Permit #2024020436

Permit Details

Status: COED

Parcel Id: 28-10-30-4295-00000-0040
COMMERCIAL SQUARE FOOTAGE: 90000 sqft
Total Square Footage: 89598 sqft
Block: 00000
Subdivision: 2157 - Palm Coast Park Tracts 18 & 20
Job Phone: 321-723-5661
Location Address: 105 MATANZAS WOODS PKWY
Type: BC - BUILDING COMMERCIAL
Issue Date: 05/20/2024
NOC: RECORDED
Applicant name: GARY HOWELL II NEAL
Owner: PALM COAST REH LLC

Address

577 BARNES BLVD, STE 650

ROCKLEDGE, FL 32955

Lot: 0040
Contracted Stated Job Value: ¤5,881,291.00
Job Description: Storage Facility - 3 story 90,000 sf
Type: CN

Contractor

M E CONSTRUCTION INC
Status Location Address State License Number Phone
ACTIVE

445 PINEDA CT

MELBOURNE, FL 32940

CGC1525425 (Exp: 08/31/2026) 321-723-5661

Sub Contractors

GARY S WELBORN
Status Location Address State License Number Phone Fax
ACTIVE

1709 North Nova Road

Holly Hill, 32117

CFC1426839 (Exp: 08/31/2026) (386) 257-1172 386-252-5979
RANDY E WHIDDEN
Status Location Address State License Number Phone
ACTIVE

4 WOOD ARBOR LANE

PALM COAST, FL 32164

EC13009295 (Exp: 08/31/2026) 386-302-8861
SHADI NOWISSER
Status Location Address State License Number Phone
INACTIVE

4201 VINELAND ROAD SUITE I-1

ORLANDO, FL 32811

CMC1250925 (Exp: 08/31/2026) 407-401-9933
GARY HOWELL II NEAL
Status Location Address State License Number Phone
ACTIVE

445 PINEDA CT

MELBOURNE, FL 32940

CGC1525425 (Exp: 08/31/2026) 321-723-5661

Inspection History

Type Request Date Result Inspector
U - UTILITY COMMERCIAL FINAL 10/23/2025 FINAL APPROVED BWRIGHT
Note: 9/19/2025 - PREVIOUS INSPECTION NOTES Site work will have to be closed out first.
FIRE FINAL 10/22/2025 APPROVED RMARTIN
Note: 10/21/2025 - PREVIOUS INSPECTION NOTES 10/6/2025 - PREVIOUS INSPECTION NOTES Need to have building address on building, R sign on front of building and fire sprinkler/alarm permits finaled prior to fire final on building permit
FIRE FINAL 10/21/2025 CANCELLED BY APPLICANT RMARTIN
Note: 10/6/2025 - PREVIOUS INSPECTION NOTES Need to have building address on building, R sign on front of building and fire sprinkler/alarm permits finaled prior to fire final on building permit
BUILDING FINAL 10/21/2025 FINAL APPROVED HCAMACHO
Note: 10/7/2025 - PREVIOUS INSPECTION NOTES 10/7/25 - NEED FIRE FINAL AND ADA INSIDE INSPECTION. New inspection due to canceled inspection Inspector Notes from Inspection 3470 7/24/25 Need to leave out a couple tiles to verify sealing of ducts, one by front door and one at return. 7/3/2025 - PREVIOUS INSPECTION NOTES not ready
U-WATER SERVICE INSTALLATION 10/21/2025 APPROVED BWRIGHT
Note: 9/19/2025 - PREVIOUS INSPECTION NOTES Site work will have to be closed out first.
EXTERIOR ARCHITECTURAL FEATURES 10/17/2025 APPROVED RPICATAGI
Note: New inspection due to canceled inspection 9/19/2025 2:28:47 PM- PREVIOUS INSPECTION NOTES 1.Architectural features of the building itself is are acceptable. 2. In accordance with LDC Section 13.04.07 A the following is required. "When visible or audible from the adjacent property of from the public right-of-way, mechanical equipment (A/C) , Utilities and Storage- shall be screened by WALLS, FENCING, ROOF ELEMENTS OR LANDSCAPING. Screening shall be at least one foot above the equipment being screeded." Applicant must provide screening for A/C units (more than 20 units) as described above.
EXTERIOR ARCHITECTURAL FEATURES 10/16/2025 CANCELLED BY APPLICANT WEB
Note: 9/19/2025 2:28:47 PM- PREVIOUS INSPECTION NOTES 1.Architectural features of the building itself is are acceptable. 2. In accordance with LDC Section 13.04.07 A the following is required. "When visible or audible from the adjacent property of from the public right-of-way, mechanical equipment (A/C) , Utilities and Storage- shall be screened by WALLS, FENCING, ROOF ELEMENTS OR LANDSCAPING. Screening shall be at least one foot above the equipment being screeded." Applicant must provide screening for A/C units (more than 20 units) as described above.
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 10/08/2025 APPROVED FWILLIS
BLD- ADA PARKING 10/08/2025 APPROVED FWILLIS
ELEVATOR CERTIFICATE - STATE 10/08/2025 APPROVED JMUNSON
Note: 10/6/2025 - PREVIOUS INSPECTION NOTES Need to upload Final Elevator paperwork/certificate to the cities portal and reschedule the inspection once that is complete.
FOOTER 10/07/2025 APPROVED FWILLIS
Note: 2 GATES NORTH AND SOUTH.
BUILDING FINAL 10/07/2025 Disapproved - NO FEE FWILLIS
Note: 10/7/25 - NEED FIRE FINAL AND ADA INSIDE INSPECTION. New inspection due to canceled inspection Inspector Notes from Inspection 3470 7/24/25 Need to leave out a couple tiles to verify sealing of ducts, one by front door and one at return. 7/3/2025 - PREVIOUS INSPECTION NOTES not ready
FIRE FINAL 10/06/2025 Disapproved - NO FEE RMARTIN
Note: Need to have building address on building, R sign on front of building and fire sprinkler/alarm permits finaled prior to fire final on building permit
BUILDING FINAL 10/06/2025 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 3470 7/24/25 Need to leave out a couple tiles to verify sealing of ducts, one by front door and one at return. 7/3/2025 - PREVIOUS INSPECTION NOTES not ready
ELECTRIC FINAL 10/06/2025 APPROVED RMARTIN
Note: 9/19/2025 - PREVIOUS INSPECTION NOTES 1-Need to have panel schedules match approved plans 2-Need to have service outlet by ouside A/C units NEC 210.63 3-Need to have correct over currect protection per the name plate on AHU's NEC 440.6 4-AHU service outlets have pumps that plug in that can not be suspended without support NEC 410.56 F
ELEVATOR CERTIFICATE - STATE 10/06/2025 Disapproved - NO FEE RMARTIN
Note: Need to upload Final Elevator paperwork/certificate to the cities portal and reschedule the inspection once that is complete.
HVAC FINAL 09/30/2025 FINAL APPROVED CPISCITELLI
Note: 9/19/2025 - PREVIOUS INSPECTION NOTES 8/26/2025 - PREVIOUS INSPECTION NOTES
HVAC FINAL 09/19/2025 Disapproved -FEE REQUIRED CPISCITELLI
Note: 8/26/2025 - PREVIOUS INSPECTION NOTES 1. Need to reroute drains outside 12 inches off building on left side of building 2. Need to tape wrap on AHU 12 3. Need to tape gap between filter rack and AHU on AHU 4 and AHU 11 4. Need to mark heaters on third floor all AHUs 5. Breakers for AHUs do not match breakers in panel. Calling for 50 AMP. Breakers are 45 AMP 6. Need unistrut caps for AHU 20 and AHU 21 7. Need to sleeve minisplit wire penetrating firewall and seal hole and firecaulk annular space.
ELECTRIC FINAL 09/19/2025 FINAL APPROVED RMARTIN
ELECTRIC FINAL 09/19/2025 Disapproved - NO FEE RMARTIN
Note: 1-Need to have panel schedules match approved plans 2-Need to have service outlet by ouside A/C units NEC 210.63 3-Need to have correct over currect protection per the name plate on AHU's NEC 440.6 4-AHU service outlets have pumps that plug in that can not be suspended without support NEC 410.56 F
EXTERIOR ARCHITECTURAL FEATURES 09/19/2025 Disapproved - NO FEE RPICATAGI
Note: 1.Architectural features of the building itself is are acceptable. 2. In accordance with LDC Section 13.04.07 A the following is required. "When visible or audible from the adjacent property of from the public right-of-way, mechanical equipment (A/C) , Utilities and Storage- shall be screened by WALLS, FENCING, ROOF ELEMENTS OR LANDSCAPING. Screening shall be at least one foot above the equipment being screeded." Applicant must provide screening for A/C units (more than 20 units) as described above.
U-WATER SERVICE INSTALLATION 09/19/2025 Disapproved - NO FEE BWRIGHT
Note: Site work will have to be closed out first.
U - UTILITY COMMERCIAL FINAL 09/19/2025 Disapproved - NO FEE BWRIGHT
Note: Site work will have to be closed out first.
HVAC FINAL 08/26/2025 Disapproved - NO FEE CPISCITELLI
Note: 1. Need to reroute drains outside to grass area 2. Seal penetrations outside linesets 3. Remove extion cords from condensate pumps. 4. Drain pans need to be adjusted to be 1.5 inches all around 5. Need to mark heatstrips all units 6. Seal duct on AHU 12 7. Strap all linesets and condensate lines 8. Minisplit wire needs to be sleeved per ul details on plans trrough 1 HR rated wall and seal hole 9. Need to verify breakers match the AHUs and ODUs. Heaters not marked
HVAC FINAL 08/20/2025 CANCELLED BY APPLICANT WEB
PLUMBING FINAL 08/01/2025 APPROVED MGIBSON
Note: 7/3/2025 - PREVIOUS INSPECTION NOTES 7/3/25: Not Ready. No CM or Superintendent on site for inspection. 1). No Plans on site for inspection. FBC [A]107.3.1 2). Water heater is not energized. Could not confirm hot water on correct side of fixtures. FBC-[A] 110.1 3).. Plumbing piping within storage units needs to be protected from damage where exposed. FBC-305.7 Inspector Notes from Inspection 3085 7/8/2024 - PREVIOUS INSPECTION NOTES WRONG INSPECTION SCHEDUALED.. THIS WAS FOR THE 5 FEET OUT OF BUILDING
ABOVE CEILING 07/24/2025 APPROVED - AS NOTED RMARTIN
Note: 7/24/25 Need to leave out a couple tiles to verify sealing of ducts, one by front door and one at return. 7/3/2025 - PREVIOUS INSPECTION NOTES not ready
ABOVE CEILING 07/11/2025 CANCELLED BY APPLICANT WEB
Note: 7/3/2025 - PREVIOUS INSPECTION NOTES not ready
ABOVE CEILING 07/03/2025 CANCELLED BY APPLICANT RMARTIN
Note: not ready
PLUMBING FINAL 07/03/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 7/3/2025 4:24:34 PM *** 7/3/25: Not Ready. No CM or Superintendent on site for inspection. 1). No Plans on site for inspection. FBC [A]107.3.1 2). Water heater is not energized. Could not confirm hot water on correct side of fixtures. FBC-[A] 110.1 3).. Plumbing piping within storage units needs to be protected from damage where exposed. FBC-305.7 Inspector Notes from Inspection 3085 7/8/2024 - PREVIOUS INSPECTION NOTES WRONG INSPECTION SCHEDUALED.. THIS WAS FOR THE 5 FEET OUT OF BUILDING
ELECTRIC - EARLY POWER 07/03/2025 APPROVED RMARTIN
Note: 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25 Released power to FPL, only power to MDP, call back in when everything is safed off and ready for power inside building, Keep MDP locked out 4/3/25 Emailed FPL @ 10 am 4/2/2025 - PREVIOUS INSPECTION NOTES Grounding electrode conductor is broken and service conduits straps broken, need to fix and call back in 3/31/25 walls and hard ceiling are good, still need to call in your hvac rough, fire sprinkler rough and fire alarm roughs. Dont forget to call in your above ceiling for drop ceiling when ready. *** NOTES ADDED BY RMARTIN 7/31/2024 11:17:19 AM *** for the ufer ground
FIREWALL FINAL 07/03/2025 APPROVED FWILLIS
Note: 5/15/2025 - PREVIOUS INSPECTION NOTES 5/13/2025 - PREVIOUS INSPECTION NOTES
FIREWALL PENETRATIONS 07/03/2025 APPROVED FWILLIS
Note: 5/13/2025 - PREVIOUS INSPECTION NOTES 5/13/25 - FIRST LAYER, PARTIAL. BOTH STAIRWELLS THIRD FLOOR. 4/21/2025 - PREVIOUS INSPECTION NOTES Above ceiling only in the two bathrooms.
FIREWALL DRYWALL NAILING 07/03/2025 APPROVED FWILLIS
Note: 5/15/2025 - PREVIOUS INSPECTION NOTES 2nd layer in stariwells. Both sides
BUILDING OTHER 07/02/2025 APPROVED FWILLIS
Note: ABOVE CEILING INSPECTION IN FRONT OFFICE.
STOREFRONT 05/29/2025 APPROVED FWILLIS
Note: New inspection due to canceled inspection 5/29/25 - SECOND AND THIRD FLOOR EAST SIDE 5/22/2025 - PREVIOUS INSPECTION NOTES SECOND AND THIRD FLOOR, THE BOTTOM PAN.
STOREFRONT 05/23/2025 CANCELLED BY APPLICANT AWS_IVR
Note: 5/22/2025 - PREVIOUS INSPECTION NOTES SECOND AND THIRD FLOOR, THE BOTTOM PAN.
STOREFRONT 05/22/2025 PARTIALLY APPROVED FWILLIS
Note: SECOND AND THIRD FLOOR, THE BOTTOM PAN.
HVAC ROUGH 05/20/2025 APPROVED CPISCITELLI
Note: 5/15/2025 - PREVIOUS INSPECTION NOTES Inspected 2nd and third floor fresh air. Need to inspect area on first floor near entry not finished 4/22/2025 - PREVIOUS INSPECTION NOTES 4/22/2025 - PREVIOUS INSPECTION NOTES Inspected dampers on first floor 4/2/2025 - PREVIOUS INSPECTION NOTES Inspected fresh air seams on first floor. Inspect exhaust in first floor bathroom and second floor bathroom to be able to sheetrock
HVAC ROUGH 05/15/2025 PARTIALLY APPROVED CPISCITELLI
Note: Inspected 2nd and third floor fresh air. Need to inspect area on first floor near entry not finished 4/22/2025 - PREVIOUS INSPECTION NOTES 4/22/2025 - PREVIOUS INSPECTION NOTES Inspected dampers on first floor 4/2/2025 - PREVIOUS INSPECTION NOTES Inspected fresh air seams on first floor. Inspect exhaust in first floor bathroom and second floor bathroom to be able to sheetrock
FIREWALL FINAL 05/15/2025 CANCELLED BY APPLICANT KSANDOE
Note: 5/13/2025 - PREVIOUS INSPECTION NOTES
FIREWALL DRYWALL NAILING 05/15/2025 PARTIALLY APPROVED KSANDOE
Note: 2nd layer in stariwells. Both sides
FIREWALL PENETRATIONS 05/13/2025 PARTIALLY APPROVED FWILLIS
Note: 5/13/25 - FIRST LAYER, PARTIAL. BOTH STAIRWELLS THIRD FLOOR. 4/21/2025 - PREVIOUS INSPECTION NOTES Above ceiling only in the two bathrooms.
FIREWALL FINAL 05/13/2025 CANCELLED BY APPLICANT FWILLIS
FRAMING 05/08/2025 APPROVED FWILLIS
Note: 5/8/25 - BOTH STAIRWELLS THIRD FLOOR CEILING ABOVE STAIRWELL TWO HOUR FIREWALL FIRST LAYER. Inspector Notes from Inspection 3460 METAL ROOF ABOVE THIRD FLOOR ONLY.
ELECTRIC - EARLY POWER 05/07/2025 PARTIALLY APPROVED RMARTIN
Note: 5/7/25 Released power to FPL, only power to MDP, call back in when everything is safed off and ready for power inside building, Keep MDP locked out 4/3/25 Emailed FPL @ 10 am 4/2/2025 - PREVIOUS INSPECTION NOTES Grounding electrode conductor is broken and service conduits straps broken, need to fix and call back in 3/31/25 walls and hard ceiling are good, still need to call in your hvac rough, fire sprinkler rough and fire alarm roughs. Dont forget to call in your above ceiling for drop ceiling when ready. *** NOTES ADDED BY RMARTIN 7/31/2024 11:17:19 AM *** for the ufer ground
ELECTRIC - EARLY POWER 04/25/2025 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 3200 4/3/25 Emailed FPL @ 10 am 4/2/2025 - PREVIOUS INSPECTION NOTES Grounding electrode conductor is broken and service conduits straps broken, need to fix and call back in 3/31/25 walls and hard ceiling are good, still need to call in your hvac rough, fire sprinkler rough and fire alarm roughs. Dont forget to call in your above ceiling for drop ceiling when ready. *** NOTES ADDED BY RMARTIN 7/31/2024 11:17:19 AM *** for the ufer ground
HVAC ROUGH 04/22/2025 PARTIALLY APPROVED CPISCITELLI
Note: Inspected dampers on first floor 4/2/2025 - PREVIOUS INSPECTION NOTES Inspected fresh air seams on first floor. Inspect exhaust in first floor bathroom and second floor bathroom to be able to sheetrock
GRAVITY SEWER 04/22/2025 APPROVED - AS NOTED MGIBSON
Note: 7/8/2024 - PREVIOUS INSPECTION NOTES WRONG INSPECTION SCHEDUALED.. THIS WAS FOR THE 5 FEET OUT OF BUILDING
ROOF SHEATHING / BRACE / TIE DOWN 04/22/2025 APPROVED - AS NOTED FWILLIS
Note: METAL ROOF ABOVE THIRD FLOOR ONLY.
FIREWALL PENETRATIONS 04/21/2025 PARTIALLY APPROVED HCAMACHO
Note: Above ceiling only in the two bathrooms.
STOREFRONT 04/15/2025 APPROVED FWILLIS
Note: 4/15/25 - EAST AND SOUTH AUTOMATIC DOORS, FIRST FLOOR ONLY. 2/6/2025 - PREVIOUS INSPECTION NOTES PARTIALLY APPROVED
FIREWALL DRYWALL NAILING 04/14/2025 APPROVED FWILLIS
Note: FIRST FLOOR BATHROOMS AND ELECTRICAL ROOM AREA. ALSO BEHIND THE ELEVATOR IN THE MECHANICAL ROOM.
FIREWALL FRAMING 04/14/2025 APPROVED FWILLIS
Note: FIRST FLOOR BATHROOM AREA SND BEHIND THE ELEVATOR IN THE MECHANICAL ROOM.
INSULATION 04/08/2025 APPROVED FWILLIS
ELECTRIC TEMP POLE 04/03/2025 APPROVED - AS NOTED MKRASKI
Note: 4/3/25 Emailed FPL @ 10 am 4/2/2025 - PREVIOUS INSPECTION NOTES Grounding electrode conductor is broken and service conduits straps broken, need to fix and call back in 3/31/25 walls and hard ceiling are good, still need to call in your hvac rough, fire sprinkler rough and fire alarm roughs. Dont forget to call in your above ceiling for drop ceiling when ready. *** NOTES ADDED BY RMARTIN 7/31/2024 11:17:19 AM *** for the ufer ground
ELECTRIC TEMP POLE 04/02/2025 Disapproved - NO FEE RMARTIN
Note: Grounding electrode conductor is broken and service conduits straps broken, need to fix and call back in 3/31/25 walls and hard ceiling are good, still need to call in your hvac rough, fire sprinkler rough and fire alarm roughs. Dont forget to call in your above ceiling for drop ceiling when ready. *** NOTES ADDED BY RMARTIN 7/31/2024 11:17:19 AM *** for the ufer ground
HVAC ROUGH 04/02/2025 PARTIALLY APPROVED CPISCITELLI
Note: Inspected fresh air seams on first floor. Inspect exhaust in first floor bathroom and second floor bathroom to be able to sheetrock
PLUMBING 2ND ROUGH 03/31/2025 APPROVED MGIBSON
ELECTRIC 2ND ROUGH 03/31/2025 APPROVED - AS NOTED RMARTIN
Note: 3/31/25 walls and hard ceiling are good, still need to call in your hvac rough, fire sprinkler rough and fire alarm roughs. Dont forget to call in your above ceiling for drop ceiling when ready. *** NOTES ADDED BY RMARTIN 7/31/2024 11:17:19 AM *** for the ufer ground
PLUMBING 1ST ROUGH 02/24/2025 CANCELLED BY INSPECTOR MGIBSON
Note: ALL FIRSTROUGH PLUMBING IS COMPLETED
BLD - SEWER TIE IN 02/24/2025 APPROVED MGIBSON
Note: 2/7/2025 - PREVIOUS INSPECTION NOTES 2/7/25: This is a partial for the sewer tie in only. The cleanout vertical pipe portion appears to have been impacted and there may be a damaged hub. (covered with dirt at the time). The hub will need to be uncovered and re-inspected. Inspector Notes from Inspection 3130 THIS WAS APPROVED ON 7/16/24
BLD - SEWER TIE IN 02/07/2025 PARTIALLY APPROVED RSIMS
Note: 2/7/25: This is a partial for the sewer tie in only. The cleanout vertical pipe portion appears to have been impacted and there may be a damaged hub. (covered with dirt at the time). The hub will need to be uncovered and re-inspected. Inspector Notes from Inspection 3130 THIS WAS APPROVED ON 7/16/24
FRAMING 02/06/2025 PARTIALLY APPROVED FWILLIS
Note: 2/6/25 - SECOND FLOOR PSRTYIAL FRAME. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25 - PARTIAL FRAMING. DOORS FOR THE UNITS WILL BE ADDED LATER. ALSO SOME UNITS ARE NOT COMPLETE.OFFICE AREA PARTIAL AND EXTERIOR FIRST LEVEL ONLY. PARTIAL FOR FIRST FLOOR. 1/29/2025 - PREVIOUS INSPECTION NOTES LEFT SIDE, HALF WAY.
STOREFRONT 02/06/2025 PARTIALLY APPROVED FWILLIS
Note: PARTIALLY APPROVED
RAKE BEAM 02/04/2025 APPROVED FWILLIS
Note: TOP OF THE ELEVATOR SHAFT TIE BEAM. NO RAKE WITH BLOCK.
FRAMING 01/31/2025 PARTIALLY APPROVED FWILLIS
Note: 1/31/25 - PARTIAL FRAMING. DOORS FOR THE UNITS WILL BE ADDED LATER. ALSO SOME UNITS ARE NOT COMPLETE.OFFICE AREA PARTIAL AND EXTERIOR FIRST LEVEL ONLY. PARTIAL FOR FIRST FLOOR. 1/29/2025 - PREVIOUS INSPECTION NOTES LEFT SIDE, HALF WAY.
FRAMING 01/29/2025 PARTIALLY APPROVED FWILLIS
Note: LEFT SIDE, HALF WAY.
SECOND FLOOR SLAB 12/04/2024 APPROVED HCAMACHO
Note: This is for 3rd floor slab.
SECOND FLOOR SLAB 10/28/2024 APPROVED FWILLIS
DOWN CELL 09/16/2024 APPROVED FWILLIS
Note: 9/10/2024 - PREVIOUS INSPECTION NOTES
LINTEL 09/16/2024 APPROVED FWILLIS
Note: 9/10/2024 - PREVIOUS INSPECTION NOTES
LINTEL 09/10/2024 CANCELLED BY APPLICANT FWILLIS
DOWN CELL 09/10/2024 CANCELLED BY APPLICANT FWILLIS
DOWN CELL 08/20/2024 APPROVED FWILLIS
Note: 2ND LIFT
LINTEL 08/20/2024 APPROVED FWILLIS
Note: 2nd lift
LINTEL 08/13/2024 APPROVED FWILLIS
DOWN CELL 08/13/2024 APPROVED FWILLIS
FOUNDATION SURVEY - OFFICE USE ONLY 08/12/2024 APPROVED DLEAP
ELECTRIC 1ST ROUGH 07/31/2024 APPROVED - AS NOTED RMARTIN
Note: *** NOTES ADDED BY RMARTIN 7/31/2024 11:17:19 AM *** for the ufer ground
MONOLITHIC SLAB 07/31/2024 APPROVED FWILLIS
Note: SLAB FOR THE BUILDING ONLY. NOTE:...... BLOCK WORK WILL BE LAID IN 10' LIFTS WITH CLEAN-OUTS.
ELECTRIC 1ST ROUGH 07/17/2024 APPROVED RMARTIN
PLUMBING OTHER 07/17/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS APPROVED ON 7/16/24
PLUMBING 1ST ROUGH 07/08/2024 APPROVED - AS NOTED MGIBSON
Note: 6/25/2024 - PREVIOUS INSPECTION NOTES THIS WAS FOR THE DWV IN BATHROOMS, FLOOR DRAINS AND C/O'S. 3'' LINE TO ELEVATOR WILL NEED TO BE INSPECTED WHEN COMPLETED.THIS WAS THE COMPLETION OF FIRST ROUGH PLUMBING INSPECTIONS .THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER 07/08/2024 Disapproved - NO FEE MGIBSON
Note: WRONG INSPECTION SCHEDUALED.
FOOTER 06/27/2024 APPROVED FWILLIS
Note: ELEVATOR SHAFT, INCLUDES BLOCK WALL AND THREE PIERS. BLOCK WALL BEING POURED SOLID.
PLUMBING 1ST ROUGH 06/25/2024 PARTIALLY APPROVED MGIBSON
Note: THIS WAS FOR THE DWV IN BATHROOMS, FLOOR DRAINS AND C/O'S. 3'' LINE TO ELEVATOR WILL NEED TO BE INSPECTED WHEN COMPLETED
FOOTER 06/20/2024 APPROVED FWILLIS
Note: ELEVATOR FOOTING
FOOTER 06/17/2024 APPROVED FWILLIS
Note: BOTH STAIRWELL FOOTERS.

Review History

Department Status Date In Date Out
BLD COMPLETE 10/07/2025 10/08/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 09/17/2025 09/25/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 08/12/2025 08/18/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 05/19/2025 05/27/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 04/25/2025 04/28/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 04/22/2025 04/25/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM This will not work for plastic piping in the floors. Please obtain detail for fire collars from the mechanical subcontractor and upload for approval
BLD COMPLETE 10/23/2024 11/07/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
PLENG COMPLETE 08/09/2024 08/12/2024
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
BLD COMPLETE 07/01/2024 07/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 06/20/2024 06/28/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ARCHR COMPLETE 04/25/2024 05/09/2024
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD COMPLETE 04/25/2024 04/25/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 04/25/2024 05/07/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 COMPLETE 04/25/2024 05/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH CANCEL 04/25/2024 05/07/2024
PLUM CANCEL 04/25/2024 05/07/2024
PLUM COMPLETE 04/19/2024 04/23/2024
Note: Released By: JIM WALKER - (386)529-4112 - JWALKER@PALMCOASTGOV.COM
MECH COMPLETE 03/14/2024 03/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ARCHR HOLD 03/14/2024 03/28/2024
Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM Repeat Comment S&W Paint color "softare" - LRV 23 is not acceptable. Light pastels must have LRF of 25 or higher.
ELEC COMPLETE 03/14/2024 03/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLUM COMPLETE 03/14/2024 03/21/2024
Note: Released By: JIM WALKER - - JWALKER@PALMCOASTGOV.COM
FI1 HOLD 03/14/2024 03/28/2024
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM Prior plan review comments were resolved however, there were additional changes to the plans that were not requested, nor were they clouded as changes. Please cloud all changes from the original submittal for review. Also the fire comments did not receive a comment response letter. Please provide a comments resonse letter for the reviewer with answers to each comment along with to page/sheet number for the corrections. in checking the plans for the prior comment corrections it was noted that tha stairwells now show sprinkler risers and or standpipes that were not shown prior therefore, The plans are not clear as to the dimensions and clearances at the stairs, landings, and doorways. Please be sure there is no encroachment by any components of the sprinkler riser, valves, assembly, supply/fdc, standpipes, etc. into the required minimum dimensions of the floor level/landings at stairs and required door landing/door swing and place a note on the plans indicating such clearance and non-obstruction.
BLD HOLD 03/14/2024 04/01/2024
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING, FLORIDA BUILDING CODE-ACCESSIBILITY Product Approval Worksheet 1. REPEAT COMMENT – REVISED CITY OF PALM COAST PRODUCT APPROVAL WORKSHEET NOT PROVIDED. Provide City of Palm Coast updated Product Approval Worksheet. The one submitted is old and no longer used. 2. REPEAT COMMENT – REVISED CITY OF PALM COAST PRODUCT APPROVAL WORKSHEET NOT PROVIDED. Include Florida Product Approval numbers for soffits, structural components and other missing items. 3. REPEAT COMMENT – REVISED CITY OF PALM COAST PRODUCT APPROVAL WORKSHEET NOT PROVIDED. Florida Product Approval Number 12875.1 is invalid. City of Palm Coast Roofing Worksheet 1. OK. Truss plans 1. OK 1. OK – MY MISTAKE. THIS INFORMATION WAS SHOWN. Plan Sheet A8120 1. REPEAT COMMENT. I STARTED THIS OFF BADLY WITH THE WRONG PLAN SHEET REFERENCE. THERE IS NO PLAN SHEET A812 – I MEANT A810. YOU DID PROVIDE THE PROPER REFERENCE TO THE 2023 FLORIDA BUI8LDING CODE AND THE EOR PROVIDED A PROPER REFERENCE TO ASCE 7-22 - THANK YOU. HOWEVER, I DO NOT SEE A REFERENCE ANYWHERE TO THE 2020 NATIONAL ELECTRIC CODE – NOT ON A810 OR ANY OF THE ELECTRICAL PLAN SHEETS. 2. Provide summary of requirements of FBCB Section 406.3.1 in Code Summary 3. OK. Plan Sheet A813 1. OK - I AGAIN REFERENCED THE WRONG PLAN SHEET. IN ADDITION, THIS INFORMATION WAS SHOWN ON PLAN SHEET A810. I APOLOGIZE. 2. OK - I AGAIN REFERENCED THE WRONG PLAN SHEET. IN ADDITION, THIS INFORMATION WAS SHOWN. ON PLAN SHEET A810. I APOLOGIZE. 3. OK. Plan Sheet S000 1. OK - HOWEVER SEE NEXT COMMENT BELOW. Plan Sheet S001 1. REPEAT COMMENT. COMMENT NOT ADDRESSED (NOTE: PLAN SHEET S000 UPLOADED BUT LABELED S001: Reference the correct roof sheathing for wind exposure category C. THE REQUIRED ROOF SHEATHING FOR WIND EXPOSURE CATEGORY C IS 15/32.
DSD COMPLETE 03/14/2024 03/14/2024
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
ARCHR HOLD 02/12/2024 02/23/2024
Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM 1.Per LDC Sec 13.02.05 B 3- earthtone exterior colors must have light reflectance value (LRV) of 25 or greater. Proposed color "SOFTWARE" has a light LRV of 23 which is too dark to meet the requirement. We suggest using African Gray - SW 9162-LRV 31. This color is the next lighter shade of gray and meets the requirement
BLD HOLD 02/12/2024 03/01/2024
Note: Held By: JIM WALKER - - JWALKER@PALMCOASTGOV.COM 1. Page A001 of the prints, A) Reference Codes section. Update codes 2023 8th edition. B) General Code Parameters Max allowed height states 85 Ft. please change max allowed height to 75 ft see table 504.3 FBC. C) Building area showing max allowed square footage as 78,000. The max allowed area per floor is 65,625 Please provide calculations. See Chapter 506.2 equation 5-2 D) Fire Protection: Bearing wall refers tp table 602. Table number is 601 please updated. 2. Page A201 detail A502 /04 mechanical room walls shall not be rated less than the rating of the hoist way enclosure served by the machinery. FBC 3005.4 3. A201 Missing wall details for the Stairway CMU walls, Elevator CMU walls, Restroom are walls. Machine room walls. . Wall details need to show type of framing members,spacing of framing members, sizes, etc. At the CMU walls provide sizes of steel reinforcement, spacing of reinforcement, required lapping. FBC 107.3.5 4. Please update all product approval numbers to current code cycle. FBC 107.2.1 5. Detail 705/ MS20.2 shown in the stairway on page 202 of the plans is not shown on page S705. Revise to show correct detail location. 704/ MS 20.2 is likey what was ment to be shown. 6. Povide detail for canopy connections to exterior walls 7. Provide detail for the cricket roof. 8. Architect to provide a list (on plan sheet) of deferred submittals including but not limited to; manufactured stairs, exterior canopy roofs, roof access ladder, guards, guards at roof hatch; handrails, roof bar joists and similar. Add note indicating all deferred submittal plans such as shop drawings shall be approved by Engineer of Record and submitted to the Palm Coast Building Department. FBCB Section 107.3.4.1. Deferred submittals requiring professional engineer design shall be signed and sealed by the responsible design professional. Structural Plan Sheets (all “S” Plan Sheets for steel building) 1.Provide printed name, address, City, State and Zip Code in the space adjacent to the image of the engineer’s seal. F.A.C 61G15-23.001 (4) (a) 1. 2.Engineer’s digital seal to include required statement in F.A.C 61G15-23.004 (2) (d). 3.Provide Engineer’s Florida Certificate of Authorization in Title Block. Plan Sheet A201 1.Note C at stair enclosures indicates Wall Type C – 8 inch CMU 2 hour fire rated but the reference to UL-U465 is an incorrect wall type not intended for CMU walls. Reference a correct UL 263 or ASTM E1129 fire barrier or alternative fire-resistive rated design per FBC Section 703.2.2. We cannot locate any complete masonry wall section details for stair enclosures. Provide complete masonry construction details for stair enclosure walls. If they are comingled with other details please clarify those that apply to the masonry walls. We see partial wall section details for elevator pit. .Plan Sheet A204 1. Provide complete design details for roof storm drain system in accordance with the Florida Building Code-Plumbing. Material specifications per Section 1102.1, 1102.3, 1102.4; roof drains per 1102.6; fittings per 1102.7; roof drain flow rates per 1105.2, sizing of conductors, leaders and storm drains per 1106.1, 1106..2; size of wall scuppers per 1106.5 and size of roof gutters per 1106.6. Include references to all applicable design standards for all materials. 2. Provide note indicating source of rainfall rates per Florida Building Code-Plumbing Section 1106.1. 3. Provide design of secondary (emergency) roof drains per Florida Building Code-Plumbing Section 1108.1 through 1108.3. Design of scuppers cannot be simply stated “size scuppers per codes”. 4. Structural engineer of record to provide statement on structural roof plan sheet indicating roof has been designed in compliance with Florida Building Code-Plumbing Section 1106.5, FBC Section 1611.1. Plan Sheets A202, A203 1. I do not see any design details for areas of refuge and believe they are required per Section 1007 of the 2003 IBC as referenced in FBCA Section 105.2.4 (see also Advisory 105.2.4). Two accessible means of egress required where more than one means of egress is required. Accessible means of egress may be by exit stairways or evacuation elevators when provided in conjunction with horizontal exits or areas of refuge. The 2003 IBC provides requirements for areas of refuge which are fire-rated spaces on levels above or below the exit discharge level. See 2003 IBC Section 1007.1 through 1007.8.3 and provide design of areas of refuge according to applicable code provisions. Plan Sheet A501 1. Florida Fire Prevention Code Section 7.2.2.4.5.10 supersedes Section 1014.6 of the FBC and requires handrail extensions a minimum of 12 inches beyond the bottom riser of stairs. 2. Florida Fire Prevention Code Section 7.2.2.4.5.5 supersedes Section 1014.7 of the FBC and requires 2.25 inches clearance between handrails and guards and walls. Plan Sheet S1.0 1. Provide roof rain load data and rain intensity. FBCB Section 1603.1.9. 2. Provide loads for stair handrails, balcony and stair guards and guard infill components. FBCB Sections 1607..8.1, 1607.8.1.1 1607.8.1.2, Table 1607.1 No. 15, No. 3. Provide stair uniform and concentrated design loads, FBCB Section 1607.3, 1607.4, Table 1607.1 No. 30. 4. Provide interior wall and partition design loads. FBCB Section 1607.14. 5. Provide statement that roof has been designed for maximum possible depth of water per FBC Section 1611.1. See Florida Building Code-Plumbing Sections 1106.5.
DSD COMPLETE 02/12/2024 02/28/2024
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
ELEC HOLD 02/12/2024 02/26/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Energy Calcs need to be updated.
FI1 HOLD 02/12/2024 02/27/2024
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM 1. Note: Partial submittals for fire protection have been submitted. If it is the intent of the engineer of record is to design the fire alarm, BDA, Stand pipe system, and sprinkler systems, the EOR needs to submit fully compliant systems for each for review. If the EOR plans to design the system for submittal by the individual fire contractors at a later time the design can be deferred until submittal by the qualified fire contractors, (each of these systems require separate permits). (Provide system documents or indicate deferred submittals). 2. Please provide detail for Fire Fighter Safety Building Marking System per Florida Administrative Code 69A-3.012 and Florida Statutes 633.027 And place the following note on the cover sheet: Please call Fire Marshal, Randy Holmes at: 386-986-2303 for proper placement and verification of proper design and notification for the Fire Fighters Safety Building Marking System prior to placement. 3. Please provide Classification of hazard of occupancy per FFPC 101, 42.1.2
GAS CANCEL 02/12/2024 02/23/2024
MECH HOLD 02/12/2024 02/23/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide UL through penetration details for refrigerant piping and condensate lines through floors per chapter 7 FBC Building 2023 8Th edition
PLUM HOLD 02/12/2024 02/26/2024
Note: Held By: JIM WALKER - - JWALKER@PALMCOASTGOV.COM Page P-001 General note 1. The Florida building codes are listed 2020, 7th edition. Please update the code cycle to 2023 8th edition.
UD1 COMPLETE 02/12/2024 02/15/2024
Note: Released By: GREG DEGLER - - GDEGLER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION - COMMERCIAL ¤60.00 10/31/2025
REINSPECTION - COMMERCIAL ¤60.00 08/20/2025
PLAN REVIEW - REVISION ¤32.50 06/13/2025
ADJUSTMENT 50% (¤25,477.15) 05/20/2024
ADMINISTRATIVE - COMMERCIAL ¤75.00 05/20/2024
INSPECTION COMMERCIAL ¤41,174.00 05/20/2024
INSPECTION - FIRE COMMERCIAL ¤1,470.50 05/20/2024
PLAN REVIEW - COMMERCIAL ¤8,234.80 05/20/2024
FC IMPACT FEE EMS ¤540.00 05/20/2024
IMPACT FEE FIRE ¤62,100.00 05/20/2024
FC IMPACT FEE LAW ENFORCEMENT ¤90.00 05/20/2024
IMPACT FEE TRANSPORTATION ¤44,010.00 05/20/2024
SURCHARGE FS 533.721 ¤254.77 05/20/2024
SURCHARGE - FS 468.631 ¤382.16 05/20/2024
SITE PLAN 30 ¤30.00 05/20/2024
Fees Total Due: ¤0.00 Total Paid: ¤133,036.58