I want to search for...

Permit #2024020216

Permit Details

Status: COED

Parcel Id: 07-11-31-7024-00440-0430
CONDITIONED SPACE: 1970 sqft
GARAGE: 401 sqft
OPENED PORCH (WITH ROOF) : 18 sqft
OPENED PORCH (WITH ROOF) : 81 sqft
Total Square Footage: 2470 sqft
Block: 00440
Subdivision: 2167 - SECTION 24-PINE GROVE
Job Phone: 904-531-5923
Location Address: 40 PRAIRIE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/05/2024
NOC: RECORDED
Applicant name: TAVARIS JEROME DAVIS
Owner: STANISLAW BAK & BAK JOLANTA

Address

STONEY CREEK

ONTARIO, CANADA L8J 3T5, 0

Address

25 FOXTROT DR

ONTARIO, CANADA L8J 3T5, 0

Lot: 0430
Contracted Stated Job Value: ¤250,000.00
Job Description: Single Family Construction
Type: CN

Contractor

BRIGHTLAND HOMES OF FLORIDA, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

3505 EAST FRONTAGE RD

ADDISON, TX 75001

STE 145

TAMPA, FL 33607

CBC1267320 (Exp: 08/31/2026) 904-531-5923

Sub Contractors

LARRY LAVON TURNAGE
Status Location Address State License Number Phone
CANCEL

531 CODISCO WAY

SANFORD, FL 32771

CMC1249777 (Exp: 08/31/2024) 407-333-2665
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JAMES E LINTON
Status Location Address State License Number Phone
ACTIVE

200 COLLEGE DR

ORANGE PARK, FL 32065

EC0001152 (Exp: 08/31/2026) 904-272-0272
OLIN MARSHALL CANNON
Status Location Address State License Number Phone
INACTIVE

1794 ROGERO RD #2

JACKSONVILLE, FL 32211

CFC1426140 (Exp: 08/31/2026) 904-343-4344

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/27/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Fix previos item 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] New inspection due to canceled inspection 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection.
BLD - BUILDING FINAL 02/27/2025 APPROVED CVANSTRAHLEN
Note: New inspection due to canceled inspection 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection.
BLD - BUILDING FINAL 02/21/2025 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 2/21/2025 8:23:39 AM *** 2/21/25: Cancelled by Applicant via text at @ 08:08. 2/19/2025 - PREVIOUS INSPECTION NOTES 2/19/25: *** Previously listed items 3, 6 and 9 remain unresolved. 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. New inspection due to canceled inspection 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection.
BLD - BUILDING FINAL 02/19/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/19/2025 1:03:30 PM *** 2/19/25: *** Previously listed items 3, 6 and 9 remain unresolved. 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. New inspection due to canceled inspection 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection.
BLD - BUILDING FINAL 02/18/2025 CANCELLED BY APPLICANT WEB
Note: 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection.
BLD - BUILDING FINAL 02/12/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/12/2025 4:22:17 PM *** 2/12/25: Inspection Complete. Waiting to result deficiencies. 1). Outdoor condensing unit requires 3" clearance from finished grade. FBCR M1305.1.4.1 2). Breakers in Meter panel need to be identified. NEC 408.4 (A) 3). FBC-P504.7.2 - Water heater relief valve discharge tube must extend to the exterior of the building and terminate not less than 6" (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface. 4). Laundry room outlets are not GFCI protected as required. NEC 210.8(A)(10). 5). Kitchen outlets are not GFCI protected as required. NEC 210.8(A)(6). 6). Kitchen island wall outlet below counter cannot be on the small appliance circuit [NEC-210.52(B)(2)] & cannot be located where it is since the counter overhang exceeds 6" past the support base. [NEC-210.52(C)(3)(3)] 7). Garbage disposal has foreign debris in it and cannot be effectively inspected. FBC-P2503.1 8). Dryer exhaust box needs to be sealed around the perimeter as required. FBC EC TABLE R402.4.1.1 9). AHU closet: Ceiling needs to be sealed at MC cable entrance into attic. FBC-302.11. 10). Locknut on MC fitting into AHU needs to be securely fastened/tightened. NEC 330.40 11). Please remove plastic from garage door safety eyes. FBC [A]107.4 12). Final termite inspection is missing. Sticker on the panel exceeds the maximum time frame that the final inspection can be completed prior to Building Final Inspection. FBC-R318 13). Master bathroom light switches cannot be located behind the door where the door needs to be almost fully closed to access them. Per NEC 210.70 (A)(1) Need to be near the entrance. New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection.
BLD - BUILDING FINAL 02/05/2025 CANCELLED BY APPLICANT WEB
Note: New inspection due to canceled inspection Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection.
BLD - BUILDING FINAL 12/23/2024 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2320 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection.
ROW - FINAL APRON (AFTER POUR) 12/23/2024 APPROVED TPOLACEK
Note: 12/23/24 TPOLACEK*** Inspector Notes from Inspection 9471 11/19/24 TPOLACEK*** BEFORE AFTER POUR WILL BE APPROVED BUILDER NEEDS TO CLEAN SEDIMENT FROM CULVERT PIPE.
U -UTILITY RESIDENTIAL FINAL 12/23/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/20/2024 5:08:08 PM *** water is locked by utility dept.-please contact to them and square away any outstanding issus Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 9/4/2024 11:27:08 AM *** no irr-no cross connection
ROW FIELD SURVEY /GRADING CERTIFICATION 11/19/2024 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 11/6/2024 - PREVIOUS INSPECTION NOTES 11/6/24 UPON WALKING PROPERTY YOU HAVE ESTABLISHED A INSIDE SWALE ON THE LEFT SIDE, BUT YOUR RIGHT SIDE IS NOT A COMMON SWALE, YOUR PROPERTY LINE IS HIGHER AND SLOPED AT THE TIME OF THIS INSPECTION. SITE PLAN AND SURVEY SHOW A COMMON SWALE. Inspector Notes from Inspection 9463 11/6/24 NEW SURVEY NOW CONFORMS TO COPC 3 TENTH STANDARD FROM TOE TO HEEL REQUIREMENT ON LEFT SIDE PROPERTY LINE. WIII SEE IF IT IS REFLECTED IN THE FIELD ON THE FIELD SURVEY. APPROVING THIS SURVEY AS NOTED. _______________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES 1021/24 TPOLACEK*** FINAL SURVEY INDICATES LEFT SIDE DRAINAGE WILL NEG IMOACT ADJOINING PROPERTY ON THE LEFT SIDE. YOU MUST CREAT AN INSIDE "W" SWALE ALONG LEFT SIDE PROPERTY. A COMMON SWALE WILL NOT WORK G PROPERTY DOES NOT HAVE POSITIVE FLOW FROM REAR TO FRONT. THE SURVEY INDICATES A .10 INSIDE SWALE THE MINIMUM COPC REQUIREMENT IS .30 FROM TOP TO TOE. MUST HAVE POSITIVE FLOW FROM REAR TO FRONT. YOU MAY NOT BACKFILL AGAINST EXISTING FENCE AS WELL. PLEASE PULL SOD AND DIRT AWAY FROM FENCE EXPOSING THE BOTTOM OF FENCE. 2 No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 9/13/2024 - PREVIOUS INSPECTION NOTES 09/13/24 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE WILL NEG IMPACT ALL ADJOINING PROPERTIES. REAR YARD DRAINAGE MUST FLOW TO FRONT SWALE. DRAINAGE SWALE ALOMG SIDES MUST BE .30 LOWER THAN 10' OFF SHOT IN ADJOINING LOTS. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 7 Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Inspector Notes from Inspection 9270 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW - STORMWATER FINAL 11/19/2024 APPROVED - AS NOTED TPOLACEK
Note: 11/19/24 TPOLACEK*** BEFORE AFTER POUR WILL BE APPROVED BUILDER NEEDS TO CLEAN SEDIMENT FROM CULVERT PIPE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/06/2024 APPROVED - AS NOTED FSLADISH
Note: 11/6/24 NEW SURVEY NOW CONFORMS TO COPC 3 TENTH STANDARD FROM TOE TO HEEL REQUIREMENT ON LEFT SIDE PROPERTY LINE. WIII SEE IF IT IS REFLECTED IN THE FIELD ON THE FIELD SURVEY. APPROVING THIS SURVEY AS NOTED. _______________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES 1021/24 TPOLACEK*** FINAL SURVEY INDICATES LEFT SIDE DRAINAGE WILL NEG IMOACT ADJOINING PROPERTY ON THE LEFT SIDE. YOU MUST CREAT AN INSIDE "W" SWALE ALONG LEFT SIDE PROPERTY. A COMMON SWALE WILL NOT WORK G PROPERTY DOES NOT HAVE POSITIVE FLOW FROM REAR TO FRONT. THE SURVEY INDICATES A .10 INSIDE SWALE THE MINIMUM COPC REQUIREMENT IS .30 FROM TOP TO TOE. MUST HAVE POSITIVE FLOW FROM REAR TO FRONT. YOU MAY NOT BACKFILL AGAINST EXISTING FENCE AS WELL. PLEASE PULL SOD AND DIRT AWAY FROM FENCE EXPOSING THE BOTTOM OF FENCE. 2 No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 9/13/2024 - PREVIOUS INSPECTION NOTES 09/13/24 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE WILL NEG IMPACT ALL ADJOINING PROPERTIES. REAR YARD DRAINAGE MUST FLOW TO FRONT SWALE. DRAINAGE SWALE ALOMG SIDES MUST BE .30 LOWER THAN 10' OFF SHOT IN ADJOINING LOTS. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 7 Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Inspector Notes from Inspection 9270 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW FIELD SURVEY /GRADING CERTIFICATION 11/06/2024 Disapproved - NO FEE FSLADISH
Note: 11/6/24 UPON WALKING PROPERTY YOU HAVE ESTABLISHED A INSIDE SWALE ON THE LEFT SIDE, BUT YOUR RIGHT SIDE IS NOT A COMMON SWALE, YOUR PROPERTY LINE IS HIGHER AND SLOPED AT THE TIME OF THIS INSPECTION. SITE PLAN AND SURVEY SHOW A COMMON SWALE. Inspector Notes from Inspection 9463 11/6/24 NEW SURVEY NOW CONFORMS TO COPC 3 TENTH STANDARD FROM TOE TO HEEL REQUIREMENT ON LEFT SIDE PROPERTY LINE. WIII SEE IF IT IS REFLECTED IN THE FIELD ON THE FIELD SURVEY. APPROVING THIS SURVEY AS NOTED. _______________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES 1021/24 TPOLACEK*** FINAL SURVEY INDICATES LEFT SIDE DRAINAGE WILL NEG IMOACT ADJOINING PROPERTY ON THE LEFT SIDE. YOU MUST CREAT AN INSIDE "W" SWALE ALONG LEFT SIDE PROPERTY. A COMMON SWALE WILL NOT WORK G PROPERTY DOES NOT HAVE POSITIVE FLOW FROM REAR TO FRONT. THE SURVEY INDICATES A .10 INSIDE SWALE THE MINIMUM COPC REQUIREMENT IS .30 FROM TOP TO TOE. MUST HAVE POSITIVE FLOW FROM REAR TO FRONT. YOU MAY NOT BACKFILL AGAINST EXISTING FENCE AS WELL. PLEASE PULL SOD AND DIRT AWAY FROM FENCE EXPOSING THE BOTTOM OF FENCE. 2 No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 9/13/2024 - PREVIOUS INSPECTION NOTES 09/13/24 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE WILL NEG IMPACT ALL ADJOINING PROPERTIES. REAR YARD DRAINAGE MUST FLOW TO FRONT SWALE. DRAINAGE SWALE ALOMG SIDES MUST BE .30 LOWER THAN 10' OFF SHOT IN ADJOINING LOTS. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 7 Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Inspector Notes from Inspection 9270 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/21/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 1021/24 TPOLACEK*** FINAL SURVEY INDICATES LEFT SIDE DRAINAGE WILL NEG IMOACT ADJOINING PROPERTY ON THE LEFT SIDE. YOU MUST CREAT AN INSIDE "W" SWALE ALONG LEFT SIDE PROPERTY. A COMMON SWALE WILL NOT WORK G PROPERTY DOES NOT HAVE POSITIVE FLOW FROM REAR TO FRONT. THE SURVEY INDICATES A .10 INSIDE SWALE THE MINIMUM COPC REQUIREMENT IS .30 FROM TOP TO TOE. MUST HAVE POSITIVE FLOW FROM REAR TO FRONT. YOU MAY NOT BACKFILL AGAINST EXISTING FENCE AS WELL. PLEASE PULL SOD AND DIRT AWAY FROM FENCE EXPOSING THE BOTTOM OF FENCE. 2 No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. 9/13/2024 - PREVIOUS INSPECTION NOTES 09/13/24 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE WILL NEG IMPACT ALL ADJOINING PROPERTIES. REAR YARD DRAINAGE MUST FLOW TO FRONT SWALE. DRAINAGE SWALE ALOMG SIDES MUST BE .30 LOWER THAN 10' OFF SHOT IN ADJOINING LOTS. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 7 Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Inspector Notes from Inspection 9270 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ELECTRIC - EARLY POWER 09/23/2024 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/23/2024 11:37:14 AM *** 9/23/24: FPL emailed to release power. 9/13/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 9/13/2024 12:50:04 PM 9/13/24: Cancelled by Applicant via text at @ 08:42. 9/4/2024 - PREVIOUS INSPECTION NOTES 9/4/24: 1). Water heater feed is not safed off properly. Requires a temp box & blank cover to prevent accidental dislodging of wire nuts. 2). Attic access door is blocked from below by cabinets. Please move cabinets and leave drywall panel out for inspection.
ELECTRIC - EARLY POWER 09/13/2024 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 9/13/2024 12:50:04 PM 9/13/24: Cancelled by Applicant via text at @ 08:42. 9/4/2024 - PREVIOUS INSPECTION NOTES 9/4/24: 1). Water heater feed is not safed off properly. Requires a temp box & blank cover to prevent accidental dislodging of wire nuts. 2). Attic access door is blocked from below by cabinets. Please move cabinets and leave drywall panel out for inspection.
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/13/2024 Disapproved - NO FEE TPOLACEK
Note: 09/13/24 TPOLACEK*** FINAL SURVEY INDICATES REAR YARD DRAINAGE WILL NEG IMPACT ALL ADJOINING PROPERTIES. REAR YARD DRAINAGE MUST FLOW TO FRONT SWALE. DRAINAGE SWALE ALOMG SIDES MUST BE .30 LOWER THAN 10' OFF SHOT IN ADJOINING LOTS. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 7 Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 19 Top of the slope sec 300.02.C(6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Inspector Notes from Inspection 9270 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
U-CROSS CONNECTION 09/04/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 9/4/2024 11:27:08 AM *** no irr-no cross connection
ELECTRIC - EARLY POWER 09/04/2024 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 9/4/2024 1:25:56 PM *** 9/4/24: 1). Water heater feed is not safed off properly. Requires a temp box & blank cover to prevent accidental dislodging of wire nuts. 2). Attic access door is blocked from below by cabinets. Please move cabinets and leave drywallm panel out for inspection.
ROW- PROJECT STATUS 08/22/2024 APPROVED - AS NOTED TPOLACEK
Note: 08/26/24 TPOLACEK*** BUILDER HAS GRADED PROPERTY ACCORDING TO SITE PLAN WITH A COMMON SWALE ON BOTH SIDES. ALTHOUGH THERE IS NO SOD DOWN AND FINAL SURVEY HAS NOT YET BEEN CONDUCTED THE GRADING LOOKS TO BE AS PROPOSED. I RANG BELL AND KNOCKED BUT THERE WAS NO ANSWER. I LEFT MY CARD IN THE DOORBELL. BUILDER WILL NEED TO LOWER THE LEFT SIDE BACK OF SWALE TO ALLOW THEIR PROPOERTY TO DRAIN INTO THEIR SWALE AND NOT CROSS OVER THE PROPERTY LINE. NIEGHBOR AT 42 SAYS THEY HAVE POURED THE DRIVEWAY BUT HAVE BROUGHT IN THREE MORE TRUCK LOADS OF DIRT THE YARD IS GOING TO BE TOO HIGH AND WILL FLOOD HIS PROPERTY. PLS CHECK ELEVATIONS AND MAKE CONTACT WITH RESIDENT. MH
ROW- PRE-APRON (PRE-POUR) 08/02/2024 APPROVED - AS NOTED FSLADISH
Note: 8/2/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. WITH A POSSIBLE STORM COMING THIS WAY IT IS THE BUILDERS RESPONSIBILITY TO DOUBLE CHECK ELEVATIONS AND SITE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
LATH/BRICK/ WATER BARRIER 07/23/2024 APPROVED - AS NOTED RSIMS
Note: 7/23/24: 1). Permit box needs attention & post needs to be reset. 2). Please remove overgrowth to make site safe for inspection.
SEWER TIE IN 07/11/2024 APPROVED - AS NOTED MGIBSON
Note: 7/8/2024 - PREVIOUS INSPECTION NOTES GRAVITY SEWER AND SEWER TIE NEED TO BE SCHEDUALED TOGETHER, BOTH ARE COVERD. THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 07/11/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 07/08/2024 Disapproved - NO FEE MGIBSON
Note: GRAVITY SEWER AND SEWER TIE NEED TO BE SCHEDUALED TOGETHER, BOTH ARE COVERD
LATH/BRICK/ WATER BARRIER 06/25/2024 APPROVED KSANDOE
Note: 6/24/2024 - PREVIOUS INSPECTION NOTES 6/20/2024 - PREVIOUS INSPECTION NOTES Nail off tyvek per spec. 6/17/2024 - PREVIOUS INSPECTION NOTES Tyvek not nailed correctly. Check all areas 6/12/2024 - PREVIOUS INSPECTION NOTES Tyvek needs to be fastened per design instruction attached below Fasteners should be spaced no closer than 6” and no further than 18” on vertical and horizontal stud lines. Note: Do not fasten within 9” of rough opening head. Inspector Notes from Inspection 2420 Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed.
INSULATION 06/25/2024 APPROVED KSANDOE
Note: 6/24/2024 - PREVIOUS INSPECTION NOTES Missing fireblocking over sub panel in garage 6/20/2024 - PREVIOUS INSPECTION NOTES Previous note has not been addressed. Missing fireblocking over sub panel in garage. 6/17/2024 - PREVIOUS INSPECTION NOTES Dryer vent top plate penetration must be sealed with fire rated foam or caulking meeting ASTM requirements
INSULATION 06/24/2024 Disapproved - NO FEE KSANDOE
Note: Missing fireblocking over sub panel in garage 6/20/2024 - PREVIOUS INSPECTION NOTES Previous note has not been addressed. Missing fireblocking over sub panel in garage. 6/17/2024 - PREVIOUS INSPECTION NOTES Dryer vent top plate penetration must be sealed with fire rated foam or caulking meeting ASTM requirements
LATH/BRICK/ WATER BARRIER 06/24/2024 CANCELLED BY APPLICANT KSANDOE
Note: 6/20/2024 - PREVIOUS INSPECTION NOTES Nail off tyvek per spec. 6/17/2024 - PREVIOUS INSPECTION NOTES Tyvek not nailed correctly. Check all areas 6/12/2024 - PREVIOUS INSPECTION NOTES Tyvek needs to be fastened per design instruction attached below Fasteners should be spaced no closer than 6” and no further than 18” on vertical and horizontal stud lines. Note: Do not fasten within 9” of rough opening head. Inspector Notes from Inspection 2420 Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed.
LATH/BRICK/ WATER BARRIER 06/20/2024 Disapproved -FEE REQUIRED KSANDOE
Note: Nail off tyvek per spec. 6/17/2024 - PREVIOUS INSPECTION NOTES Tyvek not nailed correctly. Check all areas 6/12/2024 - PREVIOUS INSPECTION NOTES Tyvek needs to be fastened per design instruction attached below Fasteners should be spaced no closer than 6” and no further than 18” on vertical and horizontal stud lines. Note: Do not fasten within 9” of rough opening head. Inspector Notes from Inspection 2420 Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed.
INSULATION 06/20/2024 Disapproved -FEE REQUIRED KSANDOE
Note: Previous note has not been addressed. Missing fireblocking over sub panel in garage. 6/17/2024 - PREVIOUS INSPECTION NOTES Dryer vent top plate penetration must be sealed with fire rated foam or caulking meeting ASTM requirements
INSULATION 06/17/2024 Disapproved - NO FEE KSANDOE
Note: Dryer vent top plate penetration must be sealed with fire rated foam or caulking meeting ASTM requirements
LATH/BRICK/ WATER BARRIER 06/17/2024 Disapproved - NO FEE KSANDOE
Note: Tyvek not nailed correctly. Check all areas 6/12/2024 - PREVIOUS INSPECTION NOTES Tyvek needs to be fastened per design instruction attached below Fasteners should be spaced no closer than 6” and no further than 18” on vertical and horizontal stud lines. Note: Do not fasten within 9” of rough opening head. Inspector Notes from Inspection 2420 Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed.
LATH/BRICK/ WATER BARRIER 06/12/2024 Disapproved - NO FEE KSANDOE
Note: Tyvek needs to be fastened per design instruction attached below Fasteners should be spaced no closer than 6” and no further than 18” on vertical and horizontal stud lines. Note: Do not fasten within 9” of rough opening head. Inspector Notes from Inspection 2420 Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed.
ROW- PROJECT STATUS 06/11/2024 APPROVED PFLANAGAN
Note: WENT OUT TO VERIFY FFE OF THE NEW HOME AND SHOT .01 FROM THE FOUNDATION SURVEY THAT WAS PROVIDED BY SWA. THIS ELEVATION IS .78 HIGHER THAN THE ADJACENT HOUSE TO THE LEFTS ELEVATION THAT MEANS IT MEETS THE CITY STANDARDS OF NO HIGHER THAN 10". I RANG THE DOOR BELL AND KNOCKED ON THE DOOR TO TALK TO THE RESIDENT AT 42 PRAIRIE LANE AND NO ANSWER. I DID LOOK AT THE SITE PLAN FOR DRAINAGE AND THE CALLS FOR A COMMON SWALE THAT WILL FLOW TO THE ROADSIDE SWALE. NO ACTION AT THIS TIME NEEDED. ---------------------------------------------------------------------------------------------------- PLS INSPECT/VERIFY HEIGHT OF NEW HOME. NEIGHBOR AT 42 IS CONCERNED WITH ELEVATIONS. MH
ALL ROUGH 06/10/2024 APPROVED - AS NOTED KSANDOE
Note: Will check all at insulation Shower surround not installed Dryer exhaust vent sealed at top plate with standard gap foam must be replaced with fire rated foam or caulk Gap in rough opening at rear slider and front entry door cannot exceed .25" Electrical at service panel must be secured within 12" of panel Bathroom exhaust duct not installed at owner bath. Bathroom exhaust must be secured with 2 methods. Kitchen island electrical not connected. Needs to be trenched. Plumbing and exhaust terminations at roof sheathing have not been installed.
ROOF VALLEY & METAL 05/29/2024 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY KSANDOE 5/21/2024 1:35:04 PM *** Addressed minor issues with framer. Truss A01 to be cleaned so a gang plate inspection can be done on next inspection. Upload all engineered repairs for review
WALL SHEATHING 05/21/2024 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/21/2024 APPROVED - AS NOTED KSANDOE
Note: *** NOTES ADDED BY KSANDOE 5/21/2024 1:35:04 PM *** Addressed minor issues with framer. Truss A01 to be cleaned so a gang plate inspection can be done on next inspection. Upload all engineered repairs for review
FOUND SURVEY APPROVED (OFFICE) 05/09/2024 APPROVED TBAKER
MONOLITHIC SLAB 04/25/2024 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 04/23/2024 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/22/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 03/28/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BADMIN INFORMATION 09/10/2024 09/10/2024
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM INCORRECT ADDRESS
MECH COMPLETE 06/10/2024 06/14/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Duct layout signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition
MECH HOLD 06/05/2024 06/10/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Duct layout signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition
BLD COMPLETE 05/29/2024 06/04/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/09/2024 05/09/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/09/2024 05/09/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 04/17/2024 04/22/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 02/29/2024 03/04/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/23/2024 02/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 02/23/2024 02/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/23/2024 02/23/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 02/23/2024 02/29/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 02/23/2024 02/28/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 02/23/2024 02/29/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 2. Provide specific product numbers including current revisions (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. (Second Request)
BADMIN COMPLETE 02/23/2024 02/29/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 02/23/2024 03/25/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN HOLD 02/06/2024 02/13/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) (YOU ARE MISSING (D) THE SHOP DRAWING APPROVAL STAMP ON THE TRUSS PACKET OR TRUSS LAYOUT. LETTER IS NOT ACCEPTED)
BLD HOLD 02/06/2024 02/13/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. City of Palm Coast Color and Material Sheet (form) appears OMITTED from submission. FBC 105 2. Provide specific product numbers including current revisions (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. 3. Provide roof underlayment and shingle revision number on Florida Product Approval Specification Sheet that corresponds with the Roofing Worksheet; underlayment Florida Product Approval number on Roofing Worksheet does not include revision number. 107.2.4 4. Provide Florida Product Approval number for shutters. 107.2.4 5. Architectural drawings do NOT have a signed seal by the Architect of Record/Engineer of Record. 6. Reference to 2023 Florida Residential Code, Section R302.3. 7. Provide elevation (height) for Second Floor on ALL Elevations. 107.3.5 8. Provide pitch/slopes of ALL roofs on the Elevations.. R802
CUSVC COMPLETE 02/06/2024 02/08/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 02/06/2024 02/09/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry and garage need to be GFCI protected. NEC 2020 210.8 2. DW outlet can not be located behind the DW. NEC 2020 422.16 3. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67
ENGIN1 HOLD 02/06/2024 02/07/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey
GAS CANCEL 02/06/2024 02/09/2024
LOCATE COMPLETE 02/06/2024 02/09/2024
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH HOLD 02/06/2024 02/09/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show 2x4 wood walls. Energy Calcs say CMU with 4.1. Revise to match
SW1 HOLD 02/06/2024 02/07/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey
ZON HOLD 02/06/2024 02/07/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Landscape plan is not for this address Flood panel number missing on site plan/survey Lot square footage missing on site plan/survey

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 05/05/2025
PLAN REVIEW - REVISION ¤32.50 05/05/2025
REINSPECTION RESIDENTIAL ¤40.00 05/05/2025
REINSPECTION RESIDENTIAL ¤40.00 05/05/2025
REINSPECTION RESIDENTIAL ¤40.00 05/05/2025
REINSPECTION RESIDENTIAL ¤40.00 05/05/2025
REINSPECTION RESIDENTIAL ¤40.00 05/05/2025
REINSPECTION RESIDENTIAL ¤40.00 05/05/2025
CONTRACTOR CHANGE ¤20.00 05/05/2025
SW ENG REINSPECTION 20 ¤20.00 05/05/2025
SW ENG REINSPECTION 20 ¤20.00 05/05/2025
SW ENG - REVIEW 20 ¤20.00 03/05/2024
SW ENG RES REVIEW 200 ¤200.00 03/05/2024
SEWER CREDIT (¤1,342.00) 03/05/2024
SEWER INSPECTION ¤25.00 03/05/2024
SEWER CAPITAL FACILITY ¤5,441.03 03/05/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 03/05/2024
SITE PLAN 30 ¤30.00 03/05/2024
WATER- TURN ON ¤25.00 03/05/2024
ADJUSTMENT 50% (¤648.64) 03/05/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/05/2024
INSPECTION - RESIDENTIAL ¤987.25 03/05/2024
PLAN REVIEW - RESIDENTIAL ¤280.02 03/05/2024
FC IMPACT FEE EMS ¤62.00 03/05/2024
IMPACT FEE FIRE ¤428.09 03/05/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/05/2024
FC IMPACT FEE LIBRARY ¤268.00 03/05/2024
IMPACT FEE PARKS ¤1,800.99 03/05/2024
IMPACT FEE SCHOOL ¤5,450.00 03/05/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 03/05/2024
WATER -IRRIGATION INSPECTION ¤25.00 03/05/2024
SURCHARGE FS 533.721 ¤6.49 03/05/2024
SURCHARGE - FS 468.631 ¤9.73 03/05/2024
SW ENG - FOUNDATION SURVEY ¤20.00 03/05/2024
SW ENG INSPECTION 80 ¤80.00 03/05/2024
SW ENG PRE APRON ¤30.00 03/05/2024
CONNECTION FEES ¤1,187.26 03/05/2024
Fees Total Due: ¤0.00 Total Paid: ¤20,854.73