 | HOLD | 02/06/2024 | 02/07/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey | |||
| GAS | CANCEL | 02/06/2024 | 02/09/2024 |
| LOCATE | COMPLETE | 02/06/2024 | 02/09/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/06/2024 | 02/09/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show 2x4 wood walls. Energy Calcs say CMU with 4.1. Revise to match | |||
| SW1 | HOLD | 02/06/2024 | 02/07/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey | |||
| ZON | HOLD | 02/06/2024 | 02/07/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Landscape plan is not for this address Flood panel number missing on site plan/survey Lot square footage missing on site plan/survey |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 05/05/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/05/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/05/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/05/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/05/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/05/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/05/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/05/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 05/05/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/05/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/05/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/05/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/05/2024 |
| SEWER CREDIT | (¤1,342.00) | 03/05/2024 |
| SEWER INSPECTION | ¤25.00 | 03/05/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 03/05/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 03/05/2024 |
| SITE PLAN 30 | ¤30.00 | 03/05/2024 |
| WATER- TURN ON | ¤25.00 | 03/05/2024 |
| ADJUSTMENT 50% | (¤648.64) | 03/05/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/05/2024 |
| INSPECTION - RESIDENTIAL | ¤987.25 | 03/05/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤280.02 | 03/05/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 03/05/2024 |
| IMPACT FEE FIRE | ¤428.09 | 03/05/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/05/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/05/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 03/05/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/05/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 03/05/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/05/2024 |
| SURCHARGE FS 533.721 | ¤6.49 | 03/05/2024 |
| SURCHARGE - FS 468.631 | ¤9.73 | 03/05/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/05/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/05/2024 |
| SW ENG PRE APRON | ¤30.00 | 03/05/2024 |
| CONNECTION FEES | ¤1,187.26 | 03/05/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,854.73 |