I want to search for...

Permit #2024020447

Permit Details

Status: COED

Parcel Id: 07-11-31-7011-00060-0160
CONDITIONED SPACE: 1851 sqft
GARAGE: 411 sqft
OPENED PORCH (WITH ROOF) : 39 sqft
OPENED PORCH (WITH ROOF) : 74 sqft
Total Square Footage: 2375 sqft
Block: 00060
Subdivision: 2193 - SECTION 11-BELLE TERRE
Job Phone: 904-531-5923
Location Address: 10 BECKER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/07/2024
NOC: RECORDED
Applicant name: TAVARIS JEROME DAVIS
Owner: BRIGHTLAND HOMES OF FLORIDA, LLC

Address

15725 N DALLAS PARKWAY

ADDISON, TX 75001

Address

STE 300

ADDISON, TX 75001

Lot: 0160
Contracted Stated Job Value: ¤250,000.00
Job Description: New Single Family Construction
Type: CN

Contractor

BRIGHTLAND HOMES OF FLORIDA, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

3505 EAST FRONTAGE RD

ADDISON, TX 75001

STE 145

TAMPA, FL 33607

CBC1267320 (Exp: 08/31/2026) 904-531-5923

Sub Contractors

LARRY LAVON TURNAGE
Status Location Address State License Number Phone
CANCEL

531 CODISCO WAY

SANFORD, FL 32771

CMC1249777 (Exp: 08/31/2024) 407-333-2665
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
OLIN MARSHALL CANNON
Status Location Address State License Number Phone
INACTIVE

1794 ROGERO RD #2

JACKSONVILLE, FL 32211

CFC1426140 (Exp: 08/31/2026) 904-343-4344
JAMES E LINTON
Status Location Address State License Number Phone
ACTIVE

200 COLLEGE DR

ORANGE PARK, FL 32065

EC0001152 (Exp: 08/31/2026) 904-272-0272

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/19/2024 FINAL APPROVED KSANDOE
BLD - BUILDING FINAL 11/15/2024 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 10/25/2024 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 09/13/2024 CANCELLED BY APPLICANT WEB
ROW - FINAL APRON (AFTER POUR) 09/12/2024 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - DRAINAGE 09/12/2024 APPROVED TPOLACEK
Note: 5/10/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY TPOLACEK 5/10/2024 8:29:43 AM *** Contractor had 10 days to make corrections and nothing has been done. Next inspection is monday 05/13/24 photos attached 4/30/2024 - PREVIOUS INSPECTION NOTES BUILDER NEEDS A TEMP PIPE, REMOVE PORTA POTTY FROM SWALE AND KEEP SWALE CLEAR. THIS IS THE LOW END OF THE DRAINAGE FOR THE ENTIRE BLOCK CONDITIONS NOW WILL PREVENT PROPER FLOW DURING RAIN. NEXT INSPECTION ON 05/10/24
ROW - STORMWATER FINAL 09/12/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 09/12/2024 FINAL APPROVED DHANEY
U-CROSS CONNECTION 09/04/2024 APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/29/2024 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 08/29/2024 APPROVED EMADISON
ELECTRIC - EARLY POWER 08/14/2024 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 9am
ROW- PRE-APRON (PRE-POUR) 07/29/2024 APPROVED - AS NOTED PFLANAGAN
Note: THE MITERED END FOOTERS NEED TO MINIMUM OF 6"X6" PLEASE MAKE SURE YOU DO THIS BEFORE POURING CONCRETE. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. -------------------------------------------------------------------------------------- 7/26/2024 - PREVIOUS INSPECTION NOTES ** 07/26/24 CULVERT PIPE PITCHED IN THE WRONG DIRECTION STORMWATER FLOWS FROM LEFT TO RIGHT ** NEED A 4:1 SLOPE FROM CULVERT TO TOP OF ROW AND COMPACT MATERIAL ** COMPACT MATERIAL IN THE APRON ** ENSURE YOU HAVE 4 INCHES OF CONCRETE IN THE ENTIRE DRIVEWAY ABOVE THE ROW
ROW- PRE-APRON (PRE-POUR) 07/26/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 07/26/24 CULVERT PIPE PITCHED IN THE WRONG DIRECTION STORMWATER FLOWS FROM LEFT TO RIGHT ** NEED A 4:1 SLOPE FROM CULVERT TO TOP OF ROW AND COMPACT MATERIAL ** COMPACT MATERIAL IN THE APRON ** ENSURE YOU HAVE 4 INCHES OF CONCRETE IN THE ENTIRE DRIVEWAY ABOVE THE ROW
ELECTRIC - EARLY POWER 07/24/2024 Disapproved -FEE REQUIRED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 7/24/2024 11:38:06 AM *** 1. Stove top power needs to be in cased in a holding box and concealed. 2. Please install faceplate at dryer receptacle. 3. Romex behind laundry door needs trimmed and safed off. NEC 110.27 Inspector Notes from Inspection 2200 *** NOTES ADDED BY JSTEWART 5/21/2024 11:23:47 AM *** Authorize release of email to FPL @ 11:23a
LATH/BRICK/ WATER BARRIER 07/23/2024 APPROVED FWILLIS
SEWER TIE IN 07/11/2024 APPROVED - AS NOTED MGIBSON
Note: 7/8/2024 - PREVIOUS INSPECTION NOTES THIS WAS THE THIRD ONE TODAY, NEED TO SCHEDUAL SEWER TIE IN AND GRAVITY SEWER ATTHE TIME BOTH ARE DONE. HAVE PLUMBING CONTRACTOR CALL MARK GIBSON 386-285-7087. THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 07/11/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 07/08/2024 Disapproved -FEE REQUIRED MGIBSON
Note: THIS WAS THE THIRD ONE TODAY, NEED TO SCHEDUAL SEWER TIE IN AND GRAVITY SEWER ATTHE TIME BOTH ARE DONE. HAVE PLUMBING CONTRACTOR CALL MARK GIBSON 386-285-7087
LATH/BRICK/ WATER BARRIER 06/12/2024 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 6/6/2024 3:28:30 PM *** Previous notes not rectified... 2. Please fasten SER line at breaker panel 12" from entry. NEC 334 4. Please install mechanical fastener to all bath exhaust ducts at fan assembly. FBC M1601.4.1 (master Toilet room) COMPLETE PRIOR TO NEXT INSPECTION. 6/4/2024 - PREVIOUS INSPECTION NOTES 5/31/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 5/31/2024 1:43:45 PM *** 1. Please seperate low voltage wires from 110 romex. 2. Please fasten SER line at breaker panel 12" from entry. NEC 334 3. Please frame in Master shower window opening to window installed and fasten edges, or install bigger window. 4. Please install mechanical fastener to all bath exhaust ducts at fan assembly. FBC M1601.4.1 5. Pad all windows/doors to 1/4" shim space. 6. Please install conduit for power to island into floor.
INSULATION 06/12/2024 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 6/6/2024 3:28:30 PM *** Previous notes not rectified... 2. Please fasten SER line at breaker panel 12" from entry. NEC 334 4. Please install mechanical fastener to all bath exhaust ducts at fan assembly. FBC M1601.4.1 (master Toilet room) COMPLETE PRIOR TO NEXT INSPECTION. 6/4/2024 - PREVIOUS INSPECTION NOTES 5/31/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 5/31/2024 1:43:45 PM *** 1. Please seperate low voltage wires from 110 romex. 2. Please fasten SER line at breaker panel 12" from entry. NEC 334 3. Please frame in Master shower window opening to window installed and fasten edges, or install bigger window. 4. Please install mechanical fastener to all bath exhaust ducts at fan assembly. FBC M1601.4.1 5. Pad all windows/doors to 1/4" shim space. 6. Please install conduit for power to island into floor.
ALL ROUGH 06/06/2024 APPROVED - AS NOTED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 6/6/2024 3:28:30 PM *** Previous notes not rectified... 2. Please fasten SER line at breaker panel 12" from entry. NEC 334 4. Please install mechanical fastener to all bath exhaust ducts at fan assembly. FBC M1601.4.1 (master Toilet room) COMPLETE PRIOR TO NEXT INSPECTION. 6/4/2024 - PREVIOUS INSPECTION NOTES 5/31/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 5/31/2024 1:43:45 PM *** 1. Please seperate low voltage wires from 110 romex. 2. Please fasten SER line at breaker panel 12" from entry. NEC 334 3. Please frame in Master shower window opening to window installed and fasten edges, or install bigger window. 4. Please install mechanical fastener to all bath exhaust ducts at fan assembly. FBC M1601.4.1 5. Pad all windows/doors to 1/4" shim space. 6. Please install conduit for power to island into floor.
ALL ROUGH 06/04/2024 CANCELLED BY APPLICANT JSTEWART
Note: 5/31/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 5/31/2024 1:43:45 PM *** 1. Please seperate low voltage wires from 110 romex. 2. Please fasten SER line at breaker panel 12" from entry. NEC 334 3. Please frame in Master shower window opening to window installed and fasten edges, or install bigger window. 4. Please install mechanical fastener to all bath exhaust ducts at fan assembly. FBC M1601.4.1 5. Pad all windows/doors to 1/4" shim space. 6. Please install conduit for power to island into floor.
ALL ROUGH 05/31/2024 Disapproved - NO FEE JSTEWART
Note: *** NOTES ADDED BY JSTEWART 5/31/2024 1:43:45 PM *** 1. Please seperate low voltage wires from 110 romex. 2. Please fasten SER line at breaker panel 12" from entry. NEC 334 3. Please frame in Master shower window opening to window installed and fasten edges, or install bigger window. 4. Please install mechanical fastener to all bath exhaust ducts at fan assembly. FBC M1601.4.1 5. Pad all windows/doors to 1/4" shim space. 6. Please install conduit for power to island into floor.
ELECTRIC-TUG 05/21/2024 APPROVED - AS NOTED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 5/21/2024 11:23:47 AM *** Authorize release of email to FPL @ 11:23a
ROW - DRAINAGE 05/10/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: *** NOTES ADDED BY TPOLACEK 5/10/2024 8:29:43 AM *** Contractor had 10 days to make corrections and nothing has been done. Next inspection is monday 05/13/24 photos attached 4/30/2024 - PREVIOUS INSPECTION NOTES BUILDER NEEDS A TEMP PIPE, REMOVE PORTA POTTY FROM SWALE AND KEEP SWALE CLEAR. THIS IS THE LOW END OF THE DRAINAGE FOR THE ENTIRE BLOCK CONDITIONS NOW WILL PREVENT PROPER FLOW DURING RAIN. NEXT INSPECTION ON 05/10/24
ROOF VALLEY & METAL 05/08/2024 APPROVED JSTEWART
WALL SHEATHING 04/30/2024 APPROVED FWILLIS
Note: 4/26/2024 - PREVIOUS INSPECTION NOTES As per your request.
ROW - DRAINAGE 04/30/2024 Disapproved - NO FEE TPOLACEK
Note: BUILDER NEEDS A TEMP PIPE, REMOVE PORTA POTTY FROM SWALE AND KEEP SWALE CLEAR. THIS IS THE LOW END OF THE DRAINAGE FOR THE ENTIRE BLOCK CONDITIONS NOW WILL PREVENT PROPER FLOW DURING RAIN. NEXT INSPECTION ON 05/10/24
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/26/2024 APPROVED FWILLIS
ROOF SHEATHING 04/26/2024 APPROVED FWILLIS
WALL SHEATHING 04/26/2024 CANCELLED BY APPLICANT FWILLIS
Note: As per your request.
FOUND SURVEY APPROVED (OFFICE) 04/25/2024 APPROVED TBAKER
MONOLITHIC SLAB 04/10/2024 APPROVED FWILLIS
Note: 4/9/2024 - PREVIOUS INSPECTION NOTES
MONOLITHIC SLAB 04/09/2024 CANCELLED BY APPLICANT MKRASKI
PLUMBING 1ST ROUGH UNDERGROUND 04/04/2024 APPROVED MGIBSON
Note: 4/3/2024 - PREVIOUS INSPECTION NOTES NEED TO HAVE APPROVED STAMPED PLANS ON SITE FOR INSPECTION. NEED TO REMOVE ALL VEGITATION FROM ALL FOOTER AREA
PLUMBING 1ST ROUGH UNDERGROUND 04/03/2024 Disapproved - NO FEE MGIBSON
Note: NEED TO HAVE APPROVED STAMPED PLANS ON SITE FOR INSPECTION. NEED TO REMOVE ALL VEGITATION FROM ALL FOOTER AREA
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/01/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 03/22/2024 APPROVED BVITALE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 08/01/2024 08/01/2024
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Blower door form needs to be year 2023. Not 2020
ENGIN1 COMPLETE 04/25/2024 04/25/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/25/2024 04/25/2024
Note: Released By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM
BLD COMPLETE 03/26/2024 04/01/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/04/2024 03/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 03/04/2024 03/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/04/2024 03/04/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 03/04/2024 03/04/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 03/04/2024 03/06/2024
Note: Released By: JPI
SWALE COMPLETE 03/04/2024 04/03/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 02/12/2024 02/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 02/12/2024 02/13/2024
Note: Held By: JPI 1. City of Palm Coast Color and Material Sheet (form) appears OMITTED from submission. FBC 105 2. Provide specific product numbers including current revisions (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. 3. Provide roof underlayment and shingle revision number on Florida Product Approval Specification Sheet that corresponds with the Roofing Worksheet; underlayment Florida Product Approval number on Roofing Worksheet does not include revision number. 107.2.4 4. Provide Florida Product Approval number for shutters. 107.2.4 5. Architectural drawings do NOT have a signed seal by the Architect of Record/Engineer of Record. 6. Reference to 2023 Florida Residential Code, Section R302.3. 7. Provide elevation (height) for Second Floor on ALL Elevations. 107.3.5 8. Provide pitch/slopes of ALL roofs on the Elevations.. R802
CUSVC COMPLETE 02/12/2024 02/14/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 02/12/2024 02/13/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry and garage need to be GFCI protected. NEC 2020 210.8 2. DW outlet can not be located behind the DW. NEC 2020 422.16 3. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 4. Need correct outlet spacing in the office. NEC 2020 210.52
GAS CANCEL 02/12/2024 02/15/2024
LOCATE COMPLETE 02/12/2024 02/12/2024
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 02/12/2024 02/15/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 02/12/2024 02/12/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on site plan
ZON HOLD 02/12/2024 02/12/2024
Note: Held By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM front setback on site plan must meet the 25ft required for an SFR-3 front sidewalk missing on siteplan Landscape plan does not match site plan/plans/ex:Garage on wrong side
ENGIN1 HOLD 02/12/2024 02/12/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 01/17/2025
REINSPECTION FEE ¤40.00 01/17/2025
SW ENG REINSPECTION 30 ¤30.00 01/17/2025
SW ENG - INSPECTION 20 ¤20.00 01/17/2025
SW ENG - INSPECTION 20 ¤20.00 01/17/2025
SW ENG - INSPECTION 20 ¤20.00 01/17/2025
REINSPECTION RESIDENTIAL ¤40.00 01/17/2025
CONNECTION FEES ¤1,187.26 03/07/2024
SW ENG INSPECTION 80 ¤80.00 03/07/2024
SW ENG PRE APRON ¤30.00 03/07/2024
SW ENG - REVIEW 20 ¤20.00 03/07/2024
SW ENG RES REVIEW 200 ¤200.00 03/07/2024
SEWER CREDIT (¤1,466.00) 03/07/2024
SEWER INSPECTION ¤25.00 03/07/2024
SEWER CAPITAL FACILITY ¤5,441.03 03/07/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 03/07/2024
SITE PLAN 30 ¤30.00 03/07/2024
SURCHARGE FS 533.721 ¤6.17 03/07/2024
SURCHARGE - FS 468.631 ¤9.25 03/07/2024
SW ENG - FOUNDATION SURVEY ¤20.00 03/07/2024
WATER- TURN ON ¤25.00 03/07/2024
ADJUSTMENT 50% (¤616.87) 03/07/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/07/2024
INSPECTION - RESIDENTIAL ¤937.75 03/07/2024
PLAN REVIEW - RESIDENTIAL ¤265.98 03/07/2024
FC IMPACT FEE EMS ¤62.00 03/07/2024
IMPACT FEE FIRE ¤428.09 03/07/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/07/2024
FC IMPACT FEE LIBRARY ¤268.00 03/07/2024
IMPACT FEE PARKS ¤1,800.99 03/07/2024
IMPACT FEE SCHOOL ¤5,450.00 03/07/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 03/07/2024
WATER -IRRIGATION INSPECTION ¤25.00 03/07/2024
Fees Total Due: ¤0.00 Total Paid: ¤20,523.16